CN104931802A CN201510133106.3A CN201510133106A CN104931802A CN 104931802 A CN104931802 A CN 104931802A CN 201510133106 A CN201510133106 A CN 201510133106A CN 104931802 A CN104931802 A CN 104931802A
Authority
CN
China
Prior art keywords
phase
user power
power utilization
load
utilization terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510133106.3A
Other languages
Chinese (zh)
Inventor
蒋秀
陈永秋
李锐然
黄荣旭
胡小伦
何南生
李威强
隋大奇
黄光炎
冯志坚
赵国荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201510133106.3A priority Critical patent/CN104931802A/en
Publication of CN104931802A publication Critical patent/CN104931802A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention discloses an outgoing line load three-phase integration protection, regulation and control method which obtains the power consumption data of a user power consumption terminal, determines whether the user power consumption terminal generates the three-phase unbalance according to a three-phase unbalance degree, if the user power consumption terminal is determined to generate the three-phase unbalance, carries out the three-phase balance degree optimization on the user power consumption terminal according to a preset balance parameter and the three-phase unbalance degree. By the above technical scheme, the balance of cooperating the three-phase load can be realized, the anomalous change of power supply voltage and current is prevented from burning out the power consumption equipment, at the same time, the line loss is reduced effectively. Meanwhile, a multi-stage line loss statistics analysis method of public transformer power supply range-outgoing line branch-branch single phase-terminal load can be formed to analyze the line loss data and specific gravity of each stage and position the line loss reasons accurately, and the elaborate line loss management measures can be made for various conditions, such as overload operation, three-phase load unbalance, electricity steal, electric leakage, inaccurate metering, etc., thereby improving the electric energy utilization efficiency.

Description

One goes out specific electric load three-phase set and becomes protection regulate and control method
Technical field
The present invention relates to the technical field of power distribution network, particularly relate to one and go out specific electric load three-phase set one-tenth protection regulate and control method.
Background technology
Along with the widespread use of Power Electronic Technique at electric power and the access of all kinds of novel electric power load, a large amount of non-linear, impact, wavy load is added in electric power system, cause power network current, voltage waveform that distortion and harmonic pollution occur, three-phase imbalance is on the rise, electric energy loss is caused to increase the weight of, the security of power consumption equipment reduces, and weakens reliability and the economy of operation of power networks.China to the research of intelligent grid with relatively evening of start to walk is discussed, but the research and development of concrete intelligent power grid technology and application aspect substantially and advanced international standard synchronous.The above electrical network of China's local level all achieves dispatching automation, 35 more than kV transformer stations substantially all achieve the integrated automation of transformation stations, You200Duo Ge prefecture-level city has built electrical power distribution automatization system, specially become for 10kV and brought negative Ore-controlling Role into, 10kV public affairs become and end loads includes electricity centralized meter-reading system in.But the 380V distribution line wide and the most complicated to distribution, current all not good means carry out comprehensive automation management.
Tradition " quartile damages " management mainly for still 10kV and Above Transmission Lines, Gong Biantai district 0.4kV distribution line loss is also carry out holistic management according to platform district, and often 0.4kV low-voltage distribution network is that line loss accounts for the largest percentage, it is also the part lacking direct ladder of management most He have greatest improvement space.
Summary of the invention
The present invention proposes one and goes out specific electric load three-phase set one-tenth protection regulate and control method, can realize the balance coordinating three-phase load, prevents the ANOMALOUS VARIATIONS of supply voltage and electric current and burn consumer, effectively reduce line loss simultaneously.
The present invention realizes above-mentioned purpose like this:
One goes out specific electric load three-phase set and becomes protection regulate and control method, it is characterized in that, comprises the following steps:
First, the electricity consumption data of user power utilization terminal are obtained;
Then, according to described tri-phase unbalance factor, judge whether described user power utilization terminal three-phase imbalance occurs;
As judged user power utilization terminal generation three-phase imbalance, then according to the balance parameters preset and described tri-phase unbalance factor, the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal.
Wherein, the tri-phase unbalance factor calculating described user power utilization terminal obtains according to the three phase power of electricity consumption data; As tri-phase unbalance factor exceedes default threshold value, then determine described user power utilization terminal generation three-phase imbalance.
Wherein, the balance parameters that described basis is preset and described tri-phase unbalance factor, the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal, be specially: according to the balance parameters preset and described tri-phase unbalance factor, calculate balance three-phase load, calculate each migration electricity relative to balance three-phase load again, according to described migration electricity, the optimization of three-phase equilibrium degree is carried out to user terminal.
Wherein, when judging user power utilization terminal generation three-phase imbalance, also calculate the residual current of three-phase electricity consumption uncompensated load; According to described residual current, alarm is carried out to described user power utilization terminal.
Wherein, described the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal after, also comprise: show to user the execution result that described three-phase equilibrium degree optimizes, and report the optimization of described three-phase equilibrium degree to described higher level main website.
The invention has the beneficial effects as follows: by obtaining the electricity consumption data of user power utilization terminal, then according to these electricity consumption data, calculating the tri-phase unbalance factor of user power utilization terminal, then according to tri-phase unbalance factor, judging whether user power utilization terminal three-phase imbalance occurs.If so, then according to the balance parameters preset and tri-phase unbalance factor, the optimization of three-phase equilibrium degree is carried out to user power utilization terminal.Technical solution of the present invention can realize the balance coordinating three-phase load, prevents the ANOMALOUS VARIATIONS of supply voltage and electric current and burns consumer, effectively reduces line loss simultaneously.
In addition; of the present invention go out specific electric load three-phase set become the protection line loss of regulate and control method to Gong Biantai district to monitor; line loss statistics is decomposed multistage electricity consumption region further; form the multistage line loss statistical analysis technique of " Gong Biantai district-outlet shunt-single-phase-end loads along separate routes "; according to detailed line loss data; analyze line loss data at different levels and proportion; accurate location line loss reason; respectively for overload operation, three-phase load unbalance, tax evasion electricity and measure the various situations such as inaccurate; formulate the Controlling line loss measure become more meticulous, improve efficiency.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described:
Fig. 1 is schematic flow sheet of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
See Fig. 1, Fig. 1 be provided by the invention go out specific electric load three-phase set become protection regulate and control method schematic flow sheet, the method comprises the following steps:
Step 101: the electricity consumption data obtaining user power utilization terminal.
In the present embodiment, user power utilization terminal gathers the real-time electricity consumption data of subscriber equipment, comprising: the real time data such as the three-phase voltage of high end load, electric current, meritorious, idle, power factor, residual voltage, electric current, active energy, capacity of idle power, Voltage unbalance rate; Maximum load rate, the highest minimum voltage value and time of occurrence, the appearance of the highest minimum current value and time, the highest minimum load value and time of occurrence, rate of qualified voltage, the historical data such as maximum unbalance rate and time.
Power-supply unit obtains the electricity consumption data that this user terminal gathers, thus carries out the optimization of three-phase equilibrium degree according to described electricity consumption data.
Step 102: according to described electricity consumption data, calculates the tri-phase unbalance factor of user power utilization terminal.
In the present embodiment, the present invention, specifically according to the three phase power of electricity consumption data, calculates the tri-phase unbalance factor of user power utilization terminal.For example, in three-phase circuit, due to A, B, the ruuning situation of each circuitry phase of C is inconsistent, causes the effective rate of utilization of circuit not reach maximum, if A, B, C three phase power is respectively Ia, Ib, Ic, then the tri-phase unbalance factor of electric current is [Max(Ia, Ib, Ic)-avg(Ia, Ib, Ic)]/avg(Ia, Ib, Ic), in like manner the tri-phase unbalance factor account form of power is consistent.
Step 103: according to tri-phase unbalance factor, judges whether user power utilization terminal three-phase imbalance occurs.If so, then step 104 is performed, if not, return step 103.
In the present embodiment, judge whether tri-phase unbalance factor exceedes default threshold value, if so, then determine user power utilization terminal generation three-phase imbalance, otherwise, determine that described user terminal is three-phase equilibrium.For example, the threshold value of setting is 20%, if the value of tri-phase unbalance factor is greater than 20%, so this district then needs to be optimized, otherwise this district's electricity consumption situation does not need to be optimized, user can arrange the size of this threshold value according to actual needs, to meet the demand of actual conditions.
Step 104: according to the balance parameters preset and tri-phase unbalance factor, the optimization of three-phase equilibrium degree is carried out to user power utilization terminal.
In the present embodiment, according to the balance parameters preset and described tri-phase unbalance factor, calculate balance three-phase load, then calculate each migration electricity relative to balance three-phase load, according to migration electricity, the optimization of three-phase equilibrium degree is carried out to user terminal.For example, according to A, B, C three-phase load, calculate balance three-phase load, then A, B, C phase will be calculated respectively relative to the migration electricity of balance three-phase load, by the electricity of migration and separate, realize three-phase equilibrium optimization.
In the present embodiment, because all low pressure large users are phase three-wire three or four lines, when therefore optimizing and revising, no longer remind and user moved separate, but reminding user should from certain separate load certain to other separate migrations.
In the present embodiment, judging whether user power utilization terminal three-phase imbalance occurs, and when determining user power utilization terminal generation three-phase imbalance, also comprising: the residual current calculating three-phase electricity consumption uncompensated load, and according to described residual current, alarm and control are carried out to user power utilization terminal.The present invention adopts three-phase power balance control technique, according to the load electricity consumption situation in feedback line loop, in conjunction with the parameter request of coulomb balance, the residual current of the three-phase electricity consumption uncompensated load that customizable permission is recorded separately, carries out corresponding single-phase load alarm and control.
In the present embodiment, remote measurement amount is stored a historical data to analog table by system 5 minutes, compares, can obtain following information according to the termination capacity in these moment and the capacity of user: a, within one day, have the super appearance of how many time point loads; B, super T.T. (total super hold time point * 5 minutes) of holding in one day; C, one day maximum load value are how many.When carrying out alarm to user, can listed for these information form be showed on interface, be drawn as curve simultaneously and show.When user power utilization terminal to the line loss per unit one day of user more than 20%, then " warning " remind, within continuous three days, exceed, provide " power-off " and remind.
In the present embodiment, after the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal, the execution result of described three-phase equilibrium degree optimization can also be shown to user, and superior main website reports the optimization of three-phase equilibrium degree.Higher level main website can carry out statistical study to the data reported of each power-supply unit, according to load customization power regulation technology, the rated capacity that customizable electric intelligent terminal can be declared according to user, setting exceeds electricity consumption ratio and carries out single-phase and Load Regulation that is three-phase, independently can set the amendment that corresponding control mode and controling parameters are carried out in field planting float factor, alarm number of times and the instruction such as reclosing number of times and interval time, and notify client by aural warning.
In the present embodiment, higher level main website can according to reported result statistical line losses situation, according to detailed line loss data, analyze line loss data at different levels and proportion, accurate location line loss reason, respectively for overload operation, three-phase load unbalance, tax evasion electricity and measure the various situations such as inaccurate, formulate the Controlling line loss measure that becomes more meticulous, improve efficiency.
In the present embodiment, have multiple account form, active loss electricity in existing main consideration circuit, line loss calculation comprises meritorious line loss calculation and idle line loss calculation, and has two kinds of account forms.Line loss electricity calculates the mode adopted two kinds, respectively: calculate theoretical line loss according to the parameter such as line length, resistance, be referred to as theory wire loss electricity and calculate, and according to two ends metering circuit in actual track, calculate the circuit of loss in circuit, be referred to as active loss electricity and calculate.
Therefore; the one that the embodiment of the present invention provides goes out specific electric load three-phase set and becomes protection regulate and control method; by obtaining the electricity consumption data of user power utilization terminal; again according to these electricity consumption data; calculate the tri-phase unbalance factor of user power utilization terminal; then according to tri-phase unbalance factor, judge whether user power utilization terminal three-phase imbalance occurs.If so, then according to the balance parameters preset and tri-phase unbalance factor, the optimization of three-phase equilibrium degree is carried out to user power utilization terminal.Technical solution of the present invention can realize the balance coordinating three-phase load, prevents the ANOMALOUS VARIATIONS of supply voltage and electric current and burns consumer, effectively reduces line loss simultaneously.
In addition; of the present invention go out specific electric load three-phase set become the protection line loss of regulate and control method to Gong Biantai district to monitor; line loss statistics is decomposed multistage electricity consumption region further; form the multistage line loss statistical analysis technique of " Gong Biantai district-outlet shunt-single-phase-end loads along separate routes "; according to detailed line loss data; analyze line loss data at different levels and proportion; accurate location line loss reason; respectively for overload operation, three-phase load unbalance, tax evasion electricity and measure the various situations such as inaccurate; formulate the Controlling line loss measure become more meticulous, improve efficiency.
One of ordinary skill in the art will appreciate that all or part of flow process realized in above-described embodiment method, that the hardware that can carry out instruction relevant by computer program has come, described program can be stored in a computer read/write memory medium, this program, when performing, can comprise the flow process of the embodiment as above-mentioned each side method.Wherein, described storage medium can be magnetic disc, CD, read-only store-memory body (Read-Only Memory, ROM) or random store-memory body (Random Access Memory, RAM) etc.
The above is the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications are also considered as protection scope of the present invention.

Claims (5)

1. go out specific electric load three-phase set and become a protection regulate and control method, it is characterized in that, comprise the following steps:
First, the electricity consumption data of user power utilization terminal are obtained;
Then, according to described tri-phase unbalance factor, judge whether described user power utilization terminal three-phase imbalance occurs;
As judged user power utilization terminal generation three-phase imbalance, then according to the balance parameters preset and described tri-phase unbalance factor, the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal.
2. one according to claim 1 goes out specific electric load three-phase set and becomes protection regulate and control method, it is characterized in that: the tri-phase unbalance factor calculating described user power utilization terminal obtains according to the three phase power of electricity consumption data;
As tri-phase unbalance factor exceedes default threshold value, then determine described user power utilization terminal generation three-phase imbalance.
3. one according to claim 1 goes out specific electric load three-phase set and becomes protection regulate and control method; it is characterized in that: the balance parameters that described basis is preset and described tri-phase unbalance factor; the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal; be specially: according to the balance parameters preset and described tri-phase unbalance factor; calculate balance three-phase load; calculate each migration electricity relative to balance three-phase load again, according to described migration electricity, the optimization of three-phase equilibrium degree is carried out to user terminal.
4. one according to claim 1 goes out specific electric load three-phase set and becomes protection regulate and control method, it is characterized in that: when judging user power utilization terminal generation three-phase imbalance, also calculates the residual current of three-phase electricity consumption uncompensated load; According to described residual current, alarm is carried out to described user power utilization terminal.
5. one according to claim 1 goes out specific electric load three-phase set and becomes protection regulate and control method; it is characterized in that: described the optimization of three-phase equilibrium degree is carried out to described user power utilization terminal after; also comprise: the execution result showing the optimization of described three-phase equilibrium degree to user, and report the optimization of described three-phase equilibrium degree to described higher level main website.
CN201510133106.3A 2015-03-26 2015-03-26 Outgoing line load three-phase integration protection, regulation and control method Pending CN104931802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510133106.3A CN104931802A (en) 2015-03-26 2015-03-26 Outgoing line load three-phase integration protection, regulation and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510133106.3A CN104931802A (en) 2015-03-26 2015-03-26 Outgoing line load three-phase integration protection, regulation and control method

Publications (1)

Publication Number Publication Date
CN104931802A true CN104931802A (en) 2015-09-23

Family

ID=54119061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510133106.3A Pending CN104931802A (en) 2015-03-26 2015-03-26 Outgoing line load three-phase integration protection, regulation and control method

Country Status (1)

Country Link
CN (1) CN104931802A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109217341A (en) * 2018-10-09 2019-01-15 郑州云海信息技术有限公司 A kind of appraisal procedure and system of data center's tri-phase unbalance factor
CN110135650A (en) * 2019-05-21 2019-08-16 华北水利水电大学 The method of online planning stage low-voltage distribution system three-phase load optimization balanced arrangement
CN110518605A (en) * 2019-08-28 2019-11-29 国网上海市电力公司 A kind of area's three-phase equilibrium depth optimization method and system

