CN104949850A - 非矿环境下对履带式全液压坑道钻机的测试装置及方法 - Google Patents

非矿环境下对履带式全液压坑道钻机的测试装置及方法 Download PDF

Info

Publication number
CN104949850A
CN104949850A CN201510226698.3A CN201510226698A CN104949850A CN 104949850 A CN104949850 A CN 104949850A CN 201510226698 A CN201510226698 A CN 201510226698A CN 104949850 A CN104949850 A CN 104949850A
Authority
CN
China
Prior art keywords
lifting support
middle transition
underground drill
drill rig
crawler type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510226698.3A
Other languages
English (en)
Other versions
CN104949850B (zh
Inventor
罗强
高龙
雷广进
刘宏亮
任小伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Baoji Oilfield Machinery Co Ltd
CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Center Co Ltd
Original Assignee
宝鸡石油机械有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 宝鸡石油机械有限责任公司 filed Critical 宝鸡石油机械有限责任公司
Priority to CN201510226698.3A priority Critical patent/CN104949850B/zh
Publication of CN104949850A publication Critical patent/CN104949850A/zh
Application granted granted Critical
Publication of CN104949850B publication Critical patent/CN104949850B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种非矿环境下对履带式全液压坑道钻机的测试装置,包括支撑架、工装钻杆、中间过渡架、以及升降支架;支撑架、中间过渡架和升降支架依次沿水平方向连接,工装钻杆一端安装在坑道钻机给进机构上,工装钻杆另一端与连接件连接,连接件再与钢丝绳连接;钢丝绳依次绕过安装在中间过渡架和升降支架的多个导向轮后从升降支架下垂再与配重块相连,在升降支架上部的横梁上安装有速度及位移测试机构,速度及位移测试机构的探头连接到配重块上。本发明还公开了一种非矿环境下对履带式全液压坑道钻机的测试方法,本发明的装置结构简单,工作可靠;本发明的方法便于实施,准确性高。

