CN104879572B - A kind of spring support hanging frame fitting fastening and preparation method thereof - Google Patents

A kind of spring support hanging frame fitting fastening and preparation method thereof Download PDF

Info

Publication number
CN104879572B
CN104879572B CN201510314169.9A CN201510314169A CN104879572B CN 104879572 B CN104879572 B CN 104879572B CN 201510314169 A CN201510314169 A CN 201510314169A CN 104879572 B CN104879572 B CN 104879572B
Authority
CN
China
Prior art keywords
pedestal
support frame
cooled
strand
stove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510314169.9A
Other languages
Chinese (zh)
Other versions
CN104879572A (en
Inventor
郭芬阳
伏程
刘治联
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deli Energy Equipment (jiangsu) Co Ltd
Original Assignee
Deli Energy Equipment (jiangsu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deli Energy Equipment (jiangsu) Co Ltd filed Critical Deli Energy Equipment (jiangsu) Co Ltd
Priority to CN201510314169.9A priority Critical patent/CN104879572B/en
Publication of CN104879572A publication Critical patent/CN104879572A/en
Application granted granted Critical
Publication of CN104879572B publication Critical patent/CN104879572B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/12Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
    • F16L3/133Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing and hanging from a pendant
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/50Ferrous alloys, e.g. steel alloys containing chromium with nickel with titanium or zirconium

Abstract

The invention discloses a kind of spring support hanging frame fitting fastening, including pedestal and support frame, support frame is symmetricly set on pedestal, support frame and pedestal formation U-shaped groove, and support frame on be provided with screwed hole, pedestal is rectangular structure, and pedestal corner is equipped with fixing hole, support frame surface is coated with zinc layers, wherein:Pedestal is made with support frame for identical material, makes the material of pedestal and support frame and includes following components:Cr, Mo, C, Co, Mn, P, S, Ni, Ti, W, V, Cu, Si, Nb, Ta, N, Mg, rare earth element, remaining is Fe and inevitable impurity;The present invention also designs a kind of preparation method of spring support hanging frame fitting fastening, and the preparation method is simple and easy to apply, and preparation process is pollution-free, prepares connector with low cost, to prepare, corrosion-resistant, wear-resisting, and intensity is high, good toughness, long service life.

Description

A kind of spring support hanging frame fitting fastening and preparation method thereof
Technical field
The present invention relates to a kind of connector, and in particular to a kind of connector for using when being installed for spring support hanging frame and its Preparation method.
Background technology
Spring support hanging frame is mainly used in power plant steam-water pipe or boiler plant, produces thermal walking and its equipment dress in operation Put, in suspension and support installation, need to be fixedly connected between each part, in the past hung branch by the way of positioning welding Each part is fixedly connected in frame, although this mode stationarity is very strong but can not be dismantled completely, it has not been convenient to repaired, The interface of welding is perishable, aging, and service life is short, high cost, and security is poor during welding, wastes resource;Existing skill The mode of welding has been abandoned in art, will be effectively connected between suspension and support using special connector, meanwhile, it is this The long-term work security of connected mode mainly depends on the condition of work and stress with contact surface.
The connector that current suspension and support is applied in installing is particularly easy to corruption because long-time works under exposed environment Erosion, easy to wear, insufficient strength, it may appear that the phenomenon such as crack, disconnection;Therefore, research and development are a kind of can overcome the spring of above skill defect Suspension and support connector turns into those skilled in the art's technical problem urgently to be resolved hurrily.
The content of the invention
The technical problems to be solved by the invention are that the shortcoming for overcoming prior art is installed there is provided a kind of spring support hanging frame With connector and preparation method thereof, the preparation method is simple and easy to apply, and preparation process is pollution-free, prepares with low cost, prepares Connector, corrosion-resistant, wear-resisting, intensity is high, good toughness, long service life.
In order to solve the above technical problems, the present invention provides a kind of spring support hanging frame fitting fastening, including pedestal and Support frame, support frame is symmetricly set on pedestal, support frame and pedestal formation U-shaped groove, and support frame on be provided with screwed hole, Pedestal is rectangular structure, and pedestal corner is equipped with fixing hole, and support frame surface is coated with zinc layers, wherein:
Pedestal is made with support frame for identical material, and the material for making pedestal and support frame is wrapped by mass percentage Include following components:
Cr:1-3%, Mo:0.8-1.0%, C:0.02-0.04%, Co:0.02-0.05%, Mn:0.5-0.8%, P:0.025- 0.030%, S:0.01-0.03%, Ni:0.5-0.6%, Ti:0.03-0.05%, W:0.2-0.4%, V:0.05-0.08%, Cu: 0.2-0.4%, Si:0.2-0.8%, Nb:0.03-0.05%, Ta:0.02-0.06%, N:0.01-0.02%, Mg:0.02-0.04%, Rare earth element:0.15-0.18%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:5-8%, bait:6-8%, lanthanum:5-8%, terbium:3-7%, Dysprosium:13-15%, lutetium:10-12%, ytterbium:8-10%, cerium:7-11%, neodymium:5-8%, praseodymium:3-5%, surplus is lanthanide series, above each group / and be 100%.
The technical scheme that further limits of the present invention as:
In foregoing spring support hanging frame fitting fastening, make the material of pedestal and support frame includes by mass percentage Following components:
Cr:1%, Mo:0.8%, C:0.04%, Co:0.02%, Mn:0.8%, P:0.030%, S:0.03%, Ni:0.6%, Ti: 0.04%, W:0.2%, V:0.08%, Cu:0.4%, Si:0.8%, Nb:0.05%, Ta:0.02%, N:0.02%, Mg:0.03%, it is dilute Earth elements:0.15%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:8%, bait:6%, lanthanum:5%, terbium:7%, dysprosium:14%, Lutetium:12%, ytterbium:8%, cerium:11%, neodymium:8, praseodymium:3%, surplus is lanthanide series, and above each component sum is 100%.
In foregoing spring support hanging frame fitting fastening, make the material of pedestal and support frame includes by mass percentage Following components:
Cr:2%, Mo:0.9%, C:0.02%, Co:0.04%, Mn:0.5%, P:0.028%, S:0.01%, Ni:0.5%, Ti: 0.03%, W:0.3%, V:0.06%, Cu:0.3%, Si:0.5%, Nb:0.03%, Ta:0.04%, N:0.01%, Mg:0.04%, it is dilute Earth elements:0.18%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:6%, bait:8%, lanthanum:8%, terbium:5%, dysprosium:15%, Lutetium:10%, ytterbium:9%, cerium:7%, neodymium:5%, praseodymium:4%, surplus is lanthanide series, and above each component sum is 100%.
In foregoing spring support hanging frame fitting fastening, make the material of pedestal and support frame includes by mass percentage Following components:
Cr:3%, Mo:1.0%, C:0.03%, Co:0.05%, Mn:0.6%, P:0.025%, S:0.02%, Ni:0.55%, Ti: 0.05%, W:0.4%, V:0.05%, Cu:0.2%, Si:0.2%, Nb:0.04%, Ta:0.06%, N:0.015%, Mg:0.02%, it is dilute Earth elements:0.17%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:5%, bait:7, lanthanum:7%, terbium:3%, dysprosium:13%, lutetium: 11%, ytterbium:10%, cerium:8%, neodymium:7%, praseodymium:5%, surplus is lanthanide series, and above each component sum is 100%.
The present invention have also been devised a kind of spring support hanging frame fitting fastening preparation method, the preparation method tool of the connector Gymnastics conduct:
(1)Respectively according to pedestal and support frame be shaped as treat according to casting mold is made as Modeling Material using molding sand and core sand With, make casting mold before, first the molding sand in Modeling Material is placed in baker and dried;
(2)The making material of pedestal and support frame is delivered into electric arc furnaces, and slightly refining causes the fusing of original material each component and aoxidized, The temperature slightly refined is 1000-1250 DEG C, and the thick refining time is 1-3h, is then re-fed into LF refining furnace and is refined and deaerated work, And progressive is smelted, smelting temperature is 1500-1650 DEG C, and the duration of heat is 1-3h, obtains casting liquid;
(3)The stable implantation step of liquid will be cast(1)In in ready casting mold, pouring temperature is 1400-1550 DEG C, is poured Note speed is 40-48kg/s, and the duration of pouring is 15-25s, respectively obtains the strand of pedestal and support frame;
(4)Obtained casting billet surface is cleared up with stainless steel brush or emery wheel, the mixed of nitric acid and hydrofluoric acid is then immersed in Pickling in solution is closed, is finally rinsed well, the strand after cleaning is heat-treated with clear water after drying, concrete operations are heat-treated For:
A anneals:Strand stove heat to 1000-1200 DEG C and is incubated blowing out after 3-4h, and stove is cooled to 500-650 DEG C, with Opening fire door continuation slow cooling is come out of the stove to 300-420 DEG C afterwards is air-cooled to room temperature;
B is quenched:After being annealed in step a strand slow stove heat is to 600-650 DEG C and is incubated 50-60min, stove heat again Water spray strand fast cooling is used after to 500-550 DEG C;
C is tempered:Strand after will be quenched to enter after insulation 1-2h go out after stove and hot to 300-320 DEG C of stove at room temperature again Stove is air-cooled to room temperature;
(5)By the quick sensing heating of strand after heat treatment to 750-800 DEG C, then room temperature is cooled to through refrigerating work procedure;
Refrigerating work procedure concrete operations are:Combined using water-cooled with air cooling, first use water-cooled to be incited somebody to action with 1-3 DEG C/s cooldown rate Then strand water-cooled is air-cooled to 250-320 DEG C to 400-450 DEG C, then uses water-cooled with 3-4 DEG C/s cooldown rate by strand water It is cooled to 100-150 DEG C, is finally air-cooled to room temperature;
(6)Zinc layers are plated to casting billet surface and obtain semi-finished product, room temperature is subsequently cooled to, ultrasonic wave then is carried out to semi-finished product Detection, detects that qualified is pedestal and support frame finished product, and support frame and pedestal are welded to connect into fixation obtain spring branch and hang Frame fitting fastening.
The beneficial effects of the invention are as follows:
The present invention is dried when making casting mold to molding sand, can reduce the polishing workload in later stage, reduces later stage soldering Workload, the pulling force in reduction casting process between cold-hot-cast liquid, it is to avoid organization internal is loose while to reduce cast(ing) surface thin Micro- stomata is produced.
The combination property that the present invention carries out heat treatment raising product to strand is to have also to have certain toughness outside hardness, The determination of heat treatment temperature should be to obtain uniform and tiny austenite crystal as principle, to obtain tiny geneva after quenching Body tissue, being grown up for austenite crystal be directly proportional to hardening heat, is carried out temper to product in time after quenching, can not only be disappeared The stress produced during except quenching, can also obtain a number of tempered martensite, it is ensured that the high rigidity of product is carried again simultaneously The high toughness of product.
Contain micro N, C micro in the present invention N, C, O in the present invention as interstitial elements such as one kind, they can be carried The intensity of high casting, can substantially refine and strengthen martensite, N is in heat treatment process so that protected while casting is strengthened Preferable plasticity is held.
The casting billet surface of the present invention is cleared up with stainless steel brush or emery wheel, and the mixing for being then immersed in nitric acid and hydrofluoric acid is molten Pickling in liquid, finally rinsed well with clear water can remove hot rolling oxide skin can improve the high-temperature oxidation resistance of casting, hardness with And friction and wear behavior.
Brief description of the drawings
Fig. 1 is the structural representation that spring support hanging frame fitting fastening of the present invention is used;
In figure:1- pedestals, 2- support frames, 3- screwed holes, 4- fixing holes.
Embodiment
Embodiment 1
A kind of spring support hanging frame fitting fastening that the present embodiment is provided, structure are as shown in figure 1, including pedestal 1 and branch Support 2, support frame 2 is symmetricly set on pedestal 1, and support frame 2 on pedestal 1 formation U-shaped groove, and support frame 2 with being provided with screw thread Hole 3, pedestal 1 is rectangular structure, and 1 four jiaos of pedestal is equipped with fixing hole 4, and the surface of support frame 2 is coated with zinc layers, wherein:
Pedestal 1 is made with support frame 2 for identical material, and the material of making pedestal 1 and support frame 2 is by mass percentage Meter includes following components:
Cr:1%, Mo:0.8%, C:0.04%, Co:0.02%, Mn:0.8%, P:0.030%, S:0.03%, Ni:0.6%, Ti: 0.04%, W:0.2%, V:0.08%, Cu:0.4%, Si:0.8%, Nb:0.05%, Ta:0.02%, N:0.02%, Mg:0.03%, it is dilute Earth elements:0.15%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:8%, bait:6%, lanthanum:5%, terbium:7%, dysprosium:14%, Lutetium:12%, ytterbium:8%, cerium:11%, neodymium:8, praseodymium:3%, surplus is lanthanide series, and above each component sum is 100%.
Above-mentioned spring support hanging frame fitting fastening preparation method, the preparation method concrete operations of the connector are:
(1)Respectively according to pedestal and support frame be shaped as treat according to casting mold is made as Modeling Material using molding sand and core sand With, make casting mold before, first the molding sand in Modeling Material is placed in baker and dried;
(2)The making material of pedestal and support frame is delivered into electric arc furnaces, and slightly refining causes the fusing of original material each component and aoxidized, The temperature slightly refined is 1000 DEG C, and the thick refining time is 2h, is then re-fed into LF refining furnace and is refined and deaerated work, and progressive Smelt, smelting temperature is 1650 DEG C, and the duration of heat is 1h, obtain casting liquid;
(3)The stable implantation step of liquid will be cast(1)In in ready casting mold, pouring temperature is 1550 DEG C, cast speed Spend for 45kg/s, the duration of pouring is 25s, respectively obtains the strand of pedestal and support frame;
(4)Obtained casting billet surface is cleared up with stainless steel brush or emery wheel, the mixed of nitric acid and hydrofluoric acid is then immersed in Pickling in solution is closed, is finally rinsed well, the strand after cleaning is heat-treated with clear water after drying, concrete operations are heat-treated For:
A anneals:Strand stove heat to 1100 DEG C and is incubated blowing out after 3h, and stove is cooled to 650 DEG C, then turn on fire door after Continuous slow cooling is come out of the stove to 300 DEG C is air-cooled to room temperature;
B is quenched:After being annealed in step a strand slow stove heat is to 600 DEG C and is incubated 55min, stove heat is to 500 DEG C again Water spray strand fast cooling is used afterwards;
C is tempered:Strand after will be quenched enters air cooling of being come out of the stove after stove and hot to 320 DEG C of stove after insulation 1h again at room temperature To room temperature;
(5)By the quick sensing heating of strand after heat treatment to 780 DEG C, then room temperature is cooled to through refrigerating work procedure;
Refrigerating work procedure concrete operations are:Combined using water-cooled with air cooling, first use water-cooled to be cast with 1 DEG C/s cooldown rate Then base water-cooled is air-cooled to 320 DEG C to 420 DEG C, then use water-cooled with 4 DEG C/s cooldown rate by strand water-cooled to 100 DEG C, most After be air-cooled to room temperature;
(6)Zinc layers are plated to casting billet surface and obtain semi-finished product, room temperature is subsequently cooled to, ultrasonic wave then is carried out to semi-finished product Detection, detects that qualified is pedestal and support frame finished product, and support frame and pedestal are welded to connect into fixation obtain spring branch and hang Frame fitting fastening.
Embodiment 2
A kind of spring support hanging frame fitting fastening that the present embodiment is provided, structure are as shown in figure 1, including pedestal 1 and branch Support 2, support frame 2 is symmetricly set on pedestal 1, and support frame 2 on pedestal 1 formation U-shaped groove, and support frame 2 with being provided with screw thread Hole 3, pedestal 1 is rectangular structure, and 1 four jiaos of pedestal is equipped with fixing hole 4, and the surface of support frame 2 is coated with zinc layers, wherein:
Pedestal 1 is made with support frame 2 for identical material, and the material of making pedestal 1 and support frame 2 is by mass percentage Meter includes following components:
Cr:2%, Mo:0.9%, C:0.02%, Co:0.04%, Mn:0.5%, P:0.028%, S:0.01%, Ni:0.5%, Ti: 0.03%, W:0.3%, V:0.06%, Cu:0.3%, Si:0.5%, Nb:0.03%, Ta:0.04%, N:0.01%, Mg:0.04%, it is dilute Earth elements:0.18%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:6%, bait:8%, lanthanum:8%, terbium:5%, dysprosium:15%, Lutetium:10%, ytterbium:9%, cerium:7%, neodymium:5%, praseodymium:4%, surplus is lanthanide series, and above each component sum is 100%.
Above-mentioned spring support hanging frame fitting fastening preparation method, the preparation method concrete operations of the connector are:
(1)Respectively according to pedestal and support frame be shaped as treat according to casting mold is made as Modeling Material using molding sand and core sand With, make casting mold before, first the molding sand in Modeling Material is placed in baker and dried;
(2)The making material of pedestal and support frame is delivered into electric arc furnaces, and slightly refining causes the fusing of original material each component and aoxidized, The temperature slightly refined is 1250 DEG C, and the thick refining time is 1h, is then re-fed into LF refining furnace and is refined and deaerated work, and progressive Smelt, smelting temperature is 1500 DEG C, and the duration of heat is 2h, obtain casting liquid;
(3)The stable implantation step of liquid will be cast(1)In in ready casting mold, pouring temperature is 1400 DEG C, cast speed Spend for 48kg/s, the duration of pouring is 15s, respectively obtains the strand of pedestal and support frame;
(4)Obtained casting billet surface is cleared up with stainless steel brush or emery wheel, the mixed of nitric acid and hydrofluoric acid is then immersed in Pickling in solution is closed, is finally rinsed well, the strand after cleaning is heat-treated with clear water after drying, concrete operations are heat-treated For:
A anneals:Strand stove heat to 1000 DEG C and is incubated blowing out after 4h, and stove is cooled to 500 DEG C, then turn on fire door after Continuous slow cooling is come out of the stove to 420 DEG C is air-cooled to room temperature;
B is quenched:After being annealed in step a strand slow stove heat is to 650 DEG C and is incubated 50min, stove heat is to 550 DEG C again Water spray strand fast cooling is used afterwards;
C is tempered:Strand after will be quenched enters air cooling of being come out of the stove after stove and hot to 300 DEG C of stove after insulation 2h again at room temperature To room temperature;
(5)By the quick sensing heating of strand after heat treatment to 750 DEG C, then room temperature is cooled to through refrigerating work procedure;
Refrigerating work procedure concrete operations are:Combined using water-cooled with air cooling, first use water-cooled to be cast with 3 DEG C/s cooldown rate Then base water-cooled is air-cooled to 250 DEG C to 400 DEG C, then use water-cooled with 3 DEG C/s cooldown rate by strand water-cooled to 150 DEG C, most After be air-cooled to room temperature;
(6)Zinc layers are plated to casting billet surface and obtain semi-finished product, room temperature is subsequently cooled to, ultrasonic wave then is carried out to semi-finished product Detection, detects that qualified is pedestal and support frame finished product, and support frame and pedestal are welded to connect into fixation obtain spring branch and hang Frame fitting fastening.
Embodiment 3
A kind of spring support hanging frame fitting fastening that the present embodiment is provided, structure are as shown in figure 1, including pedestal 1 and branch Support 2, support frame 2 is symmetricly set on pedestal 1, and support frame 2 on pedestal 1 formation U-shaped groove, and support frame 2 with being provided with screw thread Hole 3, pedestal 1 is rectangular structure, and 1 four jiaos of pedestal is equipped with fixing hole 4, and the surface of support frame 2 is coated with zinc layers, wherein:
Pedestal 1 is made with support frame 2 for identical material, and the material of making pedestal 1 and support frame 2 is by mass percentage Meter includes following components:
Cr:3%, Mo:1.0%, C:0.03%, Co:0.05%, Mn:0.6%, P:0.025%, S:0.02%, Ni:0.55%, Ti: 0.05%, W:0.4%, V:0.05%, Cu:0.2%, Si:0.2%, Nb:0.04%, Ta:0.06%, N:0.015%, Mg:0.02%, it is dilute Earth elements:0.17%, remaining is Fe and inevitable impurity;
Rare earth element includes following components by mass percentage:Samarium:5%, bait:7%, lanthanum:7%, terbium:3%, dysprosium:13%, Lutetium:11%, ytterbium:10%, cerium:8%, neodymium:7%, praseodymium:5%, surplus is lanthanide series, and above each component sum is 100%.
Above-mentioned spring support hanging frame fitting fastening preparation method, the preparation method concrete operations of the connector are:
(1)Respectively according to pedestal and support frame be shaped as treat according to casting mold is made as Modeling Material using molding sand and core sand With, make casting mold before, first the molding sand in Modeling Material is placed in baker and dried;
(2)The making material of pedestal and support frame is delivered into electric arc furnaces, and slightly refining causes the fusing of original material each component and aoxidized, The temperature slightly refined is 1105 DEG C, and the thick refining time is 3h, is then re-fed into LF refining furnace and is refined and deaerated work, and progressive Smelt, smelting temperature is 1580 DEG C, and the duration of heat is 3h, obtain casting liquid;
(3)The stable implantation step of liquid will be cast(1)In in ready casting mold, pouring temperature is 1500 DEG C, cast speed Spend for 40kg/s, the duration of pouring is 20s, respectively obtains the strand of pedestal and support frame;
(4)Obtained casting billet surface is cleared up with stainless steel brush or emery wheel, the mixed of nitric acid and hydrofluoric acid is then immersed in Pickling in solution is closed, is finally rinsed well, the strand after cleaning is heat-treated with clear water after drying, concrete operations are heat-treated For:
A anneals:Strand stove heat to 1200 DEG C and is incubated blowing out after 3h, and stove is cooled to 600 DEG C, then turn on fire door after Continuous slow cooling is come out of the stove to 400 DEG C is air-cooled to room temperature;
B is quenched:After being annealed in step a strand slow stove heat is to 620 DEG C and is incubated 60min, stove heat is to 520 DEG C again Water spray strand fast cooling is used afterwards;
C is tempered:Strand after will be quenched enters air cooling of being come out of the stove after stove and hot to 310 DEG C of stove after insulation 1h again at room temperature To room temperature;
(5)By the quick sensing heating of strand after heat treatment to 765 DEG C, then room temperature is cooled to through refrigerating work procedure;
Refrigerating work procedure concrete operations are:Combined using water-cooled with air cooling, first use water-cooled to be cast with 2 DEG C/s cooldown rate Then base water-cooled is air-cooled to 290 DEG C to 400 DEG C, then use water-cooled with 3 DEG C/s cooldown rate by strand water-cooled to 120 DEG C, most After be air-cooled to room temperature;
(6)Zinc layers are plated to casting billet surface and obtain semi-finished product, room temperature is subsequently cooled to, ultrasonic wave then is carried out to semi-finished product Detection, detects that qualified is pedestal and support frame finished product, and support frame and pedestal are welded to connect into fixation obtain spring branch and hang Frame fitting fastening.
In addition to the implementation, the present invention can also have other embodiment.All use equivalent or equivalent transformation shape Into technical scheme, all fall within the protection domain of application claims.

