CN104933265A - Method for designing interior decoration of building based on BIM - Google Patents

Method for designing interior decoration of building based on BIM Download PDF

Info

Publication number
CN104933265A
CN104933265A CN201510395910.9A CN201510395910A CN104933265A CN 104933265 A CN104933265 A CN 104933265A CN 201510395910 A CN201510395910 A CN 201510395910A CN 104933265 A CN104933265 A CN 104933265A
Authority
CN
China
Prior art keywords
built
module
race
design
built module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510395910.9A
Other languages
Chinese (zh)
Inventor
刘长春
孙媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong University
Original Assignee
Nantong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong University filed Critical Nantong University
Priority to CN201510395910.9A priority Critical patent/CN104933265A/en
Publication of CN104933265A publication Critical patent/CN104933265A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for designing the interior decoration of a building based on a BIM. The method for designing the interior decoration of the building based on the BIM comprises the steps of parametrization design, division, classification and marshalling of of an interior decoration modules, establishment of an interior decoration module family library, establishment of an interior decoration module family information model, inspection and optimization of an interior decoration parametrization design scheme, and the like. By the adoption of the method, the design scheme of the interior decoration modules can be diversified, in this way, multiple options are provided for the interior decoration scheme, and the purpose of flexible design is realized. The workload of modifying drawings can be reduced, errors in the drawings are greatly reduced, and visual images are provided for production, construction, management, dismantling and the like by a three-dimensional simulation view.