Description

非矿环境下对履带式全液压坑道钻机的测试装置及方法
技术领域
本发明属于机械设备技术领域,涉及一种非矿环境下对履带式全液压坑道钻机的测试装置,本发明还涉及一种非矿环境下对履带式全液压坑道钻机的测试方法。
背景技术
矿用坑道勘探履带式全液压坑道钻机(以下简称坑道钻机)是一种低转速大转矩、适于大直径中深孔钻进的旋转式钻进设备。该设备具有技术性能先进、工艺适应性强、安全可靠、移动搬迁方便等优点,主要适用于煤矿井下大直径中深瓦斯抽放孔及其它工程孔的施工。
坑道钻机出厂前必须进行给进力和起拔力的载荷试验,通过带载试验验证坑道钻机主承载部件的整体稳定性、给进机构在钻孔过程中对钻杆的给进能力和拔出能力、夹持器在大载荷时对钻杆的夹持能力。
但在非矿坑道环境下坑道钻机主体无法进行支撑和固定,无法模拟实际工况进行给进力和起拔力的载荷施加。因此,迫切需要一种在非矿环境下进行坑道钻机给进力和起拔力测试的方法及试验装置,保证坑道钻机验证试验的顺利进行。
发明内容
本发明的目的是提供一种非矿环境下对履带式全液压坑道钻机的测试装置,解决了现有技术中在非矿坑道环境下坑道钻机主体无法进行支撑和固定,无法模拟实际工况进行给进力和起拔力的载荷施加的问题。
本发明方法的另一目的是提供一种非矿环境下对履带式全液压坑道钻机的测试方法,解决坑道钻机在非矿环境主体固定、给进力和起拔力试验载荷精确施加、给进机构运动速度测定等问题。
本发明所采用的技术方案是,一种非矿环境下对履带式全液压坑道钻机的测试装置,包括支撑架、工装钻杆、中间过渡架、以及升降支架;支撑架、中间过渡架和升降支架依次沿水平方向连接,工装钻杆一端安装在坑道钻机给进机构上,工装钻杆另一端与连接件连接,连接件再与钢丝绳连接;
钢丝绳依次绕过安装在中间过渡架和升降支架的多个导向轮后从升降支架下垂再与配重块相连,在升降支架上部的横梁上安装有速度及位移测试机构,速度及位移测试机构的探头连接到配重块上。
本发明所采用的另一技术方案是,一种非矿环境下对履带式全液压坑道钻机的测试方法,利用上述的检测装置,具体按照以下步骤实施:
试验前将坑道钻机行驶到车间工作台上,通过其自身配备的支撑稳固装置将坑道钻机主体部分顶离地面,在其下部用枕木垫稳;收回支撑稳固装置后将下支撑梁总成中的前后两件横梁依次安装在坑道钻机前后两组支撑稳固装置下方,然后将下支撑梁总成连接完整;利用四个立柱将上支撑梁总成安装在下支撑梁总成上,然后伸出坑道钻机支撑稳固装置的顶升油缸使接地装置插入下支撑梁总成和上支撑梁总成的横梁枕木内,将坑道钻机牢固固定在支撑架中;
当坑道钻机进行起拔力试验时,将中间过渡架安装在支撑架前端的连接耳座上,同时升降支架安装在中间过渡架前端的连接耳座上;当坑道钻机进行给进力试验时,将中间过渡架安装在支撑架后端的连接耳座上,同时升降支架安装在中间过渡架后端的连接耳座上;
将导向轮依次安装到中间过渡架和升降支架上部,将工装钻杆安装到坑道钻机的给进机构上,钢丝绳穿过导向轮一端通过连接件与工装钻杆连接、另一端与配重块相连接;
操作履带式全液压坑道钻机,给进和拔出工装钻杆,连接在工装钻杆上的钢丝绳跟随工装钻杆提升和下放配重块,通过速度及位移测试机构采集和记录履带式全液压坑道钻机的性能数据,试验完成后通过数据对比,得到履带式全液压坑道钻机的性能结论,即成。
本发明的有益效果是,在非矿环境下,能够真实模拟坑道钻机各部件受力状态,对其进行给进力和起拔力进行测试,解决了坑道钻机在非矿环境下的整机固定和动态试验载荷施加的问题;该测试方法所依赖的试验装置结构简单、连接方便、承载能力大、适用于多种型号坑道钻机的安装及试验;并且试验时满足坑道钻机运转的前提下无需提供额外的动力接入,操作简单、使用安全性高。
附图说明
图1为本发明装置在坑道钻机起拔力测试时的安装位置示意图;
图2为本发明装置在坑道钻机给进力测试时的安装位置示意图;
图3为本发明装置在支撑架1内的安装结构示意图。
图中,1.支撑架,2.中间过渡架,3.升降支架,4.工装钻杆,5.连接件,6.导向轮,7.钢丝绳,8.配重块,9.速度及位移测试机构,10.下支撑梁总成,11.上支撑梁总成,12.立柱。
具体实施方式
下面结合附图和具体实施方式对本发明进行详细说明。
参照图1、图2、图3,本发明装置的结构是,
包括用于固定坑道钻机的支撑架1、工装钻杆4、保证工装钻杆4顺利往复运动的中间过渡架2、以及用于支撑配重块8上下运动的升降支架3;支撑架1、中间过渡架2和升降支架3依次沿水平方向连接,工装钻杆4一端安装在坑道钻机给进机构上,工装钻杆4另一端与连接件5连接,连接件5再与钢丝绳7连接;
钢丝绳7依次绕过安装在中间过渡架2和升降支架3的多个导向轮6后从升降支架3下垂再与配重块8相连,在升降支架3上部的横梁上安装有速度及位移测试机构9,速度及位移测试机构9的探头连接到配重块8上;
支撑架1包括下支撑梁总成10及上支撑梁总成11,下支撑梁总成10及上支撑梁总成11之间通过四个立柱12可靠连接。
本发明方法,利用上述的检测装置,具体按照以下步骤实施:
首先,如图3,试验前将坑道钻机行驶到车间工作台上,通过其自身配备的支撑稳固装置将坑道钻机主体部分顶离地面,在其下部用枕木垫稳;收回支撑稳固装置后将下支撑梁总成10中的前后两件横梁依次安装在坑道钻机前后两组支撑稳固装置下方,然后将下支撑梁总成10连接完整;利用四个立柱12将上支撑梁总成11安装在下支撑梁总成10上,然后伸出坑道钻机支撑稳固装置的顶升油缸使接地装置插入下支撑梁总成10和上支撑梁总成11的横梁枕木内,将坑道钻机牢固固定在支撑架1中;
然后,参照图1、图2,当坑道钻机进行起拔力试验时,将中间过渡架2安装在支撑架1前端的连接耳座上,同时升降支架3安装在中间过渡架2前端的连接耳座上;当坑道钻机进行给进力试验时,将中间过渡架2安装在支撑架1后端的连接耳座上,同时升降支架3安装在中间过渡架2后端的连接耳座上,将导向轮6依次安装到中间过渡架2和升降支架3上部,将工装钻杆4安装到坑道钻机的给进机构上,钢丝绳7穿过导向轮6一端通过连接件5与工装钻杆4连接、另一端与配重块8相连接,然后操作坑道钻机即可实施起拔力或给进力的测试。
最后,操作履带式全液压坑道钻机,给进和拔出工装钻杆4,连接在工装钻杆4上的钢丝绳7跟随工装钻杆4提升和下放配重块8,通过速度及位移测试机构9采集和记录履带式全液压坑道钻机的性能数据,试验完成后通过数据对比,完成履带式全液压坑道钻机给进力和起拔力的设计验证,得到履带式全液压坑道钻机的性能结论,即成。
本发明方法解决了非矿环境下坑道钻机的安装与定位,通过提升额定载荷的配重块实现了履带式全液压坑道钻机的性能测试,并且完成该测试方法所依赖的装置结构简单、承载能力大、兼容性强、操作简单、试验无需额外动力输入、使用安全性高。

Claims (3)

1.一种非矿环境下对履带式全液压坑道钻机的测试装置,其特征在于:包括支撑架(1)、工装钻杆(4)、中间过渡架(2)、以及升降支架(3);支撑架(1)、中间过渡架(2)和升降支架(3)依次沿水平方向连接,工装钻杆(4)一端安装在坑道钻机给进机构上,工装钻杆(4)另一端与连接件(5)连接,连接件(5)再与钢丝绳(7)连接;
钢丝绳(7)依次绕过安装在中间过渡架(2)和升降支架(3)的多个导向轮(6)后从升降支架(3)下垂再与配重块(8)相连,在升降支架(3)上部的横梁上安装有速度及位移测试机构(9),速度及位移测试机构(9)的探头连接到配重块(8)上。
2.根据权利要求1所述的非矿环境下对履带式全液压坑道钻机的测试装置,其特征在于:所述的支撑架(1)包括下支撑梁总成(10)及上支撑梁总成(11),下支撑梁总成(10)及上支撑梁总成(11)之间通过四个立柱(12)连接。
3.一种非矿环境下对履带式全液压坑道钻机的测试方法,其特征在于:利用权利要求1和2所述的检测装置,具体按照以下步骤实施:
试验前将坑道钻机行驶到车间工作台上,通过其自身配备的支撑稳固装置将坑道钻机主体部分顶离地面,在其下部用枕木垫稳;收回支撑稳固装置后将下支撑梁总成(10)中的前后两件横梁依次安装在坑道钻机前后两组支撑稳固装置下方,然后将下支撑梁总成(10)连接完整;利用四个立柱(12)将上支撑梁总成(11)安装在下支撑梁总成(10)上,然后伸出坑道钻机支撑稳固装置的顶升油缸使接地装置插入下支撑梁总成(10)和上支撑梁总成(11)的横梁枕木内,将坑道钻机牢固固定在支撑架(1)中;
当坑道钻机进行起拔力试验时,将中间过渡架(2)安装在支撑架(1)前端的连接耳座上,同时升降支架(3)安装在中间过渡架(2)前端的连接耳座上;当坑道钻机进行给进力试验时,将中间过渡架(2)安装在支撑架(1)后端的连接耳座上,同时升降支架(3)安装在中间过渡架(2)后端的连接耳座上;
将导向轮(6)依次安装到中间过渡架(2)和升降支架(3)上部,将工装钻杆(4)安装到坑道钻机的给进机构上,钢丝绳(7)穿过导向轮(6)一端通过连接件(5)与工装钻杆(4)连接、另一端与配重块(8)相连接;
操作履带式全液压坑道钻机,给进和拔出工装钻杆(4),连接在工装钻杆(4)上的钢丝绳(7)跟随工装钻杆(4)提升和下放配重块(8),通过速度及位移测试机构(9)采集和记录履带式全液压坑道钻机的性能数据,试验完成后通过数据对比,得到履带式全液压坑道钻机的性能结论,即成。
CN201510226698.3A 2015-05-06 2015-05-06 非矿环境下对履带式全液压坑道钻机的测试装置及方法 Expired - Fee Related CN104949850B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510226698.3A CN104949850B (zh) 2015-05-06 2015-05-06 非矿环境下对履带式全液压坑道钻机的测试装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510226698.3A CN104949850B (zh) 2015-05-06 2015-05-06 非矿环境下对履带式全液压坑道钻机的测试装置及方法

Publications (2)

Publication Number Publication Date
CN104949850A true CN104949850A (zh) 2015-09-30
CN104949850B CN104949850B (zh) 2017-05-10

Family

ID=54164677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510226698.3A Expired - Fee Related CN104949850B (zh) 2015-05-06 2015-05-06 非矿环境下对履带式全液压坑道钻机的测试装置及方法

Country Status (1)

Country Link
CN (1) CN104949850B (zh)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201373785Y (zh) * 2009-03-23 2009-12-30 煤炭科学研究总院西安研究院 一种钻机给进力和起拔力的测量装置
CN102539047A (zh) * 2011-12-20 2012-07-04 中煤科工集团西安研究院 用于测试动力头式钻机给进力、起拔力的的测试装置
CN102778351A (zh) * 2012-07-25 2012-11-14 宁波帅特龙车辆部件有限公司 拉动试验装置
CN102890001A (zh) * 2012-09-21 2013-01-23 山西汾河焦煤股份有限公司回坡底煤矿 气动支腿式锚杆钻机检测台
RU2476847C1 (ru) * 2011-10-31 2013-02-27 Общество с ограниченной ответственностью "ПОЗИТРОН" Стенд для тестирования гидравлического забойного двигателя
CN103323336A (zh) * 2013-01-22 2013-09-25 同济大学 一种可进行锚杆拉拔力测试的试验模拟装置及其方法
KR20130114844A (ko) * 2012-04-10 2013-10-21 현대중공업 주식회사 드릴링 파이프 핸들링 장치의 오버로드 테스트용 웨이트
CN203629961U (zh) * 2013-10-30 2014-06-04 渤海装备辽河重工有限公司 钻机提升设备拉力试验装置
CN204116025U (zh) * 2014-09-16 2015-01-21 宝鸡石油机械有限责任公司 一种用于钻机液压猫头及其连接件的载荷试验装置
CN204188396U (zh) * 2014-11-19 2015-03-04 石家庄赛恩特煤矿机械制造有限公司 一种液压钻机仿真工况试验台

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201373785Y (zh) * 2009-03-23 2009-12-30 煤炭科学研究总院西安研究院 一种钻机给进力和起拔力的测量装置
RU2476847C1 (ru) * 2011-10-31 2013-02-27 Общество с ограниченной ответственностью "ПОЗИТРОН" Стенд для тестирования гидравлического забойного двигателя
CN102539047A (zh) * 2011-12-20 2012-07-04 中煤科工集团西安研究院 用于测试动力头式钻机给进力、起拔力的的测试装置
KR20130114844A (ko) * 2012-04-10 2013-10-21 현대중공업 주식회사 드릴링 파이프 핸들링 장치의 오버로드 테스트용 웨이트
CN102778351A (zh) * 2012-07-25 2012-11-14 宁波帅特龙车辆部件有限公司 拉动试验装置
CN102890001A (zh) * 2012-09-21 2013-01-23 山西汾河焦煤股份有限公司回坡底煤矿 气动支腿式锚杆钻机检测台
CN103323336A (zh) * 2013-01-22 2013-09-25 同济大学 一种可进行锚杆拉拔力测试的试验模拟装置及其方法
CN203629961U (zh) * 2013-10-30 2014-06-04 渤海装备辽河重工有限公司 钻机提升设备拉力试验装置
CN204116025U (zh) * 2014-09-16 2015-01-21 宝鸡石油机械有限责任公司 一种用于钻机液压猫头及其连接件的载荷试验装置
CN204188396U (zh) * 2014-11-19 2015-03-04 石家庄赛恩特煤矿机械制造有限公司 一种液压钻机仿真工况试验台

Also Published As

Publication number Publication date
CN104949850B (zh) 2017-05-10

Similar Documents

Publication Publication Date Title
US10969314B2 (en) Device and method for anchor bolt (cable) supporting structure test and anchoring system performance comprehensive experiment
CN111175121B (zh) 巷道围岩钻孔卸压相似模拟试验系统及使用方法
CN111721632B (zh) 模拟岩爆的钻压一体化试验装置和试验方法
CN106593310A (zh) 多功能钻井实验台架
CN210322612U (zh) 锚杆支护及锚固结构性能综合试验测试设备
CN102561349A (zh) 多功能静力压桩机
CN206146749U (zh) 一种锚杆锚索拉拔冲击力学性能测试装置
CN104502006A (zh) 一种铁钻工上、卸扣扭矩测试方法
CN207587999U (zh) 一种金属接地极快速安装装置
CN205349223U (zh) 一种建筑用钻孔装置
CN103206202A (zh) 一种深海管中管力学传递特性分析实验装置
CN107860662B (zh) 一种大型深水主被动联合波浪补偿装置陆上试验方法
CN208140477U (zh) 一种用于煤岩巷道细观力学研究的试验装置
CN106769143A (zh) 轨道式多功能钻井实验台架
CN107328542B (zh) 锚杆抗冲击性能动态定量试验装置及其试验方法
CN102207001B (zh) 液压支架柱窝结构试验装置
CN104949850A (zh) 非矿环境下对履带式全液压坑道钻机的测试装置及方法
CN103256014A (zh) 一种用于将连续油管下入海洋立管的注入头实验装置
CN203702251U (zh) 一种锚固器弹簧抓爪推杆安装装置
CN103628903B (zh) 一种巷道全断面锚杆锚索一体化平行安装方法及装置
CN201746836U (zh) 一种锚固装置
CN103035163B (zh) 盾构试验机支撑及反力推进装置
CN108051306B (zh) 一种岩体离层错位对锚索破断影响的试验装置
CN203572682U (zh) 一种地应力测试二次定角度取芯装置
CN209510235U (zh) 一种低空桩架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210112

Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee after: Baoji Oilfield Machinery Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co., Ltd

Address before: 721002 No. 2 Dongfeng Road, Shaanxi, Baoji

Patentee before: Baoji Oilfield Machinery Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20210506

CF01 Termination of patent right due to non-payment of annual fee