CN104894983A - Recovery steel beam for high-speed railways - Google Patents

Recovery steel beam for high-speed railways Download PDF

Info

Publication number
CN104894983A
CN104894983A CN201510243891.8A CN201510243891A CN104894983A CN 104894983 A CN104894983 A CN 104894983A CN 201510243891 A CN201510243891 A CN 201510243891A CN 104894983 A CN104894983 A CN 104894983A
Authority
CN
China
Prior art keywords
framework
associate
horizontal
speed railway
steel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510243891.8A
Other languages
Chinese (zh)
Inventor
张耀辉
王海林
刘嘉武
陈士通
徐光兴
秦志宇
彭兴山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
China Railway Corp
Original Assignee
Shijiazhuang Tiedao University
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University, China Railway Corp filed Critical Shijiazhuang Tiedao University
Priority to CN201510243891.8A priority Critical patent/CN104894983A/en
Publication of CN104894983A publication Critical patent/CN104894983A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a recovery steel beam for high-speed railways. The recovery steel beam comprises main bearing structures. Each main bearing structure comprises two parallel main truss structures connected through an upper longitudinal connection framework, a lower longitudinal connection framework and middle transverse connection diagonal bars, wherein the upper longitudinal connection framework and the lower longitudinal connection framework are parallel. Each main truss structure is formed by connecting a plurality of main truss frameworks and end trusses arranged at two ends. Longitudinal rail-bearing beams used for installing steel rails are arranged on the of surfaces of the main bearing structures. The recovery steel beam fills in the gap that recovery steel beams for high-speed railway bridges do not exist in China in the past and is of great significance for fast recovery construction after disasters of the high-speed railways occur.

Description

A kind of high-speed railway emergency steel girder
Technical field
The present invention relates to a kind of high-speed railway bridge rush repair equipment, particularly a kind of emergency steel girder of high-speed railway bridge after disaster is destroyed being applicable to China Express Railway 32m, 24m, 20m span.
Background technology
At present, for interim girder steel mainly steel I-beam, type-64 military beam, assembled truss beam and eight or the seven formula railway recovery girder steels of common railway bridge rush-repair.These emergency steel girders are all developed in the past the eighties in last century, the no matter repairing application of all not competent current China Express Railway bridge from the aspect such as compliance, technical indicator.China is the country that a geological disaster takes place frequently, and High-speed Railway Network covers China's major part disaster region, and destroy once high-speed railway meets with and interrupt, economic loss is very large.At present, China is not also applicable to the special girder steel equipment of high-speed railway bridge repairing, therefore develops a kind of high-speed railway emergency steel girder and plugs a gap, significant.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of emergency steel girder of high-speed railway bridge after disaster is destroyed being applicable to China Express Railway 32m, 24m, 20m span.
For solving the problem, the technical solution used in the present invention is:
A kind of high-speed railway emergency steel girder, its key technology is: it comprises main bearing structure, described main bearing structure comprises two main truss structure be arranged in parallel, be connected with middle horizontal-associate hound by upper and lower two flat vertical frameworks between two main truss structure, described main truss structure is formed by connecting by multiple main truss framework and the end truss being arranged on its two ends, and described main bearing structure end face is provided with the support rail longeron for installing rail.
As a further improvement on the present invention, it comprises the two main bearing structures be set up in parallel, and is connected between two main bearing structures by horizontal-associate framework between two bridges, is provided with horizontal-associate adjustment framework between bridge between two bridges between horizontal-associate framework.
As a further improvement on the present invention, the length of described main truss framework is 6m or 4m.
As a further improvement on the present invention, tied by expansion pin between described main truss framework and connect.
As a further improvement on the present invention, described support rail longeron adopts plate frame element of construction form, is provided with the tread can installing rail and the bolt hole installing pressing track plate.
As a further improvement on the present invention, between described bridge, the width of horizontal-associate adjustment framework is 0.4m.
As a further improvement on the present invention, between described bridge, horizontal-associate framework adopts frame type flake structure.
As a further improvement on the present invention, described main truss framework comprises upper chord, lower chord and the web member between upper chord and lower chord arranged in a crossed manner.
The beneficial effect adopting technique scheme to produce is:
The present invention has filled up the blank of China Express Railway bridge without emergency steel girder, for after China Express Railway calamity to rob logical construction fast significant.The present invention forms bridge deck by the end face of main bearing structure, arranges two support rail longerons at its end face, installs rail by support rail longeron, and its sound construction is stablized, quick and easy for installation.Connected into the main truss structure of sheet by multiple main truss framework, convenient storage, transport and spelling group, its length can adjust according to actual needs.
Two main bearing structures are parallel to be arranged, and can form a hole two-wire girder steel, by arranging horizontal-associate adjustment framework between bridge, when two-wire spacing is changed to 5m by 4.6m, is arranged on by horizontal-associate adjustment framework between bridge the change realizing two-wire spacing between bridge between horizontal-associate framework.
Described main truss framework adopts the specification of 4m and 6m, and emergency steel girder not only can adapt to the high-speed railway bridge that standard span is 32m, 24m, 20m, can be also that 2m carries out span change according to modulus; Not only can adapt to the repairing of high-speed railway bridge, also can adapt to the repairing of common railway bridge.
Connected by expansion type pin between main truss framework, easy disassembly and basic eliminate pin interporal lacuna, improve the rigidity of structure.
The present invention can also expand and is applied at ordinary times in bridge engineering construction, as the application such as beam structure of make-shift bridge, construction bracket, interim crane gear.
Accompanying drawing explanation
Fig. 1 is section structure schematic diagram of the present invention.
Fig. 2 is side-looking structural formula of the present invention intention.
Fig. 3 is plan structure formula of the present invention intention.
Fig. 4 is 6m main truss frame structures formula intention in the present invention.
Fig. 5 is 4m main truss frame structures schematic diagram in the present invention.
Fig. 6 is middle-end trussed construction schematic diagram of the present invention.
Fig. 7 is upper flat vertical connection frame structures schematic diagram in the present invention.
Fig. 8 is lower flat vertical connection frame structures schematic diagram in the present invention.
Fig. 9 is the plan structure schematic diagram of support rail longeron in the present invention.
Figure 10 is the section structure formula intention of support rail longeron in the present invention.
Figure 11 is the structural representation of horizontal-associate framework between jackshaft of the present invention.
Figure 12 is the structural representation of horizontal-associate adjustment framework between jackshaft of the present invention.
Wherein: between 1 main truss framework, 2 flat vertical frameworks, 3 horizontal-associate hounds, 4 support rail longerons, 5 bridges, between horizontal-associate framework, 6 bridges, horizontal-associate adjusts horizontal-associate strut between framework, 7 end truss, 8 rail, 9 bridges.
Detailed description of the invention
Below in conjunction with accompanying drawing 1-12 and specific embodiment, invention is described in further detail:
A kind of high-speed railway emergency steel girder as illustrated in the accompanying drawings from 1 to 3, its be for high-speed railway bridge repairing special girder steel equipment, the present embodiment for 32m across.Whole hole emergency steel girder agent structure comprises the two main bearing structures be set up in parallel, connected by horizontal-associate framework 5 between two bridges between two main bearing structures, be provided with horizontal-associate adjustment framework 6 between bridge between two bridges between horizontal-associate framework 5, between bridge, between horizontal-associate framework 5 and bridge, horizontal-associate adjustment framework 6 forms the transverse splicing system between main bearing structure.
Horizontal-associate strut 9 between bridge is also provided with up and down between described two main bearing structures, between described bridge, horizontal-associate strut 9 to coordinate between bridge horizontal-associate adjustment framework 6 between horizontal-associate framework 5 and bridge to form the transverse splicing system between main bearing structure, makes to connect between two main bearing structures more firmly stable.
Described main bearing structure comprises two main truss structure be arranged in parallel, be connected with middle horizontal-associate hound 3 by upper and lower two flat vertical frameworks 2 between two main truss structure, described flat vertical connection framework 2 is adopt the structural system composed of bar be made up of channel-section steel and square steel, above establishes link bolt hole.Flat vertical connection framework 2 is respectively used to the integrated connection of main truss structure lower planes position, and described horizontal-associate hound 3 adopts square steel pipe structure, for the lateral connection between two panels main truss structure.
As Fig. 2,4,5 and 6, described main truss structure is formed by connecting with the end truss 7 being arranged on two ends by multiple main truss framework 1, is tied connect between described main truss framework 1 by expansion pin.Described main bearing structure end face is provided with the support rail longeron 4 for installing rail 8, is formed the bridge deck of emergency steel girder by support rail longeron 4 framework unit.As shown in Figures 9 and 10, support rail longeron 4 adopts plate frame element of construction form, it has the tread can installing rail 8 and the bolt hole installing pressing track plate.The rail 8 of emergency steel girder is just fixed on bridge deck support rail longeron, and fixes with pressing track plate.
As attached Figure 4 and 5, described main truss framework 1 has the framework unit of 4m and 6m two kinds of different sizes, and as required, the span that can be realized emergency steel girder by the framework element number adjusting two kinds of different sizes is changed according to modulus 2m.
Between described bridge, horizontal-associate framework 5 adopts frame type flake structure, and its effect is when rushing to repair for double track bridge, by two groups of main bearing structure transverse splicings of single line integrally.When horizontal-associate adjustment framework 6 is the distance between centers of tracks differences for double track bridge between described bridge, adjust the center to center distance between two groups of main bearing structures of single line with it.
As shown in Figure 4, described main truss framework 1 comprises upper chord 1-1, lower chord 1-2 and the web member 1-3 between upper chord 1-1 and lower chord 1-2 arranged in a crossed manner, two web member 1-3 are that X-type cross is arranged, the web member 1-3 formation web system that many groups are arranged in a crossed manner.Wherein upper chord 1-1 and lower chord 1-2 adopts H type section structure, and web member 1-3 adopts channel-section steel.Web system and top-bottom chord with bolts, connecting pin bores is all established in the both sides of top-bottom chord and web system.Main truss structure top-bottom chord centre-height is 2750mm, and often organizing main bearing structure left and right chord member transverse pitch is 2500mm.
Last it is noted that above embodiment is only in order to illustrate technical scheme of the present invention, be not intended to limit; Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in previous embodiment, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of embodiment of the present invention technical scheme.

Claims (8)

1. a high-speed railway emergency steel girder, it is characterized in that: it comprises main bearing structure, described main bearing structure comprises two main truss structure be arranged in parallel, be connected with middle horizontal-associate hound (3) by upper and lower two flat vertical frameworks (2) between two main truss structure, described main truss structure is formed by connecting by multiple main truss framework (1) and the end truss (7) that is arranged on its two ends, and described main bearing structure end face is provided with the support rail longeron (4) for installing rail.
2. a kind of high-speed railway emergency steel girder according to claim 1, it is characterized in that: it comprises the two main bearing structures be set up in parallel, connected by horizontal-associate framework (5) between two bridges between two main bearing structures, between two bridges, between horizontal-associate framework (5), be provided with horizontal-associate adjustment framework (6) between bridge.
3. a kind of high-speed railway emergency steel girder according to claim 1 and 2, is characterized in that: the length of described main truss framework (1) is 6m or 4m.
4. a kind of high-speed railway emergency steel girder according to claim 1, is characterized in that: tied by expansion pin between described main truss framework (1) and connect.
5. a kind of high-speed railway emergency steel girder according to claim 1, is characterized in that: described support rail longeron (4) adopts plate frame element of construction form, is provided with the tread can installing rail and the bolt hole installing pressing track plate.
6. a kind of high-speed railway emergency steel girder according to claim 2, is characterized in that: between described bridge, the width of horizontal-associate adjustment framework (6) is 0.4m.
7. a kind of high-speed railway emergency steel girder according to claim 2, is characterized in that: between described bridge, horizontal-associate framework (5) adopts frame type flake structure.
8. a kind of high-speed railway emergency steel girder according to claim 1 and 2, is characterized in that: described main truss framework (1) comprises upper chord (1-1), lower chord (1-2) and the web member (1-3) between upper chord (1-1) and lower chord (1-2) arranged in a crossed manner.
CN201510243891.8A 2015-05-14 2015-05-14 Recovery steel beam for high-speed railways Pending CN104894983A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510243891.8A CN104894983A (en) 2015-05-14 2015-05-14 Recovery steel beam for high-speed railways

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510243891.8A CN104894983A (en) 2015-05-14 2015-05-14 Recovery steel beam for high-speed railways

Publications (1)

Publication Number Publication Date
CN104894983A true CN104894983A (en) 2015-09-09

Family

ID=54027913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510243891.8A Pending CN104894983A (en) 2015-05-14 2015-05-14 Recovery steel beam for high-speed railways

Country Status (1)

Country Link
CN (1) CN104894983A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542032A (en) * 2017-04-25 2018-01-05 江苏沪宁钢机股份有限公司 A kind of safety-type bolt steel girder bridge and its construction technology
CN113957812A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable railway emergency repair beam and erection method thereof
CN113957813A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable truss member, expandable rush-repair beam truss and emergency rush-repair beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2409232Y (en) * 2000-01-28 2000-12-06 三卓工程顾问有限公司 Combined truss
KR100885817B1 (en) * 2008-09-10 2009-02-26 매크로드 주식회사 A bearing for monorail
CN101603288A (en) * 2009-07-03 2009-12-16 中铁大桥局股份有限公司 A kind of three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and mounting method thereof
CN202116984U (en) * 2011-05-11 2012-01-18 天津城市建设学院 Dragging-adjustable cross-brace device for continuous beams of spatial steel pipe trusses
CN204780638U (en) * 2015-05-14 2015-11-18 中国铁路总公司 High -speed railway salvagees girder steel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2409232Y (en) * 2000-01-28 2000-12-06 三卓工程顾问有限公司 Combined truss
KR100885817B1 (en) * 2008-09-10 2009-02-26 매크로드 주식회사 A bearing for monorail
CN101603288A (en) * 2009-07-03 2009-12-16 中铁大桥局股份有限公司 A kind of three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and mounting method thereof
CN202116984U (en) * 2011-05-11 2012-01-18 天津城市建设学院 Dragging-adjustable cross-brace device for continuous beams of spatial steel pipe trusses
CN204780638U (en) * 2015-05-14 2015-11-18 中国铁路总公司 High -speed railway salvagees girder steel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘嘉武; 徐光兴: "《新型铁路抢修钢梁的研究方略》", 《国防交通工程与技术》 *
陈坤,陈士通,孙志星: "《铁路快速抢修钢桥方案研究》", 《国防交通工程与技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542032A (en) * 2017-04-25 2018-01-05 江苏沪宁钢机股份有限公司 A kind of safety-type bolt steel girder bridge and its construction technology
CN113957812A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable railway emergency repair beam and erection method thereof
CN113957813A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable truss member, expandable rush-repair beam truss and emergency rush-repair beam

Similar Documents

Publication Publication Date Title
US11578465B2 (en) Temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and method of constructing same
CN103215886B (en) Novel short segment steel box-concrete combined beam
JP2009275476A (en) Vertical beam system of movement work vehicle for cantilever construction
CN101967793A (en) Quick-spliced sectional type composite material truss bridge
CN104894983A (en) Recovery steel beam for high-speed railways
CN104805769B (en) A kind of self-balancing arc beam cast-in-place support and construction method thereof
KR101725086B1 (en) Steel girder using through bridge girder segment for rapid bridge replacement
CN203890866U (en) Construction auxiliary beam
CN107905043B (en) Combined rail beam system of steel web truss with suspended bottom plate opening
CN204780638U (en) High -speed railway salvagees girder steel
CN206736717U (en) A kind of general maintenance platform of packaged type bridges
CN203411888U (en) Multi-gang and multi-span continuous steel truss bridge
CN203461693U (en) Ultrahigh steel support leg for combined gantry crane with Bailey truss
CN211873032U (en) Large-span regular splayed prestressed truss steel support
CN210886955U (en) Detachable combined jig frame used on flat steel box girder
CN103498419A (en) Box girder steel core mould and construction method thereof
CN205857004U (en) A kind of construction beam
CN105648911B (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete adhesion type prestressed girder support
CN207812189U (en) A kind of suspension type bottom plate open steel web truss combined track girder system system
CN109629350B (en) Prestressed seamless connection concrete track beam for empty iron and construction method thereof
CN106592434A (en) Modular box-type beam-slab structure and bridge erection method based on box-type beam-slab structure
CN113481885A (en) Construction method of I-shaped steel reinforcing beam for bridge
CN202248510U (en) Transversely arranged brace rod type bailey
CN109024267B (en) Steel truss girder structure of curved bridge floor
CN204551278U (en) A kind of self-balancing arc beam cast-in-place support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150909

RJ01 Rejection of invention patent application after publication