Description

The in-built method for designing of building based on BIM
Technical field
The present invention relates to the in-built method for designing of a kind of building.
Background technology
The in-built design drawing of traditional residential is used for greatly the in-built construction of on-the-spot processing, its drawing (working drawing) generally comprises the contents such as plane, facade, connection detail, floor file, water power figure, it is careful, accurate that drawing size marking and material mark, internally assembling structure and way have explicitly bright, to ensure the enforcement of on-the-spot processing connection detail especially.The in-built modular requirement being applicable to the overall processes such as production, construction, management can not be adapted to.
Summary of the invention
The object of the present invention is to provide a kind of design proposal of in-built module that makes more diversified, thus make in-built scheme have the in-built method for designing of the building based on BIM of multiple choices.
Technical solution of the present invention is:
The in-built method for designing of building based on BIM, is characterized in that: comprise the following steps:
(1) Parametric designing:
Parametric designing refers to the size by changing a figure part or a few part, automatically the change to relevant portion in figure is completed, thus realizing the driving of size to figure, the geological information needed for wherein driving and topology information are by Computer Automatic Extraction; Operation parameter design means in the in-built design of industrialized house, when change at a certain view the size of a certain module, position or shape time, in all the other views, the size of same module, position or shape synchronously produce corresponding change automatically, simultaneously, in inside components detail list, related data also can make respective change;
Select the Revit software of autodesk, inc. to carry out in-built modular design, make in-built design and architectural design, exterior design become complete Parametric designing system, the BIM shared platform that constructing function is powerful;
(2) division of in-built module, classification and marshalling:
In the process of in-built Module Division, module classification and marshalling are the necessary conditions of Module Division, and the factor affecting the in-built Module Division of industrialized house comprises the function of module, structure, module production, module assembly, cost control etc.In-built module is sorted out and the foundation of marshalling is Module recognition;
In the practical operation of the in-built Module Division of industrialized house, adopt the method that qualitative analysis is combined with quantitative test, namely according to the result of qualitative analysis, the association factor of binding modules, formed " the in-built module correlativity of industrialized house and association factor analytical table ", to carry out fuzzy clustering, realize the division of in-built module, classification and marshalling; In this table, be strong coupling between the in-built module that " corresponding scoring " score value is greater than 0.8, all the other are weak coupling;
The in-built module correlativity of industrialized house and association factor analytical table
Sequence number Strength of association Corresponding scoring Connection type Fit system
1 By force 1.0 Function, structure forever connect, and can not be split, as welding Become to be integrated after connecting, zero allowance
2 Stronger 0.8 Function is consistent, compact conformation, is difficult to split, as the connection adopting pressure fitted to set up Be combined with strict tolerance
3 Generally 0.6 Function is mutual, and structure is fixed, and is difficult to split, as keyway connects Be combined with tolerance
4 More weak 0.4 There is certain function mutual, be fixedly connected with, easily split, as bolt Be combined with dimensional requirement
5 Weak 0.2 Substantially independent, mobile link, removablely connects, as spring connects There is annexation, but without cooperation requirement
6 Nothing 0 Complete independence, does not have annexation Without coordinating
(3) structure in in-built module race storehouse:
The system of Revit Architecture has carried part furniture, light fixture, race that door and window is conventional, and the category in in-built module race is returned by these races; But due to the diversity of in-built module, and the imperfection of system database, when the in-built modular design of the industrialized house of reality, need to create a large amount of self-defined races of in-built module to meet design requirement;
There are two kinds of component modes in the race storehouse that self-defining in-built module race is formed: the first is newly-built race in Revit Architecture, and according to the difference of same clan's type similar in-built module adoption class in different file, the file in this race storehouse carries out arranging and naming according to level; It two is that self-defined race is loaded into after in in-built project, exists in Project browser with hierarchical tree structure; Above-mentioned the first be public in-built module race storehouse, it is not present in the concrete in-built project of Revit Architecture, may be used for any in-built project; The second is project in-built module race storehouse, only refers to the in-built module race storehouse of a certain detailed programs;
Public in-built module race storehouse is kept in computer hard disc or other mobile storage facilities, and its position stored determines its path; When in-built design needs, find this race according to certain path and be loaded in Revit Architecture project;
(4) in-built module race information model is set up:
The composition of in-built module race information model comprises correlation parameter in the hierarchical diagram of race, the type attribute of race and instance properties, and in-built module detail list;
In the decomposition and coding of product module, adopt the module partition method of layering, form a kind of product; The decomposition of the in-built module of industrialized house and coded reference said method, form the hierarchical diagram similar with product; According to this layering and coding method, industrialized house inside components successively decomposes, until form inseparable, to have independence sub-unit and web member, and the in-built module race corresponding with sub-unit and web member is in the end of the hierarchical diagram of race;
In Revit Architecture, based on System Families, carried out the establishment of in-built module race by " type attribute " panel of race, build its essential information; In in-built module detail list, by the setting of " detail list attribute ", improve in-built module race information model further;
(5) test and optimization of in-built modularized design scheme
In-built modularization overall process is the in-built modularized design scheme of industrialized house by the process of constantly test and optimization; Test and optimization by way of mainly containing three:
(1) test and optimization of design proposal is carried out by virtual construction
Virtual construction is that building course in kind essence on computers realizes, it adopts Computer Simulation and virtual reality, modeling technique, the high-performance computer utilizing workstation to be representative or computing machine group, carry out the simulation reconstruction of building course, with pinpoint the problems and take to remedy, preventive measure, avoid the loss of building course in kind;
The in-built modular design of industrialized house adopts parametrization means, flat, vertical, sectional view and three-dimensional model interrelated, synchronously generate; When using Revit Architecture to carry out in-built design, the modeling process flat, vertical, sectional view drawing process is also in-built three-dimensional model; Because this three-dimensional model is vector, the size dimension of all in-built module races, position relationship are by accurate Numerical Control, the numerical value when correlation values of three bit models is built with material object is consistent, and consistent when the annexation between in-built module race is also built with material object;
Industrialized house in-built modularization virtual construction is divided into static virtual construction and dynamic virtual construction two kinds of forms; Use Revit Architecture to carry out static virtual construction, can internally the quantity, specification, installation method etc. of die-filling piece test and optimize;
It is internally build the simulation made from work progress that in-built modularization dynamic virtual is built, and internally fills modular construction, in-built modularization management and the dismounting of in-built modularization and all has certain reference value; After installation NavisWorks, Revit item file can export as NWC formatted file, again this file NavisWorks is opened, construction simulation setting is carried out to relevant inside components, inside components can be shown according to the sequencing of set time, thus realize the target of dynamic virtual construction;
(2) test and optimization of design proposal is carried out by actual loading test means
The in-built product of industrialized house for mass production, completes in Design Fundamentals, and after carrying out virtual construction, further measuring means is that the trial-production of in-built module and trial assembly are joined, i.e. the actual loading test of in-built module; Actual loading test shows in-built design proposal to user, can listen to the suggestion of user so that optimizing design scheme on the one hand, on the other hand, for user provides the in-built product of variation, menu mode, selects, satisfying personalized in-built demand for user;
(3) scheme test and optimization is carried out in in-built modularization implementation process
Virtual construction and actual loading test belong to the necessary means of in-built modular design, are also the main paties of in-built modular arrangement test and optimization;
The complexity of in-built module body and structure, the fine degree of in-built Module Division can affect its speed of producing and efficiency, and in-built module can check the rationality of in-built Module Division in the process of plant produced; In-built modular construction process is the stage the most easily finding design problem after design proposal completes, and the problems such as the assembling convenience of in-built module, the order of installation all can come out; In-builtly complete in later use procedure, user and administration departments, according to the experience in actual use procedure, can propose reasonably suggestion to design proposal; Rational design proposal also should improve the ratio that can reuse parts as far as possible, and is ensureing under the prerequisite firmly connected, the difficulty reducing assembling by rational connected mode and remove.
The invention enables the design proposal of in-built module more diversified, thus make in-built scheme have multiple choices, thus realize the target of flexible design.The workload of revisions on drawings can be reduced, and greatly reduce the mistake in drawing, three-dimensional mimetic view be produce, construction, the stage such as management and dismounting provide image intuitively.
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the change schematic diagram of internal partition wall module position and quantity in planimetric map.
Fig. 2 is the interlock schematic diagram cuing open internal partition wall module in elevation drawing.
Fig. 3 is the interlock schematic diagram of " quantity " in interior wall detail list.
Fig. 4 is the Function Decomposition schematic diagram of in-built product.
Fig. 5 is the schematic diagram of public in-built module race storehouse and path example thereof.
Fig. 6 is the schematic diagram of " wall " race storehouse example.
Fig. 7 is the schematic diagram of " specialized equipment " race storehouse example.
Fig. 8 is tree-shaped in-built module race hierarchy schematic diagram.
Fig. 9 is detail list Properties palette schematic diagram.
Embodiment
The in-built method for designing of building based on BIM, comprises the following steps:
(1) Parametric designing:
Parametric designing refers to the size by changing a figure part or a few part, automatically the change to relevant portion in figure is completed, thus realizing the driving of size to figure, the geological information needed for wherein driving and topology information are by Computer Automatic Extraction; Operation parameter design means in the in-built design of industrialized house, when change at a certain view the size of a certain module, position or shape time, in all the other views, the size of same module, position or shape synchronously produce corresponding change automatically, simultaneously, in inside components detail list, related data also can make respective change;
Common building three-dimensional model is different from the in-built information model of industrialized house that Parametric designing means are set up, the latter only has the geometric data of reflection in-built module (containing in-built space module) geometric attribute, and information model also comprises the project data such as material, type, model code, manufacturer.These geometric datas and project data are shared between each ingredient of the in-built modular architecture of industrialized house.
Parametric designing can realize the flexible design of in-built module.In Parametric designing, component models and module subsystem are all sizings, and when changing the parameter value of module or module subsystem certain, system just can drive grand master pattern block or module subsystem automatically, makes it change into new module and module subsystem.Meanwhile, the change of module or module subsystem array mode also has the feature of interlock.From said process, Parametric designing makes the design proposal of in-built module more diversified, thus makes in-built scheme have multiple choices, thus realizes the target of flexible design.
At present, the in-built modular Parametric designing popular software of industrialized house is the Revit of autodesk, inc., and this software is one of BIM software that usage degree is wider in the world, uses in a large number in industrialized house Parametric designing.Select Revit to carry out in-built modular design, make in-built design and architectural design, exterior design become complete Parametric designing system, the BIM shared platform that constructing function is powerful.
(2) division of in-built module, classification and marshalling:
Use for reference product module multi-angle classification Partition Theory, the in-built module of industrialized house has different dividing mode, and its angle is the different phase of in-built modularization Life cycle.When carrying out in-built Module Division towards modular design, partitioning standards is the correlativity of functions of modules, programming project is the Function Decomposition of in-built product, the tree-shaped system of now in-built module generation classification, and the framework of this tree-shaped system and the in-built modular architecture of existing industrialized house is similar; When carrying out in-built Module Division towards modularized production, emphasis considers the difficulty reducing the in-built module of processing and manufacturing, improves and manufactures efficiency and product quality; When carrying out in-built Module Division towards modular construction and maintenance management, optimizing the division methods of module, reducing the quantity of parts, reduce the complicacy of interface, make assembling and remove all simple and easy to do; When carrying out in-built Module Division towards modularization dismounting, considering the feature of environmental protection, maintainability, the recyclability according to material, carrying out that there is the division of recycling the in-built module of performance.
The division methods of the in-built module of desirable industrialized house towards in-built modularization Life cycle, should realize multiobject coordination.
In the process of in-built Module Division, module classification and marshalling are the necessary conditions of Module Division, and the factor affecting the in-built Module Division of industrialized house comprises the function of module, structure, module production, module assembly, cost control etc.In-built module is sorted out and the foundation of marshalling is Module recognition;
So-called qualitative analysis, carry out function and structure correlativity to each module of in-built product exactly to study, with the compactedness of the rank and relation of determining each module, wherein functional dependency relates generally to the effect of module in in-built use, and structural dependence relates generally to the relation of in-built module contact, connection and cooperation.Qualitative analysis also should consider factor and the cost control faces in in-built modularization overall process each stage.The advantage of qualitative analysis does not need various algorithm, and being easy to implement of Module Division and cluster is easy.This also causes the shortcoming of qualitative analysis simultaneously, and namely the method more relies on experience, has certain subjectivity, thus may cause Module Division science and rational shortcoming.
Compare with qualitative analysis, quantitative analysis method affects less by subjective factor, but the mathematical modeling of in-built module cluster and solution procedure very complicated, meanwhile, on data are determined and evaluated, also have an insurmountable difficult problem.In this context, the enforcement of in-built Module Division and fuzzy clustering is more conducive to based on the in-built module clustering method of rough set.Its " association factor " (Association Factor internally between die-filling piece, AF) rough analysis is carried out, association factor each other can be drawn, again according to the division principle of weak coupling between the module of strong coupling between same module subsystem internal module, disparate modules subsystem, in-built module larger for association factor is polymerized, forms module subsystem.
In the practical operation of the in-built Module Division of industrialized house, adopt the method that qualitative analysis is combined with quantitative test, namely according to the result of qualitative analysis, the association factor of binding modules, formed " the in-built module correlativity of industrialized house and association factor analytical table ", to carry out fuzzy clustering, realize the division of in-built module, classification and marshalling; In this table, be strong coupling between the in-built module that " corresponding scoring " score value is greater than 0.8, all the other are weak coupling;
The in-built module correlativity of industrialized house and association factor analytical table
Sequence number Strength of association Corresponding scoring Connection type Fit system
1 By force 1.0 Function, structure forever connect, and can not be split, as welding Become to be integrated after connecting, zero allowance
2 Stronger 0.8 Function is consistent, compact conformation, is difficult to split, as the connection adopting pressure fitted to set up Be combined with strict tolerance
3 Generally 0.6 Function is mutual, and structure is fixed, and is difficult to split, as keyway connects Be combined with tolerance
4 More weak 0.4 There is certain function mutual, be fixedly connected with, easily split, as bolt Be combined with dimensional requirement
5 Weak 0.2 Substantially independent, mobile link, removablely connects, as spring connects There is annexation, but without cooperation requirement
6 Nothing 0 Complete independence, does not have annexation Without coordinating
(3) structure in in-built module race storehouse:
The general introduction of in-built module race
" race " is an important concept in Revit Architecture, and it is the basis that in building or in-built project, various pel is formed.The be loaded into race of Revit Architecture is divided into three kinds: scale of construction race, model classification race, annotation categories race, and wherein model classification race is used for generating item object model pel, detail drawing component etc.
The component such as furniture, door, window in Revit Architecture project is all the model classification race that can be loaded into, and in-built modular design is the process of carrying out modeling with various model classification race.
Revit Architecture is not the special software of the in-built design of industrialized house, when this software is used for in-built modular design, model classification family parameter should meet modulus requirement, thus the component making this kind of race generate has modular characteristics, this race meeting modulus requirement can be called as " in-built module race ".These self-defining in-built module races organize according to other institutional framework of layered multi-stage, and form database, this database is in-built module race storehouse.
Another foundation of definition " in-built module race " concept is Product Design Theory " product family " concept.The essential distinction of these two concepts is, " product family " is the entity of a set product, and " in-built module race " is virtual variable entity.Nonetheless, " product family " based on same technology platform, there is relevance, modularization, theory in groups still have important reference value to " in-built module race ".
In conjunction with " product family " concept of " race " in Revit Architecture and Product Design Theory, can understand from following several respects " in-built module race ": 1. in-built module race is the data bank of in-built modular design, be not directly used in the structure of inside components product library, but can as the construction basis of product library; 2. " race " is family, is the set of several body, and these are individual because based on identical platform definition, therefore present form in groups; 3. the individuality that often group " race " is inner is all based on identical technology or has suitable relevance, and when concrete utilization is to in-built modular design, same group " race " creates based on same " model race "; 4. same " race's model " can define multiple different model classification race, with the flexible design theory unification mutually of module.
The general using method of in-built module race in the in-built modular design of industrialized house is: self-defined race is loaded in in-built project, named to race by " type attribute ", and the contents such as its dimensional parameters, material, structure are set, after type attribute is provided with, the form of die-filling piece within this race is placed in project, becomes the parts (component) of in-built project.Inside components in project can change its correlation parameter by the editor of " instance properties ", to meet the demand of in-built modeling.
The system of Revit Architecture has carried part furniture, light fixture, race that door and window is conventional, and the category in in-built module race is returned by these races; But due to the diversity of in-built module, and the imperfection of system database, when the in-built modular design of the industrialized house of reality, need to create a large amount of self-defined races of in-built module to meet design requirement;
There are two kinds of component modes in the race storehouse that self-defining in-built module race is formed: the first is newly-built race in Revit Architecture, and according to the difference of same clan's type similar in-built module adoption class in different file, the file in this race storehouse carries out arranging and naming according to level; It two is that self-defined race is loaded into after in in-built project, exists in Project browser with hierarchical tree structure; Above-mentioned the first be public in-built module race storehouse, it is not present in the concrete in-built project of Revit Architecture, may be used for any in-built project; The second is project in-built module race storehouse, only refers to the in-built module race storehouse of a certain detailed programs;
Public in-built module race storehouse is kept in computer hard disc or other mobile storage facilities, and its position stored determines its path; When in-built design needs, find this race according to certain path and be loaded in Revit Architecture project;
(4) in-built module race information model is set up:
The composition of in-built module race information model comprises correlation parameter in the hierarchical diagram of race, the type attribute of race and instance properties, and in-built module detail list;
In the decomposition and coding of product module, adopt the module partition method of layering, form a kind of product; The decomposition of the in-built module of industrialized house and coded reference said method, form the hierarchical diagram similar with product; According to this layering and coding method, industrialized house inside components successively decomposes, until form inseparable, to have independence sub-unit and web member, and the in-built module race corresponding with sub-unit and web member is in the end of the hierarchical diagram of race;
In Revit Architecture, based on System Families, carried out the establishment of in-built module race by " type attribute " panel of race, build its essential information; In in-built module detail list, by the setting of " detail list attribute ", improve in-built module race information model further;
(5) test and optimization of in-built modularized design scheme
In-built modularization overall process is the in-built modularized design scheme of industrialized house by the process of constantly test and optimization; Test and optimization by way of mainly containing three:
(1) test and optimization of design proposal is carried out by virtual construction
Virtual construction is that building course in kind essence on computers realizes, it adopts Computer Simulation and virtual reality, modeling technique, the high-performance computer utilizing workstation to be representative or computing machine group, carry out the simulation reconstruction of building course, with pinpoint the problems and take to remedy, preventive measure, avoid the loss of building course in kind;
The in-built modular design of industrialized house adopts parametrization means, flat, vertical, sectional view and three-dimensional model interrelated, synchronously generate; When using Revit Architecture to carry out in-built design, the modeling process flat, vertical, sectional view drawing process is also in-built three-dimensional model; Because this three-dimensional model is vector, the size dimension of all in-built module races, position relationship are by accurate Numerical Control, the numerical value when correlation values of three bit models is built with material object is consistent, and consistent when the annexation between in-built module race is also built with material object;
Industrialized house in-built modularization virtual construction is divided into static virtual construction and dynamic virtual construction two kinds of forms; Use Revit Architecture to carry out static virtual construction, can internally the quantity, specification, installation method etc. of die-filling piece test and optimize;
It is internally build the simulation made from work progress that in-built modularization dynamic virtual is built, and internally fills modular construction, in-built modularization management and the dismounting of in-built modularization and all has certain reference value; After installation NavisWorks, Revit item file can export as NWC formatted file, again this file NavisWorks is opened, construction simulation setting is carried out to relevant inside components, inside components can be shown according to the sequencing of set time, thus realize the target of dynamic virtual construction;
(2) test and optimization of design proposal is carried out by actual loading test means
The in-built product of industrialized house for mass production, completes in Design Fundamentals, and after carrying out virtual construction, further measuring means is that the trial-production of in-built module and trial assembly are joined, i.e. the actual loading test of in-built module; Actual loading test shows in-built design proposal to user, can listen to the suggestion of user so that optimizing design scheme on the one hand, on the other hand, for user provides the in-built product of variation, menu mode, selects, satisfying personalized in-built demand for user;
(3) scheme test and optimization is carried out in in-built modularization implementation process
Virtual construction and actual loading test belong to the necessary means of in-built modular design, are also the main paties of in-built modular arrangement test and optimization;
The complexity of in-built module body and structure, the fine degree of in-built Module Division can affect its speed of producing and efficiency, and in-built module can check the rationality of in-built Module Division in the process of plant produced; In-built modular construction process is the stage the most easily finding design problem after design proposal completes, and the problems such as the assembling convenience of in-built module, the order of installation all can come out; In-builtly complete in later use procedure, user and administration departments, according to the experience in actual use procedure, can propose reasonably suggestion to design proposal; Rational design proposal also should improve the ratio that can reuse parts as far as possible, and is ensureing under the prerequisite firmly connected, the difficulty reducing assembling by rational connected mode and remove.

Claims (1)

1., based on the in-built method for designing of building of BIM, it is characterized in that: comprise the following steps:
(1) Parametric designing:
Parametric designing refers to the size by changing a figure part or a few part, automatically the change to relevant portion in figure is completed, thus realizing the driving of size to figure, the geological information needed for wherein driving and topology information are by Computer Automatic Extraction; Operation parameter design means in the in-built design of industrialized house, when change at a certain view the size of a certain module, position or shape time, in all the other views, the size of same module, position or shape synchronously produce corresponding change automatically, simultaneously, in inside components detail list, related data also can make respective change;
Select the Revit software of autodesk, inc. to carry out in-built modular design, make in-built design and architectural design, exterior design become complete Parametric designing system, the BIM shared platform that constructing function is powerful;
(2) division of in-built module, classification and marshalling:
In the process of in-built Module Division, module classification and marshalling are the necessary conditions of Module Division, and the factor affecting the in-built Module Division of industrialized house comprises the function of module, structure, module production, module assembly, cost control; In-built module is sorted out and the foundation of marshalling is Module recognition;
In the practical operation of the in-built Module Division of industrialized house, adopt the method that qualitative analysis is combined with quantitative test, namely according to the result of qualitative analysis, the association factor of binding modules, formed " the in-built module correlativity of industrialized house and association factor analytical table ", to carry out fuzzy clustering, realize the division of in-built module, classification and marshalling; In this table, be strong coupling between the in-built module that " corresponding scoring " score value is greater than 0.8, all the other are weak coupling;
The in-built module correlativity of industrialized house and association factor analytical table
(3) structure in in-built module race storehouse:
The system of Revit Architecture has carried part furniture, light fixture, race that door and window is conventional, and the category in in-built module race is returned by these races; But due to the diversity of in-built module, and the imperfection of system database, when the in-built modular design of the industrialized house of reality, need to create a large amount of self-defined races of in-built module to meet design requirement;
There are two kinds of component modes in the race storehouse that self-defining in-built module race is formed: the first is newly-built race in Revit Architecture, and according to the difference of same clan's type similar in-built module adoption class in different file, the file in this race storehouse carries out arranging and naming according to level; It two is that self-defined race is loaded into after in in-built project, exists in Project browser with hierarchical tree structure; Above-mentioned the first be public in-built module race storehouse, it is not present in the concrete in-built project of Revit Architecture, may be used for any in-built project; The second is project in-built module race storehouse, only refers to the in-built module race storehouse of a certain detailed programs;
Public in-built module race storehouse is kept in computer hard disc or other mobile storage facilities, and its position stored determines its path; When in-built design needs, find this race according to certain path and be loaded in Revit Architecture project;
(4) in-built module race information model is set up:
The composition of in-built module race information model comprises correlation parameter in the hierarchical diagram of race, the type attribute of race and instance properties, and in-built module detail list;
In the decomposition and coding of product module, adopt the module partition method of layering, form a kind of product; The decomposition of the in-built module of industrialized house and coded reference said method, form the hierarchical diagram similar with product; According to this layering and coding method, industrialized house inside components successively decomposes, until form inseparable, to have independence sub-unit and web member, and the in-built module race corresponding with sub-unit and web member is in the end of the hierarchical diagram of race;
In Revit Architecture, based on System Families, carried out the establishment of in-built module race by " type attribute " panel of race, build its essential information; In in-built module detail list, by the setting of " detail list attribute ", improve in-built module race information model further;
(5) test and optimization of in-built modularized design scheme
In-built modularization overall process is the in-built modularized design scheme of industrialized house by the process of constantly test and optimization; Test and optimization by way of mainly containing three:
(1) test and optimization of design proposal is carried out by virtual construction
Virtual construction is that building course in kind essence on computers realizes, it adopts Computer Simulation and virtual reality, modeling technique, the high-performance computer utilizing workstation to be representative or computing machine group, carry out the simulation reconstruction of building course, with pinpoint the problems and take to remedy, preventive measure, avoid the loss of building course in kind;
The in-built modular design of industrialized house adopts parametrization means, flat, vertical, sectional view and three-dimensional model interrelated, synchronously generate; When using Revit Architecture to carry out in-built design, the modeling process flat, vertical, sectional view drawing process is also in-built three-dimensional model; Because this three-dimensional model is vector, the size dimension of all in-built module races, position relationship are by accurate Numerical Control, the numerical value when correlation values of three bit models is built with material object is consistent, and consistent when the annexation between in-built module race is also built with material object;
Industrialized house in-built modularization virtual construction is divided into static virtual construction and dynamic virtual construction two kinds of forms; Use Revit Architecture to carry out static virtual construction, can internally the quantity, specification, installation method etc. of die-filling piece test and optimize;
It is internally build the simulation made from work progress that in-built modularization dynamic virtual is built, and internally fills modular construction, in-built modularization management and the dismounting of in-built modularization and all has certain reference value; After installation NavisWorks, Revit item file can export as NWC formatted file, again this file NavisWorks is opened, construction simulation setting is carried out to relevant inside components, inside components can be shown according to the sequencing of set time, thus realize the target of dynamic virtual construction;
(2) test and optimization of design proposal is carried out by actual loading test means
The in-built product of industrialized house for mass production, completes in Design Fundamentals, and after carrying out virtual construction, further measuring means is that the trial-production of in-built module and trial assembly are joined, i.e. the actual loading test of in-built module; Actual loading test shows in-built design proposal to user, can listen to the suggestion of user so that optimizing design scheme on the one hand, on the other hand, for user provides the in-built product of variation, menu mode, selects, satisfying personalized in-built demand for user;
(3) scheme test and optimization is carried out in in-built modularization implementation process
Virtual construction and actual loading test belong to the necessary means of in-built modular design, are also the main paties of in-built modular arrangement test and optimization;
The complexity of in-built module body and structure, the fine degree of in-built Module Division can affect its speed of producing and efficiency, and in-built module can check the rationality of in-built Module Division in the process of plant produced; In-built modular construction process is the stage the most easily finding design problem after design proposal completes, and the problems such as the assembling convenience of in-built module, the order of installation all can come out; In-builtly complete in later use procedure, user and administration departments, according to the experience in actual use procedure, can propose reasonably suggestion to design proposal; Rational design proposal also should improve the ratio that can reuse parts as far as possible, and is ensureing under the prerequisite firmly connected, the difficulty reducing assembling by rational connected mode and remove.
CN201510395910.9A 2015-07-07 2015-07-07 Method for designing interior decoration of building based on BIM Pending CN104933265A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510395910.9A CN104933265A (en) 2015-07-07 2015-07-07 Method for designing interior decoration of building based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510395910.9A CN104933265A (en) 2015-07-07 2015-07-07 Method for designing interior decoration of building based on BIM

