CN104881011A - Noodles quick-freeze production line control system - Google Patents

Noodles quick-freeze production line control system Download PDF

Info

Publication number
CN104881011A
CN104881011A CN201510248758.1A CN201510248758A CN104881011A CN 104881011 A CN104881011 A CN 104881011A CN 201510248758 A CN201510248758 A CN 201510248758A CN 104881011 A CN104881011 A CN 104881011A
Authority
CN
China
Prior art keywords
box
workshop section
face
noodles
face box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510248758.1A
Other languages
Chinese (zh)
Inventor
郭明涛
董德永
苏江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU HENGLI REFRIGERATING EQUIPMENT CO Ltd
Original Assignee
ZHENGZHOU HENGLI REFRIGERATING EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU HENGLI REFRIGERATING EQUIPMENT CO Ltd filed Critical ZHENGZHOU HENGLI REFRIGERATING EQUIPMENT CO Ltd
Priority to CN201510248758.1A priority Critical patent/CN104881011A/en
Publication of CN104881011A publication Critical patent/CN104881011A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Noodles (AREA)

Abstract

A noodles quick-freeze production line control system includes a noodles packaging section, a noodles box pushing section, a noodles box quick-freeze section, a noodles box turning section, a de-box and noodles block conveying section, and an empty box pushing section connected together successively. In the noodles packaging section, an inlet box photoelectric counter and an inlet box blocking electromagnetic valve are arranged in a noodles box inlet. The noodles packaging section includes an operation table for packaging noodles with boxes. The operation table is provided with an inlet box conveyor and an outlet box conveyor. The noodles box pushing section includes a feeding conveyer and a pre-feeding conveyer and also includes a feeding counting photoelectric switch. The noodles box quick-freeze section is composed of a quick freezer. The noodles box pushing section includes a noodles box detecting switch and a delivery conveyer used for pushing noodles box out. The noodles box turning section is provided with a motor. The de-box and noodles block conveying section is provided with a de-box machine and empty boxes are pushed into the empty box pushing section and conveyed by an empty box conveyer. According to the invention, working strength is reduced and production efficiency is improved at the same time during the production process.

Description

A kind of noodles quick-frozen production line control system
Technical field
The present invention relates to quick-frozen field, particularly relate to a kind of noodles quick-frozen production line control system.
Background technology
In existing noodles quick-frozen production line, majority is by manually carrying out noodles mounted box, putting to the charging aperture to instant freezer by the face box in the face of installing, and is taken out by the face box frozen, carry out de-box, clean, drain, to reuse by artificial by the discharging opening of instant freezer.And then cause that production environment condition of work is severe, the inefficient problem of the large and production run of labour intensity.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of noodles quick-frozen production line that can carry out PLC and automatically control, to solve prior art Problems existing.
For solving the problems of the technologies described above, the present invention by the following technical solutions:
Noodles quick-frozen production line control system comprises that the noodles mounted box workshop section, the face box that are connected successively push workshop section, workshop section released by Mian He quick-frozen workshop section, face box, face box upset workshop section, face box take off box and face block conveying workshop section, sylphon push workshop section; Noodles mounted box workshop section Mian He inflow point be provided with calculating face box quantity enter that box photoelectric counter and blocking surface box enter this workshop section enter box block electromagnetic valve, noodles mounted box workshop section comprises the operator's console of noodles mounted box, operator's console is provided with face box sent into this workshop section carry out noodles mounted box enter box conveyor and the face box installing noodles sent into next workshop section go out box conveyor; Face box pushes workshop section and comprises and face box pushed follow-up workshop section and to stock up conveyor and front conveyor of stocking up, and include the counting optoelectronic switch of stocking up of number that the face box of next workshop section sent in record, push at face box workshop section to arrange blocking surface box entering surface box quick-frozen workshop section block electromagnetic valve of stocking up near the position of Mian He quick-frozen workshop section simultaneously; Mian He quick-frozen workshop section is made up of instant freezer; Face box is released workshop section and is comprised and be arranged on Mian He quick-frozen workshop section porch and the face box of the box-like state of the detection faces shipment conveyor that detects optoelectronic switch and released by face box; Face box upset workshop section is provided with the motor being carried out by the face box freezed overturning; Face box takes off box and face block conveying workshop section is provided with the face box departed from by food in face box and box and takes off box machine, also be provided with simultaneously face box sylphon being transported to next workshop section take off box after conveyor and food in the box of disengaging is delivered to outside face block conveyor, sylphon pushes workshop section and arranges sylphon conveyor sylphon being pushed noodles mounted box workshop section; The solenoid valve of above-mentioned each workshop section, optoelectronic switch, conveyor are all connected with PLC control system.
Beneficial effect of the present invention: the present invention is being lowered labour intensity in process of production, enhanced productivity simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Wherein, 1-enters box photoelectric counter; 2-enters box block electromagnetic valve; 01-face box arranges magnetic switch; 7-enters box conveyor; 02-face box arranges solenoid valve; 03-face box arranges vertical magnetism switch; 12-noodles arrange vertical cylinder solenoid valve; 04-face box arranges air blowing solenoid valve; 16-chain motor; 17-chain deceleration proximity switch; 18-chain stops proximity switch; 19-goes out box conveyor; 20-stocks up conveyor; 21-stocks up front conveyor; 05-face box pushes solenoid valve; 06-face box pushes vertical magnetism switch; 07-face box pushes horizontal magnetic switch; 28-face box pushes mechanism's testing button; 29-stocks up counting optoelectronic switch; 30-stocks up block electromagnetic valve; 31-instant freezer; Solenoid valve released by 08-face box; Vertical magnetism switch released by 09-face box; Horizontal magnetic switch released by 010-face box; 38-face box detects optoelectronic switch; 39-shipment conveyor; 40-face box ejecting mechanism testing button; 41-face box turns front conveyor; 011-face box upset electricity; 44-face block conveyor one; 45-face block conveyor two; 46-takes off box front conveyor; 47-face box takes off box machine; 48-face box takes off conveyor after box; 49-flushing water pump; 50-drying fan; 51-cleaning and delivering device; 52-water level switch; 53-sylphon upset front conveyor; 54-sylphon upset motor one; 55-sylphon upset motor two; Conveyor after the upset of 56-sylphon.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
As shown in Figure 1, noodles quick-freezing plant production line control system provided by the invention, comprises noodles mounted box workshop section, face box pushes workshop section, Mian He quick-frozen workshop section, workshop section released by face box, the upset of face box workshop section, face box take off box and face block conveying workshop section, sylphon cleaning and dry up workshop section, sylphon upset workshop section; Solenoid valve in above-mentioned each workshop section, optoelectronic switch, proximity switch, magnetic switch, testing button, conveying mechanism are all connected with PLC control system.
Noodles mounted box workshop section Mian He inflow point be provided with calculating face box quantity enter that box photoelectric counter 1 and blocking surface box enter this workshop section enter box block electromagnetic valve 2, noodles mounted box workshop section comprises the operator's console of noodles mounted box, operator's console is provided with face box sent into this workshop section carry out noodles mounted box enter box conveyor 7 and the face box installing noodles sent into next workshop section go out box conveyor 19; Noodles mounted box workshop section pushes workshop section with face box and is connected, noodles mounted box workshop section also arranges that the face box be connected with PLC arranges magnetic switch 01, face box arranges solenoid valve 02, face box arranges vertical magnetism switch 03, noodles arrange vertical cylinder solenoid valve 12, face box arranges air blowing solenoid valve 04, also comprises the chain motor 16 promoting to hold the face case structure of face box, the chain deceleration proximity switch 17 being arranged on front, case structure final position, face in noodles mounted box workshop section, the chain that is arranged on case structure final position, face in noodles mounted box workshop section stop proximity switch 18.Wherein face box arranges magnetic switch 01 and comprises face box and arrange and vertically move back limit magnetic switch, face box arranges vertically to enter to limit magnetic switch, face box arrangement level is entered to limit magnetic switch, face box arrangement level moves back limit magnetic switch, face box arranges solenoid valve 02 and comprises face box arrangement vertical cylinder solenoid valve, face box arranges horizontal air cylinder solenoid valve, face box arrangement vertical magnetism switch 03 comprises noodles arrangement and vertically moves back limit magnetic switch, face box arranges vertically to enter to limit magnetic switch, face box arranges air blowing solenoid valve 04 and comprises noodles arrangement air blowing solenoid valve one, noodles arrange air blowing solenoid valve two, noodles arrange air blowing solenoid valve three.
Face box pushes workshop section and comprises and face box pushed follow-up workshop section and to stock up conveyor 20 and front conveyor 21 of stocking up, and include the counting optoelectronic switch 29 of stocking up that the number of the face box of next workshop section sent in record, simultaneously push at face box workshop section to arrange blocking surface box entering surface box quick-frozen workshop section block electromagnetic valve 30 of stocking up near the position of Mian He quick-frozen workshop section; Face box pushes workshop section and is connected with Mian He quick-frozen workshop section, face box pushes workshop section and is connected with Mian He quick-frozen workshop section, and face box pushes workshop section and also comprises that the face box be connected with PLC control system pushes solenoid valve 05, face box pushes vertical magnetism switch 06, face box pushes horizontal magnetic switch 07, opposite box pushes the face box carrying out testing and pushes mechanism's testing button 28.Wherein face box pushes solenoid valve 05 and comprises that face box pushes vertical cylinder solenoid valve, face box pushes horizontal air cylinder solenoid valve, face box pushes vertical magnetism switch 06 and comprises that face box pushes vertical lower limit magnetic switch, face box pushes vertical upper limit magnetic switch, and face box pushes horizontal magnetic switch 07 and comprises face box and push that level moves back limit magnetic switch, face box pushes level and enters to limit magnetic switch.
Mian He quick-frozen workshop section is made up of instant freezer, and instant freezer is preferably plain net instant freezer 31.
Face box is released workshop section and is included in the face box detection optoelectronic switch 38 that face box arranges the box-like state of detection faces from the position that Mian He quick-frozen workshop section enters the porch of this workshop section and the shipment conveyor 39 released by face box; The opposite side that workshop section is arranged on Mian He quick-frozen workshop section released by described box, also comprises that solenoid valve 08 released by the face box be connected with PLC, vertical magnetism switch 09 released by face box, horizontal magnetic switch 010 released by face box, the face box ejecting mechanism testing button 40 carrying out testing released by opposite box.Wherein face box release solenoid valve 08 comprises face box release vertical cylinder solenoid valve, face box release horizontal air cylinder solenoid valve, face box is released vertical magnetism switch 09 and is comprised that vertical upper limit magnetic switch released by face box, vertical lower limit magnetic switch released by face box, and face box is released horizontal magnetic switch 010 and comprised that face box release level moves back limit magnetic switch, face box release level is entered to limit magnetic switch.
Face box upset workshop section is provided with and is carried out overturning the motor by freezing by face box; Sylphon pushes workshop section and arranges conveying mechanism sylphon being pushed noodles mounted box workshop section.
Face box upset workshop section of face box upset workshop section is provided with the motor being carried out by the face box freezed overturning; Specifically, the face box upset motor 011 that face box turns front conveyor 41, the face box good to quick-frozen overturns of the good face box of the quick-frozen before transporting upset is comprised;
Face box takes off box and face block conveying workshop section is provided with the face box departed from by food in face box and box and takes off box machine 47, also be provided with simultaneously face box sylphon being transported to next workshop section take off box after conveyor 48 and food in the box of disengaging is delivered to outside face block conveyor, also comprise the de-box front conveyor 46 that face box that transport overturn carries out de-box.
Sylphon pushes workshop section and comprises connected sylphon cleaning and dry up workshop section, sylphon upset workshop section; Sylphon cleaning and dry up workshop section be provided with the cleaning sylphon be connected with PLC control system flushing water pump 49, dry up sylphon drying fan 50, transport the sylphon after cleaning and enter the cleaning and delivering device 51 of next workshop section, the water level switch 52 of sensed water level; Sylphon upset workshop section comprise the transport be connected with PLC control system overturn before the sylphon of sylphon overturn front conveyor 53, to sylphon overturn sylphon overturns motor 1, sylphon overturns motor 2 55, transport the sylphon that the sylphon after overturning enters noodles mounted box workshop section overturns conveyor 56 afterwards.
After control system starts, each workshop section sequence starting successively of production line, thus reduce to open the impact brought element instantaneously simultaneously.
Operationally the course of work of each workshop section is as follows:
Noodles mounted box workshop section course of action: enter box conveyor 7 and start, enter box block electromagnetic valve 2 to let pass, enter the quantity that box photoelectric counter 1 can set the sylphon entering noodles mounted box workshop section, when after the quantity reaching setting, enter box block electromagnetic valve 2 to stop follow-up face box, enter box conveyor 7 time delay and stop.Face box arranges vertical cylinder solenoid valve and noodles arrange vertical cylinder solenoid valve 12) beginning action, decline if face box arranges vertical cylinder, face box arranges and vertically enters to limit magnetic switch action, then face box arranges the startup of horizontal air cylinder solenoid valve; Stretch out if face box arranges horizontal air cylinder, if face box arranges vertically enter to limit magnetic switch action, then face box arrangement horizontal air cylinder solenoid valve and noodles arrangement vertical cylinder solenoid valve 12 all stop, and face box arranges horizontal air cylinder and shrinks, and face box arranges vertical cylinder contraction.Noodles arrange the action of vertical cylinder solenoid valve, noodles arrange vertical cylinder and decline, noodles arrange and vertically enter to limit magnetic switch action, then noodles arrange the startup of air blowing solenoid valve, start noodles and arrange process, after finishing time arrives, noodles arrange air blowing solenoid valve to be stopped, face box arranges vertical cylinder to be stopped, and face box arranges vertical cylinder and rises.Limit magnetic switch is vertically moved back in face box arrangement and face box arrangement level moves back limit magnetic switch and the vertical limit magnetic switch equal action rear chain motor 16 that moves back of noodles arrangement starts, go out box conveyor 19 to stop, chain deceleration proximity switch 17 action rear chain motor 16 slows down, chain stops proximity switch 18 action rear chain motor 16 to stop, and goes out box conveyor and starts.
Face box pushes workshop section's course of action: front conveyor 21 of stocking up starts successively with conveyor 20 of stocking up, and counting photoelectricity 29 of stocking up presets the threshold value of entering surface box quantity, and after box number count reaches preset value face to face, block electromagnetic of stocking up valve 30 stops.After the delay adjustments time, box pushes the action of horizontal air cylinder solenoid valve, face box pushes horizontal air cylinder and advances, if face box pushes level enter to limit magnetic switch action, face box pushes vertical cylinder solenoid valve and starts, face box pushes vertical cylinder and rises, face box pushes vertical upper limit magnetic switch 25 action then face box arrangement horizontal air cylinder solenoid valve stopping, face box pushes horizontal air cylinder and returns, face box push level move back limit magnetic switch action then face box push vertical cylinder solenoid valve and stop, face box pushes vertical cylinder and declines, face box pushes vertical cylinder lower limit magnetic switch 24 action block electromagnetic valve 30 of then stocking up and lets pass, then face box pushes action and completes.If face box is not when push-on process when the face box of pressing pushes mechanism's testing button 28, then performs once face box and push action.
Workshop section's course of action released by face box: shipment conveyor starts, the time that face box detects Photoelectric Detection face box exceed setting-up time and face box after photoelectricity, the action of vertical cylinder solenoid valve released by face box, face box is released vertical cylinder and is declined, the action of vertical lower limit magnetic switch released by face box, then the startup of horizontal air cylinder solenoid valve released by face box, face box is released horizontal air cylinder and is advanced, face box release level enters to limit magnetic switch action then face box release vertical cylinder solenoid valve stopping, face box is released vertical cylinder and is risen, vertical upper limit magnetic switch action then face box release horizontal air cylinder stopping released by face box, face box is released horizontal air cylinder and is returned, face box release horizontal air cylinder move back the action of limit magnetic switch then the projecting motion of face box complete.If face box is not when push when pressing face box ejecting mechanism testing button 40, perform once face box projecting motion.
Face box upset workshop section course of action: face box turns front conveyor 41, face box upset motor starts successively and stops;
Face box takes off box and face block conveying workshop section action engineering: de-box front conveyor 46, face box take off box machine 47, face block conveyor 1, face block conveyor 2 44, face box take off conveyor 48 start and stop successively after box;
Sylphon cleans and dries up workshop section's action engineering: flushing water pump 49, drying fan 50, cleaning and delivering device 51 start and stop successively, and water level switch 52 is failure to actuate, and stops flushing water pump 49 also to send lack of water warning message;
Sylphon upset workshop section action engineering: conveyor start and stop successively after sylphon upset front conveyor 53, sylphon upset motor 1, sylphon upset motor 2 55, sylphon upset;
During stopping, each workshop section stops successively, if cylinder is also in course of action, then shuts down after executing currently used action again.

Claims (10)

1. a noodles quick-freezing plant production line, is characterized in that:
Comprise that the noodles mounted box workshop section, the face box that are connected successively push workshop section, workshop section released by Mian He quick-frozen workshop section, face box, face box upset workshop section, face box take off box and face block conveying workshop section, sylphon push workshop section; Noodles mounted box workshop section Mian He inflow point be provided with calculating face box quantity enter that box photoelectric counter (1) and blocking surface box enter this workshop section enter box block electromagnetic valve (2), noodles mounted box workshop section comprises the operator's console of noodles mounted box, operator's console is provided with face box sent into this workshop section carry out noodles mounted box enter box conveyor (7) and the face box installing noodles sent into next workshop section go out box conveyor (19); Face box pushes workshop section and comprises and face box pushed follow-up workshop section and to stock up conveyor (20) and front conveyor of stocking up (21), and include counting optoelectronic switch (29) of stocking up that the number of the face box of next workshop section sent in record, simultaneously push at face box workshop section to arrange blocking surface box entering surface box quick-frozen workshop section block electromagnetic valve (30) of stocking up near the position of Mian He quick-frozen workshop section; Mian He quick-frozen workshop section is made up of instant freezer; Face box is released workshop section and is comprised and be arranged on Mian He quick-frozen workshop section porch and the face box of the box-like state of the detection faces shipment conveyor (39) that detects optoelectronic switch (38) and released by face box; Face box upset workshop section is provided with the motor being carried out by the face box freezed overturning; Face box takes off box and face block conveying workshop section is provided with the face box departed from by food in face box and box and takes off box machine (47), also be provided with simultaneously face box sylphon being transported to next workshop section take off box after conveyor (48) and food in the box of disengaging is delivered to outside face block conveyor, sylphon pushes workshop section and arranges sylphon conveyor sylphon being pushed noodles mounted box workshop section; The solenoid valve of above-mentioned each workshop section, optoelectronic switch, conveyor are all connected with PLC control system.
2. noodles quick-freezing plant production line control system according to claim 1, is characterized in that: described sylphon pushes workshop section and comprises connected sylphon cleaning and dry up workshop section, sylphon upset workshop section; Sylphon cleaning and dry up workshop section be provided with the cleaning sylphon be connected with PLC control system flushing water pump (49), dry up the sylphon after cleaning drying fan (50), transport the sylphon after drying up and enter the cleaning and delivering device (51) of next workshop section, the water level switch (52) of sensed water level; Sylphon upset workshop section comprises that sylphon that a workshop section in the transport that is connected with PLC control system passes the sylphon of coming overturns front conveyor (53), the sylphon that overturns sylphon overturns motor one (54) and sylphon overturns motor two (55), transport the sylphon that the sylphon after overturning enters noodles mounted box workshop section overturns conveyor (56) afterwards.
3. noodles quick-freezing plant production line control system according to claim 1, it is characterized in that: noodles mounted box workshop section pushes workshop section with face box and is connected, noodles mounted box workshop section also arranges the face box be connected with PLC and arranges magnetic switch (01), face box arranges solenoid valve (02), face box arranges vertical magnetism switch (03), noodles arrange vertical cylinder solenoid valve (12), face box arranges air blowing solenoid valve (04), also comprise the chain motor (16) promoting to hold the face case structure of face box, be arranged on the chain deceleration proximity switch (17) in front, case structure final position, face in noodles mounted box workshop section, the chain being arranged on case structure final position, face in noodles mounted box workshop section stops proximity switch (18).
4. noodles quick-freezing plant production line control system according to claim 3, it is characterized in that: described box arrangement magnetic switch (01) comprises face box arrangement and vertically move back limit magnetic switch, face box arranges vertically to enter to limit magnetic switch, face box arrangement level is entered to limit magnetic switch, face box arrangement level moves back limit magnetic switch, described box arranges solenoid valve (02) and comprises face box arrangement vertical cylinder solenoid valve, face box arranges horizontal air cylinder solenoid valve, described box arrangement vertical magnetism switch (03) comprises noodles arrangement and vertically moves back limit magnetic switch, face box arranges vertically to enter to limit magnetic switch, described box arranges air blowing solenoid valve (04) and comprises noodles arrangement air blowing solenoid valve one, noodles arrange air blowing solenoid valve two, noodles arrange air blowing solenoid valve three.
5. noodles quick-freezing plant production line control system according to claim 1, it is characterized in that: described box pushes workshop section and be connected with Mian He quick-frozen workshop section, face box pushes workshop section and also comprises that the face box be connected with PLC control system pushes solenoid valve (05), face box pushes vertical magnetism switch (06), face box pushes horizontal magnetic switch (07), opposite box pushes the face box carrying out testing and pushes mechanism's testing button (28).
6. noodles quick-freezing plant production line control system according to claim 5, it is characterized in that: described box pushes solenoid valve (05) and comprise that face box pushes vertical cylinder solenoid valve, face box pushes horizontal air cylinder solenoid valve, described box pushes vertical magnetism switch (06) and comprises that face box pushes vertical lower limit magnetic switch, face box pushes vertical upper limit magnetic switch, and described box pushes horizontal magnetic switch (07) and comprise face box and push that level moves back limit magnetic switch, face box pushes level and enters to limit magnetic switch.
7. noodles quick-freezing plant production line control system according to claim 1, is characterized in that: the instant freezer (31) of described Mian He quick-frozen workshop section is plain net instant freezer.
8. noodles quick-freezing plant production line control system according to claim 1, it is characterized in that: the opposite side that workshop section is arranged on Mian He quick-frozen workshop section released by described box, also comprise that solenoid valve (08) released by the face box be connected with PLC, vertical magnetism switch (09) released by face box, horizontal magnetic switch (010) released by face box, face box ejecting mechanism testing button (40) carrying out testing released by opposite box.
9. noodles quick-freezing plant production line control system according to claim 8, it is characterized in that: described box is released solenoid valve (08) and comprised face box release vertical cylinder solenoid valve, face box release horizontal air cylinder solenoid valve, described box is released vertical magnetism switch (09) and is comprised that vertical upper limit magnetic switch released by face box, vertical lower limit magnetic switch released by face box, and described box is released horizontal magnetic switch (010) and comprised that face box release level moves back limit magnetic switch, face box release level is entered to limit magnetic switch.
10. noodles quick-freezing plant production line control system according to claim 1, is characterized in that:
Described box upset workshop section comprises face box upset motor (011) that face box turns front conveyor (41), the face box good to quick-frozen overturns of the good face box of the quick-frozen before transporting upset; Described box takes off box and face block conveying workshop section and also comprises the de-box front conveyor (46) that face box that transport overturn carries out de-box.
CN201510248758.1A 2015-05-15 2015-05-15 Noodles quick-freeze production line control system Pending CN104881011A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510248758.1A CN104881011A (en) 2015-05-15 2015-05-15 Noodles quick-freeze production line control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510248758.1A CN104881011A (en) 2015-05-15 2015-05-15 Noodles quick-freeze production line control system

Publications (1)

Publication Number Publication Date
CN104881011A true CN104881011A (en) 2015-09-02

Family

ID=53948541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510248758.1A Pending CN104881011A (en) 2015-05-15 2015-05-15 Noodles quick-freeze production line control system

Country Status (1)

Country Link
CN (1) CN104881011A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113907260A (en) * 2021-10-14 2022-01-11 河北福成五丰食品股份有限公司 Production line and production process of quick-frozen noodles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113907260A (en) * 2021-10-14 2022-01-11 河北福成五丰食品股份有限公司 Production line and production process of quick-frozen noodles

Similar Documents

Publication Publication Date Title
CN104317239A (en) Method and device for automatically controlling plate discharge at outlet of drying machine
CN103831730B (en) The freezing rough selvedge processing machine of tunnel type
CN108910541B (en) Energy-saving ash conveying system and method for power plant
CN103660145A (en) Automatic distributor of injection moulding machine
CN104881011A (en) Noodles quick-freeze production line control system
CN203765475U (en) Tunnel type freezing burr processor
CN204038486U (en) Based on the material-blockage preventing device of belt conveyer
CN204965142U (en) Noodless quick -freeze production line management system
CN204406131U (en) Plate automaton is put in a kind of dryer outlet
CN103896036A (en) Automatic feeding and discharging method and system of freeze dryer
CN206307523U (en) A kind of clear wall device of the moist materials from bonding hopper of conveyer
US2405947A (en) Escapement mechanism
CN204747935U (en) Loudspeaker paste dress system
CN102126610B (en) Continuous operation method of lifting conveyor
CN105016070A (en) Multi-outlet push-out device for cigarette cartons
CN103046301A (en) Control device and control method of integrated automatic washing system
CN109785590B (en) Tobacco rod lifter inlet blockage alarm system and method
CN109160300A (en) A kind of the side formula mould turnover method and mould turnover system of bilayer smoke box
CN204211854U (en) A kind of precious metal coin plated film automatic production line
CN203845457U (en) Wind-suction-type feeding and impurity-removing integration machine
CN204120180U (en) Multilayer fruit air-dry machine
CN203528885U (en) Multifunctional grain sack filling machine
CN203038089U (en) Controlling device of integrated automatic washing system
US3613883A (en) Apparatus and method for transferring flaccid articles
CN110682425A (en) Conveying device for conveying fly ash bricks in steam curing kettle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150902