CN104936235B - For supporting the method and apparatus in the wireless communication system of dual link - Google Patents
For supporting the method and apparatus in the wireless communication system of dual link Download PDFInfo
- Publication number
- CN104936235B CN104936235B CN201410108582.5A CN201410108582A CN104936235B CN 104936235 B CN104936235 B CN 104936235B CN 201410108582 A CN201410108582 A CN 201410108582A CN 104936235 B CN104936235 B CN 104936235B
- Authority
- CN
- China
- Prior art keywords
- old
- particular cell
- uplink
- spcell
- transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention is provided to support the method and apparatus in the wireless communication system of dual link.The method includes in the case of the change from old particular cell to new particular cell occurs, one or more actions are performed at the user equipment to handle the precedent transmission of the old particular cell.Using disclosed method and equipment, the precedent transmission on old particular cell can be effectively handled.
Description
Technical field
Present disclose relates generally to wireless communication systems.More specifically, this disclosure relates in the channel radio for supporting dual link
Method and apparatus in letter system.
Background technology
According to 3GPP Release12(“R12”)Specification, " dual link "(It " dual connectivity " or is reduced to
“DC”)Refer to user equipment(“UE”)It in wireless communications will be with macro base station(“MeNB”)And small base station(“SeNB”)It protects simultaneously
Connection is held, wherein macro base station can provide a main plot(“Pcell”)And small base station can provide it is one or more auxiliary small
Area(“Scell”), as shown in Figure 1.According to the current RAN2 about dual link, there are the spies that one is configured to SeNB
Different cell(SPcell).During the SPcell life cycles, it will remain in state of activation and be mainly responsible for and set for user
Standby physical uplink control channel(“PUCCH”)Transmission.In same SeNB, SPcell is not remained unchanged but can
To change, such as when occasional service overload occurs for SPcell or is temporarily in the wireless transmission environments of difference.In the situation
Under, the SPcell or for old SPcell will be converted into conventional Scell and another Scell of SeNB will be configured to newly
SPcell to continue the transmission of PUCCH, and to be SPcell change process to the transfer process.
Although 3GPP Rel10/11 have been defined for carrier aggregation(“CA”)In based on switching(“HO”)Process
Pcell changes, but Pcell changes process can not be used for SPcell changes.In Rel10/11CA, Pcell is responsible for many
Item, such as mobile management and radio jink failure(“RLF”)Deng, therefore HO processes are deferred in Pcell changes.But in 3GPP
In R12DC, SPcell only comprising PUCCH transmit and therefore the change of SPcell may be considered that in mode with lower layer protocol
Reconfiguring for parameter is similar.In other words, SPcell changes not take changes process with the Pcell defined in Rel10/11
Identical mode.
Therefore, it is necessary on how to handling the solution of the precedent transmission on old SPcell.
Invention content
In order to solve some technical problems mentioned above, an aspect of this disclosure provides one kind and user is being supported to set
The standby method with being used in macro base station and the cordless communication network of the dual link of small base station, wherein the small base station at least wraps
Include be configured to the user equipment physical uplink control channel transmission a particular cell, the method includes
In the case of the change from old particular cell to new particular cell occurs, one or more is performed at the user equipment
Act the precedent transmission to handle the old particular cell.
In one embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
The uplink synchronization state of particular cell.
In one embodiment, this method further comprises stopping timing advance timer and determines the old spy
The uplink synchronisation of different cell is invalid.
In another embodiment, the method further includes checking the state of timing advance timer, in response to
The timing advance timer is still being run, and the uplink synchronisation for determining the old particular cell is effective;And response
Stop or expire during the timing advance timer changes in particular cell, determine the uplink of the old particular cell
Link synchronization is invalid.
In another embodiment, the method further includes in response to completing particular cell reconfiguration course, weight
The new uplink synchronisation for starting timing advance timer and determining the old particular cell is effective.
In one embodiment, the method further includes based on the instruction from base station to timing advance timer
Operation is performed, to determine that the uplink synchronisation of the old particular cell is effectively or invalid based on the operation.
In another embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
Particular cell activation relative to the user equipment or deactivation status.
In yet another embodiment, the method further includes determining the old particular cell relative to the user
Equipment is in the state of activation and starts cell packet data inactivity timer.
In one embodiment, the method further includes determining the old particular cell relative to the user
Equipment is in the deactivation status.
In yet another embodiment, the method further includes determining the old spy based on the instruction from base station
Different cell is in the activation or deactivation status relative to the user equipment.
In one embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
The previous downlink transmission of particular cell.
In yet another embodiment, wherein the old particular cell is active relative to the user equipment,
The method further includes one in following:Release ongoing downlink mixing on the old particular cell
Automatic repeat request process and discharge all relevant DL HARQ buffers;Keep the downlink
Link hybrid automatic repeat request process and relevant buffer are correctly received until corresponding downlink transmission;Special
After cell changing procedure, in response to receiving downlink scheduling signaling on the old particular cell, will newly it receive down
The information of uplink transmission and buffering merges;And after particular cell change process, in response to being received from the small base station
To new downlink transmission, release comes from the information of the buffering of the old particular cell.
In another embodiment, wherein the old particular cell is in relative to the user equipment deactivates shape
State, all DL HARQs the method further includes discharging for the old particular cell delay
Rush device and downlink hybrid automatic repeat request processes;And the small base station is waited for dispatch new transmission.
In yet another embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
The previous uplink transmission of particular cell.
In another embodiment, wherein the previous uplink transmission is passed including uplink ascending control information
Defeated, the method further includes one in following:In response to complete uplink on the new particular cell with
Machine access procedure triggers the uplink uplink control information transmission on the old particular cell;In response to completing
Uplink random access procedure on the old particular cell triggers the uplink on the old particular cell
Link uplink control information transmission, wherein the uplink random access procedure is used for the user equipment and the small-sized base
Uplink synchronisation between standing;In response to the uplink uplink control information transmission on the new particular cell, touch
Send out the uplink uplink control information transmission on the old particular cell;In response in the new particular cell
On receive first dispatch, trigger the uplink uplink control information transmission on the old particular cell;
In response to receiving dispatch on the old particular cell or in response to receiving about the old particular cell
Dispatch triggers the uplink uplink control information transmission on the old particular cell;And in response to connecing
It receives and comes from the instruction that base station is transmitted in medium access control control unit, trigger the institute on the old particular cell
State uplink uplink control information transmission.
In one embodiment, wherein the previous uplink transmission is passed including uplink upstream data information
Defeated, and the old particular cell is active, the method further includes one in following:Release with it is described
The relevant all ongoing uplink hybrid automatic repeat request processes in old particular cell and uplink mixing are certainly
Dynamic retransmission request buffer;And pause mixes certainly with the relevant all ongoing uplinks in the old particular cell
Dynamic repeat request process and retain all of uplink hybrid automatic repeat request process for receiving negative confirmation
Uplink hybrid automatic repeat request buffer, to perform one below:It is described new special in response to being successfully accessed to
Cell restarts the uplink transmission on the old particular cell;In response to being successfully received from described new
Particular cell first dispatch, restart the non-adaptive re-transmission on the old particular cell;In response to
First uplink signalling is received on the old particular cell, is restarted all temporary on the old particular cell
The uplink hybrid automatic repeat request process stopped;In response to completing the uplink random on the old particular cell
Access procedure triggers the uplink upstream data information transmission on the old particular cell, wherein the uplink
Link random access procedure is for the uplink synchronisation between the user equipment and the small base station;And in response to
Uplink associated with the uplink hybrid automatic repeat request process suspended is received on the old particular cell
Signaling restarts the uplink hybrid automatic repeat request process of the pause on the old particular cell.
In another embodiment, wherein in the change process from the old particular cell to the new particular cell
In, the method includes discharging the old particular cell.Here, the release movement may, for example, be in particular cell(Nothing
Line electric resources control RRC)During change, user equipment is moved accordingly based on receiving the instruction that comes from small base station
Make, such as the particular cell that user equipment discharges old particular cell or keep this old according to instruction according to instruction, i.e.,
The old particular cell is not discharged.
In yet another embodiment, the release old particular cell includes at least one of following:Release with it is described
The relevant all uplink ascending control information configurations in old particular cell;Release and the relevant institute in the old particular cell
There are upstream or downstream hybrid automatic repeat request processes;And release with the relevant all uplinks in the old particular cell or under
Row mixed automatic repeat request buffer.
In one embodiment, wherein the previous uplink transmission is passed including uplink upstream data information
It is defeated, and the old particular cell is in unactivated state, the method further includes discharge with it is described old special small
The relevant all ongoing uplink hybrid automatic repeat request processes in area and uplink hybrid automatic repeat request
Buffer.
Another aspect of the present disclosure provides a kind of nothing in the dual link for supporting user equipment and macro base station and small base station
The equipment used in line communication network, wherein the small base station includes at least the physical uplink for being configured to the user equipment
One particular cell of link control channel transmission, the equipment include:Execution unit, for occurring from old particular cell
To new particular cell change in the case of, it is described old to handle that one or more actions are performed at the user equipment
The precedent transmission of particular cell.
Another aspect of the present disclosure provides a kind of user equipment for being used to perform the above method.
Using many aspects and the method and apparatus of embodiment according to the disclosure, can well solve in dual link
The problem of precedent transmission of old particular cell how is handled under framework further improves the possibility in dual link wireless transmission
And reliability, and also improve efficiency of transmission.
Description of the drawings
According to the detailed description of illustrative embodiments below in conjunction with the accompanying drawings, the above and other purpose of the disclosure, spy
The advantage of seeking peace will be apparent, in the accompanying drawings:
Fig. 1 is the diagram for schematically showing the dual link framework according to disclosure embodiment;
Fig. 2 is to schematically show to be automatically resumed on old SPcell according to the user equipment of disclosure embodiment
UL control information(“UCI”)The sequence diagram of transmission;
Fig. 3 is the media for being used to indicate user equipment and performing UCI transmission schematically shown according to disclosure embodiment
Access control(“MAC”)Control unit(“CE”)Diagram;
Fig. 4 is to schematically show to restart user equipment old using message 2 or 4 according to disclosure embodiment
The sequence diagram of UL transmission on SPcell;
Fig. 5 is the first dispatch schematically shown according to the utilization of disclosure embodiment on new SPcell
(For example, scheduling grant(“grant”))To restart the sequence diagram of the transmission of the UL on old SPcell;
Fig. 6 is to schematically show the first scheduling received on old SPcell according to the utilization of disclosure embodiment to be permitted
Can come restart the UL on old SPcell transmission sequence diagram;
Fig. 7 is to schematically show to be permitted according to the corresponding scheduling that the utilization of disclosure embodiment receives on old SPcell
It can restart the corresponding UL hybrid automatic repeat-requests on old SPcell(“HARQ”)The sequence diagram of process;
Fig. 8 is the flow chart for schematically showing the method according to disclosure embodiment;And
Fig. 9 is to schematically show using in the wireless communication system for supporting dual link according to disclosure embodiment
The block diagram of equipment.
Specific embodiment
The disclosure proposes the precedent transmission on how to handle old SPcell in multiple illustrative embodiments
Multiple solutions.Specifically, the disclosure proposes same for changing the UL of the old SPcell of process completion post processing in SPcell
Four kinds of embodiments of step state are completed to post-process the activation/deactivation state of old SPcell in SPcell change processes
Three kinds of embodiments handle previous downlink according to old SPcell activation/deactivations state(“DL”)The UE of transmission
Code of conduct/solution, the UL UCI how automatically restarted on old SPcell(“UCI”)It transmits and ensures
Five kinds of embodiments of the synchronization between SeNB and UE in such ULUCI transmission and how to handle previous UL objects
Manage uplink shared channel(“PUSCH”)It transmits and ensures the SeNB in the automatic UL PUSCH transmissions on old SPcell
Five kinds of synchronous embodiments between UE.
As previously mentioned, after SPcell change processes, old SPcell is converted to routine
Scell.Changed Cheng Qian in the SPcell, UL transmission, such as UL PUSCH are certainly existed on the old SPcell(Such as
UL HARQ process transmissions)Transmission, UL UCI transmissions, such as UL detection reference signals(“SRS”), UL channel quality indicator
(“CQI”), precoding matrix indicators(“PMI”)And order instruction(“RI”)Transmission etc..In addition, due to being reconfigured in SPcell
Cheng Qian, the old SPcell are always at state of activation, therefore cell packet data inactivity timer sCellDeactivationTimer
There is no operations.In consideration of it, the disclosure also proposed about corelation behaviours of the UE after SPcell reconfiguration courses with suitably
Handle the precedent transmission of old SPcell.
In short, after SPcell change processes are completed, for old SPcell, the disclosure is intended at least solve following ask
Topic:
Problem 1:How the uplink of old SPcell is handled(UL)It is synchronous(“SYN”)State;
Problem 2:After completing SPcell change processes in UE sides, the activation of old SPcell/deactivate how is handled or determined
State living;And
Problem 3:How the previous UL/DL data transmission of old SPcell and ULUCI transmission are handled.
Problem 1. handles the solution of old SPcell UL SYN
In order to ensure correct after SPcell change processes and suitably progress UL transmission, it should identify or determine and is old
The UL SYN states of SPcell, correctly to guide subsequent operations of the UE on old SPcell.For this purpose, under the disclosure proposes
Four illustrative embodiments in face, will lead to different UE behaviors:
Embodiment 1:When SPcell, which is configured, to be completed, UE stops timing advance timer(“TAT”)And then will
The UL synchronous regimes of old SPcell, which are considered as, in vain, that is, thinks UE and old SPcell uplink and asynchronous;
Embodiment 2:SPcell changes process and has no effect on the TAT timers being currently running, and UE will be
Its side checks the timer state after completing SPcell change processes, and
If TAT is still being run, UE and old SPcell uplink synchronous are confirmed;
Alternatively, if TAT stops during SPcell reconfiguration courses/expires, UE and old SPcell UL are same
Step is considered as invalid, that is, determines UE and old SPcell uplinks and asynchronous.
