CN104910952B - Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process - Google Patents

Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process Download PDF

Info

Publication number
CN104910952B
CN104910952B CN201510278776.4A CN201510278776A CN104910952B CN 104910952 B CN104910952 B CN 104910952B CN 201510278776 A CN201510278776 A CN 201510278776A CN 104910952 B CN104910952 B CN 104910952B
Authority
CN
China
Prior art keywords
tower
steam
gas
purging
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510278776.4A
Other languages
Chinese (zh)
Other versions
CN104910952A (en
Inventor
张毅
葛春涛
王展
张广文
赵文芳
许晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Qingdao Safety Engineering Institute filed Critical China Petroleum and Chemical Corp
Priority to CN201510278776.4A priority Critical patent/CN104910952B/en
Publication of CN104910952A publication Critical patent/CN104910952A/en
Application granted granted Critical
Publication of CN104910952B publication Critical patent/CN104910952B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

The present invention provides a catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process. According to the present invention, during the catalytic cracking apparatus shutdown process, the sealed relaying purging technology of various towers in the stable absorption unit and the desulfurization unit is performed, the stable absorption unit purging steam is purged to the desulfurization unit, and through various tower top safety valve sub-pipelines of the desulfurization unit, the steam purging oil gas is conveyed to the low pressure flare pipeline inside the apparatus and is transferred into a fractionation tower, is cooled through a fractionation tower top cooling system, and is separated in an oil-gas separator in front of a gas compressor. According to the present invention, the low pressure flare pipeline to the outside of the apparatus is added to the oil-gas separator to discharge the non-condensing gas to the gas cabinet outside the apparatus and recover, such that the sealed relaying purging of the stable absorption unit and the desulfurization unit of the cracking apparatus is achieved through the simple process change in the case of no increase of the additional cooling equipment investment so as to achieve the environmental protection shutdown purpose.

Description

Catalytic cracking unit stable absorption, the desulfurization unit airtight relay purging process of shut-down
Technical field
During the present invention relates to a kind of catalytic cracking unit, stable absorption unit and desulfurization unit shut-down, the airtight relay blowing of each tower Sweep technique.
Background technology
Heavy oil catalytically cracking equipment, uses MIP-CGP technique, and designed capacity is 800,000 tons/year.Catalytic cracking unit is over the years Maintenance stop work during, each column overhead of absorption tower, Analytic Tower, reabsorber and desulfurization unit in stable absorption unit is without cold But system, causes each tower of shut-down process to purge steam and cannot condense, and steam blowing oil gas must not enter low pressure and put flare system, Cause shut-down steam blowing, it is necessary to open tower top emptying discharge.Cause environmental pollution, and oil and gas loss.Nowadays, due to enterprise The increase of environmental protection pressure, this kind of unrest arrange, the shut-down mode that leaves about can not meet current requirement.This just requires must propose newly Processing scheme, stop work during, reach the requirement of the environmental protection of airtight shut-down.
Summary of the invention
For existing catalytic cracking unit during stopping work, each tower purges steam and cannot condense, it is necessary to opens tower top discharge, makes Become environmental pollution and the problem of oil and gas loss, during the invention provides a kind of catalytic cracking unit shut-down, the airtight relay of each tower The technique of purging, it is achieved the environmental protection of catalytic cracking unit is stopped work, and the recovery of oil gas.
The present invention uses following technical scheme:
Catalytic cracking unit stable absorption, the desulfurization unit airtight relay purging process of shut-down, including
Step 1: stable absorption unit, desulfurization unit are removed pressure and terminated, catalytic cracking unit stops work, Analytic Tower, absorption tower, again The tower top of absorption tower, dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, amine liquid regenerator and fractionating column is airtight;
Step 2: open aerostatic press rich gas valve, to steam at the bottom of Analytic Tower tower, condensing oil tank carries aerostatic press to steam, steam Gas in rich gas, Analytic Tower, through condensing oil tank, subsequently into absorption tower, the sour water formed in condensing oil tank, passes through The outlet of condensed oil pot bottom enters sewage disposal system;
Step 3: when absorption tower column bottom temperature is more than 100 DEG C, opens and be passed through steam at the bottom of absorbing tower, carry out steam relay purging, Steam is caught up with into reabsorber;
Step 4: when reabsorber column bottom temperature is more than 100 DEG C, opens and be passed through steam at the bottom of reabsorber tower, carry out steam relay Purging, catches up with steam into dry gas desulfurizing tower;
Step 5: when dry gas desulfurizing tower column bottom temperature is more than 100 DEG C, Kai Tadi is passed through steam, carries out steam relay purging, logical Overdrying desulfurization column overhead relief valve by-pass, catches up with steam and sets fire torch pipe net into low pressure gas, and low pressure gas torch pipe net of setting fire is intrinsic pressure Power sets and is not more than 0.15MPa;
Step 6: liquefied gas tank desulfurizing tower first carries out water top, after water top is terminated, enters steam blowing stage, liquefied gas tank desulfurizing tower tower The end, to steam, carries out steam blowing, and steam enters low pressure gas by tower top relief valve by-pass and sets fire torch pipe net;
Step 7: pressure removed by amine liquid regenerator oxytropism gas torch pipe net of setting fire, and is passed through steam at the bottom of amine liquid tower tower, and steam is by tower inner acidic Gas catches up with sour gas to set fire after torch pipe net, closes amine liquid regenerator and enters sour gas and set fire the hands valve of torch pipe net;Open tower top safety Valve by-pass, enters fractionating column by amine liquid Ta Tanei steam blowing;
Step 8: after gas air-blowing has been swept in dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, closes low pressure gas and sets fire torch pipe net Valve, opens fractionator overhead relief valve by-pass valve, purging in dry gas desulfurizing tower, liquefied gas tank desulfurizing tower and amine liquid regenerator Steam enters fractionating column;
Step 9: steam in fractionating column, after being fractionated into column overhead air cooler and aftercooler cooling, enters the oil gas before aerostatic press and divides In device;
Step 10: do not coagulate device in Gas in the gs-oil separator before aerostatic press, increase setting fire outside device newly through gs-oil separator top Torch line is delivered to torch Holder System and is reclaimed;In gs-oil separator, cold oil aqueous mixtures is pumped up to sewage disposal system;
Step 11: by Analytic Tower, absorption tower, reabsorber, dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, amine liquid regenerator and point Evaporate condensation sewage at the bottom of the tower of tower, and the condensation sewage that low pressure gas is set fire in torch pipe net delivers to sewage disposal system.
The present invention has a following beneficial effect:
Catalytic cracking unit, in the downtime, is implemented in stable absorption unit, desulfurization unit after each tower airtight relay purging technology, Fully meet the requirement that environmental protection is stopped work, and the most extra increase cooling device, save cost, really real in the downtime Show pipeline purging, the target of steaming tower purging " zero-emission ", effectively prevent shut-down process, pollution on the environment.? Before aerostatic press, gs-oil separator increases by one to the torch flow process of setting fire outside device, it is achieved the recovery of shut-down oil gas, it is to avoid shut-down product Loss, reduces shut-down loss.Each tower steam relay purges, Analytic Tower give steam points, condensing oil tank, absorption as main Tower, reabsorber, dry gas desulfurizing tower only need a small amount of to steam, and a large amount of saving purges steam, and improves steam utilization rate, subtracts Little waste.
Accompanying drawing explanation
Fig. 1 is that stable absorption unit of the present invention purges flow chart to desulfurization unit steam relay.
Fig. 2 is that inventive desulfurization unit purges flow chart to fractionating column steam relay.
Detailed description of the invention
The present invention will be described in detail below in conjunction with the accompanying drawings:
Catalytic cracking unit stable absorption, the desulfurization unit airtight relay purging process of shut-down, including
Step 1: stable absorption unit, desulfurization unit are removed pressure and terminated, catalytic cracking unit stops work, Analytic Tower, absorption tower, again The tower top of absorption tower, dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, amine liquid regenerator and fractionating column is airtight;
Step 2: open aerostatic press rich gas valve, to steam at the bottom of Analytic Tower tower, condensing oil tank carries aerostatic press to steam, steam Gas in rich gas, Analytic Tower, through condensing oil tank, subsequently into absorption tower, the sour water formed in condensing oil tank, passes through The outlet of condensed oil pot bottom enters sewage disposal system;
Step 3: when absorption tower column bottom temperature is more than 100 DEG C, opens and be passed through steam at the bottom of absorbing tower, carry out steam relay purging, Steam is caught up with into reabsorber;
Step 4: when reabsorber column bottom temperature is more than 100 DEG C, opens and be passed through steam at the bottom of reabsorber tower, carry out steam relay Purging, catches up with steam into dry gas desulfurizing tower;
Step 5: when dry gas desulfurizing tower column bottom temperature is more than 100 DEG C, Kai Tadi is passed through steam, carries out steam relay purging, logical Overdrying desulfurization column overhead relief valve by-pass, catches up with steam and sets fire torch pipe net into low pressure gas, and low pressure gas torch pipe net of setting fire is intrinsic pressure Power sets and is not more than 0.15MPa;
Step 6: liquefied gas tank desulfurizing tower first carries out water top, after water top is terminated, enters steam blowing stage, liquefied gas tank desulfurizing tower tower The end, to steam, carries out steam blowing, and steam enters low pressure gas by tower top relief valve by-pass and sets fire torch pipe net;
Step 7: pressure removed by amine liquid regenerator oxytropism gas torch pipe net of setting fire, and is passed through steam at the bottom of amine liquid tower tower, and steam is by tower inner acidic Gas catches up with sour gas to set fire after torch pipe net, closes amine liquid regenerator and enters sour gas and set fire the hands valve of torch pipe net;Open tower top safety Valve by-pass, enters fractionating column by amine liquid Ta Tanei steam blowing;
Step 8: after gas air-blowing has been swept in dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, closes low pressure gas and sets fire torch pipe net Valve, opens fractionator overhead relief valve by-pass valve, purging in dry gas desulfurizing tower, liquefied gas tank desulfurizing tower and amine liquid regenerator Steam enters fractionating column;
Step 9: steam in fractionating column, after being fractionated into column overhead air cooler and aftercooler cooling, enters the oil gas before aerostatic press and divides In device;
Step 10: do not coagulate device in Gas in the gs-oil separator before aerostatic press, increase setting fire outside device newly through gs-oil separator top Torch line is delivered to torch Holder System and is reclaimed;In gs-oil separator, cold oil aqueous mixtures is pumped up to sewage disposal system;
Step 11: by Analytic Tower, absorption tower, reabsorber, dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, amine liquid regenerator and point Evaporate condensation sewage at the bottom of the tower of tower, and the condensation sewage that low pressure gas is set fire in torch pipe net delivers to sewage disposal system.
During catalytic cracking unit stable absorption unit of the present invention and desulfurization unit are stopped work, use each tower relay purging process, In the case of not increasing the investment of extra cooling device, change by quick-reading flow sheets is dynamic, it is achieved catalytic unit stablizes unit and desulfurization unit Airtight relay purging, reach environmental protection stop work purpose.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above, the art Change that technical staff is made in the essential scope of the present invention, retrofit, add or replace, also should belong to the protection of the present invention Scope.

Claims (1)

1. catalytic cracking unit stable absorption, the desulfurization unit airtight relay purging process of shut-down, it is characterised in that: include
Step 1: stable absorption unit, desulfurization unit are removed pressure and terminated, catalytic cracking unit stops work, Analytic Tower, absorption tower, again The tower top of absorption tower, dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, amine liquid regenerator and fractionating column is airtight;
Step 2: open aerostatic press rich gas valve, to steam at the bottom of Analytic Tower tower, condensing oil tank carries aerostatic press to steam, steam Gas in rich gas, Analytic Tower, through condensing oil tank, subsequently into absorption tower, the sour water formed in condensing oil tank, passes through The outlet of condensed oil pot bottom enters sewage disposal system;
Step 3: when absorption tower column bottom temperature is more than 100 DEG C, opens and be passed through steam at the bottom of absorbing tower, carry out steam relay purging, Steam is caught up with into reabsorber;
Step 4: when reabsorber column bottom temperature is more than 100 DEG C, opens and be passed through steam at the bottom of reabsorber tower, carry out steam relay Purging, catches up with steam into dry gas desulfurizing tower;
Step 5: when dry gas desulfurizing tower column bottom temperature is more than 100 DEG C, Kai Tadi is passed through steam, carries out steam relay purging, logical Overdrying desulfurization column overhead relief valve by-pass, catches up with steam and sets fire torch pipe net into low pressure gas, and low pressure gas torch pipe net of setting fire is intrinsic pressure Power sets and is not more than 0.15MPa;
Step 6: liquefied gas tank desulfurizing tower first carries out water top, after water top is terminated, enters steam blowing stage, liquefied gas tank desulfurizing tower tower The end, to steam, carries out steam blowing, and steam enters low pressure gas by tower top relief valve by-pass and sets fire torch pipe net;
Step 7: pressure removed by amine liquid regenerator oxytropism gas torch pipe net of setting fire, and is passed through steam at the bottom of amine liquid tower tower, and steam is by tower inner acidic Gas catches up with sour gas to set fire after torch pipe net, closes amine liquid regenerator and enters sour gas and set fire the hands valve of torch pipe net;Open tower top safety Valve by-pass, enters fractionating column by amine liquid Ta Tanei steam blowing;
Step 8: after gas air-blowing has been swept in dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, closes low pressure gas and sets fire torch pipe net Valve, opens fractionator overhead relief valve by-pass valve, purging in dry gas desulfurizing tower, liquefied gas tank desulfurizing tower and amine liquid regenerator Steam enters fractionating column;
Step 9: steam in fractionating column, after being fractionated into column overhead air cooler and aftercooler cooling, enters the oil gas before aerostatic press and divides In device;
Step 10: do not coagulate device in Gas in the gs-oil separator before aerostatic press, increase setting fire outside device newly through gs-oil separator top Torch line is delivered to torch Holder System and is reclaimed;In gs-oil separator, cold oil aqueous mixtures is pumped up to sewage disposal system;
Step 11: by Analytic Tower, absorption tower, reabsorber, dry gas desulfurizing tower, liquefied gas tank desulfurizing tower, amine liquid regenerator and point Evaporate condensation sewage at the bottom of the tower of tower, and the condensation sewage that low pressure gas is set fire in torch pipe net delivers to sewage disposal system.
CN201510278776.4A 2015-05-27 2015-05-27 Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process Active CN104910952B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510278776.4A CN104910952B (en) 2015-05-27 2015-05-27 Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510278776.4A CN104910952B (en) 2015-05-27 2015-05-27 Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process

Publications (2)

Publication Number Publication Date
CN104910952A CN104910952A (en) 2015-09-16
CN104910952B true CN104910952B (en) 2017-01-11

Family

ID=54080404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510278776.4A Active CN104910952B (en) 2015-05-27 2015-05-27 Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process

Country Status (1)

Country Link
CN (1) CN104910952B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106554000B (en) * 2015-09-30 2018-07-06 中国石油化工股份有限公司 Sulphur unit green shut-down method
CN112410056A (en) * 2019-08-20 2021-02-26 中国石油天然气股份有限公司 Purging system of catalytic cracking unit
CN113476878A (en) * 2021-07-09 2021-10-08 山东金诚重油化工技术研究院 Method for combined removal of trace nitrogen

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57179281A (en) * 1981-04-28 1982-11-04 Tokyo Gas Co Ltd Decoking apparatus in heavy oil cracking gas apparatus
CN202440471U (en) * 2011-12-27 2012-09-19 中国寰球工程公司 Oil gas recovery system

Also Published As

Publication number Publication date
CN104910952A (en) 2015-09-16

Similar Documents

Publication Publication Date Title
KR101584529B1 (en) Solution treatment device
CN205084577U (en) Retrieve device that multicomponent high concentration low discharge is interrupted organic waste gas active ingredient
CN104910952B (en) Catalytic cracking apparatus stable absorption unit and desulfurization unit shutdown sealed relaying purging process
CN105251311A (en) Method for recycling effective ingredients of multi-component high-concentration small-flow intermittent organic waste gas
CN204051368U (en) carbon five tail gas recycling and treating device
CN104930873A (en) Dead steam recovery technique
NL2015921B1 (en) Process for the purification of a gas
CN205618328U (en) A combination equipment for preparing it is dry, clean gaseous
CN105154144A (en) Negative-pressure debenzylation device and negative-pressure debenzolization method
CN208990499U (en) A kind of tower high boiling solvent absorption VOC and recycle device
CN204265717U (en) Steam heating washing oil negative pressure crude benzol distillation plant
CN201688136U (en) Fuel gas recycle device
CN204824737U (en) Smelt decompression vacuum apparatus of oil pipe way and container
CN203408490U (en) Vacuumizing pipeline gas essential oil recovery device
CN106000054A (en) Coke oven flue ammonia water spraying and desulfurizing technology and device
CN103524301B (en) Methyl alcohol rectification system and method for recycling methyl alcohol in incondensable gas of system
CN204380404U (en) Reclaim the spinning liquid adsorption plant of drop and pollutant in on-condensible gas
CN203768322U (en) Negative-pressure distilled benzene circulating washing oil regeneration device
CN220834862U (en) System for recycling gasoline hydrogenation noncondensable gas
CN204159182U (en) A kind of roasting method acid regeneration acid mist reclaiming clean device being provided with condenser
CN205164428U (en) Airtight recovery unit of oil refining chemical plant installations shut -down steam blowing oil gas
CN205042190U (en) Non -condensable gas diffuses device
CN220744171U (en) Collecting and recycling device for volatile materials
CN209406348U (en) A kind of waste and old clay treatment system
CN219449633U (en) Device for reducing naphthalene content in debenzolized lean oil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Yanan City, Shandong province Qingdao City three road 266071 No. 218

Applicant after: Qingdao Safety Engineering Research Institute of Sinopec Co., Ltd.

Applicant after: Sinopec Corp.

Address before: 100728 Chaoyangmen street, Beijing, No. 22, No.

Applicant before: Sinopec Corp.

Applicant before: Qingdao Safety Engineering Research Institute of Sinopec Co., Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant