CN104919384A - 用于设备维护和/或风险减缓的电力系统设备的评估 - Google Patents
用于设备维护和/或风险减缓的电力系统设备的评估 Download PDFInfo
- Publication number
- CN104919384A CN104919384A CN201380070756.7A CN201380070756A CN104919384A CN 104919384 A CN104919384 A CN 104919384A CN 201380070756 A CN201380070756 A CN 201380070756A CN 104919384 A CN104919384 A CN 104919384A
- Authority
- CN
- China
- Prior art keywords
- power system
- system device
- data
- health
- field test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M99/00—Subject matter not provided for in other groups of this subclass
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0283—Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
Claims (20)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261727875P | 2012-11-19 | 2012-11-19 | |
US61/727,875 | 2012-11-19 | ||
PCT/US2013/070695 WO2014078829A1 (en) | 2012-11-19 | 2013-11-19 | Assessment of power system equipment for equipment maintenance and/or risk mitigation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104919384A true CN104919384A (zh) | 2015-09-16 |
CN104919384B CN104919384B (zh) | 2018-09-18 |
Family
ID=49753480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201380070756.7A Active CN104919384B (zh) | 2012-11-19 | 2013-11-19 | 用于设备维护和/或风险减缓的电力系统设备的评估 |
Country Status (5)
Country | Link |
---|---|
US (1) | US9995655B2 (zh) |
EP (1) | EP2920660B1 (zh) |
CN (1) | CN104919384B (zh) |
BR (1) | BR112015011382B1 (zh) |
WO (1) | WO2014078829A1 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107450456A (zh) * | 2016-05-31 | 2017-12-08 | 波音公司 | 作为维护预测器的受监控的机器性能 |
CN112005223A (zh) * | 2018-09-24 | 2020-11-27 | 惠普发展公司,有限责任合伙企业 | 设备状态评估 |
CN115719168A (zh) * | 2023-01-10 | 2023-02-28 | 佰聆数据股份有限公司 | 基于多电力终端协同的发电设备运行风险分析方法及装置 |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140324495A1 (en) * | 2013-02-22 | 2014-10-30 | Vestas Wind Systems A/S | Wind turbine maintenance optimizer |
WO2014145153A2 (en) * | 2013-03-15 | 2014-09-18 | Neeley John | Automatic recording and graphing of measurement data |
WO2015064651A1 (ja) * | 2013-10-29 | 2015-05-07 | 京セラ株式会社 | 設備管理システム及び設備管理方法 |
EP3164833A1 (en) * | 2014-07-03 | 2017-05-10 | General Electric Company | Apparatus and method for decimation of historical reference dataset |
KR20160143140A (ko) * | 2015-06-04 | 2016-12-14 | 엘에스산전 주식회사 | 전력설비 건전성 평가시스템 |
DE112016003869T5 (de) | 2015-09-28 | 2018-05-17 | Eaton Intelligent Power Limited | System und Verfahren zur Inbetriebnahme und zur Wartung von Industrieeinrichtungen |
US10438144B2 (en) | 2015-10-05 | 2019-10-08 | Fisher-Rosemount Systems, Inc. | Method and apparatus for negating effects of continuous introduction of risk factors in determining the health of a process control system |
US10481595B2 (en) * | 2015-10-05 | 2019-11-19 | Fisher-Rosemount Systems, Inc. | Method and apparatus for assessing the collective health of multiple process control systems |
US10146286B2 (en) * | 2016-01-14 | 2018-12-04 | Intel Corporation | Dynamically updating a power management policy of a processor |
CN106124902B (zh) * | 2016-07-19 | 2019-08-13 | 广西电网有限责任公司电力科学研究院 | 一种配电变压器健康状态评估系统 |
US10355478B2 (en) | 2017-03-22 | 2019-07-16 | Eaton Intelligent Power Limited | System and method for asset health monitoring using multi-dimensional risk assessment |
US11507716B2 (en) | 2018-07-09 | 2022-11-22 | International Business Machines Corporation | Predicting life expectancy of machine part |
US11908573B1 (en) | 2020-02-18 | 2024-02-20 | C/Hca, Inc. | Predictive resource management |
WO2020105151A1 (ja) * | 2018-11-21 | 2020-05-28 | 株式会社日立製作所 | 設備保守点検支援システム及び点検順序決定方法 |
US11226358B2 (en) * | 2019-02-27 | 2022-01-18 | Caterpillar Inc. | Power system damage analysis and control system |
US20220221528A1 (en) * | 2019-05-23 | 2022-07-14 | Siemens Aktiengesellschaft | Method and device for assessing state of health of transformer, and storage medium |
US11119759B2 (en) | 2019-12-18 | 2021-09-14 | Bank Of America Corporation | Self-learning code conflict resolution tool |
US11269901B2 (en) | 2020-01-16 | 2022-03-08 | International Business Machines Corporation | Cognitive test advisor facility for identifying test repair actions |
JP7621910B2 (ja) | 2020-12-04 | 2025-01-27 | 株式会社東芝 | 状態診断装置および状態診断方法 |
CN114563111B (zh) * | 2022-04-30 | 2022-07-22 | 江西省气象信息中心(江西省气象培训中心、江西省农村经济信息中心) | 气温观测设备的健康度评估方法、系统、设备和存储介质 |
US12038479B2 (en) * | 2022-09-09 | 2024-07-16 | Cisco Technology, Inc. | Stress-testing electrical components using telemetry modeling |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101080700A (zh) * | 2004-12-17 | 2007-11-28 | 韩国标准科学研究院 | 用于真空泵的故障保护和预知维护的精确诊断方法及精确诊断系统 |
CN101273314A (zh) * | 2005-09-30 | 2008-09-24 | 罗斯蒙德公司 | 用于利用监控数据与关键程度评估数据执行加工厂中的功能的方法和装置 |
US20080312783A1 (en) * | 2007-06-12 | 2008-12-18 | The Boeing Company | Systems and Methods for Health Monitoring of Complex Systems |
CN102193555A (zh) * | 2011-03-11 | 2011-09-21 | 凯里供电局 | 集控中心全景状态监测系统 |
US8170893B1 (en) * | 2006-10-12 | 2012-05-01 | Sergio J Rossi | Eliminating sources of maintenance losses |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6756907B2 (en) | 2002-06-11 | 2004-06-29 | Jerrell Penn Hollaway | Maintainance support system for an electrical apparatus |
US20070093925A1 (en) | 2005-10-21 | 2007-04-26 | Moughler Eric A | Processes for improving production of a work machine |
US8768657B2 (en) * | 2006-01-12 | 2014-07-01 | Jentek Sensors, Inc. | Remaining life prediction for individual components from sparse data |
EP2392982B1 (en) * | 2006-09-28 | 2015-03-25 | Fisher-Rosemount Systems, Inc. | Abnormal situation prevention in a heat exchanger |
US8494810B2 (en) | 2009-06-05 | 2013-07-23 | Jentek Sensors, Inc. | Component adaptive life management |
US8484150B2 (en) * | 2010-02-26 | 2013-07-09 | General Electric Company | Systems and methods for asset condition monitoring in electric power substation equipment |
US9225793B2 (en) * | 2011-01-28 | 2015-12-29 | Cisco Technology, Inc. | Aggregating sensor data |
CN102183555B (zh) | 2011-03-14 | 2013-12-25 | 天津师范大学 | 一种快速测定水体氟污染的方法 |
US9053468B2 (en) * | 2011-04-07 | 2015-06-09 | General Electric Company | Methods and systems for monitoring operation of equipment |
-
2013
- 2013-11-19 CN CN201380070756.7A patent/CN104919384B/zh active Active
- 2013-11-19 WO PCT/US2013/070695 patent/WO2014078829A1/en active Application Filing
- 2013-11-19 BR BR112015011382-6A patent/BR112015011382B1/pt active IP Right Grant
- 2013-11-19 US US14/083,616 patent/US9995655B2/en active Active
- 2013-11-19 EP EP13802782.6A patent/EP2920660B1/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101080700A (zh) * | 2004-12-17 | 2007-11-28 | 韩国标准科学研究院 | 用于真空泵的故障保护和预知维护的精确诊断方法及精确诊断系统 |
US20080109185A1 (en) * | 2004-12-17 | 2008-05-08 | Korea Research Institute Of Standsards And Science | Precision Diagnostic Method For The Failure Protection And Predictive Maintenance Of A Vacuum Pump And A Precision Diagnostic System Therefor |
CN101273314A (zh) * | 2005-09-30 | 2008-09-24 | 罗斯蒙德公司 | 用于利用监控数据与关键程度评估数据执行加工厂中的功能的方法和装置 |
US8170893B1 (en) * | 2006-10-12 | 2012-05-01 | Sergio J Rossi | Eliminating sources of maintenance losses |
US20080312783A1 (en) * | 2007-06-12 | 2008-12-18 | The Boeing Company | Systems and Methods for Health Monitoring of Complex Systems |
CN102193555A (zh) * | 2011-03-11 | 2011-09-21 | 凯里供电局 | 集控中心全景状态监测系统 |
Non-Patent Citations (5)
Title |
---|
CARL S BYINGTON等: "Data Fasion for Developing Predictive Diagnostics for Electromechanical Systems", 《HTTP://DSP-BOOK.NAROD.RU/HMDF/2379CH23.PDF》 * |
EDMUND HANDSCHIN,等: "Novel Methods for the Condition Based Maintenance of Distribution Networks", 《2007 IEEE LAUSANNE POWER TECH》 * |
IAEA-TECDOC-1551: "Implementation Strategies and Tools for Condition Based Maintenance at Nuclear Power Plants", 《HTTPS://WWW-PUB.IAEA.ORG/MTCD/PUBLICATIONS/PDF/TE_1551_WEB.PDF》 * |
MING DONG,等: "Hidden semi-Markov model-based methodology for multi-sensor equipment health diagnosis and prognosis", 《EUROPEAN JOURNAL OF OPERATIONAL RESEARCH》 * |
R. SHOURESHI,等: "Sensor Fusion and Complex Data Analysis for Predictive Maintenance", 《36TH ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107450456A (zh) * | 2016-05-31 | 2017-12-08 | 波音公司 | 作为维护预测器的受监控的机器性能 |
US11816590B2 (en) | 2016-05-31 | 2023-11-14 | The Boeing Company | Monitored machine performance as a maintenance predictor |
CN112005223A (zh) * | 2018-09-24 | 2020-11-27 | 惠普发展公司,有限责任合伙企业 | 设备状态评估 |
CN115719168A (zh) * | 2023-01-10 | 2023-02-28 | 佰聆数据股份有限公司 | 基于多电力终端协同的发电设备运行风险分析方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
BR112015011382B1 (pt) | 2021-10-19 |
CN104919384B (zh) | 2018-09-18 |
US20140156225A1 (en) | 2014-06-05 |
US9995655B2 (en) | 2018-06-12 |
EP2920660B1 (en) | 2019-06-12 |
WO2014078829A1 (en) | 2014-05-22 |
EP2920660A1 (en) | 2015-09-23 |
BR112015011382A2 (pt) | 2021-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104919384B (zh) | 用于设备维护和/或风险减缓的电力系统设备的评估 | |
US10534361B2 (en) | Industrial asset health model update | |
Thöns | On the value of monitoring information for the structural integrity and risk management | |
CN104966141B (zh) | 更新用于生成工业资产健康状况简档的模型的方法和系统 | |
US10002701B2 (en) | Profiling transformer of power system | |
US10860013B2 (en) | Power system equipment design flaw identification | |
JP2013538543A (ja) | 送電網用の機械学習 | |
Orcesi et al. | Use of lifetime functions in the optimization of nondestructive inspection strategies for bridges | |
Liu et al. | Utility and information analysis for optimum inspection of fatigue-sensitive structures | |
Huang et al. | Optimization of resilient biofuel infrastructure systems under natural hazards | |
Puggina et al. | Development of a statistical methodology for gas turbine prognostics | |
CN118445731A (zh) | 变压器的故障确定方法、装置和变压器故障检测系统 | |
Wang et al. | Probabilistic model-checking based reliability analysis for failure correlation of multi-state systems | |
Zhou et al. | Quantification of value of information associated with optimal observation actions within partially observable Markov decision processes | |
CN115471361A (zh) | 关口电能表的现场电能计量误差预测方法、系统及介质 | |
Geara et al. | Hybrid inspection-monitoring approach for optimal maintenance planning | |
Xue et al. | Research on the Digital Model of Substation Inspection System Based on Digital Twin Technology | |
Khurmi et al. | Condition based maintenance in nuclear power plants: Limitations & practicality | |
Wang et al. | Temperature Monitoring of Mass Concrete Structure Using Wireless Sensing System | |
CN118278921B (zh) | 设备维修性能检测方法、装置、计算机设备和存储介质 | |
CN118733985B (zh) | 水电站发电机组劣质化分析方法及系统 | |
Yuan et al. | Research on power grid outage risk assessment and early warning model based on intelligent decision algorithm | |
Hayat et al. | A New Approach to Reliability Prediction in Component-based Systems | |
KR20250078684A (ko) | 시설물 점검 및 진단의 평가에 대한 부적정률기인인자 도출 방법 및 장치 | |
Römgens et al. | Robust Damage Detection and Localization Under Varying Environmental Conditions Using Neural Networks and Input‐Residual Correlations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180511 Address after: Baden, Switzerland Applicant after: ABB Switzerland Co.,Ltd. Address before: Zurich Applicant before: ABB TECHNOLOGY Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210524 Address after: Baden, Switzerland Patentee after: ABB grid Switzerland AG Address before: Baden, Switzerland Patentee before: ABB Switzerland Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: Swiss Baden Patentee after: Hitachi energy Switzerland AG Address before: Swiss Baden Patentee before: ABB grid Switzerland AG |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231222 Address after: Zurich, SUI Patentee after: Hitachi Energy Co.,Ltd. Address before: Swiss Baden Patentee before: Hitachi energy Switzerland AG |
|
TR01 | Transfer of patent right |