CN104929647B - 顶管机止退装置及其安装方法 - Google Patents
顶管机止退装置及其安装方法 Download PDFInfo
- Publication number
- CN104929647B CN104929647B CN201510247611.0A CN201510247611A CN104929647B CN 104929647 B CN104929647 B CN 104929647B CN 201510247611 A CN201510247611 A CN 201510247611A CN 104929647 B CN104929647 B CN 104929647B
- Authority
- CN
- China
- Prior art keywords
- stopping device
- push
- bench
- angle side
- pipe joints
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510247611.0A CN104929647B (zh) | 2015-05-15 | 2015-05-15 | 顶管机止退装置及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510247611.0A CN104929647B (zh) | 2015-05-15 | 2015-05-15 | 顶管机止退装置及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104929647A CN104929647A (zh) | 2015-09-23 |
CN104929647B true CN104929647B (zh) | 2017-12-08 |
Family
ID=54117040
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510247611.0A Active CN104929647B (zh) | 2015-05-15 | 2015-05-15 | 顶管机止退装置及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104929647B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351664B (zh) * | 2016-10-25 | 2018-09-25 | 上海建科工程咨询有限公司 | 一种大直径顶管止退装置 |
CN106761774A (zh) * | 2016-12-13 | 2017-05-31 | 中铁隧道勘测设计院有限公司 | 一种顶管法隧道工程用管节止退装置 |
CN109458493A (zh) * | 2018-12-20 | 2019-03-12 | 上海市政建设有限公司 | 一种顶管止退限位装置及其使用方法 |
CN110195595B (zh) * | 2019-05-09 | 2021-01-05 | 上海隧道工程有限公司 | 顶管机管片的止退装置及其使用方法 |
CN113294166B (zh) * | 2021-05-20 | 2023-11-14 | 北京建工土木工程有限公司 | 大断面矩形顶管斜向始发方法 |
CN113374932B (zh) * | 2021-07-09 | 2022-02-18 | 中铁上海工程局集团有限公司 | 一种移动式顶管止退支架装置及止退方法 |
CN114526376B (zh) * | 2022-01-12 | 2024-03-29 | 中建隧道建设有限公司 | 叠线顶管施工方法 |
CN115012950B (zh) * | 2022-06-08 | 2023-04-07 | 中铁一局集团(广州)建设工程有限公司 | 一种临近地铁的富水砂层顶管施工方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201392672Y (zh) * | 2009-01-15 | 2010-01-27 | 上海金鹏源辐照技术有限公司 | 止退器 |
CN201818900U (zh) * | 2010-09-09 | 2011-05-04 | 上海水务建设工程有限公司 | 大口径顶管机出洞防偏差装置 |
CN103244126B (zh) * | 2013-04-12 | 2015-07-08 | 上海交通大学 | 一种防止顶管机和管节后退的施工方法 |
CN103899321B (zh) * | 2014-04-23 | 2016-04-13 | 上海隧道工程有限公司 | 顶拉结合法矩形顶管隧道施工方法 |
CN104265321B (zh) * | 2014-08-06 | 2016-04-13 | 上海隧道工程有限公司 | 超大型全断面矩形顶管掘进施工方法 |
CN104265302B (zh) * | 2014-08-06 | 2016-09-07 | 上海隧道工程有限公司 | 顶管管节止退装置 |
-
2015
- 2015-05-15 CN CN201510247611.0A patent/CN104929647B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104929647A (zh) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929647B (zh) | 顶管机止退装置及其安装方法 | |
CN103264968B (zh) | 超高层核心筒内外挂塔吊支撑梁结构的施工方法 | |
CN105887811B (zh) | 基于高精度信息化监控超深软土桩柱一体化施工方法 | |
CN103541735B (zh) | 隧道掘进机步进顶推支撑装置及施工方法 | |
CN202298628U (zh) | 逆作法钢管柱自动调垂装置 | |
CN103669866B (zh) | 地下室钢筋混凝土柱节点连接结构的施工方法 | |
CN113294166B (zh) | 大断面矩形顶管斜向始发方法 | |
CN111622268B (zh) | 基于电力管廊下穿大型刚性箱涵的保护施工方法 | |
CN109667590B (zh) | 一种钢套筒的组装施工方法 | |
CN111609212A (zh) | 逆向顶进钢管套修整偏位顶管施工工法 | |
CN201635410U (zh) | 承受吊装施工荷载的混凝土结构临时加固装置 | |
CN113737796A (zh) | 钢板桩高压水冲辅助打桩与拔桩同步注浆施工工法 | |
CN112983447A (zh) | 一种盾构机空推地铁暗挖车站施工方法 | |
CN113622961A (zh) | 一种长输热网蒸汽管大管径长距离顶管施工方法 | |
CN104785904A (zh) | 大型空分装置冷箱预埋螺栓安装工艺 | |
CN204533812U (zh) | 一种泥水平衡式顶管施工系统 | |
CN106120793A (zh) | 一种倾斜预应力管桩的纠偏方法及结构 | |
CN112815144A (zh) | 人工顶管施工工艺 | |
CN205393933U (zh) | 盾构机的螺旋输送机洞内拆装装置 | |
CN205975615U (zh) | 一种倾斜预应力管桩的纠偏结构 | |
CN111828049B (zh) | 浅埋暗挖隧道超前小导管施工方法 | |
CN103850247B (zh) | 一种地下连续墙接头保护板及施工机具及施工方法 | |
CN113685198A (zh) | 顶管施工装置及施工工艺 | |
CN207932916U (zh) | 一种隧洞出渣轨道枕木基础快速修复吊装工具 | |
CN103758141B (zh) | 双壁钢围堰的平衡分体方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160301 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan Applicant before: China Railway Erju Co., Ltd. Applicant before: City reduction of fractions to a common denominator company of China Railway Erju Co., Ltd |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |