CN104913150A - Pipeline water pressure test plugging device - Google Patents
Pipeline water pressure test plugging device Download PDFInfo
- Publication number
- CN104913150A CN104913150A CN201510289932.7A CN201510289932A CN104913150A CN 104913150 A CN104913150 A CN 104913150A CN 201510289932 A CN201510289932 A CN 201510289932A CN 104913150 A CN104913150 A CN 104913150A
- Authority
- CN
- China
- Prior art keywords
- closure plate
- blocking device
- pipeline
- wheel
- regulating mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/10—Means for stopping flow from or in pipes or hoses
- F16L55/12—Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ
- F16L55/128—Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose
- F16L55/132—Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose the closure device being a plug fixed by radially deforming the packing
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
- G01N3/10—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
- G01N3/12—Pressure testing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Mechanical Engineering (AREA)
- Examining Or Testing Airtightness (AREA)
- Pipe Accessories (AREA)
Abstract
The invention discloses a pipeline water pressure test plugging device. The pipeline water pressure test plugging device comprises a circular plug board, sealing rings, support adjusting frames, at least two symmetrically-arranged adjusting mechanisms, limiting blocks and a movement assisting mechanism, wherein the sealing rings are fixed on the outer circumference of the plug board; the support adjusting frames are combined by horizontal steel plates and vertical steel plates; the support adjusting frames are connected to one side board surface of the plug board; the adjusting mechanisms are arranged at the out ends of the support adjusting frames; the adjusting mechanisms are used for adjusting gaps between the sealing rings and pressure test pipelines; the limiting blocks are arranged on the end parts, which are close to the outer circumference of the plug board, of the adjusting mechanisms; one limiting block is arranged on each adjusting mechanism; the movement assisting mechanism is arranged on the plug board and the support adjusting frames. The pipeline water pressure test plugging device is convenient to install and detach, the pressure test construction period can be shortened, and the engineering investment is saved.
Description
Technical field
The present invention relates to a kind of hydraulic test of pipeline blocking device, belong to hydraulic test of pipeline technical field.
Background technique
In pipeline construction, the Pressure test program of hydrostatic test employing is carried out normally to pipeline: machinery, blocking materials etc. that the rear backrest of bearing water pressure and rear backrest support all are set at every 1km pressure testing pipeline section two ends, then independent the hydrostatic test is carried out to this pressure testing pipeline section.This pressure-measuring method can not carry out continuous pressure testing to pressure testing pipeline section, and the duration of the hydrostatic test is longer, pressure testing device and operational sequence more complicated, the investment of construction is comparatively large, and needs there are enough water sources near proof test section, and engineering water usage is larger.
Prior art discloses " a kind of Mountain Area aqueduct pressure-measuring method and pressure testing device ", a kind of new hydraulic test of pipeline method and pressure testing device is proposed in invention, by the plugging plate in pressure testing device and expansion joint, pressure testing section is divided into upstream pressure testing section and downstream pressure testing section, in conjunction with other parts of pressure testing device, the continuous pressure testing to pressure testing pipeline section can be realized, duration and water usage can be reduced, save construction investment.
In order to ensure the sealing of pressure testing section, by plugging plate assemble welding in flange, before pipeline pressure test, by multiple bolts and nuts, the flange that plugging plate is housed is assemblied between upstream pressure testing section and downstream pressure testing section, after pipeline pressure test, multiple bolts and nuts are taken apart, the flange that plugging plate is housed is replaced by through hole flange, and fixed by multiple screw bolt and nut, therefore, the flange being equipped with shutoff version needs repeatedly to tighten and dismantle multiple screw bolt and nut, complex operation when installing and remove, and causes the duration longer.
Summary of the invention
For the above-mentioned defect existed in prior art, the invention provides a kind of hydraulic test of pipeline blocking device be easy for installation and removal.
The present invention is achieved by the following technical solution: a kind of hydraulic test of pipeline blocking device, comprises circular closure plate; Seal ring, described seal ring is fixed on the excircle of described closure plate; Supporting adjustment rack, described supporting adjustment rack is formed by the steel plate of substantially horizontal and the steel plate combination of vertical direction, and described supporting adjustment rack is connected on the side plate face of described closure plate; At least two symmetrically arranged regulating mechanisms, described regulating mechanism is installed on the outer end of described supporting adjustment rack, and described regulating mechanism is for adjusting the gap between described seal ring and pressure testing pipeline; Limiting stopper, described limiting stopper is installed on the end of described regulating mechanism near described closure plate excircle, each described regulating mechanism is all provided with a described limiting stopper; Mobile assisting agency, described mobile assisting agency is installed on described closure plate and described supporting adjustment rack.
Further, described regulating mechanism is set to four, each described regulating mechanism comprise adjustment handwheel, with the stud, the nut A that coordinates with described stud that adjust handwheel and be connected, described limiting stopper is provided with nut B, described stud and described nut B are connected.
Further, described mobile assisting agency comprises road wheel, upper saw pulley and overturn-preventing wheel, described road wheel is be installed on described closure plate footpath wheel downwards, described upper saw pulley is the wheel being installed on the radial both sides of described closure plate, the wheel of described overturn-preventing wheel for being installed on described closure plate radial top, after blocking device puts into pipeline, described road wheel, described upper saw pulley contact with inner-walls of duct with described overturn-preventing wheel.
Further, described road wheel and described overturn-preventing wheel are set to three respectively, and described upper saw pulley is set to two.
Further, described mobile assisting agency comprises draw ring and handle, and described draw ring and described handle are separately positioned on described closure plate both sides.
Further, described seal ring is fixed on described closure plate by bolt, nut and annular pressing plate.
Further, described seal ring is the shaped rubber circle of one-way water stop or two-way water stop.
The present invention is when reality uses, blocking device entirety being positioned over treats in the pipeline of pressure testing, by mobile assisting agency, blocking device is moved to specified position, limiting stopper is welded in pipe interior, to limit the displacement of blocking device along conduit axis, the gap smaller between seal ring and pressure testing pipeline is made by adjustment regulating mechanism, until pressure testing pipeline can be sealed completely, reach pressure testing requirement, after pressure testing, regulate regulating mechanism, gap between seal ring and pressure testing pipeline is increased, then regulating mechanism and limiting stopper are departed from, blocking device is shifted out from pressure testing pipeline, limiting stopper can not be removed after pressure testing, only limiting stopper need be reconfigured, blocking device just can continue on for the pipeline pressure test of identical caliber, therefore, the blocking device that the present invention proposes is not only convenient to be installed and removes, can also reuse, effectively can save construction investment.
Accompanying drawing explanation
Fig. 1 is the structural representation of hydraulic test of pipeline blocking device in the embodiment of the present invention;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the B-B view of Fig. 2;
In figure, 1, closure plate, 2, seal ring, 3, adjustment rack is supported, 31, the steel plate of substantially horizontal, 32, the steel plate of vertical direction, 4, regulating mechanism, 41, adjustment handwheel, 42, stud, 43, nut A, 5, limiting stopper, 51, nut B, 6, mobile assisting agency, 61, road wheel, 62, upper saw pulley, 63, overturn-preventing wheel, 64, draw ring, 65, handle.
Embodiment
Below by indefiniteness embodiment and the present invention is further illustrated by reference to the accompanying drawings:
As shown in Figure 1-Figure 3, embodiments provide a kind of hydraulic test of pipeline blocking device, comprise circular closure plate 1; Seal ring 2, seal ring 2 is fixed on the excircle of closure plate 1; Supporting adjustment rack 3, supporting adjustment rack 3 is combined by the steel plate 31 of substantially horizontal and the steel plate 31 of vertical direction, and supporting adjustment rack 3 is connected on the side plate face of closure plate 1; At least two symmetrically arranged regulating mechanisms 4, regulating mechanism 4 is installed on the outer end of supporting adjustment rack 3, and regulating mechanism 4 is for adjusting the gap between seal ring 2 and pressure testing pipeline; Limiting stopper 5, limiting stopper 5 is installed on the end of regulating mechanism 4 near closure plate 1 excircle, each regulating mechanism 4 is all provided with a limiting stopper 5; Mobile assisting agency 6, mobile assisting agency 6 is installed on closure plate 1 and supporting adjustment rack 3.
The present invention is when reality uses, blocking device entirety being positioned over treats in the pipeline of pressure testing, by mobile assisting agency 6, blocking device is moved to specified position, limiting stopper 5 is welded in pipe interior, to limit the displacement of blocking device along conduit axis, the gap smaller between seal ring 2 and pressure testing pipeline is made by adjustment regulating mechanism 4, until pressure testing pipeline can be sealed completely, reach pressure testing requirement, after pressure testing, regulate regulating mechanism 4, gap between seal ring 2 and pressure testing pipeline is increased, then regulating mechanism 4 and limiting stopper 5 are departed from, just blocking device can be shifted out from pressure testing pipeline, limiting stopper can not be removed after pressure testing, only need reconfigure a limiting stopper 5, blocking device just can continue on for the pipeline pressure test of identical caliber, therefore, the blocking device that the present invention proposes is not only convenient to be installed and removes, can also reuse, effectively can save construction investment.
Concrete, regulating mechanism 4 is set to four, each regulating mechanism 4 comprises adjustment handwheel 41, the stud 42 be connected with adjustment handwheel 41, the nut A43 coordinated with stud 42, limiting stopper 5 is provided with nut B51, stud 42 and nut B51 are connected, before pipeline pressure test, adjustment handwheel 41 and limiting stopper 5 are cooperated together by stud 42 and nut A43's and nut B51, after pipeline pressure test, nut B51 on limiting stopper 5 and limiting stopper 5 stays in the duct, rotating adjustment handwheel 41 makes regulating mechanism 4 and limiting stopper 5 depart from, thus achieve the disengaging of blocking device, this screw-thread fit Placement is convenient to the installation and removal of adjust structure 4, namely the installation and removal of blocking device are facilitated.
Mobile assisting agency 6 comprises road wheel 61, upper saw pulley 62 and overturn-preventing wheel 63, road wheel 61 is for being installed on closure plate 1 footpath wheel downwards, upper saw pulley 62 is for being installed on the wheel of the radial both sides of closure plate 1, overturn-preventing wheel 63 is for being installed on the wheel of closure plate 1 radial top, after blocking device puts into pipeline, road wheel 61, upper saw pulley 62 contact with inner-walls of duct with overturn-preventing wheel 63.Because pressure testing closure plate 1 is generally steel plate, weight is larger, arrange road wheel 61, upper saw pulley 62 and overturn-preventing wheel 63 can make to be rolling friction between blocking device and inner-walls of duct, reduce the resistance of the movement of blocking device in pipeline, the direction of blocking device movement in pipeline can also be kept, stability when keeping blocking device to move in pipeline.
For increasing stability when blocking device moves further, road wheel 61 and overturn-preventing wheel 63 are set to three, three road wheel 61 distributions triangular in shape respectively, the 63 also distributions triangular in shape of three overturn-preventing wheels, upper saw pulley 62 is set to two, respectively arranges one in the radial both sides of closure plate 1.
For convenience of the movement of operation blocking device, mobile assisting agency 6 also comprises draw ring 64 and handle 65, and draw ring 64 and handle 65 are separately positioned on the both sides of closure plate 1 axis, arranges like this and also helps blocking device moving outside pressure testing pipeline.
Seal ring 2 is fixed on closure plate 1 by bolt, nut and annular pressing plate, when seal ring 2 serious wear, is turned on by bolt and nut, just the seal ring 2 of wearing and tearing can be changed, simple to operation.
Seal ring 2 can be the shaped rubber circle of one-way water stop or two-way water stop, when pressure testing section carries out continuous pressure testing, the water of upstream pressure testing section is put into downstream pressure testing section and carries out pressure testing, now, select the anisotropic rubber circle of two-way water stop, so no matter water is in upstream pressure testing section or downstream pressure testing section, and seal ring 2 can be isolated the water of upstream pressure testing section and downstream pressure testing section well.
Other parts in the present embodiment adopt known technology, do not repeat them here.
Above-described embodiment for explanation of the present invention, is not only that those skilled in the art also can make a change on this basis to its restriction.
Claims (7)
1. a hydraulic test of pipeline blocking device, is characterized in that, comprises circular closure plate;
Seal ring, described seal ring is fixed on the excircle of described closure plate;
Supporting adjustment rack, described supporting adjustment rack is formed by the steel plate of substantially horizontal and the steel plate combination of vertical direction, and described supporting adjustment rack is connected on the side plate face of described closure plate;
At least two symmetrically arranged regulating mechanisms, described regulating mechanism is installed on the outer end of described supporting adjustment rack, and described regulating mechanism is for adjusting the gap between described seal ring and pressure testing pipeline;
Limiting stopper, described limiting stopper is installed on the end of described regulating mechanism near described closure plate excircle, each described regulating mechanism is all provided with a described limiting stopper;
Mobile assisting agency, described mobile assisting agency is installed on described closure plate and described supporting adjustment rack.
2. hydraulic test of pipeline blocking device according to claim 1, it is characterized in that, described regulating mechanism is set to four, each described regulating mechanism comprise adjustment handwheel, with the stud, the nut A that coordinates with described stud that adjust handwheel and be connected, described limiting stopper is provided with nut B, described stud and described nut B are connected.
3. hydraulic test of pipeline blocking device according to claim 1, it is characterized in that, described mobile assisting agency comprises road wheel, upper saw pulley and overturn-preventing wheel, described road wheel is be installed on described closure plate footpath wheel downwards, described upper saw pulley is the wheel being installed on the radial both sides of described closure plate, the wheel of described overturn-preventing wheel for being installed on described closure plate radial top, after blocking device puts into pipeline, described road wheel, described upper saw pulley contact with inner-walls of duct with described overturn-preventing wheel.
4. hydraulic test of pipeline blocking device according to claim 3, is characterized in that, described road wheel and described overturn-preventing wheel are set to three respectively, and described upper saw pulley is set to two.
5. hydraulic test of pipeline blocking device according to claim 1, is characterized in that, described mobile assisting agency comprises draw ring and handle, and described draw ring and described handle are separately positioned on described closure plate both sides.
6. hydraulic test of pipeline blocking device according to claim 1, is characterized in that, described seal ring is fixed on described closure plate by bolt, nut and annular pressing plate.
7. hydraulic test of pipeline blocking device according to claim 1, is characterized in that, described seal ring is the shaped rubber circle of one-way water stop or two-way water stop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510289932.7A CN104913150B (en) | 2015-05-29 | 2015-05-29 | A kind of hydraulic test of pipeline plugging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510289932.7A CN104913150B (en) | 2015-05-29 | 2015-05-29 | A kind of hydraulic test of pipeline plugging device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104913150A true CN104913150A (en) | 2015-09-16 |
CN104913150B CN104913150B (en) | 2016-08-17 |
Family
ID=54082455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510289932.7A Active CN104913150B (en) | 2015-05-29 | 2015-05-29 | A kind of hydraulic test of pipeline plugging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104913150B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106885092A (en) * | 2017-04-01 | 2017-06-23 | 成都市排水有限责任公司 | A kind of differential blocking underwater pipeline device |
CN112523305A (en) * | 2020-11-26 | 2021-03-19 | 浙江世润建创科技发展有限公司 | Construction method for quickly plugging long-distance water pipeline pressure test inspection well |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003185549A (en) * | 2001-12-18 | 2003-07-03 | Hitachi Plant Eng & Constr Co Ltd | Close-down apparatus for testing piping withstand pressure |
CN101013073A (en) * | 2007-02-08 | 2007-08-08 | 中国建筑第二工程局 | Cast-in-situs steel reinforced concrete raceway water pressure testing method |
JP2008111736A (en) * | 2006-10-31 | 2008-05-15 | Yukiyoshi Ito | Pressure tester for pipe joint part |
CN101339110A (en) * | 2008-08-14 | 2009-01-07 | 宋玉田 | Pipeline pressure testing machine |
CN202057551U (en) * | 2011-04-07 | 2011-11-30 | 新兴河北工程技术有限公司 | Hydrostatic testing machine for pipe fitting |
CN202992512U (en) * | 2012-12-12 | 2013-06-12 | 中国水利水电第三工程局有限公司 | Pipeline suppressing and plugging device |
CN103471930A (en) * | 2013-09-27 | 2013-12-25 | 杜培文 | Hilly region water conveying pipeline pressing testing method and device |
CN204739361U (en) * | 2015-05-29 | 2015-11-04 | 杜培文 | Pipeline hydrostatic test plugging device |
-
2015
- 2015-05-29 CN CN201510289932.7A patent/CN104913150B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003185549A (en) * | 2001-12-18 | 2003-07-03 | Hitachi Plant Eng & Constr Co Ltd | Close-down apparatus for testing piping withstand pressure |
JP2008111736A (en) * | 2006-10-31 | 2008-05-15 | Yukiyoshi Ito | Pressure tester for pipe joint part |
CN101013073A (en) * | 2007-02-08 | 2007-08-08 | 中国建筑第二工程局 | Cast-in-situs steel reinforced concrete raceway water pressure testing method |
CN101339110A (en) * | 2008-08-14 | 2009-01-07 | 宋玉田 | Pipeline pressure testing machine |
CN202057551U (en) * | 2011-04-07 | 2011-11-30 | 新兴河北工程技术有限公司 | Hydrostatic testing machine for pipe fitting |
CN202992512U (en) * | 2012-12-12 | 2013-06-12 | 中国水利水电第三工程局有限公司 | Pipeline suppressing and plugging device |
CN103471930A (en) * | 2013-09-27 | 2013-12-25 | 杜培文 | Hilly region water conveying pipeline pressing testing method and device |
CN204739361U (en) * | 2015-05-29 | 2015-11-04 | 杜培文 | Pipeline hydrostatic test plugging device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106885092A (en) * | 2017-04-01 | 2017-06-23 | 成都市排水有限责任公司 | A kind of differential blocking underwater pipeline device |
CN106885092B (en) * | 2017-04-01 | 2022-11-15 | 成都市排水有限责任公司 | Differential pressure type underwater pipeline plugging device |
CN112523305A (en) * | 2020-11-26 | 2021-03-19 | 浙江世润建创科技发展有限公司 | Construction method for quickly plugging long-distance water pipeline pressure test inspection well |
CN112523305B (en) * | 2020-11-26 | 2022-03-25 | 浙江世润建创科技发展有限公司 | Construction method for quickly plugging long-distance water pipeline pressure test inspection well |
Also Published As
Publication number | Publication date |
---|---|
CN104913150B (en) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210153402U (en) | Extrusion type sealing blind plate | |
CN104759821B (en) | A kind of seam welder automatic diameter changing system authority | |
CN103062419A (en) | Steel forged refrigeration valve | |
CN104913150A (en) | Pipeline water pressure test plugging device | |
CN204785045U (en) | Push pipe passes through to lay in engineering takes gyro wheel pipeline in sleeve pipe | |
CN204739361U (en) | Pipeline hydrostatic test plugging device | |
CN105479098A (en) | Online dismounting method for large-scale gas pipeline | |
CN103161959A (en) | Tube push bench sealing device with replaceable deviation rectifying section | |
CN101810957A (en) | Rapid feeding device of pressure filter | |
CN209876148U (en) | Pipeline bearing structure for municipal construction | |
CN204785049U (en) | Push pipe passes through in engineering in sleeve pipe roughing -in with taking gyro wheel garter spring | |
CN210239692U (en) | Rotary material distribution device for tunnel secondary lining | |
CN201014060Y (en) | Device used for movable supporting pipeline in casing tube | |
CN202674629U (en) | Loose connecting flange | |
CN202569708U (en) | Sludge feeding mechanism of plate-and-frame press filter with double diaphragms | |
JP5271156B2 (en) | Renewal method of fluid pipe and pipe fixing support device for fluid pipe renewal | |
CN212004603U (en) | Quick connector for stainless steel pipe fitting | |
JP2019095038A (en) | Flow control device and method for attaching flow control device | |
CN111119781A (en) | Natural gas directional drilling pipeline isolation pipe plugging system | |
CN212156016U (en) | Fluorine-lined diaphragm valve capable of being rapidly disassembled | |
CN221424224U (en) | Central chemical supply pipeline system | |
CN208395620U (en) | A kind of water-tight equipment for dual-steel wheel road roller | |
CN214404923U (en) | Reinforced concrete steel socket pipe convenient to equipment | |
CN219241867U (en) | Multi-pipeline three-dimensional ultrahigh-pressure choke manifold | |
CN216112775U (en) | Quick repair tool for damaged pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20161202 Address after: 250013 Ji'nan, Lixia District, Shandong Lixia Road, No. 121 Patentee after: Shandong Survey and Design Institute of Water Conservancy Address before: 250013 Ji'nan, Lixia District, Shandong Lixia Road, No. 121 Patentee before: Du Peiwen |