Claims (4)

1. a kind of preparation method of spring support hanging frame fitting fastening, the connector includes pedestal (1) and support frame (2), institute The support frame (2) stated is symmetricly set on described pedestal (1), support frame as described above (2) and the pedestal (1) formation U-shaped groove, And screwed hole (3) is provided with described support frame (2), the pedestal (1) is rectangular structure, and pedestal (1) corner is all provided with There is fixing hole (4), support frame as described above (2) surface is coated with zinc layers, wherein:
The pedestal (1) is made with support frame (2) for identical material, makes the pedestal (1) and the material of support frame (2) Include following components by mass percentage:
Cr:1-3%, Mo:0.8-1.0%, C:0.02-0.04%, Co:0.02-0.05%, Mn:0.5-0.8%, P:0.025- 0.030%, S:0.01-0.03%, Ni:0.5-0.6%, Ti:0.03-0.05%, W:0.2-0.4%, V:0.05-0.08%, Cu:0.2-0.4%, Si:0.2-0.8%, Nb:0.03-0.05%, Ta:0.02-0.06%, N:0.01-0.02%, Mg: 0.02-0.04%, rare earth element:0.15-0.18%, remaining is Fe and inevitable impurity;
Described rare earth element includes following components by mass percentage:Samarium:5-8%, bait:6-8%, lanthanum:5-8%, terbium:3- 7%, dysprosium:13-15%, lutetium:10-12%, ytterbium:8-10%, cerium:7-11%, neodymium:5-8%, praseodymium:3-5%, surplus is group of the lanthanides member Element, above each component sum is 100%, it is characterised in that:The preparation method concrete operations of the connector are:
(1) respectively according to pedestal and support frame be shaped as it is stand-by according to casting mold is made by Modeling Material of molding sand and core sand, Make before casting mold, first the molding sand in Modeling Material is placed in baker and dried;
(2) the making material of pedestal and support frame is delivered to electric arc furnaces and slightly refined and cause the fusing of original material each component and oxidation, it is thick to refine Temperature be 1000-1250 DEG C, the thick refining time is 1-3h, is then re-fed into LF refining furnace and is refined and deaerated work, is gone forward side by side Row is smelted, and smelting temperature is 1500-1650 DEG C, and the duration of heat is 1-3h, obtains casting liquid;
(3) it will cast in the stable implantation step of liquid (1) in ready casting mold, pouring temperature is 1400-1550 DEG C, cast speed Spend for 40-48kg/s, the duration of pouring is 15-25s, respectively obtains the strand of pedestal and support frame;
(4) obtained casting billet surface is cleared up with stainless steel brush or emery wheel, the mixing for being then immersed in nitric acid and hydrofluoric acid is molten Pickling in liquid, is finally rinsed well with clear water, and the strand after cleaning is heat-treated after drying, the heat treatment concrete operations For:
A anneals:Strand stove heat to 1000-1200 DEG C and is incubated blowing out after 3-4h, and stove is cooled to 500-650 DEG C, then beats Blow-on door continuation slow cooling is come out of the stove to 300-420 DEG C is air-cooled to room temperature;
B is quenched:After being annealed in step a strand slow stove heat is to 600-650 DEG C and is incubated 50-60min, stove heat is extremely again Water spray strand fast cooling is used after 500-550 DEG C;
C is tempered:Strand after will be quenched enters sky of being come out of the stove after stove and hot to 300-320 DEG C of stove after insulation 1-2h again at room temperature It is cooled to room temperature;
(5) then the quick sensing heating of strand after heat treatment is cooled to room temperature to 750-800 DEG C through refrigerating work procedure;
Described refrigerating work procedure concrete operations are:Combined using water-cooled with air cooling, first use water-cooled with 1-3 DEG C/s cooldown rate By strand water-cooled to 400-450 DEG C, 250-320 DEG C is then air-cooled to, then use water-cooled with 3-4 DEG C/s cooldown rate by strand Water-cooled is finally air-cooled to room temperature to 100-150 DEG C;
(6) zinc layers are plated to casting billet surface and obtains semi-finished product, be subsequently cooled to room temperature, ultrasonic wave inspection then is carried out to semi-finished product Survey, detection qualified as pedestal and support frame finished product, and support frame and pedestal are welded to connect fixation and obtain spring support hanging frame Fitting fastening.
2. the preparation method of spring support hanging frame fitting fastening according to claim 1, it is characterised in that:Make described The material of pedestal (1) and support frame (2) includes following components by mass percentage:
Cr:1%, Mo:0.8%, C:0.04%, Co:0.02%, Mn:0.8%, P:0.030%, S:0.03%, Ni:0.6%, Ti:0.04%, W:0.2%, V:0.08%, Cu:0.4%, Si:0.8%, Nb:0.05%, Ta:0.02%, N:0.02%, Mg: 0.03%, rare earth element:0.15%, remaining is Fe and inevitable impurity;
Described rare earth element includes following components by mass percentage:Samarium:8%, bait:6%, lanthanum:5%, terbium:7%, dysprosium: 14%, lutetium:12%, ytterbium:8%, cerium:11%, neodymium:8, praseodymium:3%, surplus is lanthanide series, and above each component sum is 100%.
3. the preparation method of spring support hanging frame fitting fastening according to claim 1, it is characterised in that:Make described The material of pedestal (1) and support frame (2) includes following components by mass percentage:
Cr:2%, Mo:0.9%, C:0.02%, Co:0.04%, Mn:0.5%, P:0.028%, S:0.01%, Ni:0.5%, Ti:0.03%, W:0.3%, V:0.06%, Cu:0.3%, Si:0.5%, Nb:0.03%, Ta:0.04%, N:0.01%, Mg: 0.04%, rare earth element:0.18%, remaining is Fe and inevitable impurity;
Described rare earth element includes following components by mass percentage:Samarium:6%, bait:8%, lanthanum:8%, terbium:5%, dysprosium: 15%, lutetium:10%, ytterbium:9%, cerium:7%, neodymium:5%, praseodymium:4%, surplus is lanthanide series, and above each component sum is 100%.
4. the preparation method of spring support hanging frame fitting fastening according to claim 1, it is characterised in that:Make described The material of pedestal (1) and support frame (2) includes following components by mass percentage:
Cr:3%, Mo:1.0%, C:0.03%, Co:0.05%, Mn:0.6%, P:0.025%, S:0.02%, Ni:0.55%, Ti:0.05%, W:0.4%, V:0.05%, Cu:0.2%, Si:0.2%, Nb:0.04%, Ta:0.06%, N:0.015%, Mg:0.02%, rare earth element:0.17%, remaining is Fe and inevitable impurity;
Described rare earth element includes following components by mass percentage:Samarium:5%, bait:7%, lanthanum:7%, terbium:3%, dysprosium: 13%, lutetium:11%, ytterbium:10%, cerium:8%, neodymium:7%, praseodymium:5%, surplus is lanthanide series, and above each component sum is 100%.
CN201510314169.9A 2015-06-09 2015-06-09 A kind of spring support hanging frame fitting fastening and preparation method thereof Active CN104879572B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510314169.9A CN104879572B (en) 2015-06-09 2015-06-09 A kind of spring support hanging frame fitting fastening and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510314169.9A CN104879572B (en) 2015-06-09 2015-06-09 A kind of spring support hanging frame fitting fastening and preparation method thereof