Embodiment 3:Complete after SPcell reconfigures, UE restart TAT timers and confirm UE with it is old
SPcell uplinks are synchronous;
Embodiment 4:The radio resource control that SeNB is transmitted in MeNB to UE(“RRC”)Increase in message additional
Instruction, perform corresponding action to indicate UE, such as stop TAT timers or keep the timer or restart timer
Deng.
According to disclosure embodiment discussed above, for embodiment 1, after the completion of SPcell change processes, such as
Fruit is still running for the TAT timers of old SPcell, then UE will stop the timer and think that old SPcell UL are same
Step state will be no longer valid.Then, UE will not perform any UL transmission until obtaining new timing on the old SPcell
In advance(“TA”).If for example, the old SPcell is in is in identical timing advance group with new SPcell(“TAG”)
Interior, then it is also invalid that UE, which thinks that the UL of the new SPcell is synchronized,.For this purpose, any UL transmission on new SPcell is started
Before, UE will perform synchronous with the UL of new SPcell.Correspondingly, it is synchronized if obtaining new UL in new SPcell, such as
Uplink PRACH processes competition-based exempt from the uplink PRACH processes competed, then UL synchronous regimes of the UE on old SPcell
Also will automatically restart, so as to which UL transmission can restart.On the other hand, if old SPcell be in it is new
TAG different SPcell, then after SPcell change processes, it is invalid that SeNB, which will be appreciated by UE in the uplink synchronous of old SPcell,
's.For this purpose, SeNB will trigger new uplink random access procedure on old SPcell(Or it is known as uplink in this application
PRACH processes), it is synchronous with the UL of old SPcell to obtain, so as to restart the transmission of the UL on old SPcell.
In R10/R11, when changing process by HO processes triggering Pcell, the TAT timers of all TAG of source eNB are all
It will be released.In comparison, for the embodiment 2 proposed by the disclosure, SPcell changes process does not influence old
The TAT operations of SPcell.That is, when UE side joints receive SPcell and change order, UE will not stop such as defined in R10
Only or discharge the timer.On the contrary, the TAT timers of the old SPcell of UE military orders continue to run with.SPcell is completed in UE sides to change
After change process, UE will check TAT states:
If TAT timers are still being run, it is still effective that UE thinks that old SPcell UL are synchronized.It is if old
SPcell is in the TAG identical with new SPcell, then it is also effective that UE, which will be considered to the uplink synchronous of new SPcell,.
Therefore, it is not necessary to uplink PRACH processes are performed on new SPcell, unless SeNB requirements UE is done so;
If TAT timers expire during SPcell change processes, UE can consider itself and old SPcell's
UL synchronizes no longer valid.At this point, SeNB can based on the corresponding TAT timer states of its own come detect the situation and really
It is invalid to determine UE to synchronize in the UL of old SPcell.Then, SeNB can or trigger UE to perform on old SPcell
Uplink PRACH processes or enable UE to determine when PRACH processes competition-based are regained with old SPcell's
UL is synchronized.
For embodiment 3, after SPcell change processes are completed, no matter the TAT timers situation of old SPcell such as
What, the TAT timers that UE will restart old SPcell.Next it may be determined that the uplink sync status on old SPcell.
SeNB sides, if detecting the uplink sync status on old SPcell and bad, such as based on old SPcell
Subsequent upstream transmission, then SeNB will trigger uplink PRACH processes on old SPcell with improve again UE with it is old
SPcell UL synchronous regimes.From this point of view, embodiment 3 is highly effective for realizing UE and old SPcell uplink synchronous.
For embodiment 4, SeNB can include indicating to control the behavior of UE by changing RRC information in SPcell
Or action.For example, after SPcell change processes, SeNB can indicate that UE performs the new uplink on old SPcell
PRACH processes.Then, in UE sides, the UL synchronizations for determining or knowing old SPcell have been considered as invalid by UE.Therefore, UE will
Any UL transmission will not be performed on old SPcell, it is synchronous with the UL on old SPcell until regaining.The opposing party
Face, SeNB may also require that UE TAT to be kept to run, and then after the completion of SPcell change processes, can be held in UE sides
Row is such as the operation rules defined in embodiment 2.
In short, above-mentioned four the proposed embodiments of the disclosure can lead to or obtain different UE behaviors, and
Ensure that operations of the UE on old SPcell can be performed correctly.
How problem 2. handles the activation/deactivation state of old SPcell
It is provided according to current R12DC, SPcell will always be at state of activation, therefore in phase life cycle of SPcell
Between, it should there is no the cell packet data inactivity timers of operation(“CellDeactivationTimer”).Then, this is old
SPcell is converted into the Scell of a routine.And for the Scell of a routine, there should be different activation/go
State of activation, and the old SPcell should be associated with timer CellDeactivationTimer.
In view of above-mentioned, the disclosure suggests how three following embodiments are handled to handle after SPcell process changes
The activation/deactivation state of old SPcell:
Embodiment 1:It is state of activation to keep old SPcell;
Embodiment 2:It is deactivation status to keep old SPcell;And
Embodiment 3:Based on the SeNB being included in SPcell change RRC informations
Order come determine SPcell be in activation or deactivation status.
For embodiment 1, after the completion of SPcell change processes, old SPcell will be considered to be at activation shape
State.However, " activation " state of being somebody's turn to do is only temporarily " to activate ", and different from previous " always state of activation ".Then,
After SPcell change processes are completed, when old SPcell is considered as state of activation, UE should be automatically activated accordingly
SCellDeactivationTimer timers.After the timer expires, UE will be considered to the old SPcell relative to this
The state of activation of UE should be stopped and then be automatically brought into unactivated state.It can be seen that the completely new UE behaviors
It is considered based on the mode that triggered RRC information is run by timer sCellDeactivationTimer.
For embodiment 2, after UE completes SPcell change processes, old SPcell will be considered to be at inactive
State.Then, UE should discharge all corresponding mixed automatic repeat requests(“HARQ”)Process, so as to cause loss of data with
And subsequent redundant retransmission.The embodiment changes RRC information using SPcell and deactivates old SPcell to trigger UE, therefore
It can be considered as the Scell deactivating operations of RRC triggerings, and this is not prescribed by R10/R11.Because version previous
In, activation or deactivation are by medium access control(“MAC”)Control unit(“CE”)Come controlling rather than controlled by RRC processes
System.
For embodiment 3, SeNB provides new instruction in changing RRC information in SPcell, to guide UE behaviors.Example
Such as, if SeNB indicates that UE remains old SPcell relative to the UE to deactivate, UE, which should be performed, to be implemented
New operation defined in mode 1.On the other hand, if SeNB orders UE deactivates old SPcell, UE will perform implementation
New operation defined in mode 2.
No matter in short, take it is any in above-mentioned three kinds of embodiments, UE will ensure that its complete SPcell changed
Correct suitable operation is performed after journey.
How problem 3. handles the previous DL transmission of old SPcell
The problem is related to for after SPcell change processes, for old SPcell activation/deactivation states, i.e. problem
Which embodiment is taken in 2:
State of activation instruction is provided in RRC information for SeNB in the embodiment 1 in problem 2 or embodiment 3
Situation, after the completion of SPcell change processes, old SPcell will remain in state of activation.For the situation, the disclosure proposes
Following UE behaviors/operation:
UE will continue to safeguard and pause at the ongoing DLHARQ processes on old SPcell;
Further, UE continues to keep corresponding DL harq buffers device, until data are correctly received;
UE waits for the further DL dispatch of SeNB(Such as permit(“grant”))To restart or to discharge
The DLHARQ processes of these pauses on the old SPcell;
After SPcell change processes, UE will be automatically resumed the DL transmission for detecting the SeNB on old SPcell,
So as to which UE knows how to handle the DL HARQ processes of the pause on old SPcell.For example,
If SeNB is retransmitted by sending relevant DL licenses to UE on old SPcell to perform DL HARQ,
Recently the DL received is transmitted and is combined to transmit with the information buffered in corresponding buffer by UE;
On the other hand, if UE receives the DL licenses as new transmission, UE will be discharged to be delayed in corresponding HARQ
The information buffered in device is rushed, and the DL received transmission is considered as new transmission.
Alternatively, if taking embodiment 2 in problem 2 or taking embodiment 3 in problem 2 but SeNB will
UE is asked to deactivate old SPcell, then UE will discharge all DL harq buffers devices and SeNB is waited for dispatch new transmission.
In short, based on the above-mentioned each embodiment of the disclosure, it can be seen that the previous DL transmission on old SPcell
It will be treated correctly after the completion of SPcell change processes.
How problem 4. handles the previous UL transmission of old SPcell
As described above, changing Cheng Qian in SPcell, there are UL transmission, such as physical uplink certainly on old SPcell
Link sharing information(“PUSCH”), PUCCH and UL UCI transmissions, including SRS, CQI/PMI/RI feedback etc..Then, exist
After the completion of SPcell change processes, it is thus necessary to determine that if handling existing UL HARQ operations, how and when restarting UE
Automatically carry out UL UCI transmissions etc..These problems are directed to which embodiment taken in problem 2 and problem 1.
As described in problem 2, when taking embodiment 2, the RRC processes triggering deactivation that SPcell changes is old
SPcell, UE will discharge all previous UL HARQ operations, and stop all ongoing UL UCI transmissions, without examining
Consider the UL synchronous regimes of old SPcell.
On the other hand, if taking the embodiment 1 in problem 3, i.e., after SPcell change processes, old SPcell will
State of activation is kept, if then it needs to be determined that handling UL UCI and UL the HARQ processes on old SPcell, as discussed below
's.For simplified description, it is assumed that the UL of SPcell old after SPcell change processes is synchronized and will be kept.Otherwise, again
Start old SPcell UL synchronize after, it will be considered that embodiment below:
How problem 4.1 after SPcell change processes restarts UL UCI transmissions
UL is transmitted, it is crucial the problem of be when UE will perform UL and transmit, it is necessary to ensure that eNB with UE be it is synchronous,
The UL transmission from UE can be received so as to eNB.In R10/R11, such as the UL UCI of UL SRS/PMI/RI/CQI etc. are passed
It is defeated to be configured by RRC information.Then, eNB will be appreciated by when UE will perform these UL transmission, such as be re-matched based on UL RRC informations
It puts and completes message.However in R12DC scenes, which will be no longer valid, because RRC agreements are only located at MeNB sides, and
SeNB does not know when MeNB receives RRC and reconfigure and completes message.That is, SeNB is difficult to know these automatic UL UCI transmissions
When will start, therefore SeNB is difficult and is less likely to receive UL UCI transmissions on old SPcell.In order to solve this
Problem, the disclosure propose following embodiment:
Embodiment 1:UE restarts triggering UE old when completing uplink PRACH processes on new SPcell
SPcell on UL UCI transmissions.Similarly, UE can also be according to the execution uplink PRACH processes on old SPcell of completing
To trigger the UL UCI transmissions restarted on old SPcell;
Embodiment 2:UE starts triggering UE when carrying out UL UCI transmissions on new SPcell in old SPcell
On restart automation UL UCI transmissions;
Embodiment 3:First dispatch is received on new SPcell(For example, license)When will triggering UE exist
UL UCI transmissions on old SPcell.That is, the data transmission for the first time on new SPcell will trigger UE in old SPcell
On restart UL UCI transmissions;
Embodiment 4:Dispatch is received on old SPcell or is received and indicates old SPcell transmission
UE will be triggered to perform UL UCI transmissions in old SPcell during dispatch.That is, the data for the first time on old SPcell pass
Contribute's triggering restarts UL UCI transmissions on old SPcell;
Embodiment 5:New MAC CE are designed, so as to which SeNB can ask UE to perform old by the MAC CE
SPcell on UL UCI transmissions;
Embodiment 6:Indicate UE on old SPcell by coming from the activation/deactivation MAC CE of SeNB
Perform UL UCI transmissions.For the embodiment, no matter which kind of state old SPcell is in, if SeNB wishes UE old
Start UL UCI transmissions on SPcell, then SeNB will send downwards the activation/deactivation MAC CE of instruction " activation " state.And
At UE sides, when receiving the first MAC CE, UE will automatically restart the UL UCI transmissions on old SPcell.It should
Embodiment is similar to the embodiment 5 that wherein UE behaviors are controlled by SeNB, but the difference lies in embodiment 6 for this purpose
And activation/deactivation MAC CE are used.
For embodiment 1, the time point when UE is completed in the uplink PRACH processes on new SPcell will be used for together
Walk UL UCI transmissions of the UE and SeNB on old SPcell.For example, for the PRACH processes from competition, message 2 is being sent
Afterwards, SeNB knows that UE will be in some period(Such as 4 milliseconds)Restart to perform UL UCI transmissions on old SPcell afterwards.
And in UE sides, when after message 2 are received on new SPcell, UE will be in some period(Such as 4 milliseconds)After restart
UL UCI transmissions are performed on old SPcell.For another example for PRACH processes competition-based, when the transmission of message 4 is used as
Between point synchronize the UL UCI transmissions of UE and SeNB on old SPcell.That is, after message 4 are received, UE will be after 4 milliseconds
Restart UL UCI transmissions on old SPcell, as shown by the embodiment 1 in Fig. 2.
For embodiment 2, when UE starts to perform in the UL UCI transmissions on new SPcell, either by which kind of reality
The mode of applying triggers, and UE will automatically proceed by its UL UCI transmission on old SPcell, this is will be appreciated that for SeNB
When UE will start the UL UCI transmissions on new SPcell.Then, for embodiment 2, when SeNB also will be appreciated by UE
It will start the UL UCI transmissions on old SPcell.It is that is, synchronous in the UL UCI transmissions of UE and SeNB on old SPcell.
The synchronization scenario may refer to embodiment 2 shown in Figure 2.
For embodiment 3, when UE on new SPcell when receiving dispatch, UE will by the use of the reception as when
Between point restart its UL UCI transmission on old SPcell.Reason is that SeNB knows UE when in new SPcell
Upper reception dispatch and therefore SeNB will be appreciated by when UE will start its UL UCI transmission on old SPcell.That is,
The reception of dispatch on new SPcell is used as synchronous UE and SeNB to perform UL UCI transmissions in old SPcell.
Shown in the embodiment 3 in Fig. 2,4 milliseconds after first PDCCH are received on new SPcell, UE will be
UL UCI transmissions are performed on old SPcell.
For embodiment 4, when receiving dispatch on old SPcell or instruction is received old
During the dispatch transmitted on SPcell, UE will restart its UL UCI transmission on old SPcell.Reason and embodiment party
Formula 3 is similar, because SeNB is aware of when that the dispatch for being directed to old SPcell will be received and therefore SeNB should
Know when UE will restart the UL UCI transmissions on old SPcell.Referring to shown by the embodiment 4 in Fig. 2,
4 milliseconds after the first PDCCH received on old SPcell, UE will carry out UL UCI transmissions on old SPcell.
Above-mentioned embodiment 1-4 is directed to the automatism of UE, and the difference lies in each embodiments to have not
Same UL UCI transmissions triggering benchmark or reference.Nevertheless, SeNB can also order UE to perform UL UCI transmissions, such as implement
Proposed by mode 5.R10 is similarly to, wherein UL UCI transmissions are triggered by RRC processes.That is, it is considered that R10/R11UL
UCI transmission is asked by eNB based on RRC processes.In comparison, in R12DC, due to there is no RRC agreements at SeNB,
The disclosure suggests that SeNB restarts the UL UCI transmissions on old SPcell come order UE by MAC CE.For this purpose, this public affairs
It opens and proposes a kind of new MAC CE, which has fairly simple form.For example, the MAC CE only include MAC CE reports
Head and be not followed by MAC CE payloads(Data portion), and sub-header is only a byte, i.e. R/R/E/LCID, in Fig. 3
Shown by last point, defined in a new Logic Channel Identifier(“LCID”), UL UCI will be performed by being used to indicate UE
Transmission.Optionally, as shown by next part in Fig. 3, the MAC CE payloads of a byte can be included in the MAC CE,
Instruction UE should perform UL UCI transmissions in which cell.Which is effective and simple, because existing in SeNB
MAC entity.By the above embodiment, the disclosure can be obtained as triggered UL UCI transmissions by RRC information in R10/R11
Same performance.
For embodiment 6, SeNB activation/deactivation MAC CE are used to trigger UE to restart in old SPcell
UL UCI transmissions.Therefore, the present disclosure defines new UE behaviors:It is first to activate/deactivate after SPcell change processes are completed
MAC CE living will trigger UE and perform UL UCI transmissions.
In short, it is feasible that the above embodiment 1-6 restarts UL UCI transmissions for guiding UE on old SPcell
's.Particularly, embodiment 5 ensures that UE and SeNB are fully synchronized in next UL UCI transmissions, so as to reach with
Performance similar R10/R11.
How problem 4.2 after SPcell change processes restarts UL PUSCH transmissions
As noted above, another major issue is how to be handled after the completion of SPcell change processes old
Previous ongoing UL PUSCH transmissions on SPcell(That is, data transmission).The problem in execution SPcell with changing
Cheng Hou, how to be handled on old SPcell in problem 1 embodiment that UL is synchronized it is related and in problem 2 such as where
The embodiment for managing the activation/deactivation state of old SPcell is related.If it takes the embodiment 2 in problem 2 or takes
Embodiment 3 but old SPcell is deactivated by SeNB requests, then UE should discharge all ongoing UL HARQ processes simultaneously
And also discharge all relevant harq buffer device information.
On the other hand, if thinking that old SPcell is active after SPcell change processes, the disclosure is built
View performs following operation and previously ongoing UL PUSCH is performed on old SPcell to handle.Following discussion is based on
Assuming that it confirmed that UE is synchronous with the UL of old SPcell.
Embodiment 1:Although after the completion of SPcell change processes, old SPcell is maintained as state of activation,
UE will discharge all ongoing ULHARQ processes and discharge all UL harq buffer devices;
Embodiment 2:UE maintains and suspends all ongoing UL HARQ processes.In addition, UE will keep being directed to
In all UL harq buffers devices for the HARQ processes for receiving NACK before this.It is successfully completed on new SPcell in UE
After UL PRACH processes, UE will automatically restart UL transmission on old SPcell(Non-adaptive HARQ is retransmitted);
Embodiment 3:Similar to embodiment 2, UE maintains and suspends all ongoing UL HARQ processes.Separately
Outside, all UL harq buffers devices that UE will keep the HARQ processes for before receiving in view of this NACK.It is successfully completed in UE
After new SPcell receives first dispatch, it is non-adaptive heavy that UE will automatically restart UL on old SPcell
It passes;
Embodiment 4:Similar to embodiment 2, UE maintains and suspends all ongoing UL HARQ processes.Separately
Outside, all UL harq buffers devices that UE will keep the HARQ processes for before receiving in view of this NACK.But different from embodiment
2, UE should wait for the further UL dispatch for coming from SeNB, to restart the UL that UL retransmitted or discharged these preservations
Harq buffer device.That is, the first UL dispatch received on old SPcell will restart the UL of all pauses of UE
HARQ process operations.
Embodiment 5:Similar to embodiment 2, UE will keep being directed to the HARQ processes of previously received NACK
All UL harq buffers devices.But different from embodiment 2, UE should wait for the further UL dispatch for coming from SeNB,
Corresponding ULHARQ buffers are retransmitted or discharge to restart UL.That is, the UL scheduling letters received on old SPcell
Order will only restart corresponding UL HARQ process operations.If being not received by corresponding UL dispatch, UE should be after
Continuous pause others HARQ processes.
For embodiment 1, after SPcell change processes are completed, even if old SPcell still in state of activation,
UE discharges all ongoing UL harq buffers devices.Therefore, which will lead to unnecessary redundant retransmission but have
The advantage of relative simplicity.
For embodiment 2, UL harq buffers device and ongoing UL HARQ processes are safeguarded.When UE is new
After completing uplink PRACH processes on SPcell, UE will automatically start the UL HARQ processes of those previously received NACK
Non-adaptive UL HARQ on old SPcell are retransmitted.For the embodiment, the reception of message 2 or message 4 will act as together
The time point of UL transmission of the SeNB and UE on old SPcell is walked, as shown in Figure 4.
For embodiment 3, embodiment 2 is similar to, and the difference lies in work as to receive on new SPcell
During first dispatch, UE will restart the non-adaptive HARQ of its UL on old SPcell and retransmit.That is, new
First dispatch on SPcell will act as the time point that UL HARQs of the synchronous SeNB and UE on old SPcell is retransmitted,
As shown in Figure 5.
For embodiment 4, UE will not restart its UL HARQ operation, until receiving head on old SPcell
A dispatch.For the embodiment, UL HARQ processes that only one dispatch will restart all current hangs.
For example, permitted in UE based on the UL in receiving TTI i come after performing corresponding UL HARQ transmissions, though be not received by into
The UL licenses of one step, UE will continue to perform non-adaptive UL HARQ re-transmissions in subsequent TTI, as shown in Figure 6.
For embodiment 5, UE will keep and safeguard all ongoing UL HARQ processes.UE will not be opened again
Begin the UL HARQ processes suspended, until receiving corresponding UL dispatch on old SPcell.That is, when old
When UL dispatch is received on SPcell, UE will only restart corresponding UL HARQ processes, but continue to keep other
UL HARQ suspend.This means that a UL dispatch will only restart a UL HARQ process, this differs markedly from reality
Apply mode 4.As shown in Figure 7, it is assumed that first dispatch is associated with UL HARQ process i, then UE will be by according to receiving
Dispatch performs adaptive re-transmission or performs new transmission, and restarts ULHARQ processes.In next TTI, by
In being not received by corresponding dispatch, UE will continue to suspend UL HARQ process i+1, as indicated by " X " in figure.Rear
In continuous TTI, due to receiving dispatch again, UE will further restart UL HARQ processes i+2 and perform by connecing
The adaptive retransmission indicated by dispatch received or new transmission, and identical process will be carried out persistently.It should be understood that
Be that process here represents that i, i+1, i+2 or i+n etc. are only exemplary, and n according to the difference of original bench mark position and
Suitable value can be taken.
In short, embodiment 1-5 is feasible for the ULHARQ processes for restarting pause on old SPcell, because
It is synchronous with UE on the time point that should restart UL transmission on old SPcell as UE for SeNB.
Fig. 8 schematically shows the flow chart of the method 800 according to embodiment of the present disclosure.As previously mentioned, this method 800
User equipment is being supported with being used in macro base station and the cordless communication network of the dual link of small base station, as shown in Figure 1
Exemplary wireless communications network.As shown in Figure 8, method 800 starts from step S801, and proceeds to step S802, at this
At step, in the case of the change from old particular cell to new particular cell occurs, performed at the user equipment
One or more acts the precedent transmission to handle the old particular cell.Then, method 800 terminates at step S803.
In one embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
The UL synchronous regimes of particular cell.
In one embodiment, this method 800 further comprises stopping timing advance timer and determine described old
Particular cell UL synchronization be invalid.
In another embodiment, the method 800 further comprises checking the state of timing advance timer, response
It is still being run in the timing advance timer, the UL synchronizations for determining the old particular cell are effective;And in response to institute
It states and stops or expire during timing advance timer changes in particular cell, the UL synchronizations for determining the old particular cell are
In vain.
In another embodiment, the method 800 further comprises in response to completing particular cell reconfiguration course,
It is effective to restart timing advance timer and determine that the UL of the old particular cell is synchronized.
In one embodiment, the method 800 further comprises determining timing advance based on the instruction from base station
When device perform operation, so as to based on the operation come to determine that the UL of the old particular cell is synchronized be effectively or invalid.
In another embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
Particular cell activation relative to the user equipment or deactivation status.
In yet another embodiment, the method 800 further comprises determining the old particular cell relative to described
User equipment is in the state of activation and starts cell packet data inactivity timer.
In one embodiment, the method 800 further comprises determining the old particular cell relative to described
User equipment is in the deactivation status.
In yet another embodiment, the method 800 further comprises determining based on the instruction from base station described old
Particular cell be in the activation or deactivation status relative to the user equipment.
In one embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
The previous downlink transmission of particular cell.
In yet another embodiment, wherein the old particular cell is active relative to the user equipment,
The method further includes one in following:Release ongoing downlink mixing on the old particular cell
Automatic repeat request process and discharge all relevant DL HARQ buffers;Keep the downlink
Link hybrid automatic repeat request process and relevant buffer are correctly received until corresponding downlink transmission;Special
After cell changing procedure, in response to receiving downlink scheduling signaling on the old particular cell, will newly it receive down
The information of uplink transmission and buffering merges;And after particular cell change process, in response to being received from the small base station
To new downlink transmission, release comes from the information of the buffering of the old particular cell.
In another embodiment, wherein the old particular cell is in relative to the user equipment deactivates shape
State, all DL HARQs the method further includes discharging for the old particular cell delay
Rush device and downlink hybrid automatic repeat request processes;And the small base station is waited for dispatch new transmission.
In yet another embodiment, wherein the one or more actions performed at the user equipment be related to it is described old
The previous UL transmission of particular cell.
In another embodiment, wherein the previous UL transmission includes UL UCI transmissions, the method further includes
One in below:In response to completing the UL random access procedures on the new particular cell, trigger in the old spy
The UL UCI transmissions in different cell;In response to completing the UL random access procedures on the old particular cell, triggering
The UL UCI transmissions on the old particular cell, wherein the UL random access procedures for the user equipment and
UL between the small base station is synchronized;In response to the UL UCI transmissions on the new particular cell, trigger described old
Particular cell on the UL UCI transmissions;In response to receiving first dispatch on the new particular cell, touch
Send out the UL UCI transmissions on the old particular cell;In response to receiving scheduling letter on the old particular cell
It enables or in response to receiving the dispatch about the old particular cell, triggers described on the old particular cell
UL UCI transmissions;And it in response to receiving the instruction for coming from base station and being transmitted in medium access control control unit, triggers
The UL UCI transmissions on the old particular cell.
In one embodiment, wherein the previous UL transmission includes the transmission of UL upstream datas information, and described old
Particular cell be active, the method further includes one in following:Release and the old particular cell
Relevant all ongoing UL hybrid automatic repeat request process and UL hybrid automatic repeat-request buffers;And pause
All ongoing UL hybrid automatic repeat request process relevant with the old particular cell and retain for receive
It is following to perform to all UL hybrid automatic repeat-requests buffers of the UL hybrid automatic repeat request process of negative confirmation
One of:In response to being successfully accessed to the new particular cell, restart the UL transmission on the old particular cell;It rings
Ying Yu is being successfully received the first dispatch from the new particular cell, restarts in the old particular cell
On non-adaptive re-transmission;In response to receiving first UL signalings on the old particular cell, restart described old
Particular cell on all pauses UL hybrid automatic repeat request process;In response to completing on the old particular cell
UL random access procedures, trigger on the old particular cell the UL upstream datas information transmission, wherein on described
Line link random access procedure synchronizes for the UL between the user equipment and the small base station;And in response to described
UL signalings associated with the UL hybrid automatic repeat request process suspended are received on old particular cell, are restarted in institute
State the UL hybrid automatic repeat request process of the pause on old particular cell.
In another embodiment, wherein in the change process from the old particular cell to the new particular cell
In, the method includes discharging the old particular cell.As previously mentioned, release here can be receive come from it is small-sized
The instruction of base station, so as to which user equipment can discharge old particular cell according to the instruction.Additionally, user equipment can also be according to
The instruction is come the particular cell that keeps this old.
In yet another embodiment, the release old particular cell includes at least one of following:Release with it is described
The relevant all UL UCI configurations in old particular cell;Release is mixed with the relevant all upstream or downstream in the old particular cell
Close automatic repeat request process;And release mixes automatic repeat with the relevant all upstream or downstream in the old particular cell
Ask buffer.
In one embodiment, wherein the previous UL transmission includes the transmission of UL upstream datas information, and described old
Particular cell be in unactivated state, the method further includes release with the old particular cell it is relevant it is all just
In the UL hybrid automatic repeat request process of progress and UL hybrid automatic repeat-request buffers.
Fig. 9 is to schematically show using in the wireless communication system for supporting dual link according to disclosure embodiment
The block diagram of equipment 900.As previously mentioned, the equipment 900 is used in the dual link for supporting user equipment and macro base station and small base station
Cordless communication network in, wherein the small base station, which includes at least, is configured to the physics UL control channels of the user equipment
One particular cell of transmission.As shown in figure 9, the equipment 900 includes:Execution unit 901, for occurring from old special
Cell to new particular cell change in the case of, it is described to handle that one or more actions are performed at the user equipment
The precedent transmission of old particular cell.It should be understood that equipment 900 here can be implemented as user equipment or part of it,
And it can be configured to perform according to method 800 illustrated in fig. 8 and its multiple embodiments.That is, another aspect of the present disclosure
A kind of UE for being used to perform the above method 800 is provided.
To sum up, each embodiment of the disclosure is described in detail with reference to attached drawing.Those skilled in the art can
With understand embodiment of the present disclosure can by hardware, software, firmware, module or its with reference to realizing, can also supply
On the signal bearing medium that any suitable data processing system uses the disclosure is embodied in set computer program product.This
Kind signal bearing medium can be transmission medium or the recordable media for machine sensible information, including magnetic medium, optical medium
Or other suitable medias.The example of recordable media includes:Disk or floppy disk in hard disk drive, for CD-ROM drive CD,
Other thinkable media of tape and those skilled in the art institute.One skilled in the art would recognize that it is compiled with suitable
The suitable communication devices of range device will all perform the step of method of disclosure as embodied in program product.
It should be noted that in order to be easier to understand the disclosure, above description is omitted for those skilled in the art
For be that well known and for the disclosure realization may be necessary some more specific technical details.
Although it is disclosed that the particular implementation of the disclosure, but it will be appreciated by those skilled in the art that can be directed to specific
Embodiment is made a change without departing from spirit and scope of the present disclosure.Therefore, the present disclosure is not limited to specific embodiment,
And appended claims include any and all such application, modification and the embodiment in the range of the disclosure.
Claims (15)
1. a kind of supporting method of the user equipment with being used in macro base station and the cordless communication network of the dual link of small base station,
Wherein described small base station includes at least one of the physical uplink control channel transmission for being configured to the user equipment
Particular cell, the method includes:
In the case of the change from old particular cell to new particular cell occurs, one is performed at the user equipment
Or multiple actions, to handle the precedent transmission of the old particular cell, the one or more performed at the user equipment is moved
Work is related at least one of the following:The uplink synchronization state of the old particular cell, the old particular cell
Previous downlink transmission and the previous uplink transmission of the old particular cell.
2. according to the method described in claim 1, the one or more actions performed wherein at the user equipment are related to institute
State the uplink synchronization state of old particular cell.
3. according to the method described in claim 2, further comprise:
Stop timing advance timer;And
The uplink synchronisation for determining the old particular cell is invalid.
4. according to the method described in claim 2, further comprise:
Check the state of timing advance timer;
It is still being run in response to the timing advance timer, is determining the uplink synchronisation of the old particular cell to have
Effect;And
Stop or expire during changing in response to the timing advance timer in particular cell, determine described old special small
The uplink synchronisation in area is invalid.
5. according to the method described in claim 2, further comprise:
In response to completing particular cell reconfiguration course, restarting timing advance timer and determining described old special small
The uplink synchronisation in area is effective.
6. according to the method described in claim 2, further comprise:
Operation is performed to timing advance timer based on the instruction from base station, so as to described old to determine based on the operation
The uplink synchronisation of particular cell is effectively or invalid.
7. according to the method described in claim 1, the one or more actions performed wherein at the user equipment are related to institute
State the previous downlink transmission of old particular cell.
8. according to the method described in claim 7, wherein described old particular cell is in activation relative to the user equipment
State, the method further includes one in following:
Pause at ongoing DL HARQ process on the old particular cell;
Relevant DL HARQ buffer is kept until corresponding downlink transmission is correctly received;
It, will in response to receiving downlink scheduling signaling on the old particular cell after particular cell change process
The downlink transmission and the information of buffering newly received merges;And
After particular cell change process, in response to receiving new downlink transmission from the small base station, release comes from
In the information of the buffering of the old particular cell.
9. it is deactivated according to the method described in claim 7, wherein described old particular cell is in relative to the user equipment
State living, the method further includes:
Release is mixed for all DL HARQ buffers and downlink of the old particular cell
Close automatic repeat request process;And
The small base station is waited for dispatch new transmission.
10. according to the method described in claim 1, the one or more actions performed wherein at the user equipment are related to institute
State the previous uplink transmission of old particular cell.
11. according to the method described in claim 10, wherein described previous uplink transmission includes uplink upload control
Information is transmitted, and the old particular cell is active, and the method further includes one in following:
In response to completing uplink random access procedure on the new particular cell, trigger described old special small
The uplink uplink control information transmission in area;
In response to completing uplink random access procedure on the old particular cell, trigger described old special small
The uplink uplink control information transmission in area, wherein the uplink random access procedure sets for the user
Uplink synchronisation between standby and described small base station;
In response to the uplink uplink control information transmission on the new particular cell, trigger described old special small
The uplink uplink control information transmission in area;
In response to receiving first dispatch on the new particular cell, the institute on the old particular cell is triggered
State uplink uplink control information transmission;
In response to receiving dispatch on the old particular cell or in response to receiving about described old special small
The dispatch in area triggers the uplink uplink control information transmission on the old particular cell;And
In response to receiving the instruction for coming from base station and being transmitted in medium access control control unit, trigger in the old spy
The uplink uplink control information transmission in different cell.
12. according to the method described in claim 10, wherein described previous uplink transmission includes uplink upstream data
Information is transmitted, and the old particular cell is active, and the method further includes one in following:
Release with the relevant all ongoing uplink hybrid automatic repeat request processes in the old particular cell and
Uplink hybrid automatic repeat request buffer;And
Pause and the relevant all ongoing uplink hybrid automatic repeat request processes in the old particular cell are simultaneously
And all uplinks for retaining the uplink hybrid automatic repeat request process for receiving negative confirmation mix automatically
Retransmission request buffer, to perform one below:
In response to being successfully accessed to the new particular cell, the uplink restarted on the old particular cell passes
It is defeated;
In response to being successfully received the first dispatch from the new particular cell, restart in the old spy
Non-adaptive re-transmission in different cell;
In response to receiving first uplink signalling on the old particular cell, restart described old special small
The uplink hybrid automatic repeat request process of all pauses in area;
In response to completing uplink random access procedure on the old particular cell, trigger described old special small
Uplink upstream data information transmission in area, wherein the uplink random access procedure sets for the user
Uplink synchronisation between standby and described small base station;And
It is related to the uplink hybrid automatic repeat request process of pause in response to being received on the old particular cell
The uplink signalling of connection restarts the uplink mixed automatic retransfer of the pause on the old particular cell
Request process.
13. according to the method described in claim 10, wherein described previous uplink transmission includes uplink upstream data
Information is transmitted, and the old particular cell be in unactivated state, and the method further includes releases and described old
The relevant all ongoing uplink hybrid automatic repeat request processes in particular cell and the automatic weight of uplink mixing
Pass request buffer.
14. a kind of supporting user equipment to be set with what is used in macro base station and the cordless communication network of the dual link of small base station
It is standby, wherein the small base station includes at least the one of the physical uplink control channel transmission for being configured to the user equipment
A particular cell, the equipment include:
Execution unit, in the case of change from old particular cell to new particular cell occurs, in the user
One or more actions are performed at equipment to handle the precedent transmission of the old particular cell, are performed at the user equipment
One or more actions be related at least one of the following:It is the uplink synchronization state of the old particular cell, described
The previous downlink transmission of old particular cell and the previous uplink transmission of the old particular cell.
15. a kind of user equipment, including:
Processor;And
Memory is configured as storage computer program code, and the computer program code by the processor when being performed
So that the user equipment performs the method according to any one of claim 1-13.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410108582.5A CN104936235B (en) | 2014-03-21 | 2014-03-21 | For supporting the method and apparatus in the wireless communication system of dual link |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410108582.5A CN104936235B (en) | 2014-03-21 | 2014-03-21 | For supporting the method and apparatus in the wireless communication system of dual link |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104936235A CN104936235A (en) | 2015-09-23 |
CN104936235B true CN104936235B (en) | 2018-07-10 |
Family
ID=54123133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410108582.5A Active CN104936235B (en) | 2014-03-21 | 2014-03-21 | For supporting the method and apparatus in the wireless communication system of dual link |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104936235B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105101388B (en) * | 2014-05-08 | 2019-08-23 | 上海诺基亚贝尔股份有限公司 | The method and apparatus of synchronous UE and SeNB in the use of new configuration parameter |
WO2017128287A1 (en) * | 2016-01-29 | 2017-08-03 | Qualcomm Incorporated | Control element extension for concurrent radio access technologies |
CN109392178B (en) * | 2017-08-10 | 2021-07-13 | 维沃移动通信有限公司 | MPDU transmission method, user side equipment and network side equipment |
CN111642032B (en) * | 2020-05-19 | 2023-06-27 | 广东小天才科技有限公司 | Method for configuring RRC state and network equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103477682A (en) * | 2011-04-08 | 2013-12-25 | 夏普株式会社 | Devices for multi-group communications |
CN103517355A (en) * | 2012-06-28 | 2014-01-15 | 华为技术有限公司 | Method for adjusting auxiliary primary cells and evolved NodeB |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101511793B1 (en) * | 2009-03-11 | 2015-04-14 | 엘지전자 주식회사 | Method of configuring radio connection in a multiple cell system |
-
2014
- 2014-03-21 CN CN201410108582.5A patent/CN104936235B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103477682A (en) * | 2011-04-08 | 2013-12-25 | 夏普株式会社 | Devices for multi-group communications |
CN103517355A (en) * | 2012-06-28 | 2014-01-15 | 华为技术有限公司 | Method for adjusting auxiliary primary cells and evolved NodeB |
Non-Patent Citations (2)
Title |
---|
Discussion on Special Scell (SPcell) change procedure;Alcatel-Lucent Shanghai Bell;《3GPP TSG RAN WG2 Meeting #85 R2-140749》;20140214;第RAN WG1卷(第Prague期);正文第1、2.2、2.4节 * |
Overview of small cell on/off scenarios and procedures;Samsung;《3GPP TSG-RAN WG1#76 R1-140367》;20140214;第RAN WG1卷(第Prague期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN104936235A (en) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6931726B2 (en) | Operation in discontinuous reception mode using carrier aggregation | |
US9936394B2 (en) | Method for processing data after unlicensed spectrum is released, and user equipment | |
JP6016796B2 (en) | Method and apparatus for processing a hybrid automatic repeat request process | |
KR101775295B1 (en) | Harq timelines for tdd-fdd carrier aggregation | |
WO2017133596A1 (en) | Method and device for transmitting uplink control information | |
RU2496261C2 (en) | Methods and devices for mobile communication network | |
WO2019179514A1 (en) | Method running on user equipment, and user equipment | |
WO2017148214A1 (en) | Discontinuous reception control method and device | |
WO2012136128A1 (en) | Method and device for acquiring secondary timing advance | |
JP2015165712A (en) | Mac reset and reconfiguration | |
JP2009296588A (en) | Method and apparatus for handling semi-persistent transmission resource | |
JP2011223575A (en) | Method for handling activation and deactivation of component carrier (cc), and communication apparatus using such method | |
WO2022127731A1 (en) | Cell changing method and user equipment | |
JPWO2012086039A1 (en) | Mobile station, base station, radio communication system and radio communication method | |
CN104936235B (en) | For supporting the method and apparatus in the wireless communication system of dual link | |
WO2013020443A1 (en) | Secondary cell random access method and device | |
JP6587846B2 (en) | User device and intermittent reception control method | |
WO2017100094A1 (en) | Macro and micro discontinuous transmission | |
WO2020088049A1 (en) | Internet of vehicles data transmission method, transmission terminal and network side device | |
KR20150075222A (en) | Method and apparatus for controlling cross-carrier scheduling | |
WO2010028607A1 (en) | Method, system and terminal for state transition | |
WO2013120435A1 (en) | Method and device for buffer state report | |
CN113692779A (en) | Maintaining, suspending, or modifying an existing PUR configuration in response to the UE entering RRC connected mode | |
JP6366729B2 (en) | Base station, terminal, and handover method | |
KR20230152763A (en) | Sidelink communication method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Pudong New Area, Pudong Jinqiao Ning Bridge Road, No. 388, No. Applicant after: Shanghai NOKIA Baer Limited by Share Ltd Applicant after: Alcatel Optical Networks Israe Address before: 201206 Shanghai, Pudong Jinqiao Ning Bridge Road, No. 388, No. Applicant before: Shanghai Alcatel-Lucent Co., Ltd. Applicant before: Alcatel Optical Networks Israe |
|
GR01 | Patent grant | ||
GR01 | Patent grant |