Publications (1)

Publication Number Publication Date
CN104933265A true CN104933265A (en) 2015-09-23

Family

ID=54120431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510395910.9A Pending CN104933265A (en) 2015-07-07 2015-07-07 Method for designing interior decoration of building based on BIM

Country Status (1)

Country Link
CN (1) CN104933265A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105389301A (en) * 2015-11-11 2016-03-09 深圳市华阳国际工程设计股份有限公司 BIM data based method and system for generating operation and maintenance form
CN105404714A (en) * 2015-10-28 2016-03-16 北京海颐威工程技术有限公司 Method and apparatus for in-place modification of member position in modeling software
CN105426601A (en) * 2015-11-11 2016-03-23 深圳市华阳国际工程设计股份有限公司 Diversity design scheme reporting method and system based on BIM (Building Information Modeling)
CN105447226A (en) * 2015-11-11 2016-03-30 深圳市华阳国际工程设计股份有限公司 BIM based house type parameterized design control method and system
CN105956310A (en) * 2016-05-16 2016-09-21 中建安装工程有限公司 Technology for electromechanical modularized design and combined installation
CN106021674A (en) * 2016-05-10 2016-10-12 扬州大学 BIM technology-based construction project interactive design method
CN106649908A (en) * 2016-04-21 2017-05-10 广州华森建筑与工程设计顾问有限公司 Parametric architectural design method based on design logic
CN106971028A (en) * 2017-03-10 2017-07-21 福州众衡时代信息科技有限公司 It is a kind of that virtual reality technology is used for the method for assembled architecture industry
CN107145695A (en) * 2017-06-27 2017-09-08 中建局集团建设发展有限公司 A kind of parametric modeling production method of fabricated shear wall structure prefabricated outer wall panel
CN107292038A (en) * 2017-06-27 2017-10-24 中建局集团建设发展有限公司 A kind of parametric modeling production method for overlapping plate prefabricated member
CN107908909A (en) * 2017-12-18 2018-04-13 云南昆船设计研究院有限公司 A kind of architectural design method based on PDM
CN108428194A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of management method and device of the building material processing dispatching based on BIM
CN108520082A (en) * 2018-01-12 2018-09-11 上海城乡建筑设计院有限公司 A kind of application process of Revit parametrizations race in electrical design
CN108959694A (en) * 2018-05-17 2018-12-07 青岛理工大学 BIM geometric model construction method for large-volume complex building
CN109118405A (en) * 2018-07-12 2019-01-01 深圳市建筑设计研究总院有限公司 Speed selects platform and method on a kind of public health space industrialization line
CN109408907A (en) * 2018-09-30 2019-03-01 夏阳 A kind of method and apparatus manufacturing three-dimensional building mock-up
CN110765521A (en) * 2019-10-11 2020-02-07 万翼科技有限公司 Forced elimination method and system based on artificial intelligence and BIM
CN111597610A (en) * 2020-04-29 2020-08-28 成都建筑材料工业设计研究院有限公司 Method for realizing rapid modeling of nonstandard parts in BIM design of cement plant by utilizing Dynamo
CN111859499A (en) * 2020-06-19 2020-10-30 中建集成建筑有限公司 Design system of modularized box type integrated house and operation method thereof
CN114036619A (en) * 2021-11-18 2022-02-11 广东天元建筑设计有限公司 BIM-based housing modular design method and device and computer storage medium
CN116432477A (en) * 2023-06-12 2023-07-14 临沂大学 BIM-based construction simulation method, system and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8886348B2 (en) * 2011-05-25 2014-11-11 Kevin Bollendorf Fabrication and tracking
CN104217065A (en) * 2014-07-28 2014-12-17 成都市第四建筑工程公司 BIM technology-based drawing reviewing system and method
US8954479B2 (en) * 2012-06-13 2015-02-10 International Business Machines Corporation End-to-end interoperability and workflows from building architecture design to one or more simulations
CN104484524A (en) * 2014-12-09 2015-04-01 张家驰 Method and system based on BIM (building information modeling) simulation model and in-site construction interaction
CN104680322A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 Project acceptance system and method based on BIM

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8886348B2 (en) * 2011-05-25 2014-11-11 Kevin Bollendorf Fabrication and tracking
US8954479B2 (en) * 2012-06-13 2015-02-10 International Business Machines Corporation End-to-end interoperability and workflows from building architecture design to one or more simulations
CN104217065A (en) * 2014-07-28 2014-12-17 成都市第四建筑工程公司 BIM technology-based drawing reviewing system and method
CN104484524A (en) * 2014-12-09 2015-04-01 张家驰 Method and system based on BIM (building information modeling) simulation model and in-site construction interaction
CN104680322A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 Project acceptance system and method based on BIM

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
AUTODESK INC.: "Autodesk Revit Architecture 2010官方标准教程", 《AUTODESK REVIT ARCHITECTURE 2010官方标准教程》 *
李玉鹏等: "基于粗糙集的模块聚类方法及应用", 《机械设计与研究》 *
黄亚斌等: "Autodesk Revit Architecture实例详解", 《AUTODESK REVIT ARCHITECTURE实例详解》 *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105404714A (en) * 2015-10-28 2016-03-16 北京海颐威工程技术有限公司 Method and apparatus for in-place modification of member position in modeling software
CN105404714B (en) * 2015-10-28 2019-01-15 北京瀚方伟业工程技术有限公司 A kind of method and apparatus for modifying member position in place in modeling software
CN105426601A (en) * 2015-11-11 2016-03-23 深圳市华阳国际工程设计股份有限公司 Diversity design scheme reporting method and system based on BIM (Building Information Modeling)
CN105447226A (en) * 2015-11-11 2016-03-30 深圳市华阳国际工程设计股份有限公司 BIM based house type parameterized design control method and system
CN105426601B (en) * 2015-11-11 2019-04-23 深圳市华阳国际工程设计股份有限公司 A kind of diverse designs scheme method for reporting and its system based on BIM
CN105389301A (en) * 2015-11-11 2016-03-09 深圳市华阳国际工程设计股份有限公司 BIM data based method and system for generating operation and maintenance form
CN106649908B (en) * 2016-04-21 2018-10-09 广州华森建筑与工程设计顾问有限公司 Parametrization architectural design engineering method based on design logic
CN106649908A (en) * 2016-04-21 2017-05-10 广州华森建筑与工程设计顾问有限公司 Parametric architectural design method based on design logic
CN106021674A (en) * 2016-05-10 2016-10-12 扬州大学 BIM technology-based construction project interactive design method
CN105956310A (en) * 2016-05-16 2016-09-21 中建安装工程有限公司 Technology for electromechanical modularized design and combined installation
CN106971028A (en) * 2017-03-10 2017-07-21 福州众衡时代信息科技有限公司 It is a kind of that virtual reality technology is used for the method for assembled architecture industry
CN107145695A (en) * 2017-06-27 2017-09-08 中建局集团建设发展有限公司 A kind of parametric modeling production method of fabricated shear wall structure prefabricated outer wall panel
CN107292038A (en) * 2017-06-27 2017-10-24 中建局集团建设发展有限公司 A kind of parametric modeling production method for overlapping plate prefabricated member
CN108428194A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of management method and device of the building material processing dispatching based on BIM
CN107908909A (en) * 2017-12-18 2018-04-13 云南昆船设计研究院有限公司 A kind of architectural design method based on PDM
CN108520082A (en) * 2018-01-12 2018-09-11 上海城乡建筑设计院有限公司 A kind of application process of Revit parametrizations race in electrical design
CN108959694A (en) * 2018-05-17 2018-12-07 青岛理工大学 BIM geometric model construction method for large-volume complex building
CN109118405A (en) * 2018-07-12 2019-01-01 深圳市建筑设计研究总院有限公司 Speed selects platform and method on a kind of public health space industrialization line
CN109408907A (en) * 2018-09-30 2019-03-01 夏阳 A kind of method and apparatus manufacturing three-dimensional building mock-up
CN109408907B (en) * 2018-09-30 2020-01-07 夏阳 Method and device for manufacturing three-dimensional building physical model
CN110765521A (en) * 2019-10-11 2020-02-07 万翼科技有限公司 Forced elimination method and system based on artificial intelligence and BIM
CN111597610A (en) * 2020-04-29 2020-08-28 成都建筑材料工业设计研究院有限公司 Method for realizing rapid modeling of nonstandard parts in BIM design of cement plant by utilizing Dynamo
CN111597610B (en) * 2020-04-29 2020-11-17 成都建筑材料工业设计研究院有限公司 Method for realizing rapid modeling of nonstandard parts in BIM design of cement plant by utilizing Dynamo
CN111859499A (en) * 2020-06-19 2020-10-30 中建集成建筑有限公司 Design system of modularized box type integrated house and operation method thereof
CN111859499B (en) * 2020-06-19 2024-03-01 中建集成建筑有限公司 Design system of modularized box-type integrated house and operation method thereof
CN114036619A (en) * 2021-11-18 2022-02-11 广东天元建筑设计有限公司 BIM-based housing modular design method and device and computer storage medium
CN116432477A (en) * 2023-06-12 2023-07-14 临沂大学 BIM-based construction simulation method, system and storage medium
CN116432477B (en) * 2023-06-12 2023-08-18 临沂大学 BIM-based construction simulation method, system and storage medium

Similar Documents

Publication Publication Date Title
CN104933265A (en) Method for designing interior decoration of building based on BIM
CN104915524A (en) BIM-based interior module group library construction method for building interior design
WO2022257099A1 (en) Prefabricated building intelligent drawing output method based on bim
US6871108B2 (en) System and method for creating a representation of an assembly
CN103020393B (en) Aircraft assembly data visualization method based on Web
Eastman Modeling of buildings: evolution and concepts
CN108959694A (en) BIM geometric model construction method for large-volume complex building
CN114580083A (en) Construction method of intelligent assembly system based on digital twins
Kang et al. BIM-based data mining method considering data integration and function extension
CN115713161A (en) Building information management system based on BIM technology
CN104598697A (en) Construction method of product simulation three-dimensional model
CN105718628A (en) Tolerance technology-oriented assembly geometric element error transfer diagram representation and construction method
Ham et al. A study on application of bim (building information modeling) to pre-design in construction project
CN118278094B (en) Building three-dimensional model calculation method and system based on database
Jiang et al. Semantic enrichment for BIM: Enabling technologies and applications
Eastman Recent developments in representation in the science of design
CN104143215B (en) Informatization model design method of cable-membrane structure
CN114155341A (en) Cross-platform consistency method for three-dimensional model of large-scale digital workshop based on Unity platform
Xue Integration of CAD/CAPP/CAM
Ssemakula et al. Application of PDES to CAD/CAPP integration
CN104915525A (en) Verification and optimization method for built-in modular design scheme
CN102629278A (en) Semantic annotation and searching method based on problem body
CN103984784B (en) Diagram-model integrated visualization method and system for nuclear power plant
Ermolenko Algorithm-aided Information Design: Hybrid Design approach on the edge of Associative Methodologies in AEC
CN112395677A (en) Construction method of civil engineering BIM (building information modeling) engineering quantity model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150923

RJ01 Rejection of invention patent application after publication