CN104923731A - V-process production method - Google Patents

V-process production method Download PDF

Info

Publication number
CN104923731A
CN104923731A CN201510318332.9A CN201510318332A CN104923731A CN 104923731 A CN104923731 A CN 104923731A CN 201510318332 A CN201510318332 A CN 201510318332A CN 104923731 A CN104923731 A CN 104923731A
Authority
CN
China
Prior art keywords
sandbox
sand
mould
casting
negative pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510318332.9A
Other languages
Chinese (zh)
Inventor
何拥军
蒋漓洪
伍斌华
杨学
赖卫华
黄立德
梁英豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Jin Te Abrasion Resistance Material Limited-Liability Co
Original Assignee
Liuzhou Jin Te Abrasion Resistance Material Limited-Liability Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Jin Te Abrasion Resistance Material Limited-Liability Co filed Critical Liuzhou Jin Te Abrasion Resistance Material Limited-Liability Co
Priority to CN201510318332.9A priority Critical patent/CN104923731A/en
Publication of CN104923731A publication Critical patent/CN104923731A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a V-process production method. The V-process production method comprises the following steps: 1) adhering a preheated plastic film onto a pattern and the whole surface of a template in a sucking manner, and uniformly spraying quick-drying paint on the film; 2) placing a sandbox with an aspirating chamber on the template; 3) filling the sandbox with dry sand without a binder, water or additives, slightly vibrating while sand feeding to ensure that the sandbox is fully filled with dry sand, planning, covering the top of the sandbox with a material film again, and vacuumizing through the walls of the sandbox; 4) turning the sandbox, drawing, and taking out a new pattern, namely a sand mould with the hardness about 90 degrees, wherein under the action of atmospheric pressure, the plastic film is evenly adhered onto the sand mould to enable the sand mould to be at a compact state; 5) assembling the mould, wherein negative pressure of a casting mould is maintained to pouring; 6) after completion of solidification of a casting, releasing the negative pressure to enable the casting mould to be collapsed automatically, and taking out the casting from casting dry sand.

Description

A kind of V method moulding production method
Technical field
The present invention relates to a kind of V method moulding production method.
Background technology
The moulding of V method and V method (V--Process) are a kind of vacuum sealed molding casting methods, also known as vacuum moulding.Molding operation is complicated, and light casting moulding productivity ratio is not high.From moulding, mould assembly, cast until casting falling sand, all will keep negative pressure to casting mold, this brings certain difficulty to mechanization Production line.In addition, the percentage elongation of plastic sheeting and the restriction of formability, affect the expansion of this method range of application.
Summary of the invention
The technical problem to be solved in the present invention overcomes existing defect, provides the high strength grinder hammerhead of a kind of Gao Ge, manganese steel material.
Object of the present invention carrys out specific implementation by the following technical programs:
A kind of V method moulding production method, comprises the steps:
1) by the plastic sheeting that heats in advance under suction function, inhale and be attached to apperance, on the whole surface of template, then on film, spray quick drying paint equably;
2) sandbox with aspirating chamber is put;
3) filling not adding additives, moisture and accrete dry sand, Jia Sha limit, limit vibrates slightly, to ensure that dry sand fills up sandbox, strikes off, and at sandbox top mulch film again, vacuumized by sandbox tank wall;
4) mould turnover, molding, due to the effect of atmospheric pressure, plastic sheeting is attached on sand mold equably, and makes molding sand be in compacted state, takes out apperance, reaches the sand mold that hardness is about 90 degree;
5) mould assembly, the negative pressure state of casting mold is maintained to cast;
6), after casting solidification completes, remove negative pressure, casting mold is defeated and dispersed voluntarily, from casting mold dry sand, take out foundry goods.
Preferably, above-mentioned V method moulding production method, concrete technology step and technological parameter as follows:
1) negative pressure is transferred to 0.04 ~ 0.06MPa, and pressurize, by film heating 0.8min, time softening shinny, carry out overlay film;
2) bonding dead head, prescinds dead head position film with blade, places dead head, bonding, guarantees to leak gas;
3) even application coating, ensures that coating layer thickness is between 0.5 ~ 1mm, emits port part and important thick large and leak brush position and carry out benefits brush, dries up the position electricity consumption of not easily drying;
4) after the abundant drying of coating, put sandbox well by flask pin, must not note during placement and touch dead head;
5) mould is inserted on plain bumper after putting sandbox well, adds sand and jolt ramming, and time of vibration is 40 ~ 60 seconds;
6) strike off molding sand after jolt ramming, be covered with film, connect sandbox negative pressure and open, pressure is 0.04 ~ 0.06MPa, pressurize, close negative pressure chamber, top box glues dead head, carry out the demoulding, to the place of the place's of scratching gas leakage and peacefully to mend after the demoulding, the casting bed in smooth cast place, is then placed on pouring area the mo(u)ld bottom half having turned over case simultaneously, carrying out lower core operation, is that 35mm puts chill by chill and surface of mould cavity spacing;
7) coremaking, lower core and mould assembling, after getting togather case, connect negative tube, and negative pressure adjustment is 0.04 ~ 0.06MPa, cast, pouring temperature is 1210 ~ 1310 DEG C, and pressurize 1.5h after cast, after casting solidification completes, remove negative pressure, casting mold is defeated and dispersed voluntarily, from casting mold dry sand, take out foundry goods.
V method moulding production method of the present invention, by the improvement of refinement, makes it not be subject to the percentage elongation of plastic sheeting and the restriction of formability, has expanded the range of application of V method moulding.
Detailed description of the invention
Below the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
embodiment 1:
V method moulding production method, concrete technology step and technological parameter as follows:
1) negative pressure is transferred to 0.04 ~ 0.06MPa, and pressurize, by film heating 0.8min, time softening shinny, carry out overlay film;
2) bonding dead head, prescinds dead head position film with blade, places dead head, bonding, guarantees to leak gas;
3) even application coating, ensures that coating layer thickness is between 0.5 ~ 1mm, emits port part and important thick large and leak brush position and carry out benefits brush, dries up the position electricity consumption of not easily drying;
4) after the abundant drying of coating, put sandbox well by flask pin, must not note during placement and touch dead head;
5) mould is inserted on plain bumper after putting sandbox well, adds sand and jolt ramming, and time of vibration is 40 ~ 60 seconds;
6) strike off molding sand after jolt ramming, be covered with film, connect sandbox negative pressure and open, pressure is 0.04 ~ 0.06MPa, pressurize, close negative pressure chamber, top box glues dead head, carry out the demoulding, to the place of the place's of scratching gas leakage and peacefully to mend after the demoulding, the casting bed in smooth cast place, is then placed on pouring area the mo(u)ld bottom half having turned over case simultaneously, carrying out lower core operation, is that 35mm puts chill by chill and surface of mould cavity spacing;
7) coremaking, lower core and mould assembling, after getting togather case, connect negative tube, and negative pressure adjustment is 0.04 ~ 0.06MPa, cast, pouring temperature is 1210 ~ 1310 DEG C, and pressurize 1.5h after cast, after casting solidification completes, remove negative pressure, casting mold is defeated and dispersed voluntarily, from casting mold dry sand, take out foundry goods.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (2)

1. a V method moulding production method, is characterized in that: comprise the steps:
1) by the plastic sheeting that heats in advance under suction function, inhale and be attached to apperance, on the whole surface of template, then on film, spray quick drying paint equably;
2) sandbox with aspirating chamber is put;
3) filling not adding additives, moisture and accrete dry sand, Jia Sha limit, limit vibrates slightly, to ensure that dry sand fills up sandbox, strikes off, and at sandbox top mulch film again, vacuumized by sandbox tank wall;
4) mould turnover, molding, due to the effect of atmospheric pressure, plastic sheeting is attached on sand mold equably, and makes molding sand be in compacted state, takes out apperance, reaches the sand mold that hardness is about 90 degree;
5) mould assembly, the negative pressure state of casting mold is maintained to cast;
6), after casting solidification completes, remove negative pressure, casting mold is defeated and dispersed voluntarily, from casting mold dry sand, take out foundry goods.
2. V method moulding production method according to claim 1, is characterized in that: concrete technology step and technological parameter as follows:
1) negative pressure is transferred to 0.04 ~ 0.06MPa, and pressurize, by film heating 0.8min, time softening shinny, carry out overlay film;
2) bonding dead head, prescinds dead head position film with blade, places dead head, bonding, guarantees to leak gas;
3) even application coating, ensures that coating layer thickness is between 0.5 ~ 1mm, emits port part and important thick large and leak brush position and carry out benefits brush, dries up the position electricity consumption of not easily drying;
4) after the abundant drying of coating, put sandbox well by flask pin, must not note during placement and touch dead head;
5) mould is inserted on plain bumper after putting sandbox well, adds sand and jolt ramming, and time of vibration is 40 ~ 60 seconds;
6) strike off molding sand after jolt ramming, be covered with film, connect sandbox negative pressure and open, pressure is 0.04 ~ 0.06MPa, pressurize, close negative pressure chamber, top box glues dead head, carry out the demoulding, to the place of the place's of scratching gas leakage and peacefully to mend after the demoulding, the casting bed in smooth cast place, is then placed on pouring area the mo(u)ld bottom half having turned over case simultaneously, carrying out lower core operation, is that 35mm puts chill by chill and surface of mould cavity spacing;
7) coremaking, lower core and mould assembling, after getting togather case, connect negative tube, and negative pressure adjustment is 0.04 ~ 0.06MPa, cast, pouring temperature is 1210 ~ 1310 DEG C, and pressurize 1.5h after cast, after casting solidification completes, remove negative pressure, casting mold is defeated and dispersed voluntarily, from casting mold dry sand, take out foundry goods.
CN201510318332.9A 2015-06-11 2015-06-11 V-process production method Pending CN104923731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510318332.9A CN104923731A (en) 2015-06-11 2015-06-11 V-process production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510318332.9A CN104923731A (en) 2015-06-11 2015-06-11 V-process production method

Publications (1)

Publication Number Publication Date
CN104923731A true CN104923731A (en) 2015-09-23

Family

ID=54111336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510318332.9A Pending CN104923731A (en) 2015-06-11 2015-06-11 V-process production method

Country Status (1)

Country Link
CN (1) CN104923731A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106670385A (en) * 2016-12-29 2017-05-17 马正松 V-method model casting process for casting household appliance base
CN106734901A (en) * 2017-02-24 2017-05-31 滁州金诺实业有限公司 Household electrical appliances base class product automation Molding Casting device
CN107398530A (en) * 2017-07-25 2017-11-28 苏州市鑫渭阀门有限公司 The V method casting techniques of the high valve body of precision
CN107716854A (en) * 2017-09-01 2018-02-23 东风精密铸造安徽有限公司 A kind of metal craft dry sand mold casting operation technique
CN108097876A (en) * 2017-12-29 2018-06-01 滁州金诺实业有限公司 A kind of quick cast man electric switch sends out type plates technique
CN109290518A (en) * 2017-07-25 2019-02-01 郑州为新科技有限公司 A kind of vertical formative technology of V method and casting technique
CN109622887A (en) * 2019-02-20 2019-04-16 都江堰瑞泰科技有限公司 Film covering device and its coating technique based on vacuum forming
CN110293207A (en) * 2019-07-10 2019-10-01 定州东方铸造有限公司 V method cast paint spraying process
CN114273609A (en) * 2020-12-01 2022-04-05 安阳市凯创科技有限公司 Medium-large precision casting part shell casting technology
CN116689710A (en) * 2023-08-02 2023-09-05 山西华德冶铸有限公司 Casting method of excavator rotating support

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106670385A (en) * 2016-12-29 2017-05-17 马正松 V-method model casting process for casting household appliance base
CN106734901A (en) * 2017-02-24 2017-05-31 滁州金诺实业有限公司 Household electrical appliances base class product automation Molding Casting device
CN107398530A (en) * 2017-07-25 2017-11-28 苏州市鑫渭阀门有限公司 The V method casting techniques of the high valve body of precision
CN109290518A (en) * 2017-07-25 2019-02-01 郑州为新科技有限公司 A kind of vertical formative technology of V method and casting technique
CN107716854A (en) * 2017-09-01 2018-02-23 东风精密铸造安徽有限公司 A kind of metal craft dry sand mold casting operation technique
CN108097876A (en) * 2017-12-29 2018-06-01 滁州金诺实业有限公司 A kind of quick cast man electric switch sends out type plates technique
CN109622887A (en) * 2019-02-20 2019-04-16 都江堰瑞泰科技有限公司 Film covering device and its coating technique based on vacuum forming
CN110293207A (en) * 2019-07-10 2019-10-01 定州东方铸造有限公司 V method cast paint spraying process
CN114273609A (en) * 2020-12-01 2022-04-05 安阳市凯创科技有限公司 Medium-large precision casting part shell casting technology
CN116689710A (en) * 2023-08-02 2023-09-05 山西华德冶铸有限公司 Casting method of excavator rotating support
CN116689710B (en) * 2023-08-02 2023-10-13 山西华德冶铸有限公司 Casting method of excavator rotating support

Similar Documents

Publication Publication Date Title
CN104923731A (en) V-process production method
CN102717031B (en) Large-scale thin-wall valve body lost foam casting process
CN101462160B (en) Full-mold casting technique of resin-bonded sand
CN104588581A (en) Manufacturing method of brake drum
CN103372630B (en) A kind of evaporative pattern production technology of engine cylinder-body
CN103658527B (en) A kind of vacuum sealed molding method of refrigerator cold closet plastic adsorption mould mould cast
CN104985119A (en) Lost foam casting process for engine cylinder block and head
CN103586412B (en) Method for casting ledges of middle troughs of scraper conveyer by V (vacuum) method
CN102049468A (en) Process for casting large-sized loader gear box body by using lost foam
CN106238680B (en) A kind of lost foam casting process of automobile saddle-type traction base
CN105964921A (en) Large casting lost-foam resin sand casting process
CN103506576B (en) A kind of production method preventing evaporative pattern casting deformation
CN109093073A (en) A kind of cast shaping process based on evaporative pattern
CN104741533A (en) Production method of casting
CN102228954B (en) Lost foam casting technique capable of reducing deformation of mould piece joining seam
CN102371338A (en) Process method for casting axle package mouth of engineering axle housing by combining V method process with vanishing die process
CN104741532A (en) Evanescent mode casting process
CN101733362A (en) Method for casting metallic mold
CN105499496A (en) Feeding and exhausting riser bush for V-method casting
CN104690227A (en) Evanescent mould casting process capable of preventing deformation
CN104874732A (en) Casting process using evanescent mold
CN105364008A (en) Evaporative pattern casting process
CN105364009A (en) Evaporative pattern casting process realizing good mechanical property for castings
CN104624961A (en) Method for improving non-solid sand filling of upper concave surface on evaporative pattern casting
CN109079100A (en) A kind of casting method for being easy to demould

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150923

RJ01 Rejection of invention patent application after publication