Publications (2)

Publication Number Publication Date
CN104879572A CN104879572A (en) 2015-09-02
CN104879572B true CN104879572B (en) 2017-07-14

Family

ID=53947180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510314169.9A Active CN104879572B (en) 2015-06-09 2015-06-09 A kind of spring support hanging frame fitting fastening and preparation method thereof

Country Status (1)

Country Link
CN (1) CN104879572B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369159A (en) * 2015-12-04 2016-03-02 苏州市吴中区胥口丰收机械配件厂 Processing process of high-temperature-resistant and anti-abrasion supporting hanger
CN105369158A (en) * 2015-12-04 2016-03-02 苏州市神龙门窗有限公司 Processing process of high-temperature-resistant stainless steel window frame
CN106282807A (en) * 2016-08-17 2017-01-04 安徽红桥金属制造有限公司 A kind of high-carbon hot rolling spring steel plate and process technique thereof
CN106350750A (en) * 2016-08-31 2017-01-25 南京惠德机械有限公司 Bearing rod of suspension riveting rivet positioning device and heat treatment process of bearing rod
CN106381454A (en) * 2016-08-31 2017-02-08 南京惠德机械有限公司 Piston rod of closed mold height measuring device and heat treatment technology of piston rod
CN107904505A (en) * 2017-11-14 2018-04-13 张剑 A kind of valve for sea water desalination processing
CN108754352A (en) * 2018-05-25 2018-11-06 倍德力能源装备(江苏)有限公司 A kind of energy-saving heat-insulating riser clamp
CN108799635A (en) * 2018-06-15 2018-11-13 荣马电器有限公司 A kind of high accurancy and precision damping suspension and support and its production technology

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102686760A (en) * 2010-07-09 2012-09-19 住友金属工业株式会社 Corrosion-resistant steel material for cargo oil tank
CN203297856U (en) * 2013-04-27 2013-11-20 东风朝阳朝柴动力有限公司 Fastening connecting piece capable of adjusting support spacing

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2200076Y (en) * 1994-08-16 1995-06-07 中国石化北京设计院 Spring support
CN2260221Y (en) * 1996-12-03 1997-08-20 李新民 Damped variable spring supporting hanging rack for heat pipeline
JP4159011B2 (en) * 2000-03-09 2008-10-01 日本発条株式会社 Spring steel and manufacturing method thereof
CN1166886C (en) * 2001-12-11 2004-09-15 帖德顺 Constant force spring support hanger frame whose supporting and hanging forces and displacement do not change and loading force can be regulated
CN203451034U (en) * 2013-07-16 2014-02-26 江苏焱鑫科技股份有限公司 Vertical displacement constant-force spring supporting hanger

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102686760A (en) * 2010-07-09 2012-09-19 住友金属工业株式会社 Corrosion-resistant steel material for cargo oil tank
CN203297856U (en) * 2013-04-27 2013-11-20 东风朝阳朝柴动力有限公司 Fastening connecting piece capable of adjusting support spacing

Also Published As

Publication number Publication date
CN104879572A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN104879572B (en) A kind of spring support hanging frame fitting fastening and preparation method thereof
CN104862615B (en) A kind of production technology of S31803 two-phase stainless steel flange
CN106181131B (en) For the solid core welding wire preparation method of anti-fused salt corrosion nickel base superalloy welding
CN103243275B (en) Preparation method of bainite/martensite/austenite composite high-strength steel
CN104630633B (en) Preparation method of anti-carburizing electrothermal alloy
CN101935807B (en) Rare earth yttrium-containing nickel-saving austenite heat-resistant stainless steel and preparation method thereof
CN105463308B (en) A kind of metal anticentripetal roll collar and its manufacturing process
CN104694832B (en) Martensitic stainless steel for nuclear reactor and preparation method of stainless steel
CN104791564A (en) C276 Hastelloy alloy flange and production technology thereof
CN106544488A (en) Bolt manufacturing method
CN108998635B (en) The preparation method of anti-oxidant electrothermal alloy
CN104630647A (en) Preparation method of high-strength hot galvanizing Q&P steel
CN104513929B (en) A kind of resistance wire alloy and its pre-oxidization treatment method
CN104451452A (en) Bearing steel for wind power equipment and preparation method thereof
CN102828143A (en) High-temperature carburizing technology for workpiece
CN105177463B (en) Delayed-fracture-resistant high-strength bolt alloy material and manufacturing method of bolts
CN104263885A (en) Heat treatment process for improving low-temperature toughness of castings
CN104726754A (en) Preparation method of high-strength aluminum alloy material for doors/windows
CN107385175B (en) A kind of other deformation method of the band-like carbide grade of reduction GCr15 bearing steel
CN104846237A (en) Manufacturing method of Ni-Fe-Cr-Mo anticorrosive alloy tube blank
CN104109800B (en) High intensity is containing vanadium height manganese nonmagnetic steel and production method thereof
CN102876870A (en) Method for producing cold-rolled magnetic pole steel plate with yield strength of 250 MPa
CN102876865A (en) Heat treatment method of 304 stainless steel
CN106282878B (en) A kind of preparation method of galvanizing warm working high intensity medium managese steel part
CN106756331A (en) A kind of automotive hub and its processing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Yangzhong City, Jiangsu province 212211 Yihe Road No. 890 Zhenjiang

Applicant after: Deli energy equipment (Jiangsu) Co., Ltd.

Address before: 212132 No. 16 Yangtze River Road, Dagang District, Zhenjiang New District, Jiangsu, Zhenjiang

Applicant before: Deli energy equipment (Jiangsu) Co., Ltd.

GR01 Patent grant
GR01 Patent grant