CN104879108B - A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method - Google Patents
A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method Download PDFInfo
- Publication number
- CN104879108B CN104879108B CN201510259567.5A CN201510259567A CN104879108B CN 104879108 B CN104879108 B CN 104879108B CN 201510259567 A CN201510259567 A CN 201510259567A CN 104879108 B CN104879108 B CN 104879108B
- Authority
- CN
- China
- Prior art keywords
- well
- heat injection
- coal bed
- bed gas
- coal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Solid Fuels And Fuel-Associated Substances (AREA)
Abstract
A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method, is related to a kind of recovery method of subterranean coal gas, solves existing coal bed gas pumping method extraction rate low, it is impossible to effectively carry out the technical problem of coal bed gas extraction.The present invention step be:Peupendicular hole construct to coal seam, construction level well, connection forms U-shaped well;At least construct three U-shaped wells, one well cementation as heat injection well, remaining is used as gas-producing well;Horizontal well is arranged in parallel, and among coal seam;150 DEG C~300 DEG C hyperthermia and superheating water are injected from heat injection well to coal seam, coal seam is heated;Iterative cycles injection hot water by coal seam until heat 100 DEG C~more than 250 DEG C;From producing well extraction coal bed gas and underground water.The present invention is used for the exploitation of subterranean coal gas, with can effectively carry out the extraction of coal bed gas, accelerates coal bed gas extraction speed, improves the advantage of extraction rate.
Description
Technical field
It is particularly a kind of to utilize coal bed gas U-shaped well extraction coal seam the present invention relates to a kind of recovery method of subterranean coal gas
The method of gas.
Background technology
As shown in figure 1, coal bed gas U-shaped well is the connected well constituted using a peupendicular hole 1 with horizontal well 2.Construct first
Peupendicular hole 1 is to coal seam 3, then construction level well 2.Horizontal well 2 includes straight well 2.1 and deflecting horizontal well 2.2, and straight well 2.1 is from ground
When face is crept into the kickoff point (KOP) of deflecting horizontal well 2.2 (starting point for the artificial deflecting that heads straight for beginning by Chui) A, start to bend with certain curvature
To landing point (hole angle reaches 90 ° of point in well track) B of deflecting horizontal well 2.2, then proceed to orient horizontal drilling, make
Deflecting horizontal well 2.2 is connected with peupendicular hole 1.The horizontal segment of horizontal well 2 often has certain gradient, is easy to current direction peupendicular hole
1, and coal seam gas and water is drained into ground by the draining pump installed in peupendicular hole 1.
The coal bed gas pumping method of prior art, for the low coal seam of gas permeability, horizontal well is only just corresponded in coal seam
One horizontal drilling, the scope of exploiting coal bed methane is extremely limited;For the higher coal seam of permeability, if control coal seam gas velocity
Liquid fluctuating when, cause coal petrography block local yielding deformation failure, cause a large amount of discharges of coal dust, both block the pump housing, again may be used
Moment crack in coal seam can be blocked, cause the unexpected reduction of aquifer yield and gas production, influence the yield of coal bed gas, and be difficult to recover
The gas production of coal bed gas well.
The content of the invention
It is an object of the invention to the shortcoming for overcoming prior art, there is provided a kind of coal bed gas U-shaped well heat injection enhanced gas extraction side
Method, solves existing coal bed gas pumping method extraction rate low, it is impossible to effectively carry out the technical problem of coal bed gas extraction.
The present invention is achieved through the following technical solutions:
A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method, its step is:
1. according to the construction requirement and sequence construction of coal bed gas U-shaped well, the peupendicular hole and horizontal well of U-shaped well of constructing, level
The horizontal segment of well is located in coal seam, and peupendicular hole is connected with horizontal well;
2. at least construct three U-shaped wells, the peupendicular hole in one of them U-shaped well uses high temperature resistant cement and steel with horizontal well
Pipe is cemented the well, and as heat injection well, remaining is cemented the well using conventional method, and as gas-producing well, the horizontal segment of heat injection well is arranged in gas-producing well
The centre of horizontal segment;
3. between all horizontal wells be arranged in parallel, and all in coal seam among;
4. after the completion of cementing the well, 150 DEG C~300 DEG C hyperthermia and superheating water are injected from heat injection well to coal seam;
5. hyperthermia and superheating water penetrates into producing well from the horizontal segment of heat injection well by coal seam, and heats coal seam;
6. iterative cycles injection hyperthermia and superheating water, 100 DEG C~more than 250 DEG C are heated to by coal seam;
7. from the peupendicular hole extraction coal bed gas and underground water of producing well, from the straight well extraction coal seam of the horizontal well of producing well
Gas.
Further, when the hot water arrival horizontal segment temperature of the heat injection well is relatively low, the control valve of the heat injection well other end is opened
Door, the relatively low hot water of discharge temperature regulates and controls to the water temperature in heat injection well.
Further, when the heat injection well is with producing well poor connectivity, vapour pressure is carried out using high steam or water before heat injection
Split, until high-temperature water can penetrate into producing well from heat injection well.
Further, the spacing of the heat injection well and producing well is 50 meters~300 meters.
Further, the production requirement of the producing well routinely coal bed gas well, installs the water lift of screw pump or coal bed gas well
Pump, and gas and water separator.
The present invention compared with prior art, with advantages below and beneficial effect:
The technological core of the present invention is that hot water with coal seam during coal seam by carrying out heat friendship to a U-shaped well injection hot water
Change, heat coal seam, the weary hot water of cooling flows out or is forced out from the other end of U-shaped well, and hot water is constantly carried out in U-shaped well follows
Ring.After coal seam is heated, the coal bed gas in coal seam is changed into free state by adsorbed state rapidly, flows into adjacent horizontal well simultaneously
Ground is drained into, the purpose of rapid extraction coal bed gas is reached.
The present invention is used for the exploitation of subterranean coal gas, with can effectively carry out the extraction of coal bed gas, accelerates coal bed gas and takes out
Speed is adopted, the advantage of extraction rate is improved.
Brief description of the drawings
Fig. 1 is the coal bed gas pumping method schematic diagram of prior art;
Fig. 2 is by the coal bed methane exploring method schematic diagram (system layout) of 3 U-shaped well constructions.
Embodiment
The exemplary embodiments of feature of present invention and advantage are embodied, will in detail be described in the following description with reference to accompanying drawing.Should
What is understood is that the present invention can have various changes in different embodiments, and it does not all depart from protection scope of the present invention,
And explanation therein and diagram are treated as purposes of discussion in itself, and it is not used to the limitation present invention.
As shown in Fig. 2 a kind of coal bed gas U-shaped well heat injection enhanced gas extraction method, step is as follows:
1. according to the construction requirement and sequence construction of coal bed gas U-shaped well, peupendicular hole 1, the horizontal well 2, level of U-shaped well of constructing
The horizontal segment of well 2 is located in coal seam 3, and peupendicular hole 1 is connected with horizontal well 2;
2. at least construct three U-shaped wells, the peupendicular hole 1 in one of them U-shaped well and horizontal well 2 using high temperature resistant cement and
Steel pipe is cemented the well, and as heat injection well H, remaining is cemented the well using conventional method, and as gas-producing well C, heat injection well H horizontal segment is arranged in production
The centre of gas well C horizontal segments;
3. between all horizontal wells 2 be arranged in parallel, and all in coal seam 3 among;
4. after the completion of cementing the well, 150 DEG C~300 DEG C hyperthermia and superheating water are injected from heat injection well H peupendicular hole 1 to coal seam 3, from note
Hot well H horizontal well 2 extracts the waste water for losing heat;
5. hyperthermia and superheating water penetrates into producing well C from heat injection well H horizontal segment by coal seam 3, and heats coal seam 3;
6. iterative cycles injection hot water by coal seam 3 until heat 100 DEG C~more than 250 DEG C;
7. from producing well C the extraction coal bed gas of peupendicular hole 1 and underground water, taken out from the straight well 2.1 of producing well C horizontal well 2
Mining coal seam gas.
When temperature is relatively low after hot water arrival heat injection well H horizontal segment, the control valve G of the heat injection well H other ends, row are opened
Go out the relatively low hot water of temperature, the water temperature in heat injection well is regulated and controled;
As heat injection well H and producing well C poor connectivities, steam pressure break is carried out using high steam or water before heat injection, until
High-temperature water can penetrate into producing well from heat injection well;
Heat injection well H and producing well C spacing is 50 meters~300 meters,
The production requirement of producing well C routinely coal bed gas wells, installs the lift pump of screw pump or coal bed gas well, and air water
Separator.
The U-shaped well of the present invention forms good hot water circulation passage, can constantly carry out hot water circuit, make the water in coal seam
Flat section keeps very high temperature, constantly heats coal seam;After the heating of coal seam, the coal bed gas desorption in adsorbed state, volumetric expansion,
When the permeability in coal seam is relatively low, very high gas pressure can be formed, is flowed beneficial to coal bed gas in coal seam.
The present invention can be embodied without departing from the spiritual or substantive of invention in a variety of forms, it should therefore be appreciated that on
State embodiment and be not limited to foregoing details, and should widely be explained in claim limited range, therefore fall into right
It is required that or the change in its equivalent scope and remodeling all should be claim and covered.
Claims (5)
1. a kind of coal bed gas U-shaped well heat injection enhanced gas extraction method, it is characterised in that:Methods described is concretely comprised the following steps:
1. according to the construction requirement and sequence construction of coal bed gas U-shaped well, peupendicular hole (1), the horizontal well (2), level of U-shaped well of constructing
The horizontal segment of well (2) is located in coal seam (3), and peupendicular hole (1) is connected with horizontal well (2);
2. at least construct three U-shaped wells, the peupendicular hole (1) in one of them U-shaped well and horizontal well (2) using high temperature resistant cement and
Steel pipe is cemented the well, and as heat injection well (H), remaining is cemented the well using conventional method, as producing well (C), and heat injection well H horizontal segment is arranged
In the centre of producing well (C) horizontal segment;
3. between all horizontal wells (2) be arranged in parallel, and all in coal seam (3) among;
4. after the completion of cementing the well, 150 DEG C~300 DEG C hyperthermia and superheating water are injected from heat injection well (H) to coal seam (3);
5. hyperthermia and superheating water penetrates into producing well (C) from the horizontal segment of heat injection well (H) by coal seam (3), and heats coal seam (3);
6. coal seam (3) are heated to more than 100 DEG C by iterative cycles injection hyperthermia and superheating water;
7. from producing well (C) peupendicular hole (1) extraction coal bed gas and underground water, from the straight well of producing well (C) horizontal well (2)
(2.1) extraction coal bed gas.
2. coal bed gas U-shaped well heat injection enhanced gas extraction method according to claim 1, it is characterised in that:The heat injection well (H)
Hot water reach horizontal segment temperature it is relatively low when, open heat injection well (H) other end control valve (G), the relatively low heat of discharge temperature
Water, regulates and controls to the water temperature in heat injection well.
3. coal bed gas U-shaped well heat injection enhanced gas extraction method according to claim 1, it is characterised in that:The heat injection well (H)
During with producing well (C) poor connectivity, steam pressure break is carried out using high steam before heat injection, until high-temperature water can penetrate into from heat injection well
To producing well.
4. coal bed gas U-shaped well heat injection enhanced gas extraction method according to claim 1, it is characterised in that:The heat injection well (H)
Spacing with producing well (C) is 50 meters~300 meters.
5. coal bed gas U-shaped well heat injection enhanced gas extraction method according to claim 1, it is characterised in that:The producing well (C)
The routinely production requirement of coal bed gas well, installs the lift pump of screw pump or coal bed gas well, and gas and water separator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510259567.5A CN104879108B (en) | 2015-05-20 | 2015-05-20 | A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510259567.5A CN104879108B (en) | 2015-05-20 | 2015-05-20 | A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104879108A CN104879108A (en) | 2015-09-02 |
CN104879108B true CN104879108B (en) | 2017-11-07 |
Family
ID=53946759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510259567.5A Active CN104879108B (en) | 2015-05-20 | 2015-05-20 | A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104879108B (en) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105422067B (en) * | 2015-12-29 | 2017-11-28 | 中国石油大学(华东) | The method of active water displacement exploiting coal bed methane |
CN107514250B (en) * | 2016-06-15 | 2019-07-30 | 中国石油化工股份有限公司 | A method of for steam assisted gravity drainage |
CN107558984A (en) * | 2017-07-27 | 2018-01-09 | 山西晋城无烟煤矿业集团有限责任公司 | A kind of Mining Area Coal Seam gas well batch production development approach |
CN107542440A (en) * | 2017-10-23 | 2018-01-05 | 大庆东油睿佳石油科技有限公司 | A kind of method of U-shaped well microwave heating exploitation of gas hydrate |
CN110318722B (en) * | 2018-03-30 | 2022-04-12 | 中国石油化工股份有限公司 | System and method for extracting oil gas by heating stratum |
CN109403924A (en) * | 2018-09-29 | 2019-03-01 | 山西晋城无烟煤矿业集团有限责任公司 | A kind of single coal bed gas well injection hot water driving gang of wells method for increasing |
CN111963137B (en) * | 2019-05-20 | 2022-11-04 | 中国石油天然气股份有限公司 | Underground gasification method for huge thick coal seam |
CN110541695A (en) * | 2019-09-05 | 2019-12-06 | 西安科技大学 | Efficient oil extraction method for in-situ pyrolysis of oil-rich coal by superheated steam |
CN110454134A (en) * | 2019-09-05 | 2019-11-15 | 湖南科技大学 | A kind of method of underground raw coal gasification |
CN111561303B (en) * | 2020-04-13 | 2021-06-25 | 中国地质大学(北京) | Device and method for improving low-coal-rank coal bed gas yield by heating coal reservoir |
CN111520119B (en) * | 2020-04-28 | 2022-04-08 | 中煤科工集团西安研究院有限公司 | Method for efficiently extracting coal bed gas by staged fracturing of large-spacing thin coal seam group multi-bottom horizontal well |
CN112523733B (en) * | 2020-11-26 | 2022-11-04 | 河南省煤层气开发利用有限公司 | Outburst elimination method for coal bed gas and coal gasification combined mining area |
CN113803048A (en) * | 2021-08-11 | 2021-12-17 | 太原理工大学 | Coal in-situ separation mining method based on pyrolysis |
CN114109340A (en) * | 2021-09-24 | 2022-03-01 | 陕西省煤田地质集团有限公司 | Underground in-situ compensation heating fluid injection pyrolysis oil extraction well structure of coal bed and oil extraction method |
CN113982589B (en) * | 2021-10-26 | 2022-12-23 | 西安交通大学 | Temperature control method and system for in-situ mining of oil-rich coal |
CN114000860A (en) * | 2021-10-26 | 2022-02-01 | 王柱军 | Coal formation well group type electric heating pyrolysis mining process |
CN114562233B (en) * | 2022-03-11 | 2023-12-12 | 重庆大学 | Coal bed gas exploitation drilling method by interaction of superheated liquid flash porous injection plumes |
CN114776273A (en) * | 2022-04-12 | 2022-07-22 | 王柱军 | Deep coal stratum well group type heat carrier heating pyrolysis mining process |
CN114856518B (en) * | 2022-05-09 | 2023-02-03 | 大连理工大学 | Method for increasing production of coal bed gas by using medium-low enthalpy dry rock geothermal energy |
CN115387775B (en) * | 2022-08-01 | 2023-07-18 | 太原理工大学 | Method for collaborative extraction and outburst elimination of gas extracted from adjacent coal seam based on tree-shaped long drilling holes |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2029203C (en) * | 1990-11-02 | 1994-04-19 | Roland P. Leaute | Steam process with foam for recovering viscous oils through horizontal wells |
CN1676870B (en) * | 2005-04-20 | 2010-05-05 | 太原理工大学 | Method for extracting oil and gas by convection heating of oil shale |
CN1888382A (en) * | 2006-07-19 | 2007-01-03 | 尤尼斯油气技术(中国)有限公司 | Deep low penetrating oil layer thin oil fire flooding horizontal well gas-injection horizontal well oil production process technology |
CN101418679B (en) * | 2008-11-12 | 2012-01-25 | 太原理工大学 | Method for pumping coalbed gas by heating coal bed |
CN102852496B (en) * | 2012-04-20 | 2015-05-06 | 中国石油天然气股份有限公司 | Medium-deep heavy oil reservoir exploitation method |
CN102678096B (en) * | 2012-05-08 | 2015-07-08 | 中国石油天然气股份有限公司 | Method for exploiting high-pour-point oil reservoir through hot water assisted gravity drainage |
-
2015
- 2015-05-20 CN CN201510259567.5A patent/CN104879108B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104879108A (en) | 2015-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104879108B (en) | A kind of coal bed gas U-shaped well heat injection enhanced gas extraction method | |
WO2017028322A1 (en) | Horizontal well staged fracturing oil production method by injection and production in same well | |
CN110029976B (en) | Hot nitrogen-assisted heavy oil reservoir steam huff-puff oil production system and method | |
CN101503957B (en) | Aboveground and underground combined heat injection coal bed gas extraction method | |
CN102900415B (en) | Deep and ultra-deep heavy oil reservoir double-horizontal well fire flooding oil drainage exploitation method | |
WO2016082188A1 (en) | Hot dry rock multi-cycle heating system and production method therefor | |
US11306571B2 (en) | Method for injecting non-condensable gas or in-situ combustion to recover remaining oil in a heavy oil reservoir with bottom water | |
CN106014357B (en) | A kind of method of oil shale thick deposit original position heat injection separate zone production oil gas | |
CN103225497B (en) | Exploitation method for microwave in-situ vaporization of formation water and displacement of thick oil | |
CN104481575B (en) | A kind of vapours displacement gas improves the method for gas pumping efficiency | |
CN109356560B (en) | In-situ mining method and in-situ mining well pattern | |
CN109025940B (en) | CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method | |
CN105545274B (en) | Well pattern and method for improving fire flooding effect of thick-layer heavy oil reservoir | |
CN105822276A (en) | Inter-crack space synchronous water injection-oil extraction method of multistage fracturing horizontal well | |
CN102102506A (en) | Fire flooding oil extraction layered steam injection method and separate injection tubular column adopted by same | |
CN107269255A (en) | A kind of method and device that fine and close oil is exploited by the displacement of reservoir oil between cluster | |
CN110005388B (en) | Fracturing and yield increasing method for 3-inch semi-slim well side drilling of ultra-low permeability oil reservoir | |
WO2018161470A1 (en) | Method sequentially employing acetone erosion and hydraulic fracturing techniques in borehole to increase permeability of coal seam | |
CN104612640A (en) | Underground coal mine drilling, heat injection and hole sealing integration method | |
CN109630081A (en) | A kind of coal bed drilling note high pressure-temperature vapor strengthens coal bed gas drainage device and method | |
CN105178931B (en) | Method for improving initial production speed of SAGD (steam assisted gravity drainage) | |
CN108661603A (en) | Nitrogen injection induces coal seam and improves Methane Recovery Recovery method from transformation | |
CN115853488A (en) | Multistage fracturing method for reducing cracking pressure of dry hot rock reservoir by using supercritical water | |
CN104453815A (en) | Thermal recovery antipollution pipe column | |
CN108643878B (en) | High-temperature disturbance strengthened acidizing and fracturing area gas extraction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |