CN104881758B - The ERP system and its operation method of integrated supply chain cooperating manufacture - Google Patents

The ERP system and its operation method of integrated supply chain cooperating manufacture Download PDF

Info

Publication number
CN104881758B
CN104881758B CN201510346738.8A CN201510346738A CN104881758B CN 104881758 B CN104881758 B CN 104881758B CN 201510346738 A CN201510346738 A CN 201510346738A CN 104881758 B CN104881758 B CN 104881758B
Authority
CN
China
Prior art keywords
current enterprise
erp system
plan
enterprise
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510346738.8A
Other languages
Chinese (zh)
Other versions
CN104881758A (en
Inventor
虞力文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shuan Shang Information Technology Co Ltd
Original Assignee
Zhejiang Shuan Shang Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Shuan Shang Information Technology Co Ltd filed Critical Zhejiang Shuan Shang Information Technology Co Ltd
Priority to CN201510346738.8A priority Critical patent/CN104881758B/en
Publication of CN104881758A publication Critical patent/CN104881758A/en
Application granted granted Critical
Publication of CN104881758B publication Critical patent/CN104881758B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention provides a kind of ERP system and its operation method of integrated supply chain cooperating manufacture, wherein, the work compound plan of downstream collaboration side is managed with collaborative sales plan, and the deliverability of the upstream partner of cooperating manufacture is managed with collaborative work center.One collaborative work center only corresponds to a kind of material.One collaborative work center can correspond to multiple upstream partners, and the summation of their deliverabilities forms the ability at the collaborative work center.Current enterprise to the management at collaborative work center by realizing the synergic production management to upstream partner.The plan of needs of cooperating manufacture material is managed with the work compound plan at collaborative work center.The master production plan of the upstream partner of cooperating manufacture is changed into the collaboration job order of corresponding current enterprise, the actual executor for cooperateing with job order is its corresponding upstream cooperation unit.It can be inside supply chain resource conversion to ERP system, so as to whole supply chain by the present invention.

Description

The ERP system and its operation method of integrated supply chain cooperating manufacture
Technical field
The present invention relates to ERP system field, the ERP system of more particularly to a kind of integrated supply chain cooperating manufacture and its operation Method.
Background technology
Enterprise Resources Plan, i.e. ERP (Enterprise Resource Planning), by U.S. Gartner Group Company proposes in nineteen ninety.Enterprise resource planning software is except including manufacturing resources planning (Manufacture Resource Plan, MRP II) outside the functions such as existing manufacturing resource planning, manufacture, finance, sale, buying, there are quality management, laboratory Management, Business Process Management, product data management, stock, distribution and transportation management, human resource management and regular reporting system System.Enterprise Resources Plan refers to establish on Information Technology Foundation, is business decision layer and employee with the management thought of systematization The management platform of decision-making operation means is provided.ERP system supports discrete type, the mixing manufacturing environment such as Diversification Type, application range from Manufacturing industry extends to the operating divisions such as retail business, service trade, banking, telecommunications industry, government bodies and school, by merging number According to storehouse technology, graphic user interface, forth generation query language, client server architecture, computer aided development instrument, portable Open system etc. corporate resources has been carried out it is effectively integrated.At present, it has been extended in the meaning representated by China ERP, For all kinds of softwares of enterprise, the scope of ERP is completely included into.It has jumped out existing enterprise border, from supply chain scope The resource of optimization enterprise is gone, is the information system based on the age of Internet economy.
Supply chain management (Supply chain management, SCM) is a kind of integrated management thought and method, it It is functional to perform plan and the control of the logistics in supply chain from supplier to end user etc..From the point of view of single enterprise's angle, Refer to enterprise by improving upstream and downstream supply chain relationship, information flow, logistics, cash flow in integrating and optimizing supply chain, to obtain Obtain the competitive advantage of enterprise.
There are two essential characteristics for SCM systems:When be covered in all supply chain companies ERP and transaction processing system it On;Second is that tool is there are one translation interface, application system to integratedy chain Shang Ge companies, especially ERP system and various Data type.
The ERP software that supply chain company where enterprise uses can not possibly be provided by same manufacturer.It is this to pass through interface Realize that not only enforcement difficulty is big, the cycle is long with the scheme of SCM software collaborations, but also the cost developed is also very high.In supply chain Generally there are multiple clients in company, and each client selects different SCM softwares just to need to develop multiple interfaces.This causes System, which can become very bulky complex, scalability, can also substantially reduce.
The content of the invention
The present invention provides a kind of ERP systems and its operation method of integrated supply chain cooperating manufacture, can be by upstream and downstream The resource conversion of partner is managed for the internal resource of current enterprise ERP system, so as to pass through the pipe to being converted resource It manages to realize the management of the production process to supply chain Shang Ge enterprises, achieve the purpose that through ERP system whole supply chain.
In a first aspect, an embodiment of the present invention provides a kind of operation method of the ERP system of integrated supply chain cooperating manufacture, It is communicated between current enterprise and upstream partner and downstream collaboration side by respective ERP system transceiving data;It is described to work as Corresponding each side's contact COM code table of comparisons of material and collaborative work center are provided in the ERP system of preceding enterprise;The association It is multiple with work centre, each collaborative work center corresponds to a kind of material of cooperating manufacture respectively, each collaboration Work centre corresponds to one or more upstream partners, and the ability at the collaborative work center is the collaborative work center The deliverability summation of corresponding all upstream partners;The described method includes:
It is described current when the ERP system of the current enterprise receives the work compound plan of the downstream collaboration side The ERP system of enterprise is described current according to the work compound plan of the downstream collaboration side and COM code table of comparisons generation The collaborative sales plan of enterprise;Wherein, the collaborative sales plan of the current enterprise includes corresponding each downstream collaboration side Planned selling product, planned selling quantity and plan Shipping Date;
It is described to work as when the ERP system of the current enterprise receives the miscoordination purchase order of the downstream collaboration side The ERP system of preceding enterprise is according to the miscoordination purchase order of the downstream collaboration side and COM code table of comparisons generation The miscoordination sales order of current enterprise;
The ERP system of the current enterprise integrate the current enterprise collaborative sales plan and the current enterprise it is non- Collaborative sales order generates the master production plan of the current enterprise;
The ERP system of the current enterprise carries out ability need according to ability parameter to the master production plan of the current enterprise Plan computing is asked, judges whether the master production plan of the current enterprise is feasible, if feasible, the ERP systems of the current enterprise It unites and Material Requirements Planning computing is carried out to the master production plan of the current enterprise, generate the material requirement meter of the current enterprise It draws;Wherein, the ability parameter includes the ability at multiple collaborative work centers;
The ERP system of the current enterprise generates the current enterprise according to the Material Requirements Planning of the current enterprise Work compound plan, and the work compound plan of the current enterprise is sent to the upstream partner;
The ERP system of the current enterprise generates the current enterprise also according to the Material Requirements Planning of the current enterprise Miscoordination purchase order, and the miscoordination purchase order of the current enterprise is sent to the upstream partner;
Wherein, the work compound plan of the current enterprise includes the current enterprise and corresponds to the upstream partner COM code, name of material, plan quantity delivered, the scheduled delivery date of cooperating manufacture;
The miscoordination purchase order of the current enterprise includes the current enterprise and corresponds to the non-of the upstream partner COM code, name of material, purchase quantity, the scheduled delivery date of cooperating manufacture.
With reference to first aspect, the first possible embodiment an embodiment of the present invention provides first aspect, wherein, it is described The COM code table of comparisons is established using following manner:
The ERP system of the current enterprise receives the material letter of the upstream partner and the downstream collaboration side respectively Breath;
The ERP system of the current enterprise is believed according to the material information of reception and the material of the current enterprise itself Breath establishes the COM code table of comparisons;
The COM code table of comparisons includes:Material is in the COM code and name of material of the current enterprise, the object Material is in the COM code of the upstream partner, name of material, production feature and delivery time in advance and the material in institute State the COM code, name of material and purchasing lead time of downstream collaboration side.
The first possible embodiment with reference to first aspect, an embodiment of the present invention provides second of possibility of first aspect Embodiment, wherein, the work compound plan and the object of the ERP system of the current enterprise according to the downstream collaboration side The material coding table of comparisons generates the collaborative sales plan of the current enterprise, including:
To be purchased material of the ERP system of the current enterprise according to the work compound of the downstream collaboration side in the works COM code by the COM code table of comparisons, searches COM code of the material to be purchased in the current enterprise, The collaborative sales plan of the current enterprise is generated according to COM code of the material to be purchased in the current enterprise.
With reference to first aspect, the third possible embodiment an embodiment of the present invention provides first aspect, wherein, it is described The ERP system of current enterprise generates the work compound meter of the current enterprise according to the Material Requirements Planning of the current enterprise It draws, including:
The ERP system of the current enterprise is according to the cooperating manufacture material need in the Material Requirements Planning of the current enterprise Information is sought, generates the work compound plan of the current enterprise;
The ERP system of the current enterprise generates the current enterprise also according to the Material Requirements Planning of the current enterprise Miscoordination purchase order, including:
The ERP system of the current enterprise is according to the miscoordination production material in the Material Requirements Planning of the current enterprise Demand information generates the miscoordination purchase order of the current enterprise.
With reference to first aspect, an embodiment of the present invention provides the 4th kind of possible embodiment of first aspect, wherein, it is described Method further includes:
The ERP system of the upstream partner receives the work compound plan of the current enterprise, according to the current enterprise The work compound plan of industry generates the collaborative sales plan of the upstream partner;
The ERP system of the upstream partner receives the miscoordination purchase order of the current enterprise, according to described current The miscoordination purchase order of enterprise generates the miscoordination sales order of the upstream partner;
The collaborative sales plan that the ERP system of the upstream partner integrates the upstream partner is cooperated with the upstream The miscoordination sales order of side generates the master production plan of the upstream partner;
The ERP system of the upstream partner carries out Capacity Requirements Planning fortune to the master production plan of the upstream partner It calculates, after determining that the master production plan of the upstream partner is feasible, the master production plan of the feasible upstream partner is sent out It send to the current enterprise.
4th kind of possible embodiment with reference to first aspect, an embodiment of the present invention provides the 5th kind of possibility of first aspect Embodiment, wherein, the method further includes:
The ERP system of the current enterprise receives the master production plan of the upstream partner, is cooperated according to the upstream The master production plan of side generates the collaboration job order of the current enterprise;
The ERP system of the current enterprise is according to the collaboration job order of the current enterprise and the collaboration of the current enterprise Can production plan analyze the upstream partner and complete to produce on schedule, if the upstream partner can not complete to produce on schedule, Progress warning information then is sent to the upstream partner, and receives the progress feedback information that the upstream partner returns;
Wherein, the collaboration job order of the current enterprise includes the production material coding of the upstream partner, plan life Produce quantity, scheduled delivery date.
4th kind of possible embodiment with reference to first aspect, an embodiment of the present invention provides the 6th kind of possibility of first aspect Embodiment, wherein, the method further includes:
The generation production after the completion of the master production plan of the upstream partner performs of the ERP system of the upstream partner Storage bill, and the production storage bill is sent to the current enterprise;
The ERP system of the upstream partner according to the upstream partner collaborative sales Shipping Information in the works, It delivers to the current enterprise and sends the Shipping Information;
The ERP system of the current enterprise receives and carries out core according to the Shipping Information of the upstream partner after cargo It is right, after verification arrival information is sent to the upstream partner.
5th kind of possible embodiment with reference to first aspect, an embodiment of the present invention provides the 7th kind of possibility of first aspect Embodiment, wherein, the method further includes:
The ERP system of the current enterprise generates the current enterprise also according to the collaboration job order of the current enterprise Coordinated procurement order, and the coordinated procurement order of the current enterprise is sent to the upstream partner;Wherein, the collaboration Purchase order includes cooperating manufacture COM code, cooperating manufacture quantity, the scheduled delivery date of the current enterprise;
The ERP system of the upstream partner receives the coordinated procurement order of the current enterprise, according to the current enterprise The coordinated procurement order of industry generates the collaborative sales order of the upstream partner.
7th kind of possible embodiment with reference to first aspect, an embodiment of the present invention provides the 8th kind of possibility of first aspect Embodiment, wherein, the method further includes:
The ERP system of the upstream partner is cooperated according to the collaborative sales order of the upstream partner with the upstream The collaborative sales plan of side analyzes the stability of requirement of the current enterprise, according to the stability of requirement tune of the current enterprise The ability at the collaborative work center of the whole current enterprise.
Second aspect, an embodiment of the present invention provides a kind of ERP system of integrated supply chain cooperating manufacture, current enterprise with It is communicated between upstream partner and downstream collaboration side by respective ERP system transceiving data;The ERP of the current enterprise Corresponding each side's contact COM code table of comparisons of material and collaborative work center are provided in system;The collaborative work center is Multiple, each collaborative work center corresponds to a kind of material of cooperating manufacture respectively, and each collaborative work center corresponds to One or more upstream partners, the ability at the collaborative work center is the corresponding all institutes in the collaborative work center State the deliverability summation of upstream partner;The system comprises:
Collaborative sales plan generation module, the ERP system for working as the current enterprise receive the downstream collaboration side Work compound plan when, the ERP system of the current enterprise is according to the work compound plan of the downstream collaboration side and described The COM code table of comparisons generates the collaborative sales plan of the current enterprise;Wherein, the collaborative sales plan of the current enterprise Planned selling product, planned selling quantity and plan Shipping Date including each downstream collaboration side of correspondence;
Miscoordination sales order generation module, the ERP system for working as the current enterprise receive the downstream collaboration During the miscoordination purchase order of side, the ERP system of the current enterprise is according to the miscoordination purchase order of the downstream collaboration side The miscoordination sales order of the current enterprise is generated with the COM code table of comparisons;
Master production plan generation module integrates the collaboration pin of the current enterprise for the ERP system of the current enterprise The miscoordination sales order of the plan of selling and the current enterprise generates the master production plan of the current enterprise;
Material Requirements Planning generation module, for the current enterprise ERP system according to ability parameter to described current The master production plan of enterprise carries out Capacity Requirements Planning computing, judges whether the master production plan of the current enterprise is feasible, if Feasible, then the ERP system of the current enterprise carries out Material Requirements Planning computing to the master production plan of the current enterprise, raw Into the Material Requirements Planning of the current enterprise;Wherein, the ability parameter includes the ability at multiple collaborative work centers;
Work compound plan generation module, for the current enterprise ERP system according to the material of the current enterprise Plan of needs generates the work compound plan of the current enterprise, and the work compound plan of the current enterprise is sent to institute State upstream partner;
Miscoordination purchase order generation module, for the current enterprise ERP system also according to the current enterprise Material Requirements Planning generates the miscoordination purchase order of the current enterprise, and by the miscoordination purchase order of the current enterprise It is sent to the upstream partner;
Wherein, the work compound plan of the current enterprise includes the current enterprise and corresponds to the upstream partner COM code, name of material, plan quantity delivered, the scheduled delivery date of cooperating manufacture;
The miscoordination purchase order of the current enterprise includes the current enterprise and corresponds to the non-of the upstream partner COM code, name of material, purchase quantity, the scheduled delivery date of cooperating manufacture.
In the prior art, for current enterprise, the deliverability of upstream partner, the demand feelings of downstream collaboration side Condition belongs to the external resource of current enterprise, these resources are existed only in inside upstream and downstream partner.In the embodiment of the present invention In, collaborative work center is the equal of mapping of the workshop of upstream partner in current enterprise ERP system, passes through collaboration Work centre is able to know that the deliverability of upstream partner.Collaborative work center is set inside the ERP system of current enterprise, It is equivalent to and the resources of production of upstream partner are converted into the internal resource of current enterprise ERP system are managed.
In the embodiment of the present invention, the work compound plan of downstream collaboration side and miscoordination purchase order are downstream collaboration sides pair The demand of current enterprise, the ERP system of current enterprise receive these demands and generate corresponding collaborative sales plan and miscoordination Sales order is the equal of the internal resource that the demand of downstream collaboration side is converted into current enterprise, in the inside of current enterprise It is managed.Therefore through this embodiment in operation method and system, can by the resource conversion of upstream and downstream partner for work as The internal resource of preceding company ERP system is managed, and so as to be managed to the production process of supply chain Shang Ge enterprises, is reached logical Cross the purpose of ERP system whole supply chain.
Description of the drawings
It in order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows the operation method of the ERP system for the integrated supply chain cooperating manufacture that first embodiment of the invention is provided Flow diagram;
Fig. 2 shows a kind of operation method flow of the ERP system for the upstream partner that first embodiment of the invention is provided Schematic diagram;
Fig. 3 shows main life of the ERP system based on upstream partner for the current enterprise that first embodiment of the invention is provided Produce the operation method flow diagram of plan;
Fig. 4 shows that a kind of method flow schematic diagram of information processing is arrived in the delivery that first embodiment of the invention is provided;
Fig. 5 shows the ERP system generation collaborative sales order for the upstream partner that first embodiment of the invention is provided A kind of method flow schematic diagram;
Fig. 6 shows the structural representation of the ERP system for the integrated supply chain cooperating manufacture that second embodiment of the invention is provided Figure;
Fig. 7 shows that the ERP system that third embodiment of the invention is provided realizes that the operation flow of supply chains production is shown It is intended to.
Specific embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the application can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to which those skilled in the art is made to more fully understand the present invention program, below in conjunction with attached in the embodiment of the present invention Figure, is clearly and completely described the technical solution in the embodiment of the present invention, it is clear that described embodiment is only this Invention part of the embodiment, instead of all the embodiments.Embodiments of the present invention, which are generally described and illustrated herein in the accompanying drawings Component can arrange and design with a variety of configurations.Therefore, the implementation to the present invention provided in the accompanying drawings below The detailed description of example is not intended to limit the scope of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiment of the present invention, those skilled in the art are obtained all on the premise of creative work is not made Other embodiment belongs to the scope of protection of the invention.
For the ease of understanding present disclosure, brief introduction is done to the technical principle of the present invention first here.
The defects of for the prior art, the present invention provides a kind of ERP systems and its fortune of integrated supply chain cooperating manufacture The resource conversion of upstream and downstream partner can be managed, so as to logical by row method for the internal resource of current enterprise ERP system It crosses to the management for being converted resource to realize the management of the production process to supply chain Shang Ge enterprises, reach through ERP system pipe Manage the purpose of supply chain.
By the ERP system and its operation method of the integrated supply chain cooperating manufacture in the present invention, supply chain can be realized Cooperating manufacture between Shang Ge enterprises manages cooperating manufacture process, additionally it is possible to which the miscoordination between supply chain Shang Ge enterprises is given birth to Production is managed.
Those skilled in the art are able to know that there are two core populations for supply chain where current enterprise:Upstream cooperation unit (upstream partner namely hereinafter) and downstream client (downstream collaboration side namely hereinafter).Upstream cooperation unit master There are two classes:Supplier and external coordination unit.Current enterprise and the business of upstream cooperation unit relate generally to two class internal resources:Outside Purchase part and cooperation part.The internal resource that the business of current enterprise and downstream client are related to is finished product.Existing ERP software passes through pin It sells, purchase, entrusting the modules such as outer to manage above-mentioned business, range of management is confined to current enterprise internal affairs.The embodiment of the present invention It is managed using upstream and downstream unit transaction is changed into internal resource, the rule of conversion is as follows.
(1) the work compound plan of cooperating manufacture client is managed with collaborative sales plan.Collaborative sales plan with it is existing The difference of marketing plan is that the former is that certain client proposes current enterprise, and the latter is that current enterprise is formulated for unknown client 's.The execution flow of collaborative sales plan and marketing plan is consistent.
(2) deliverability of the upstream cooperation unit of cooperating manufacture is managed with collaborative work center, a collaborative work Center only corresponds to a kind of outsourcing piece or cooperation part, i.e., only corresponds to a kind of material.One collaborative work center can be corresponded on multiple Cooperation unit is swum, the summation of their deliverabilities forms the ability at the collaborative work center.Current enterprise sets up multiple collaborations Work centre.Current enterprise to the management at collaborative work center by realizing the synergic production management to upstream cooperation unit.
(3) plan of needs of cooperating manufacture material is managed with the work compound plan at collaborative work center.
(4) work is sent in the collaboration that the master production plan of the upstream cooperation unit of cooperating manufacture is changed into corresponding current enterprise It is single.The actual executor for cooperateing with job order is its corresponding upstream cooperation unit.
Compared with prior art, it then follows above-mentioned rule, the operation principle of supply chain management by integrated supply chain company ERP System is converted into integrated supply chain resource, supply chain resource is converted into all kinds of resources of ERP software management, so as to fulfill ERP The target of Integrated Simulation supply chain business.
In the present invention, material, order with " collaboration " printed words, plan are referred to carry out the material of cooperating manufacture, ordered Single, plan.Material, order with " miscoordination " printed words, plan refer to carry out material, order, the meter of miscoordination production It draws.
Present disclosure is discussed in detail with reference to specific embodiment.Those skilled in the art are able to know that, hereafter institute The step label write is not the restriction to specific steps execution sequence such as step 101, step 102, in the execution phase of each step In the case of mutual independence, the execution sequence of each step can be not limited to the label hereafter write depending on the specific condition of production Sequentially.
Embodiment one
As shown in Figure 1, first embodiment of the invention provides a kind of operation of the ERP system of integrated supply chain cooperating manufacture Method, wherein, led between current enterprise and upstream partner and downstream collaboration side by respective ERP system transceiving data Letter.
Current enterprise can be by the method that ERP system communicates with upstream and downstream partner:In current enterprise and upstream and downstream Increase data communication module and data communication object module in the ERP system of partner, while set up an address and safeguard Mechanism, it becomes possible to realize the communication function between ERP system.The communication function of ERP system is received and dispatched automatically by system.
The COM code table of comparisons of corresponding each side's contact material is provided in the ERP system of current enterprise.The COM code The foundation of the table of comparisons includes:The ERP system of current enterprise receives the material information of upstream partner and downstream collaboration side respectively;When The ERP system of preceding enterprise establishes the COM code table of comparisons according to the material information of reception and the material information of current enterprise itself.
The above-mentioned COM code table of comparisons includes:Material is in the COM code and name of material of current enterprise, and material is in upstream Material of COM code, name of material, production feature and the delivery time in advance and material of partner in downstream collaboration side is compiled Code, name of material and purchasing lead time.
By the above-mentioned COM code table of comparisons, current enterprise is in the COM code for receiving upstream and downstream partner and sending Afterwards, the COM code of itself can be translated into, so as to know the information of material needed for upstream and downstream partner, such as required material Title, the corresponding production feature of required material, delivery time in advance and purchasing lead time, so as to subsequent production work into Row.
Collaborative work center is additionally provided in the ERP system of current enterprise.The setting principle at collaborative work center is:Collaboration Work centre is multiple, and each collaborative work center corresponds to a kind of material of cooperating manufacture, each collaborative work center pair respectively One or more upstream partners are answered, the ability at collaborative work center is the corresponding all upstream partners in collaborative work center Deliverability summation.
On collaborative work center it is to be understood that the upstream partner that collaborative work center is exactly current enterprise is working as Mapping in the ERP system of preceding enterprise, the deliverability of upstream partner are embodied by the ability at collaborative work center, currently The ERP system of enterprise manages upstream partner by managing collaborative work center.
The operation method of the ERP system of integrated supply chain cooperating manufacture in the present embodiment comprises the following steps:
Step 101, when the ERP system of current enterprise receives the work compound plan of downstream collaboration side, current enterprise ERP system is according to the work compound plan of downstream collaboration side and the collaborative sales meter of COM code table of comparisons generation current enterprise It draws.
In a step 101, the work compound plan of downstream collaboration side, the collaborative sales plan of current enterprise are to be assisted With the plan of production.The work compound plan of downstream collaboration side includes COM code to be purchased, the object to be purchased of downstream collaboration side Material quantity and plan are received the date.The collaborative sales plan of current enterprise includes the planned selling production of corresponding each downstream collaboration side Product, planned selling quantity and plan Shipping Date.
The specific generating process of the collaborative sales plan of current enterprise is:
The material of to be purchased material of the ERP system of current enterprise according to the work compound of downstream collaboration side in the works is compiled Code by the COM code table of comparisons, searches COM code of the material to be purchased of downstream collaboration side in current enterprise, under Swim the collaborative sales plan of COM code generation current enterprise of the material to be purchased of partner in current enterprise.COM code The table of comparisons here functions as the effect of COM code conversion.
Step 102, when the ERP system of current enterprise receives the miscoordination purchase order of downstream collaboration side, current enterprise ERP system according to the miscoordination purchase order and the COM code table of comparisons of downstream collaboration side generate current enterprise miscoordination pin Sell order.
In a step 102, the miscoordination purchase order of downstream collaboration side, the miscoordination sales order of current enterprise be into The order of row miscoordination production.The miscoordination purchase order of downstream collaboration side includes the buying COM code of downstream collaboration side, adopts It purchases material quantity and receives the date.The miscoordination sales order of current enterprise includes the sale production of corresponding each downstream collaboration side Product, sales volume and Shipping Date.
The specific generating process of the miscoordination sales order of current enterprise is:
The ERP system of current enterprise passes through according to the buying COM code in the miscoordination purchase order of downstream collaboration side The COM code table of comparisons searches COM code of the buying material of downstream collaboration side in current enterprise, according to downstream collaboration side Buying material in current enterprise COM code generation current enterprise miscoordination sales order.The COM code table of comparisons exists Here COM code conversion is played the role of.
Step 103, the collaborative sales plan of ERP system synthesis current enterprise of current enterprise and the miscoordination of current enterprise Sales order generates the master production plan of current enterprise,
Step 104, the ERP system of current enterprise carries out ability need according to ability parameter to the master production plan of current enterprise Plan computing is asked, judges whether the master production plan of current enterprise is feasible.Wherein, ability parameter includes multiple collaborative work centers Ability.If the master production plan of current enterprise is feasible, the ERP system of current enterprise to the master production plan of current enterprise into Row Material Requirements Planning computing generates the Material Requirements Planning of current enterprise.
It has been previously mentioned, the ability at collaborative work center is the confession of the corresponding all upstream partners in collaborative work center Should be able to power summation, it is recognised that the master production plan of current enterprise needs the participation of upstream partner, therefore at step 104 The ability with reference to collaborative work center is needed, judges whether the master production plan of current enterprise is feasible.
At step 104, the ERP system of current enterprise carries out energy according to ability parameter to the master production plan of current enterprise Power plan of needs computing generates the Capacity Requirements Planning of current enterprise, and the ERP system of current enterprise is by judging current enterprise Whether Capacity Requirements Planning is feasible, judges whether the master production plan of current enterprise is feasible.If the ability need meter of current enterprise It draws feasible, then it is assumed that the master production plan of current enterprise is feasible, conversely, then the master production plan of current enterprise is infeasible.
At step 104, if the master production plan of current enterprise is feasible, material requirements calculating is carried out to it, is worked as The Material Requirements Planning of preceding enterprise.If the master production plan of current enterprise is infeasible, display alarm information reminds current enterprise Staff, master production plan is infeasible, so as to which staff be made to adjust master production plan as early as possible, until master production plan can Row.
Step 105, the ERP system of current enterprise generates the collaboration of current enterprise according to the Material Requirements Planning of current enterprise Production plan, and the work compound plan of current enterprise is sent to upstream partner.
In step 105, the work compound plan of current enterprise is that current enterprise carries out cooperating manufacture with upstream partner Plan.The specific generating process of the work compound plan of current enterprise is:The ERP system of current enterprise is according to current enterprise Cooperating manufacture material requirement information in Material Requirements Planning, generates the work compound plan of current enterprise.Wherein, cooperating manufacture Material is the material of cooperating manufacture between current enterprise and upstream partner.
In step 105, cooperating manufacture material requirement information includes COM code, demand, the need of cooperating manufacture material Ask the date.The material that the work compound plan of current enterprise includes the cooperating manufacture that current enterprise corresponds to upstream partner is compiled Code, name of material, plan quantity delivered, scheduled delivery date.
It is understood that for current enterprise, each collaborative work center corresponds to a kind of cooperating manufacture material, collaboration Production plan is the production plan of cooperating manufacture material, therefore work compound plan and collaborative work center be there are correspondence, Each plan of cooperating corresponds to a collaborative work center.
Step 106, the ERP system of current enterprise is also according to the non-of the Material Requirements Planning generation current enterprise of current enterprise Coordinated procurement order, and the miscoordination purchase order of current enterprise is sent to upstream partner.
In step 106, the miscoordination purchase order of current enterprise is that current enterprise carries out miscoordination with upstream partner The order of production.The specific generating process of the miscoordination purchase order of current enterprise is:The ERP system of current enterprise is according to current Miscoordination production material demand information in the Material Requirements Planning of enterprise generates the miscoordination purchase order of current enterprise.Its In, miscoordination production material is the material that miscoordination produces between current enterprise and upstream partner.
In step 106, miscoordination production material demand information includes the COM code of miscoordination production material, demand Amount, Date Required.The miscoordination purchase order of current enterprise includes the miscoordination production that current enterprise corresponds to upstream partner COM code, name of material, purchase quantity, scheduled delivery date.
By above-mentioned steps 101 to step 106, using the operation method in the embodiment of the present invention, current enterprise ERP system can receive the work compound plan of downstream collaboration side and the miscoordination purchase order of downstream collaboration side, current enterprise ERP system can also upstream partner send current enterprise work compound plan and current enterprise miscoordination buying order It is single, therefore the ERP system of current enterprise can contact the production process of current enterprise and the production process of upstream and downstream partner Together, it is managed so as to be produced to the cooperating manufacture between supply chain Shang Ge enterprises and miscoordination.
In the prior art, for current enterprise, the deliverability of upstream partner, the demand feelings of downstream collaboration side Condition belongs to the external resource of current enterprise, these resources are existed only in inside upstream and downstream partner.In the embodiment of the present invention In, collaborative work center is the equal of mapping of the workshop of upstream partner in current enterprise ERP system, passes through collaboration Work centre is able to know that the deliverability of upstream partner.Collaborative work center is set inside the ERP system of current enterprise, It is equivalent to and the resources of production of upstream partner are converted into the internal resource of current enterprise ERP system are managed.
In the embodiment of the present invention, the work compound plan of downstream collaboration side and miscoordination purchase order are downstream collaboration sides pair The demand of current enterprise, the ERP system of current enterprise receive these demands and generate corresponding collaborative sales plan and miscoordination Sales order is the equal of the internal resource that the demand of downstream collaboration side is converted into current enterprise, in the inside of current enterprise It is managed.
Therefore through this embodiment in operation method, can by the resource conversion of upstream and downstream partner be current enterprise The internal resource of ERP system is managed, so as to by realizing the management for being converted resource to supply chain Shang Ge enterprises The management of production process reaches the purpose of whole supply chain.
Above-mentioned operation method shown in FIG. 1 is the description carried out from current enterprise side, and Fig. 2 is from the side description of upstream partner Upstream partner ERP system a kind of operation method flow diagram, as shown in Fig. 2, the operation method in the present embodiment is also Comprise the following steps:
Step 201, the ERP system of upstream partner receives the work compound plan of current enterprise, according to current enterprise Work compound plan generates the collaborative sales plan of upstream partner.Specific generating process with reference to above, with current enterprise according to The process of the collaborative sales plan of the work compound plan generation current enterprise of downstream collaboration side is identical.
Step 202, the ERP system of upstream partner receives the miscoordination purchase order of current enterprise, according to current enterprise Miscoordination purchase order generation upstream partner miscoordination sales order.Specific generating process is looked forward to reference to above with current The process that industry generates the miscoordination sales order of current enterprise according to the miscoordination purchase order of downstream collaboration side is identical.
Step 203, the collaborative sales plan of ERP system synthesis upstream partner of upstream partner and upstream partner Miscoordination sales order generates the master production plan of upstream partner.
Step 204, the ERP system of upstream partner carries out Capacity Requirements Planning fortune to the master production plan of upstream partner It calculates, after determining that the master production plan of upstream partner is feasible, the master production plan of feasible upstream partner is sent to currently Enterprise.
By step 201 to step 204, the ERP system of upstream partner can receive the demand of current enterprise (currently The work compound plan of enterprise and miscoordination purchase order), and according to the main life of the demand of current enterprise formulation upstream partner Production plan.The master production plan of feasible upstream partner is also returned to current enterprise by the ERP system of upstream partner.
The operational process of ERP system based on upstream partner shown in Fig. 2, the present embodiment additionally provide Fig. 3, and Fig. 3 is The operation method flow diagram of master production plan of the ERP system of current enterprise based on upstream partner.As shown in figure 3, work as The ERP system of preceding enterprise is made that following processing according to the master production plan of upstream partner.
Step 301, the ERP system of current enterprise receives the master production plan of upstream partner, according to upstream partner Master production plan generates the collaboration job order of current enterprise.
Specifically, after the ERP system of current enterprise receives the master production plan of upstream partner, to upstream partner Master production plan carries out Data Format Transform, and work is sent in the collaboration that the master production plan of upstream partner is converted to current enterprise It is single.
It is recognised that there are correspondence between collaborative work center and upstream partner, therefore according to upstream partner Master production plan generation collaboration job order, also there are correspondences with collaborative work center.It is considered that collaboration job order There is the collaborative work center being subordinate to.The content of the collaboration job order of current enterprise is interior with the master production plan of upstream partner Hold identical.The collaboration job order of current enterprise includes the production material coding of upstream partner, planned production quantity, and plan is delivered Date.
Step 302, the ERP system of current enterprise is according to the collaboration job order of current enterprise and the work compound of current enterprise Can planning analysis upstream partner complete to produce on schedule, if upstream partner can not complete to produce on schedule, upstream cooperate Side sends progress warning information, and receives the progress feedback information of upstream partner return.
Specifically, the collaborative work plan of current enterprise is the equal of that current enterprise produces meter to the expectation of upstream partner It draws, the collaboration job order of current enterprise includes the content of the master production plan of upstream partner, the collaboration job order of current enterprise Be the equal of the actual production plan of upstream partner, therefore the ERP system of current enterprise sends work according to the collaboration of current enterprise Single and current enterprise work compound plan, which can be analyzed, knows that can upstream partner complete to produce on schedule, if upstream partner It can not complete to produce on schedule, then upstream partner sends warning information to the ERP system of current enterprise, reminds upstream partner tune The whole production schedule accelerates manufacturing schedule.The ERP system of current enterprise also receives the progress feedback information of upstream partner return.
By step 301 and step 302, the ERP system of current enterprise is according to the master production plan of upstream partner Generation collaboration job order, and collaboration job order is managed, it is equal to the production to upstream partner inside current enterprise Process is managed.
For current enterprise and the delivery arrival situation of upstream partner, the above method of the present embodiment can also be included such as Delivery shown in Fig. 4 is to message processing flow, as shown in figure 4, concrete processing procedure is as follows.
Step 401, the ERP system of upstream partner generation production after the completion of the master production plan of upstream partner performs Storage bill, and production storage bill is sent to current enterprise.
Specifically, after the completion of the master production plan of upstream partner performs, according to production procedure, the ERP of upstream partner System will generate production storage bill, and production storage bill is also sent to current enterprise, made current by the ERP system of upstream partner The warehouse situation of upstream partner is known by enterprise.
Step 402, the ERP system of upstream partner according to upstream partner collaborative sales Shipping Information in the works, It delivers to current enterprise and sends Shipping Information.
Specifically, the collaborative sales plan of upstream partner includes the Shipping Information of upstream partner.Upstream partner ERP system delivers to current enterprise according to the collaborative sales Shipping Information in the works of upstream partner and sends Shipping Information.
Step 403, the ERP system of current enterprise receives and carries out core according to the Shipping Information of upstream partner after cargo Right, upstream partner sends arrival information after verification.
Specifically, while the ERP system of current enterprise receives upstream partner shipment, can also receive Swim the Shipping Information of partner.The ERP system of current enterprise carries out the cargo received according to the Shipping Information of upstream partner Verification, upstream partner returns to arrival information after verification.
By step 401 to step 403, the ERP system of upstream partner can be sent to current enterprise system gives birth to Storage bill and Shipping Information are produced, the ERP system of current enterprise can also be according to the situation for receiving cargo, upstream partner's return Arrival information is received management so as to fulfill the storage delivery between current enterprise and upstream partner.
Fig. 5 is the method flow schematic diagram of the ERP system generation collaborative sales order of the upstream partner in the present embodiment. As shown in figure 5, the concrete processing procedure of the ERP system generation collaborative sales order of upstream partner is as follows.
Step 501, the ERP system of current enterprise is also according to the collaboration of the collaboration job order generation current enterprise of current enterprise Purchase order, and the coordinated procurement order of current enterprise is sent to upstream partner;Wherein, coordinated procurement order includes current Cooperating manufacture COM code, cooperating manufacture quantity, the scheduled delivery date of enterprise.
Specifically, the principle of cooperating manufacture is first to produce, according to the practical condition label purchase order of upstream partner. Therefore herein, the ERP system of current enterprise is able to know that the specific of upstream partner according to the collaboration job order of current enterprise The condition of production so as to arrange procurement demand according to the specific condition of production of upstream partner, generates the coordinated procurement of current enterprise Order.It is current since the coordinated procurement order of current enterprise is generated according to the specific condition of production of upstream partner The coordinated procurement order of enterprise is more conform with the actual production capacity of upstream partner.
Step 502, the ERP system of upstream partner receives the coordinated procurement order of current enterprise, according to current enterprise Coordinated procurement order generates the collaborative sales order of upstream partner.
It is able to know that according to the principle of cooperating manufacture, upstream partner is raw for the production task of collaborative sales order Production is completed, therefore the collaborative sales order of upstream partner is served only for sales management effect.
By step 501 and step 502, meet the actual life of upstream partner by cooperateing with job order that can generate The coordinated procurement order of production situation, so as to fulfill the cooperating manufacture between current enterprise and upstream partner and coordinated procurement.
Summary processing method, in the present embodiment, the ERP system of upstream partner can also include following treated Journey:The ERP system of upstream partner according to the collaborative sales order of upstream partner and the collaborative sales plan of upstream partner, The stability of requirement of current enterprise is analyzed, the collaborative work center of current enterprise is adjusted according to the stability of requirement of current enterprise Ability.
Specifically, the collaborative sales order of upstream partner is generated according to the coordinated procurement order of current enterprise, energy Enough reflect the actual purchase situation of current enterprise.The collaborative sales plan of upstream partner is the work compound according to current enterprise Plan generation, reflection is the expectation production schedule of current enterprise before the start of production.By the association for comparing upstream partner With the collaborative sales plan of sales order and upstream partner, it is able to know that between the expectation production of current enterprise and actual purchase Gap, so as to analyze the buying stability of current enterprise.
If differing too big between the expectation production and actual purchase of current enterprise, illustrate that the demand of current enterprise is stablized Property it is poor, be easy to cause upstream partner production waste.The stability of requirement of current enterprise is poor, less than default standard stabiliser During property, the ERP system of upstream partner can change the deliverability that upstream partner is supplied to current enterprise.
The process of ability at the collaborative work center of the ERP system adjustment current enterprise of upstream partner can be:Upstream The ERP system adjustment of partner is supplied to the deliverability of current enterprise, and deliverability modification information is sent to current enterprise Industry;The ERP system of current enterprise carries out the ability at related collaborative work center according to the deliverability modification information received Adjustment.
Since the ability at collaborative work center in current enterprise ERP system is determined by the deliverability of upstream partner, because This in this way upstream partner can change current enterprise collaborative work center ability, so as to make current enterprise not It can propose excessively high expectation production.(when the ERP system of current enterprise carries out Capacity Requirements Planning computing to master production plan, The ability with reference to collaborative work center is needed, if the ability at collaborative work center reduces, the production capacity of master production plan It can accordingly reduce.)
In a particular application, receive process there is also delivery between current enterprise and downstream collaboration side, which can wrap It includes:(1) ERP system of current enterprise generation production storage bill after the completion of the master production plan of current enterprise performs, and will be raw Production storage bill is sent to downstream collaboration side.(2) ERP system of current enterprise according to current enterprise collaborative sales hair in the works Goods information, downstream partner deliver and send Shipping Information.(3) ERP system of downstream collaboration side receives basis after cargo The Shipping Information of current enterprise is checked, and arrival information is sent to current enterprise after verification.
Storage bill will be produced by above-mentioned current enterprise and Shipping Information is handed down to downstream collaboration side, downstream collaboration side can Cargo is checked, and then arrival information is fed back to current enterprise, the ERP system of current enterprise and downstream collaboration side both sides are led to Crossing respective ERP system can realize that distributing for cargo is capable of the accuracy of effective guarantee cargo, is carried with management process, the process The safety guarantee of Sheng Liao enterprises.
In actual production, the ERP system of current enterprise further includes following process flow:The ERP system root of current enterprise According to the Material Requirements Planning of current enterprise, the Production Scheduling Problem of current enterprise is generated, and is sent to the production vehicle of current enterprise Between carry out production operation.
By with the application of the invention, existing ERP manufacturers only need to increase data communication and data communication object module in its product, Setting up an address maintenance mechanism simultaneously can be without the collaboration between development interface realization isomery ERP software.ERP is soft Supply chain associated traffic data sends realization and standardizes, after automation in part, it is possible to realize that supply chains automate.
The technical scheme is that the core operation principles, computation model in ERP software are real on the basis of being basically unchanged Existing supply chains production.This causes ERP manufacturers only to need less input that product can be made to realize supply chains production, simultaneously Client continues to use entire supply chains production management the administrative skill of existing ERP substantially.It is this that cooperating manufacture upstream is cooperated The supply of unit is converted into collaborative work center, supply chain procreative collaboration, the process monitoring related operation at collaborative work center Carry out substitution method, not only simplify supply chains production management business, implementation success rate can also be improved and reduce client Realize the learning cost of supply chains production.
In the case where production line automation, intelligence degree be not high, current enterprise can be deep by being carried out to production line Spend cutting, the flexible manufacturing ability of the external increase production line of process committee.It is outer that current enterprise manages committee by collaborative work center Not only simple, intuitive, and it is efficiently automatic.Client only need to be by increasing or decreasing the method at collaborative work center come flexibly simultaneously Convenient adjustment production line, improves market susceptibility and respond.If current enterprise is gathered around, there are one operational efficiency height, collaboration lifes Production automation, intelligentized supply chain, theoretically current enterprise production outsourcing and can be managed by collaborative work center entirely, So as to build a virtual production line.
Current enterprise is arranged to the time in advance of cooperating manufacture outsourcing piece:The production feature of upstream cooperation unit and current The sum of purchasing lead time of enterprise, it is possible to zero inventory management pattern is realized in the entire supply chain of current enterprise, so that Business Ecosystem where current enterprise overall stock greatly reduce, turnover rate of materials has and is significantly promoted.
Embodiment two
Based on the technical principle of embodiment one, second embodiment of the invention provides a kind of integrated supply chain cooperating manufacture ERP system, it is above-mentioned to be suitable for for performing the operation method of the ERP system of the integrated supply chain cooperating manufacture in embodiment one The description of embodiment one is equally applicable to embodiment two.
As shown in fig. 6, a kind of ERP system of integrated supply chain cooperating manufacture, current enterprise and upstream partner and downstream It is communicated between partner by respective ERP system transceiving data;Corresponding each side is provided in the ERP system of current enterprise The contact COM code table of comparisons of material and collaborative work center;Collaborative work center is multiple, each collaborative work center point A kind of material of cooperating manufacture is not corresponded to, and each collaborative work center corresponds to one or more upstream partners, in collaborative work The ability of the heart is the deliverability summation of the corresponding all upstream partners in collaborative work center;The system includes:
Collaborative sales plan generation module 61 receives the collaboration work of downstream collaboration side for the ERP system of current enterprise During industry plan, the ERP system of current enterprise is worked as according to the work compound plan of downstream collaboration side and the generation of the COM code table of comparisons The collaborative sales plan of preceding enterprise;Wherein, the collaborative sales plan of current enterprise includes the plan of corresponding each downstream collaboration side Sell product, planned selling quantity and plan Shipping Date;
Miscoordination sales order generation module 62 receives the non-association of downstream collaboration side for the ERP system of current enterprise During with purchase order, the ERP system of current enterprise is according to the miscoordination purchase order of downstream collaboration side and the COM code table of comparisons Generate the miscoordination sales order of current enterprise;
Master production plan generation module 63, for the collaborative sales plan of the ERP system synthesis current enterprise of current enterprise With the master production plan of the miscoordination sales order generation current enterprise of current enterprise;
Material Requirements Planning generation module 64, for current enterprise ERP system according to ability parameter to current enterprise Master production plan carries out Capacity Requirements Planning computing, judges whether the master production plan of current enterprise is feasible, if feasible, currently The ERP system of enterprise carries out Material Requirements Planning computing to the master production plan of current enterprise, generates the material of current enterprise and needs Ask plan;Wherein, ability parameter includes the ability at multiple collaborative work centers;
Work compound plan generation module 65, based on material requirement of the ERP system of current enterprise according to current enterprise The work compound plan of generation current enterprise is drawn, and the work compound plan of current enterprise is sent to upstream partner;
Miscoordination purchase order generation module 66 needs for the ERP system of current enterprise also according to the material of current enterprise The miscoordination purchase order of plan generation current enterprise is sought, and the miscoordination purchase order of current enterprise is sent to upstream cooperation Side;
Wherein, the work compound plan of current enterprise includes the object that current enterprise corresponds to the cooperating manufacture of upstream partner Expect coding, name of material, plan quantity delivered, scheduled delivery date;
The miscoordination purchase order of current enterprise includes current enterprise and corresponds to the object that the miscoordination of upstream partner produces Expect coding, name of material, purchase quantity, scheduled delivery date.
The connection relation of above each module is as shown in Figure 6.
It is understood that the upstream-downstream relationship of supply chain Shang Ge enterprises depends on the relative position of each enterprise, certain enterprise is opposite It is down-stream enterprise to swim enterprise thereon, is then upstream firm compared with enterprise downstream, therefore in embodiment one and embodiment two The ERP system and its operation method of offer can be applied in each enterprise in supply chain, be not subject to foregoing current enterprise Limitation.
Using the ERP system in the embodiment of the present invention, the ERP system of current enterprise can receive the collaboration of downstream collaboration side Production plan and the miscoordination purchase order of downstream collaboration side, the ERP system of current enterprise can also upstream partner be sent The work compound plan of current enterprise and the miscoordination purchase order of current enterprise, therefore the ERP system of current enterprise can incite somebody to action The production process of current enterprise and the production process of upstream and downstream partner link together, so as to between supply chain Shang Ge enterprises Cooperating manufacture and miscoordination production be managed.
In the prior art, for current enterprise, the deliverability of upstream partner, the demand feelings of downstream collaboration side Condition belongs to the external resource of current enterprise, these resources are existed only in inside upstream and downstream partner.
In embodiments of the present invention, collaborative work center is the equal of the workshop of upstream partner in current enterprise Mapping in ERP system is able to know that the deliverability of upstream partner by collaborative work center.In the ERP of current enterprise Internal system sets collaborative work center, is equivalent to the resources of production of upstream partner being converted into current enterprise ERP system Internal resource is managed.
In the embodiment of the present invention, the work compound plan of downstream collaboration side and miscoordination purchase order are downstream collaboration sides pair The demand of current enterprise, the ERP system of current enterprise receive these demands and generate corresponding collaborative sales plan and miscoordination Sales order is the equal of the internal resource that the demand of downstream collaboration side is converted into current enterprise, in the inside of current enterprise It is managed.
Therefore through this embodiment in ERP system, can by the resource conversion of upstream and downstream partner be current enterprise ERP The internal resource of system is managed, and so as to be managed to the production process of supply chain Shang Ge enterprises, reaches whole supply chain Purpose.
Embodiment three
Technical principle based on embodiment one and embodiment two, it is real that third embodiment of the invention provides a kind of ERP system The operation flow of existing supply chains production, the flow are specifically as shown in Figure 7.
It is suitable for embodiment one with identical technical principle with embodiment one and embodiment two due to embodiment three Description with embodiment two is equally applicable to embodiment three.
Fig. 7 shows that the ERP system that third embodiment of the invention is provided realizes that the operation flow of supply chains production is shown It is intended to.As shown in fig. 7, be certain client's ERP software system on the left of in Fig. 7, the downstream being equivalent in embodiment one and embodiment two The ERP system of partner, intermediate for certain enterprise's ERP software system, the current enterprise being equivalent in embodiment one and embodiment two ERP system, right side is the ERP software system of certain supplier or external coordination unit, is equivalent in embodiment one and embodiment two Upstream partner ERP system.
Operation flow as shown in Figure 7, it is soft in the ERP of certain client, certain enterprise, certain supplier or certain external coordination unit first Collaborative work center and the COM code table of comparisons, the foundation rule of collaborative work center and the COM code table of comparisons are established in part system Then with the description in embodiment one.
When supply chain in Fig. 7 produces, operation flow is as follows:
(1) ERP system of certain client sends work compound plan and miscoordination purchase order to certain enterprise.
(2) ERP system of certain enterprise receives the work compound plan of certain client and miscoordination purchase order, according to certain client Work compound plan generation collaborative sales plan, according to the miscoordination purchase order of certain client generate miscoordination sales order.
(3) the ERP system synthesis collaborative sales plan of certain enterprise and miscoordination sales order generation master production plan, and it is right Whether master production plan progress Capacity Requirements Planning computing, generative capacity plan of needs, judgement plan of needs are feasible.If energy Power plan of needs is feasible, then the ERP system of certain enterprise carries out Capacity Requirements Planning Material Requirements Planning computing, and generation material needs Ask plan.
(4) cooperating manufacture material of the ERP system of certain enterprise in Material Requirements Planning generates collaborative work center Work compound plan, and work compound plan is sent to certain supplier/external coordination unit.The ERP system of certain enterprise is also according to object Expect the miscoordination production material generation miscoordination purchase order in plan of needs, and miscoordination purchase order is sent to certain supply Business/external coordination unit.The ERP system of certain enterprise generates Production Scheduling Problem according to Material Requirements Planning, for Workshop Production operation.
(5) the work compound plan that the ERP system of certain supplier/external coordination unit is sent according to the ERP system of certain enterprise is given birth to Into collaborative sales plan, the miscoordination purchase order sent according to the ERP system of certain enterprise generates miscoordination sales order.
(6) the ERP system synthesis collaborative sales plan of certain supplier/external coordination unit and miscoordination sales order generate main life Production plan, and Capacity Requirements Planning computing is carried out to master production plan, generative capacity plan of needs judges the Capacity Requirements Planning It is whether feasible.If feasible, the ERP system generation Material Requirements Planning of certain supplier/external coordination unit, and according to material requirement meter Generation Production Scheduling Problem is drawn to process for Workshop Production.
(7) feasible master production plan is also sent to certain enterprise by the ERP system of certain supplier/external coordination unit.
(8) ERP system of certain enterprise generates collaboration job order according to the master production plan of certain supplier/external coordination unit, and It can complete to produce on schedule according to collaboration job order and work compound planning analysis supplier/external coordination unit, if cannot, to Certain supplier/external coordination unit sends progress warning information, and receives the progress feedback that certain supplier/external coordination unit returns.
(9) after the completion of the master production plan of certain supplier/external coordination unit performs, ERP system generation production storage bill, and Production storage bill and Shipping Information are sent to certain enterprise.
(10) ERP system of certain enterprise is also to certain supplier/external coordination unit feedback arrival information.
(11) after the completion of the ERP system master production plan of certain enterprise performs, the ERP system generation production storage of certain enterprise It is single, and send production storage bill and Shipping Information to certain client.
(12) ERP system of certain client also feeds back to goods information to certain enterprise.
ERP system shown in Fig. 7 all there is supplier to supply handling of goods and materials module in the ERP system of each enterprise, be used for Contact material situation between each enterprise is managed.
In Fig. 7, the ERP system of certain enterprise can also be according to collaboration job order generation coordinated procurement order, and is sent to certain Supplier/external coordination unit.The coordinated procurement order that the ERP system of certain supplier/external coordination unit recipient enterprise is sent, generation association Same sales order.
In Fig. 7, certain supplier/external coordination unit ERP system can also be sold according to its internal collaborative sales order and collaboration The stability of requirement of planning analysis enterprise is sold, to adjust the ability at the collaborative work center of certain enterprise.
ERP system shown in Fig. 7, additionally it is possible to according to the coordinated procurement order of respective enterprise, miscoordination purchase order and Arrival situation generation buying storage bill.
In Fig. 7, when the master production plan in certain supplier/external coordination unit ERP system changes, ERP systems of certain enterprise Collaboration job order in system can correspond to update in real time.
Using the ERP system in the embodiment of the present invention, the ERP system of current enterprise can receive the collaboration of downstream collaboration side Production plan and the miscoordination purchase order of downstream collaboration side, the ERP system of current enterprise can also upstream partner be sent The work compound plan of current enterprise and the miscoordination purchase order of current enterprise, therefore the ERP system of current enterprise can incite somebody to action The production process of current enterprise and the production process of upstream and downstream partner link together, so as to between supply chain Shang Ge enterprises Cooperating manufacture and miscoordination production be managed.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in change or replacement, should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention described should be subject to the protection scope in claims.

Claims (10)

1. a kind of operation method of the ERP system of integrated supply chain cooperating manufacture, which is characterized in that current enterprise is cooperated with upstream It is communicated between side and downstream collaboration side by respective ERP system transceiving data;It is set in the ERP system of the current enterprise It is equipped with corresponding each side's contact COM code table of comparisons of material and collaborative work center;The collaborative work center is multiple, often A collaborative work center corresponds to a kind of material of cooperating manufacture respectively, and each collaborative work center corresponds to one or more A upstream partner;The described method includes:
When the ERP system of the current enterprise receives the work compound plan of the downstream collaboration side, the current enterprise ERP system the current enterprise is generated according to the work compound plan of the downstream collaboration side and the COM code table of comparisons Collaborative sales plan;Wherein, the collaborative sales plan of the current enterprise includes the meter of corresponding each downstream collaboration side Cross out sells product, planned selling quantity and plan Shipping Date;
When the ERP system of the current enterprise receives the miscoordination purchase order of the downstream collaboration side, the current enterprise The ERP system of industry is described current according to the miscoordination purchase order of the downstream collaboration side and COM code table of comparisons generation The miscoordination sales order of enterprise;
The ERP system of the current enterprise integrates the collaborative sales plan of the current enterprise and the miscoordination of the current enterprise Sales order generates the master production plan of the current enterprise;
The ERP system of the current enterprise carries out ability need meter according to ability parameter to the master production plan of the current enterprise It rows calculation, judges whether the master production plan of the current enterprise is feasible, if feasible, the ERP system pair of the current enterprise The master production plan of the current enterprise carries out Material Requirements Planning computing, generates the Material Requirements Planning of the current enterprise; Wherein, the ability parameter includes the ability at multiple collaborative work centers, and the ability at the collaborative work center is the collaboration The deliverability summation of the corresponding all upstream partners of work centre;
The ERP system of the current enterprise generates the collaboration of the current enterprise according to the Material Requirements Planning of the current enterprise Production plan, and the work compound plan of the current enterprise is sent to the upstream partner;
The ERP system of the current enterprise generates the non-of the current enterprise also according to the Material Requirements Planning of the current enterprise Coordinated procurement order, and the miscoordination purchase order of the current enterprise is sent to the upstream partner;
Wherein, the work compound plan of the current enterprise includes the collaboration that the current enterprise corresponds to the upstream partner COM code, name of material, plan quantity delivered, the scheduled delivery date of production;
The miscoordination purchase order of the current enterprise includes the miscoordination that the current enterprise corresponds to the upstream partner COM code, name of material, purchase quantity, the scheduled delivery date of production.
2. operation method according to claim 1, which is characterized in that the COM code table of comparisons is built using following manner It is vertical:
The ERP system of the current enterprise receives the material information of the upstream partner and the downstream collaboration side respectively;
The ERP system of the current enterprise according to the material information of reception, build with the current enterprise by the material information of itself The vertical COM code table of comparisons;
The COM code table of comparisons includes:In the COM code and name of material of the current enterprise, the material exists material COM code, name of material, production feature and the delivery time in advance of the upstream partner and the material are under described Swim COM code, name of material and the purchasing lead time of partner.
3. operation method according to claim 2, which is characterized in that the ERP system of the current enterprise is according under described It swims the work compound plan of partner and the COM code table of comparisons generates the collaborative sales plan of the current enterprise, bag It includes:
The material of to be purchased material of the ERP system of the current enterprise according to the work compound of the downstream collaboration side in the works Coding by the COM code table of comparisons, searches COM code of the material to be purchased in the current enterprise, according to COM code of the material to be purchased in the current enterprise generates the collaborative sales plan of the current enterprise.
4. operation method according to claim 1, which is characterized in that the ERP system of the current enterprise is worked as according to described The Material Requirements Planning of preceding enterprise generates the work compound plan of the current enterprise, including:
The ERP system of the current enterprise is believed according to the cooperating manufacture material requirement in the Material Requirements Planning of the current enterprise Breath, generates the work compound plan of the current enterprise;
The ERP system of the current enterprise generates the non-of the current enterprise also according to the Material Requirements Planning of the current enterprise Coordinated procurement order, including:
The ERP system of the current enterprise is according to the miscoordination production material demand in the Material Requirements Planning of the current enterprise Information generates the miscoordination purchase order of the current enterprise.
5. operation method according to claim 1, which is characterized in that the method further includes:
The ERP system of the upstream partner receives the work compound plan of the current enterprise, according to the current enterprise Work compound plan generates the collaborative sales plan of the upstream partner;
The ERP system of the upstream partner receives the miscoordination purchase order of the current enterprise, according to the current enterprise Miscoordination purchase order generate the miscoordination sales order of the upstream partner;
The ERP system of the upstream partner integrates the collaborative sales plan of the upstream partner and the upstream partner Miscoordination sales order generates the master production plan of the upstream partner;
The ERP system of the upstream partner carries out Capacity Requirements Planning computing to the master production plan of the upstream partner, After determining that the master production plan of the upstream partner is feasible, the master production plan of the feasible upstream partner is sent to The current enterprise.
6. operation method according to claim 5, which is characterized in that the method further includes:
The ERP system of the current enterprise receives the master production plan of the upstream partner, according to the upstream partner Master production plan generates the collaboration job order of the current enterprise;
The ERP system of the current enterprise is according to the collaboration job order of the current enterprise and the work compound of the current enterprise Can upstream partner described in planning analysis complete to produce on schedule, if the upstream partner can not complete to produce on schedule, to The upstream partner sends progress warning information, and receives the progress feedback information that the upstream partner returns;
Wherein, the collaboration job order of the current enterprise includes production material coding, the planned production number of the upstream partner Amount, scheduled delivery date.
7. operation method according to claim 5, which is characterized in that the method further includes:
The ERP system of upstream partner generation production storage after the completion of the master production plan of the upstream partner performs It is single, and the production storage bill is sent to the current enterprise;
The ERP system of the upstream partner according to the upstream partner collaborative sales Shipping Information in the works, to institute Current enterprise is stated to deliver and send the Shipping Information;
The ERP system of the current enterprise is checked after receiving cargo according to the Shipping Information of the upstream partner, core To rear arrival information is sent to the upstream partner.
8. operation method according to claim 6, which is characterized in that the method further includes:
The ERP system of the current enterprise generates the collaboration of the current enterprise also according to the collaboration job order of the current enterprise Purchase order, and the coordinated procurement order of the current enterprise is sent to the upstream partner;Wherein, the coordinated procurement Order includes cooperating manufacture COM code, cooperating manufacture quantity, the scheduled delivery date of the current enterprise;
The ERP system of the upstream partner receives the coordinated procurement order of the current enterprise, according to the current enterprise Coordinated procurement order generates the collaborative sales order of the upstream partner.
9. operation method according to claim 8, which is characterized in that the method further includes:
The ERP system of the upstream partner is according to the collaborative sales order of the upstream partner and the upstream partner The stability of requirement of the current enterprise is analyzed in collaborative sales plan, and institute is adjusted according to the stability of requirement of the current enterprise State the ability at the collaborative work center of current enterprise.
10. a kind of ERP system of integrated supply chain cooperating manufacture, which is characterized in that current enterprise and upstream partner and downstream It is communicated between partner by respective ERP system transceiving data;Correspondence is provided in the ERP system of the current enterprise Each side's contact COM code table of comparisons of material and collaborative work center;The collaborative work center is multiple, each association Correspond to a kind of material of cooperating manufacture respectively with work centre, each collaborative work center correspond to it is one or more it is described on Swim partner;The system comprises:
Collaborative sales plan generation module, the ERP system for working as the current enterprise receive the association of the downstream collaboration side During with production plan, the work compound plan and the material of the ERP system of the current enterprise according to the downstream collaboration side Encode the collaborative sales plan that the table of comparisons generates the current enterprise;Wherein, the collaborative sales plan of the current enterprise includes Planned selling product, planned selling quantity and the plan Shipping Date of corresponding each downstream collaboration side;
Miscoordination sales order generation module, the ERP system for working as the current enterprise receive the downstream collaboration side During miscoordination purchase order, the miscoordination purchase order and institute of the ERP system of the current enterprise according to the downstream collaboration side State the miscoordination sales order that the COM code table of comparisons generates the current enterprise;
Master production plan generation module, the ERP system by the current enterprise are integrated based on the collaborative sales of the current enterprise Draw the master production plan that the current enterprise is generated with the miscoordination sales order of the current enterprise;
Material Requirements Planning generation module, for the current enterprise ERP system according to ability parameter to the current enterprise Master production plan carry out Capacity Requirements Planning computing, judge whether the master production plan of the current enterprise feasible, if feasible, Then the ERP system of the current enterprise carries out Material Requirements Planning computing to the master production plan of the current enterprise, generates institute State the Material Requirements Planning of current enterprise;Wherein, the ability parameter includes the ability at multiple collaborative work centers, the collaboration The ability of work centre is the deliverability summation of the corresponding all upstream partners in the collaborative work center;
Work compound plan generation module, for the current enterprise ERP system according to the material requirement of the current enterprise Plan generates the work compound plan of the current enterprise, and the work compound plan of the current enterprise is sent on described Swim partner;
Miscoordination purchase order generation module, for the current enterprise ERP system also according to the current enterprise material Plan of needs generates the miscoordination purchase order of the current enterprise, and the miscoordination purchase order of the current enterprise is sent To the upstream partner;
Wherein, the work compound plan of the current enterprise includes the collaboration that the current enterprise corresponds to the upstream partner COM code, name of material, plan quantity delivered, the scheduled delivery date of production;
The miscoordination purchase order of the current enterprise includes the miscoordination that the current enterprise corresponds to the upstream partner COM code, name of material, purchase quantity, the scheduled delivery date of production.
CN201510346738.8A 2015-06-19 2015-06-19 The ERP system and its operation method of integrated supply chain cooperating manufacture Expired - Fee Related CN104881758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510346738.8A CN104881758B (en) 2015-06-19 2015-06-19 The ERP system and its operation method of integrated supply chain cooperating manufacture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510346738.8A CN104881758B (en) 2015-06-19 2015-06-19 The ERP system and its operation method of integrated supply chain cooperating manufacture

Publications (2)

Publication Number Publication Date
CN104881758A CN104881758A (en) 2015-09-02
CN104881758B true CN104881758B (en) 2018-05-29

Family

ID=53949245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510346738.8A Expired - Fee Related CN104881758B (en) 2015-06-19 2015-06-19 The ERP system and its operation method of integrated supply chain cooperating manufacture

Country Status (1)

Country Link
CN (1) CN104881758B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105913163A (en) * 2015-10-23 2016-08-31 乐视致新电子科技(天津)有限公司 Mobile phone supply chain system based on complete flow and working method thereof
CN107016517A (en) * 2016-10-24 2017-08-04 禾盈软件科技有限公司 Supply chain order business automation processing system and its method
CN107977818A (en) * 2017-12-05 2018-05-01 北京小米移动软件有限公司 Supply data processing method, device, computing device and storage medium
CN110414793A (en) * 2019-07-01 2019-11-05 南京钢铁股份有限公司 The seamless interfacing method of client's ERP system and manufacture end ERP system based on user demand
CN113221527A (en) * 2021-05-10 2021-08-06 首钢京唐钢铁联合有限责任公司 Production form generation method, device, equipment and medium
CN113689163B (en) * 2021-07-30 2023-07-18 苏州浪潮智能科技有限公司 BOM price checking and quoting system and information management method thereof
CN113780904A (en) * 2021-11-12 2021-12-10 中国信息通信研究院 Supply chain management system and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103020806A (en) * 2013-01-04 2013-04-03 上海宝钢商贸有限公司 Information management system and information management method based on specific user supply chain coordination

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103020806A (en) * 2013-01-04 2013-04-03 上海宝钢商贸有限公司 Information management system and information management method based on specific user supply chain coordination

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
企业间ERP系统的概念模型与关键技术研究;王锟;《中国优秀硕士学位论文全文数据库信息科技辑》;20110315;I138-848 *
基于供应链协同的信息化管理研究与应用;许小双;《浙江烟草》;20120730;第146-151页 *

Also Published As

Publication number Publication date
CN104881758A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN104881758B (en) The ERP system and its operation method of integrated supply chain cooperating manufacture
Cutting-Decelle et al. A review of approaches to supply chain communications: from manufacturing to construction
US8190465B2 (en) Make-to-specification process and data model
US9767495B2 (en) Different sales and planning product options
CN109285060A (en) A kind of buying integrated management system
Fulkerson A response to dynamic change in the market place
Knolmayer et al. Supply chain management based on SAP systems: Architecture and planning processes
Mohsen Developments of digital technologies related to supply chain management
CN115081868A (en) ERP and MES management service system for service process and pushing method thereof
Yue et al. Multi-layered coding-based study on optimization algorithms for automobile production logistics scheduling
Wu [Retracted] Optimization of E‐Commerce Supply Chain Management Process Based on Internet of Things Technology
Yu et al. Modularization based design for innovative product-related industrial service
Kanda et al. A coordination-based perspective on the procurement process in the supply chain
Liu et al. Easy-SC: a supply chain simulation tool
Hiddleston Logistics Management
Briffaut E-enabled operations management
Tsipoulanidis How can Lean Sourcing Processes and Robotic Process Automation (RPA) as a new digital technology in SCM support the objectives of Marketing to fulfil customer demands efficiently?
Zhu COLLABORATIVE MODELLING AND SIMULATION FOR MANUFACTURING COST ANALYSIS.
Walters et al. Building the “Connected” Business Model: Identifying Capability Requirements
Walters et al. Aligning marketing and operations for more effective and efficient ‘total operations’
Makatsoris et al. Beyond CRM: a system to bridge the gap between the customer and the global manufacturing supply chain
Leong Industrial need: Production system engineering integration standards
Renna Integrating ERP with Negotiation Tools in Supply Chain
Djatna et al. A conceptual modelling of digital contract for independent palm oil supply chain systems
Liao Warranty Chain Management System

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529

Termination date: 20210619

CF01 Termination of patent right due to non-payment of annual fee