CN104944329A - 一种沙地整拖井架的方法 - Google Patents
一种沙地整拖井架的方法 Download PDFInfo
- Publication number
- CN104944329A CN104944329A CN201510355518.1A CN201510355518A CN104944329A CN 104944329 A CN104944329 A CN 104944329A CN 201510355518 A CN201510355518 A CN 201510355518A CN 104944329 A CN104944329 A CN 104944329A
- Authority
- CN
- China
- Prior art keywords
- ground
- derrick
- sand
- fixed pulley
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F19/00—Hoisting, lifting, hauling or pushing, not otherwise provided for
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种沙地整拖井架的方法,包括以下步骤:(1)地锚的预埋:在填埋地锚时,边填沙土边加水使沙性土质沉积,使地层组织在水的作用下下沉、地层沉实;用水浇灌地锚坑与地面的接触面,使地面更加平实,增加沙土和基础之间的阻滞率,防止基础下沉;(2)为防止沙地整拖时,滑车翻起泥沙进入定滑轮凹槽引起大绳跳槽导致事故发生,在地锚绳与定滑轮连接绳及定滑轮下面放一块托板;(3)在地锚和钻井井架之间通过钢丝绳连接定滑轮和动滑轮组,用挖掘机或推土机牵引钢丝绳将整个钻井井架向前移动。本发明减少了因地锚翻出坑外而延长的整拖时间;杜绝了因滑轮进沙而导致的大绳跳槽可能引发的事故。
Description
技术领域
本发明涉及整拖井架的方法,尤其是一种沙地整拖井架的方法。
背景技术
钻井井架整拖就是在一个钻井平台上部署多个井位,一口井钻完后,在距地锚和井架底座前方约11米左右放置二只滑轮,分别用对称的钢丝绳套连接地锚和井架底座上的钢丝绳挂在主动和被动滑轮上,再用36毫米的钢丝绳将滑轮组串联起来,用挖掘机或推土机牵引钢丝绳将整个钻井井架向前移动。用整拖方法将整体井架和钻井平台向前移动5米,只需要半个小时左右,和以往移动井位将整个井架解体后再进行安装两天时间来比节约工期约40多倍,但是在沙质地层整拖作业时,由于砂土的阻滞率(粘实系数)小,地层松软,致使整拖地锚在砂土坑中吃不上力,导致整拖牵引力变小,平常尺寸(4*1*4m)的地锚坑难以提供足够大的拉力,使地锚容易翻出地面或在地下平行移动,此种情况只能减小拖拉机牵引力或降低拖拉机速度,致使井架无法起步平移导致施工时间加长;而且沙地整拖时,滑车翻起泥沙,可能进入滑轮凹槽,引起大绳跳槽导致的事故。
发明内容
本发明所要解决的技术问题是,提供一种减少了因地锚翻出坑外而延长的整拖时间;杜绝因滑轮进沙而导致的大绳跳槽的沙地整拖井架的方法。
为了解决上述技术问题,本发明采用的技术方案是:一种沙地整拖井架的方法,包括以下步骤:
(1)地锚的预埋:将按一般土壤的标准挖掘的地锚坑加深加宽,加深10%-20%,加宽80%-120%;在填埋地锚时,边填沙土边加水使沙性土质沉积,使地层组织在水的作用下下沉、地层沉实;用水浇灌地锚坑与地面的接触面,使地面更加平实,增加沙土和基础之间的阻滞率,防止基础下沉;
(2)为防止沙地整拖时,滑车翻起泥沙进入定滑轮凹槽引起大绳跳槽导致事故发生,在地锚绳与定滑轮连接绳及定滑轮下面放一块托板;
(3)在地锚和钻井井架之间通过钢丝绳连接定滑轮和动滑轮组,用挖掘机或推土机牵引钢丝绳将整个钻井井架向前移动。
所述步骤(1)中,在填埋地锚时,填沙30-50cm,洒水浮过沙面,静止15-25分钟,重复上述过程,直至地锚坑与地面持平。
所述步骤(2)中的托板为钢板。
本发明的有益效果是:达到了整拖施工中的所有效果;减少了因地锚翻出坑外而延长的整拖时间;杜绝了因滑轮进沙而导致的大绳跳槽可能引发的事故。
具体实施方式
下面结合具体实施方式对本发明作进一步详细说明:
本发明的沙地整拖井架的方法,包括以下步骤:
(1)地锚的预埋:将按一般土壤的标准挖掘的地锚坑加深加宽,加深10%-20%,加宽80%-120%;在填埋地锚时,边填沙土边加水使沙性土质沉积,使地层组织在水的作用下下沉、地层沉实;用水浇灌地锚坑与地面的接触面,使地面更加平实,增加沙土和基础之间的阻滞率,防止基础下沉;
(2)为防止沙地整拖时,滑车翻起泥沙进入定滑轮凹槽引起大绳跳槽导致事故发生,在地锚绳与定滑轮连接绳及定滑轮下面放一块托板;
(3)在地锚和钻井井架之间通过钢丝绳连接定滑轮和动滑轮组,用挖掘机或推土机牵引钢丝绳将整个钻井井架向前移动。
所述步骤(1)中,在填埋地锚时,填沙30-50cm,洒水浮过沙面,静止15-25分钟,重复上述过程,直至地锚坑与地面持平。
所述步骤(2)中的托板为钢板。
本发明主要是为了在实际工作中解决因沙土地粘滞阻力小导致地锚翻出和泥沙进入滑轮槽导致大绳跳槽,达到尽量在短时间内安全快速的完成整拖作业任务,具体地说:
1.改变原有地锚坑尺寸:在沙土地里按一般土壤的标准挖掘地锚坑埋放地锚固定整拖用滑轮组无法满足足够沙土地整拖所需用牵引力大小,在现场作业时首先将地锚坑尺寸加大(加深加宽地锚坑,一般4米深,1米宽,此类井需4.5米深,2米宽)
2、在填埋地锚时,边填沙土边加水使沙性土质沉积,使地层组织在水的作用下下沉、地层沉实,阻滞率增加达到阻止地锚地下移动与被拉出地面的可能。
3、用水浇灌地面使基础与地面的接触面更加平实,增加沙土和基础之间的阻滞率。防止基础下沉。
4、放铁质托板后由基础直接承受整拖大绳通过地锚施加的向下的压力,定滑轮承受的压力减小(滑轮自身重量可不计)。在定滑轮下方放一块钢板,防止沙土进入,增加阻力,使被拖移井架无法起步前移。
采用此种整拖方法:应用于冀中、二连、新疆沙土质整拖井。可广泛应用于5000m及以下钻机丛式井井位间的直线沙土质整拖井施工。
综上所述,本发明的内容并不局限在上述的实施例中,相同领域内的有识之士可以在本发明的技术指导思想之内可以轻易提出其他的实施例,但这种实施例都包括在本发明的范围之内。
Claims (3)
1.一种沙地整拖井架的方法,其特征在于,包括以下步骤:
(1)地锚的预埋:将按一般土壤的标准挖掘的地锚坑加深加宽,加深10%-20%,加宽80%-120%;在填埋地锚时,边填沙土边加水使沙性土质沉积,使地层组织在水的作用下下沉、地层沉实;用水浇灌地锚坑与地面的接触面,使地面更加平实,增加沙土和基础之间的阻滞率,防止基础下沉;
(2)为防止沙地整拖时,滑车翻起泥沙进入定滑轮凹槽引起大绳跳槽导致事故发生,在地锚绳与定滑轮连接绳及定滑轮下面放一块托板;
(3)在地锚和钻井井架之间通过钢丝绳连接定滑轮和动滑轮组,用挖掘机或推土机牵引钢丝绳将整个钻井井架向前移动。
2.根据权利要求1所述的沙地整拖井架的方法,其特征在于,所述步骤(1)中,在填埋地锚时,填沙30-50cm,洒水浮过沙面,静止15-25分钟,重复上述过程,直至地锚坑与地面持平。
3.根据权利要求1所述的沙地整拖井架的方法,其特征在于,所述步骤(2)中的托板为钢板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510355518.1A CN104944329A (zh) | 2015-06-25 | 2015-06-25 | 一种沙地整拖井架的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510355518.1A CN104944329A (zh) | 2015-06-25 | 2015-06-25 | 一种沙地整拖井架的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104944329A true CN104944329A (zh) | 2015-09-30 |
Family
ID=54159482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510355518.1A Pending CN104944329A (zh) | 2015-06-25 | 2015-06-25 | 一种沙地整拖井架的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104944329A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105692094A (zh) * | 2016-02-26 | 2016-06-22 | 中国冶集团有限公司 | 一种在松软地面条件下光伏板运输方法及装置 |
CN107381461A (zh) * | 2017-07-24 | 2017-11-24 | 中国石油集团渤海钻探工程有限公司 | 松软砂质含水区域钻机整拖工艺 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101849453A (zh) * | 2009-04-04 | 2010-10-06 | 高清 | 一种地表种植改良沙漠技术 |
CN202346715U (zh) * | 2011-12-12 | 2012-07-25 | 中国石油集团渤海钻探工程有限公司 | 电动钻机的整体快速平移装置 |
JP2014108060A (ja) * | 2012-11-30 | 2014-06-12 | Naokuni Kumagai | アンカーブロック |
-
2015
- 2015-06-25 CN CN201510355518.1A patent/CN104944329A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101849453A (zh) * | 2009-04-04 | 2010-10-06 | 高清 | 一种地表种植改良沙漠技术 |
CN202346715U (zh) * | 2011-12-12 | 2012-07-25 | 中国石油集团渤海钻探工程有限公司 | 电动钻机的整体快速平移装置 |
JP2014108060A (ja) * | 2012-11-30 | 2014-06-12 | Naokuni Kumagai | アンカーブロック |
Non-Patent Citations (3)
Title |
---|
卢肇钧等: "锚定板埋置深度对其抗拔力的影响", 《土木工程学报》 * |
惠庆文等: "沙区线路施工埋设临时地锚的方法", 《电力技术》 * |
罗锦光: "人工地锚的计算与埋设", 《林业机械》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105692094A (zh) * | 2016-02-26 | 2016-06-22 | 中国冶集团有限公司 | 一种在松软地面条件下光伏板运输方法及装置 |
CN107381461A (zh) * | 2017-07-24 | 2017-11-24 | 中国石油集团渤海钻探工程有限公司 | 松软砂质含水区域钻机整拖工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437798B (zh) | 一种穿过盾构掘进断面的锚索群的预处理方法 | |
CN104533467B (zh) | 一种高承压水、断层破碎巷道的支护方法 | |
CN104631438B (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN102953373B (zh) | 流砂条件下人工挖孔灌注桩施工工法 | |
CN101634375B (zh) | 管道地下安装施工装置及其方法 | |
AU2020286274A1 (en) | Aquifer connection method for inner dump in open-pit mine | |
CN106640108A (zh) | 一种地下建筑模块化施工体系及其施工方法 | |
CN105908625A (zh) | 一种既有铁路线下拖拉法增设框架桥的施工方法 | |
CN108708284B (zh) | 一种抵抗泄洪急流冲击的钢栈桥施工方法 | |
CN110106889A (zh) | 一种深基坑灌注护坡桩加锚索支护施工工法 | |
CN207727546U (zh) | 一种排水体和固化层组合地基结构 | |
CN105862862B (zh) | 一种大直径桩埋锤打捞方法 | |
CN104944329A (zh) | 一种沙地整拖井架的方法 | |
CN109339096A (zh) | 一种综合管廊明挖预制拼装施工一体化施工装置及其施工方法 | |
CN109056767A (zh) | 一种富水粉土地层降水与回灌施工方法 | |
CN203053721U (zh) | 一种煤岩掘进机大坡度试验台 | |
CN104328814A (zh) | 大深度海底管道后挖沟工艺 | |
CN106400807A (zh) | 海工驳船灌浆方法及其设备 | |
TW201200683A (en) | Static pressure implant method for precast retaining wall | |
CN206752413U (zh) | 一种海工驳船作业设备 | |
CN106400745B (zh) | 一种海工驳船作业方法及设备 | |
CN101509265B (zh) | 软弱地基场地牵引式推土机平整法及其牵引式推土机 | |
CN109972644A (zh) | 顶推用沉井装置及其施工方法 | |
CN104534168A (zh) | 一种深埋管机 | |
CN108978439A (zh) | 应用挖掘机安装的应急桥架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150930 |
|
WD01 | Invention patent application deemed withdrawn after publication |