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286654A (en) * 2008-02-01 2008-10-15 清华大学 Energy saver for intelligent control of power system load transfer
CN101635456A (en) * 2009-06-23 2010-01-27 上海申瑞电力科技股份有限公司 Method for joint state estimation of transmission network and distribution network
CN201532431U (en) * 2009-11-04 2010-07-21 刘俊昌 Indicating alarm detecting the residual current on-line
CN201562975U (en) * 2009-10-28 2010-08-25 王照晨 Three-phase load balancing device
CN102394501A (en) * 2011-03-18 2012-03-28 北京潞能麒麟电力设备有限公司 Energy-saving method and device based on power grid load dynamic balance
CN102636717A (en) * 2012-04-27 2012-08-15 江苏省电力公司徐州供电公司 Portable three-phase load acquisition recorder for low-pressure multipath outgoing cable
CN202424178U (en) * 2011-12-14 2012-09-05 河南省电力公司新乡供电公司 Three-phase load imbalance adjusting switch
KR101219544B1 (en) * 2011-05-25 2013-01-09 주식회사 파워이십일 Optimised connection interpretive method of distribution line connection
CN103354361A (en) * 2013-06-19 2013-10-16 国家电网公司 Low-voltage three-phase load automation balancing device
CN103474985A (en) * 2013-06-27 2013-12-25 国家电网公司 Realization method for function of adaptive load type distribution transformer
CN103545827A (en) * 2013-10-25 2014-01-29 国家电网公司 Method for three-phase imbalance load distribution suitable for low-voltage distribution network
CN103545921A (en) * 2013-09-24 2014-01-29 许继集团有限公司 Urban distribution transformer area autonomous control optimization power system and monitoring system thereof
CN104092229A (en) * 2014-07-14 2014-10-08 山东卓尔电气有限公司 Distributed type power supply zone branch circuit three-phase load current balance monitoring method and device
CN104113058A (en) * 2013-04-22 2014-10-22 上海市电力公司 Method for calculating power distribution low-voltage line loss
CN104124761A (en) * 2014-08-15 2014-10-29 杭州智光一创科技有限公司 Low-voltage big user integrated protection control method for power distribution network
CN104242326A (en) * 2013-06-18 2014-12-24 李春明 Three-phase load balancer
CN204089210U (en) * 2014-08-29 2015-01-07 国家电网公司 A kind of three-phase load unbalance adjusting device
CN104362637A (en) * 2014-12-03 2015-02-18 广东电网有限责任公司电力科学研究院 Low-voltage platform region intelligent management method based on forward-backward substitution algorithm

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286654A (en) * 2008-02-01 2008-10-15 清华大学 Energy saver for intelligent control of power system load transfer
CN101635456A (en) * 2009-06-23 2010-01-27 上海申瑞电力科技股份有限公司 Method for joint state estimation of transmission network and distribution network
CN201562975U (en) * 2009-10-28 2010-08-25 王照晨 Three-phase load balancing device
CN201532431U (en) * 2009-11-04 2010-07-21 刘俊昌 Indicating alarm detecting the residual current on-line
CN102394501A (en) * 2011-03-18 2012-03-28 北京潞能麒麟电力设备有限公司 Energy-saving method and device based on power grid load dynamic balance
KR101219544B1 (en) * 2011-05-25 2013-01-09 주식회사 파워이십일 Optimised connection interpretive method of distribution line connection
CN202424178U (en) * 2011-12-14 2012-09-05 河南省电力公司新乡供电公司 Three-phase load imbalance adjusting switch
CN102636717A (en) * 2012-04-27 2012-08-15 江苏省电力公司徐州供电公司 Portable three-phase load acquisition recorder for low-pressure multipath outgoing cable
CN104113058A (en) * 2013-04-22 2014-10-22 上海市电力公司 Method for calculating power distribution low-voltage line loss
CN104242326A (en) * 2013-06-18 2014-12-24 李春明 Three-phase load balancer
CN103354361A (en) * 2013-06-19 2013-10-16 国家电网公司 Low-voltage three-phase load automation balancing device
CN103474985A (en) * 2013-06-27 2013-12-25 国家电网公司 Realization method for function of adaptive load type distribution transformer
CN103545921A (en) * 2013-09-24 2014-01-29 许继集团有限公司 Urban distribution transformer area autonomous control optimization power system and monitoring system thereof
CN103545827A (en) * 2013-10-25 2014-01-29 国家电网公司 Method for three-phase imbalance load distribution suitable for low-voltage distribution network
CN104092229A (en) * 2014-07-14 2014-10-08 山东卓尔电气有限公司 Distributed type power supply zone branch circuit three-phase load current balance monitoring method and device
CN104124761A (en) * 2014-08-15 2014-10-29 杭州智光一创科技有限公司 Low-voltage big user integrated protection control method for power distribution network
CN204089210U (en) * 2014-08-29 2015-01-07 国家电网公司 A kind of three-phase load unbalance adjusting device
CN104362637A (en) * 2014-12-03 2015-02-18 广东电网有限责任公司电力科学研究院 Low-voltage platform region intelligent management method based on forward-backward substitution algorithm

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
卢道远: "配网中不平衡电流的成因及其影响", 《广东输电与变电技术》 *
李峻: "低压三相不平衡调整优选方案的计算机实现", 《电气安全》 *
王守相 等: "配电系统联络开关的优化配置", 《继电器》 *
王艺智 等: "城市配网智能公变台区系统关键技术研究及系统设计", 《数字技术与应用》 *
郑松松 等: "基于用电信息采集系统的超容分析", 《上海电力学院学报》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109217341A (en) * 2018-10-09 2019-01-15 郑州云海信息技术有限公司 A kind of appraisal procedure and system of data center's tri-phase unbalance factor
CN110135650A (en) * 2019-05-21 2019-08-16 华北水利水电大学 The method of online planning stage low-voltage distribution system three-phase load optimization balanced arrangement
CN110135650B (en) * 2019-05-21 2023-04-28 华北水利水电大学 Method for three-phase load optimization balance configuration of low-voltage distribution system in online planning stage
CN110518605A (en) * 2019-08-28 2019-11-29 国网上海市电力公司 A kind of area's three-phase equilibrium depth optimization method and system
CN110518605B (en) * 2019-08-28 2022-10-14 国网上海市电力公司 Three-phase balance depth optimization method and system for transformer area

Similar Documents

Publication Publication Date Title
CN103501058B (en) Based on the energy efficiency management system of Intelligent platform zone
Yan et al. Hybrid energy storage capacity allocation method for active distribution network considering demand side response
CN102969787A (en) Distribution transformer economical operation control method
CN105046360A (en) Power load weight management system based on peak-valley time period and peak-valley time period management method
CN111009925A (en) Method for calculating maximum capacity of distributed photovoltaic access low-voltage power distribution network
CN104931802A (en) Outgoing line load three-phase integration protection, regulation and control method
CN102664400B (en) Monitoring method for electric energy quality
CN115513963A (en) Centralized-local reactive power cooperative control method for distributed photovoltaic power distribution network
Mahato et al. Review of active power control techniques considering the impact of MPPT and FPPT during high PV penetration
CN103618322B (en) Dynamic reactive efficiency quantitative evaluation method oriented towards transient voltage stability
CN105023062A (en) Electrical load weight management system and method based on peak and valley time periods
CN204144950U (en) A kind of compensation program control circuit on-load voltage regulation system
CN104882892A (en) Demand side response method based on voltage regulation
CN112234614B (en) Power distribution network bearing capacity assessment method considering heat accumulation type electric heating large-scale access
CN104268798A (en) Method for assessing influence on power distribution network from distributed power sources and electric cars
CN103066600A (en) Harmonic current limiting value monitoring method based on load simultaneity factor
CN103545818B (en) Power system active power distribution network intermittent energy drops into or excises the defining method of point
Wu et al. Estimation of the power quality problem caused by large wind farm: A real case study
Huang et al. Automatic reactive power control in distribution network based on Feeder Power Factor Assessment
Fan et al. The maximum power supply capability calculation based on the actual load characteristics
Li et al. Power precise load shedding control strategy considering user demand response clustering
CN103400309A (en) Method for evaluating influence of ultrahigh-voltage access on stability of provincial power grid
CN205039554U (en) Power station energy memory
CN117220356B (en) Multi-time-scale-based annual loss reduction operation optimization method and system for power transmission network
Sun et al. Analysis of Security Operational Characteristics of Distribution Network considering Electric Vehicle Load Access Forecast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication