CN104868478B - A kind of method of the startup dynamic partition scheme under the power network state of emergency - Google Patents

A kind of method of the startup dynamic partition scheme under the power network state of emergency Download PDF

Info

Publication number
CN104868478B
CN104868478B CN201510305457.8A CN201510305457A CN104868478B CN 104868478 B CN104868478 B CN 104868478B CN 201510305457 A CN201510305457 A CN 201510305457A CN 104868478 B CN104868478 B CN 104868478B
Authority
CN
China
Prior art keywords
impedance
formula
represent
modulus
equivalent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510305457.8A
Other languages
Chinese (zh)
Other versions
CN104868478A (en
Inventor
汤奕
陈倩
石磊
蔡明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201510305457.8A priority Critical patent/CN104868478B/en
Publication of CN104868478A publication Critical patent/CN104868478A/en
Application granted granted Critical
Publication of CN104868478B publication Critical patent/CN104868478B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of method of the startup dynamic partition scheme under power network state of emergency, the method comprises the following steps:Step 10)The modulus of impedance desired value of the weak node in each partition power grid in measuring and calculating power network;Step 20)The relational expression set up between power margin and impedance modular character;Step 30)According to the power margin limit value and formula of setting(1), calculate modulus of impedance metrics-thresholds;Step 40)By step 10)The modulus of impedance desired value of all weak nodes and step 30 in the partition power grid for measuring)The modulus of impedance metrics-thresholds for measuring are compared, if the modulus of impedance desired value of any one weak node is less than modulus of impedance metrics-thresholds in partition power grid, start dynamic partition scheme;Otherwise the partition power grid voltage security at the moment, return to step 10).The method of the startup dynamic partition scheme under the power network state of emergency, may be implemented under the power network state of emergency, start dynamic partition, it is ensured that power supply reliability.

Description

A kind of method of the startup dynamic partition scheme under the power network state of emergency
Technical field
The invention belongs to bulk power grid emergent control technical field, it particularly relates to opening under a kind of power network state of emergency The method of dynamic dynamic partition scheme.
Background technology
Regional power grid interconnection, extra-high voltage alternating current-direct current system develop rapidly and long-distance and large-capacity power transmission general layout it is basic Formation has all greatly reinforced the electrical link between bulk power grid.The development of this electric power general layout of overall importance, integrated will cause electricity Net stability characteristic (quality) is increasingly complex, dynamic mutual influence between aggravation regional power grid.
In this context, power network emergency even can quickly control load in the case of failure, using original circuit Switched-mode power supply network is rationally recombinated, so control related elements trend, improve subregion reactive voltage supporting role be Determine that power network keeps the key of safe and stable operation.For having been achieved with the power network of layering and zoning operation, dynamic partition skill Art is undoubtedly carries out prevention and control, the effective means for making power network exit the state of emergency for operation of power networks.Additionally,《State Council 599 command electric power safety accident emergencies are disposed and regulations of investigating》(lower abbreviation《599 commands》) there is difference to power system Different zones power network cutting load ratio has carried out clear and definite regulation under degree accident conditions, rationally application power network Dynamic partitioning techniques Can active response《599 commands》, reduce to subtract supplying load proportion to the full extent, it is ensured that power supply reliability.
Power network dynamic partition be a global question, it is necessary to global to power network (including safety and stability, short circuit current and The aspects such as power supply reliability) there is an entirety to hold.And it is then power network state of emergency dynamic partition skill when to carry out dynamic partition The precondition of art research, its core is to need the critical conditions according to residing for system, judges whether to need to take partition scheme, Formulate a rational start-up criterion for starting dynamic partition scheme.At present in terms of partition scheme start-up criterion, correlative study Also compare shortage.
The content of the invention
Technical problem:The technical problems to be solved by the invention are:A kind of startup dynamic under power network state of emergency is provided The method of partition scheme, to realize under the power network state of emergency, starts dynamic partition, it is ensured that power supply reliability.
Technical scheme:In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of method of the startup dynamic partition scheme under power network state of emergency, the method comprises the following steps:
Step 10) measuring and calculating power network in each partition power grid in weak node modulus of impedance desired value;
Step 20) relational expression set up between power margin as shown in formula (1) and impedance modular character;
Formula (1)
In above formula, KPRepresent power margin;VindexRepresent impedance modular character;θ represents Equivalent Network impedance angle;Represent negative Lotus impedance angle;
Step 30) according to the power margin limit value and formula (1) of setting, calculate modulus of impedance metrics-thresholds;
Step 40) by step 10) the modulus of impedance desired value and step 30 of all weak nodes in the partition power grid that measures) survey The modulus of impedance metrics-thresholds for obtaining are compared, if the modulus of impedance desired value of any one weak node is less than resistance in partition power grid Anti- modular character threshold value, then start dynamic partition scheme;Otherwise the partition power grid voltage security at the moment, return to step 10).
Further, described modulus of impedance metrics-thresholds are 0.358.
Beneficial effect:The present invention compared with prior art, with advantages below:
The method of the present invention determines to carry out node voltage stabilization using the impedance modular character based on Thevenin's equivalence first Property analysis, then determine the relation between impedance modular character and power margin, and according to the limit value of pre-determined power margin, Determine modulus of impedance metrics-thresholds under the power network state of emergency, row index calculating is finally entered to weak node in subregion, once in the presence of section The modulus of impedance desired value of point is less than modulus of impedance metrics-thresholds, then start dynamic partition scheme.The method is dexterously by voltage indexes Value is associated with given power margin, calculates modulus of impedance metrics-thresholds, so that partition scheme starts threshold value and more truly may be used Letter.In addition, the method for the present invention from mains side it is active/reactive response enabling capabilities are not enough and case of heavy load under there is load and dash forward Change situation is accounted for.These factors will primarily result in the partition power grid frequency of occurrences, voltage, short circuit current problem.For current The electric power general layout of regional power grid interconnection, unless there is islet operation, the probability that general frequency issues occur is not very big, is mainly gone back It is voltage problem.Therefore dynamic partition scheme start-up criterion concentrates consideration voltage indexes under the power network state of emergency.So start more Added with effect and accurately.In the method for the present invention, it is analyzed using quiescent voltage index, can accurately reflects in subregion each The Voltage Stability Level of node, judges whether partition power grid is in a state of emergency, simple, workable etc. excellent with calculating Gesture.
Brief description of the drawings
Fig. 1 is FB(flow block) of the invention;
Fig. 2 is node voltage Thevenin's equivalence system diagram.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and in conjunction with the embodiments.But the invention is not restricted to be given The embodiment for going out.
The power network state of emergency refers mainly to various operation constraintss and is broken rear power network and enters unsure state, the present invention For Dynamic partitioning techniques mainly for power network be subject to inside and outside disturbance after, due to the fragility of itself, into improper fortune Row state.This state not necessarily occurs the out-of-limit situation of constraints.When operation constrains the nargin for leaving less than a certain During threshold value, you can to think that power network enters the state of emergency.Consider to be led when mains side and the extraordinary change of load side respectively herein Send a telegraph net into the factor of the state of emergency, such as power supply it is active/reactive response enabling capabilities are not enough, wind-powered electricity generation intermittence new energy work( Occur the aspects such as sudden load change under rate big ups and downs, case of heavy load.
As shown in figure 1, the method for the startup dynamic partition scheme under a kind of power network state of emergency of the embodiment of the present invention, bag Include following steps:
Step 10) measuring and calculating power network in each partition power grid in weak node modulus of impedance desired value.
Step 20) relational expression set up between power margin as shown in formula (1) and impedance modular character;
Formula (1)
In above formula, KPRepresent power margin;VindexRepresent impedance modular character;θ represents Equivalent Network impedance angle;Represent negative Lotus impedance angle.
Step 30) according to the power margin limit value and formula (1) of setting, calculate modulus of impedance metrics-thresholds;
Step 40) by step 10) the modulus of impedance desired value and step 30 of all weak nodes in the partition power grid that measures) survey The modulus of impedance metrics-thresholds for obtaining are compared, if the modulus of impedance desired value of any one weak node is less than resistance in partition power grid Anti- modular character threshold value, then start dynamic partition scheme;Otherwise the partition power grid voltage security at the moment, return to step 10).
Step 10) in, calculate the modulus of impedance desired value of weak node, Dai Wei is carried out to weak node in partition power grid first Southern equivalent parameters are calculated, and obtain the equivalent impedance of Dai Weinan systems, thus calculate the modulus of impedance desired value of the weak node.
Set up real-time Thevenin's equivalence circuit diagram as shown in Figure 2.It is in Fig. 2, all electromotive force in system is equivalent for one Individual equivalent electromotive force, usesRepresent;Similarly, by the line impedance in addition to the node with an equivalent impedanceTo represent, Represent node load impedance.For any weak node of a certain subregion electric field, complication system is switched to by Thevenin's equivalence Simple AC system.Comprise the following steps that:
Step 101) when the real-time Thevenin's equivalence parameter of the system of carrying out is calculated, first with preceding double sampling and process The data calculating parameter initial value for arriving.According to formula (201), Thevenin's equivalence impedance initial value is obtained based on traditional two-point method
Formula (201)
System Thevenin's equivalence potential initial value is obtained according to formula (202)
Formula (202)
In formula,Represent first time sampled voltage phasor, UL0The voltage magnitude sampled obtain for the first time is represented,Represent Sample for the first time the voltage phase angle for obtaining;Represent second sampled voltage phasor, UL1Represent the electricity sampled obtain for the second time Pressure amplitude value,Represent the voltage phase angle sampled obtain for the second time;IL0Represent the current amplitude sampled obtain for the first time;IL1Represent Sample for the second time the current amplitude for obtaining.
The predicted value of corresponding equivalent impedance is calculated according to formula (203)
Formula (203)
Wherein,Represent that ith iteration obtains equivalent impedance predicted value,Represent the equivalence electricity that ith iteration is obtained Resistance predicted value,Represent the equivalent reactance predicted value that ith iteration is obtained, Eeqi-1What expression was iterated to calculate out for the i-th -1 time etc. Value potential amplitude, δeqi-1The equivalent potential phase angle that expression is iterated to calculate out for the i-th -1 time, ULiRepresent the voltage that i & lt sampling is obtained Amplitude,Represent the voltage phase angle that i & lt sampling is obtained, ILiRepresent the current amplitude that i & lt sampling is obtained.
For the sampling of wherein i & lt, the voltage phasor obtained using i & lt samplingCurrent data ILiAnd i-th -1 The amplitude E of the secondary equivalent potential being calculatedeqi-1With the phase angle δ of equivalent potentialeqi-1, it is calculated equivalent potential correctionJudgment variable Δ Z and angle modification amount Δ δ in the middle of corresponding is calculated according to formula (204):
Formula (204)
And then obtain the correction of equivalent potential
IfAnd Δ Z>0, then
IfAnd Δ Z<0, then
IfAnd Δ Z>0, then
IfAnd Δ Z<0, then
IfThen
In formula,Represent that the i-th -1 time iteration obtains equivalent impedance, Reqi-1The equivalence electricity that the i-th -1 time iteration of expression is obtained Resistance, Xeqi-1The equivalent reactance value that the i-th -1 time iteration of expression is obtained, ULi-1The i-th -1 time voltage magnitude for obtaining of sampling is represented, ILi-1Represent the i-th -1 time current amplitude for obtaining of sampling.
Thus, the Thevenin's equivalence potential phasor that i & lt sampling is obtained is calculated according to formula (205)
Formula (205)
Wherein,The i-th -1 time Thevenin's equivalence potential phasor for obtaining of sampling is represented,Represent that equivalent potential is repaiied Positive quantity,Represent the Thevenin's equivalence potential phasor that i & lt sampling is obtained.
It is being calculated the corresponding Thevenin's equivalence potential phasor of i & lt samplingAfterwards, formula (211) meter is carried it into Calculate the equivalent impedance phasor after i & lt sampling
Formula (211)
Wherein,The Thevenin's equivalence potential phasor that i & lt sampling is obtained is represented,After expression i & lt sampling etc. Value impedance phasor, ILiRepresent the current amplitude that i & lt sampling is obtained, ULiRepresent the voltage magnitude that i & lt sampling is obtained.
So far the calculating to the real-time Thevenin's equivalence parameter of i & lt sampled data is completed, is continued acquisition i+1 time and is adopted Sample data, and repeat the calculating of above-mentioned real-time Thevenin's equivalence parameter.
Step 102) measuring and calculating Dai Weinan systems equivalent impedance:
Thevenin's equivalence circuit diagram as shown in Figure 2 understands that the apparent energy that the load bus under polar coordinate system is obtained is such as Shown in formula (206):
Formula (206)
As shown in formula (207), the active P that load bus absorbsL, reactive power QLRespectively
Formula (207)
In formula, θ represents Equivalent Network impedance angle,Represent load impedance angle, EeqRepresent Thevenin's equivalence electromotive force amplitude; ZeqRepresent Thevenin's equivalence impedance magnitude, ZLNode load impedance magnitude is represented,Represent node load impedance;Expression is worn The southern equivalent impedance of dimension;
PLAnd QLTo ZLDerivation, can proper ZL=ZeqWhen,The now active power of line transmission Reach maximum PLmaxThe reactive power Q obtained with load sideLmaxAlso maximum is reached, as shown in formula (208):
Formula (208)
Step 103) measuring and calculating modulus of impedance index test value:
From step 102), when line transmission power is maximum, voltage is in critical stable state, now load impedance It is equal with Thevenin's equivalence impedance value, that is, there is formula (209):
Formula (209)
Voltage stability is judged with impedance modular character, index test value is defined as:
Formula (210)
Modulus of impedance index test value is accurately reflected between system current operating conditions point and maximum transmission power point Gap.When index test value closer to 0 when, illustrate that operating point becomes closer to voltage stability critical point, node voltage it is steady It is qualitative poorer.
In step 20) in, the process of the relational expression set up between power margin and impedance modular character is:
Power margin KPIt is defined as
Formula (301)
Convolution (207) and formula (301), obtain KPAnother expression way, as shown in formula (302):
Formula (302)
Can be obtained by formula (210)
Formula (303)
Then convolution (302) and formula (303), obtain power margin KPWith impedance modular character VindexBetween relation
In step 30) in, the power margin limit value of setting, to be previously set, can be according to the operating rule of this area Limit.For example, according to《Power system safety and stability computing technique specification》To power margin in (standard No. DL/T1234-2013) KPSetting, derive corresponding modulus of impedance metrics-thresholds, and whether the criterion of the state of emergency is reached in this, as node voltage. 《Power system safety and stability computing technique specification》Point out, when in region, load maximum or section tidal current reach maximum, KPNo 8% must be less than;Under N-1 failures, KP5% must not be less than.It can thus be concluded that formula (401):
Formula (401)
It can thus be concluded that:
Therefore, can be by Vindex<0.358 used as dynamic partition start-up criterion.
An embodiment is enumerated below.
By taking 230kV Shanghai Ju Feng 1# this weak node as an example, Load flow calculation is carried out by BPA softwares and stablizes file to transport OK, simulation time is 10s, obtains the weak node real time information (including active power, reactive power, voltage magnitude and phase Angle), MATLAB is imported data to, and programming carries out voltage indexes calculating, obtains a result as shown in table 1.
The 230kV Shanghai Ju Feng 1# voltage indexes results of table 1
Time/s Voltage indexes value Time/s Voltage indexes value
0.5 0.763099818763312 5.5 0.662943865068431
1.0 0.679590478635123 6.0 0.667358883729164
1.5 0.498000794003520 6.5 0.675677440313633
2.0 0.457948311073828 7.0 0.685469870716686
2.5 0.462524250660278 7.5 0.695403741868622
3.0 0.465589621643638 8.0 0.703210457591864
3.5 0.453258840128252 8.5 0.707505750033555
4.0 0.404039885804003 9.0 0.708775548352132
4.5 0.617469536821706 9.5 0.709931902035739
5.0 0.572478419419662 10.0 0.711083592870503
From data in table 1, in this 10s of emulation, the voltage indexes value V of the nodeindex>0.358, explanation 230kV Shanghai Ju Feng 1# busbar voltage stabilizations.Further determine whether to need boot partition scheme, in addition it is also necessary to whole subregion its His weak node carries out same calculating, and whether observation index value exceeds 0.358, can just draw a conclusion.The index of other nodes Calculate as the computational methods of above-mentioned weak node, just do not repeat one by one.
It should be noted that:Described embodiment is only some embodiments of the present application, rather than whole embodiments. Based on the embodiment in the application, it is all that those of ordinary skill in the art are obtained under the premise of creative work is not made Other embodiment, belongs to the scope of the application protection.

Claims (1)

1. the method for the startup dynamic partition scheme under a kind of power network state of emergency, it is characterised in that the method includes following step Suddenly:
Step 10) measuring and calculating power network in each partition power grid in weak node modulus of impedance desired value;
Step 10) in, calculate the modulus of impedance desired value of weak node, Dai Weinan etc. is carried out to weak node in partition power grid first Value parameter is calculated, and obtains the equivalent impedance of Dai Weinan systems, then calculate the modulus of impedance desired value of the weak node;Specifically include step It is rapid 101) to step 103):
Step 101) when the real-time Thevenin's equivalence parameter of the system of carrying out is calculated, obtained first with preceding double sampling and treatment Data calculating parameter initial value, according to formula (201), Thevenin's equivalence impedance initial value is obtained based on traditional two-point method
System Thevenin's equivalence potential initial value is obtained according to formula (202)
In formula,Represent first time sampled voltage phasor, UL0The voltage magnitude sampled obtain for the first time is represented,Represent first The secondary voltage phase angle for obtaining of sampling;Represent second sampled voltage phasor, UL1Represent the voltage amplitude sampled obtain for the second time Value,Represent the voltage phase angle sampled obtain for the second time;IL0Represent the current amplitude sampled obtain for the first time;IL1Represent second The current amplitude that sampling is obtained;
The predicted value of corresponding equivalent impedance is calculated according to formula (203)
Wherein,Represent that ith iteration obtains equivalent impedance predicted value,Represent that the substitutional resistance that ith iteration is obtained is pre- Measured value,Represent the equivalent reactance predicted value that ith iteration is obtained, Eeqi-1The equivalent potential that expression is iterated to calculate out for the i-th -1 time Amplitude, δeqi-1The equivalent potential phase angle that expression is iterated to calculate out for the i-th -1 time, ULiThe voltage magnitude that i & lt sampling is obtained is represented, Represent the voltage phase angle that i & lt sampling is obtained, ILiRepresent the current amplitude that i & lt sampling is obtained;
For the sampling of wherein i & lt, the voltage phasor obtained using i & lt samplingCurrent data ILiAnd the i-th No. -1 time meter The amplitude E of the equivalent potential for obtainingeqi-1With the phase angle δ of equivalent potentialeqi-1, it is calculated equivalent potential correctionRoot Judgment variable Δ Z and angle modification amount Δ δ in the middle of corresponding is calculated according to formula (204):
And then obtain the correction of equivalent potential
IfAnd Δ Z>0, then
IfAnd Δ Z<0, then
IfAnd Δ Z>0, then
IfAnd Δ Z<0, then
IfThen
In formula,Represent that the i-th -1 time iteration obtains equivalent impedance, Reqi-1The substitutional resistance value that the i-th -1 time iteration of expression is obtained, Xeqi-1The equivalent reactance value that the i-th -1 time iteration of expression is obtained, ULi-1Represent the i-th -1 time the sample voltage magnitude for obtaining, ILi-1Table Show the i-th -1 time current amplitude for obtaining of sampling;
The Thevenin's equivalence potential phasor that i & lt sampling is obtained is calculated according to formula (205)
Wherein,The i-th -1 time Thevenin's equivalence potential phasor for obtaining of sampling is represented,Equivalent potential correction is represented,Represent the Thevenin's equivalence potential phasor that i & lt sampling is obtained;
The equivalent impedance phasor after i & lt is sampled is calculated according to formula (211)
Wherein,The Thevenin's equivalence potential phasor that i & lt sampling is obtained is represented,Represent the equivalent resistance after i & lt sampling Anti- phasor;
I+1 time sampled data is obtained, and repeats said process, calculate real-time Thevenin's equivalence parameter;
Step 102) measuring and calculating Dai Weinan systems equivalent impedance:
Shown in the apparent energy such as formula (206) that load bus under polar coordinate system is obtained:
As shown in formula (207), the active P that load bus absorbsL, reactive power QLRespectively:
In formula, θ represents Equivalent Network impedance angle,Represent load impedance angle, EeqRepresent Thevenin's equivalence electromotive force amplitude;ZeqTable Show Thevenin's equivalence impedance magnitude, ZLNode load impedance magnitude is represented,Represent node load impedance;Represent Dai Weinan Equivalent impedance;
Using PLAnd QLTo ZLDerivation, proper ZL=ZeqWhen,Now the active power of line transmission reaches Maximum PLmaxThe reactive power obtained with load side reaches maximum QLmax, as shown in formula (208):
Step 103) measuring and calculating modulus of impedance index test value:
According to step 102), when line transmission power is maximum, voltage is in critical stable state, now load impedance and Dai Wei Southern equivalent impedance value is equal, that is, have formula (209):
Voltage stability is judged with impedance modular character, index test value is defined as formula (210):
Step 20) relational expression set up between power margin and impedance modular character, specifically include:
Power margin KPIt is defined as formula (301):
Convolution (207) and formula (301), obtain KPExpression way, as shown in formula (302):
Formula (303) can be obtained by formula (210):
Convolution (302) and formula (303), obtain power margin KPWith impedance modular character VindexBetween relation such as formula (1) shown in:
Step 30) according to the power margin limit value and formula (1) of setting, calculate modulus of impedance metrics-thresholds;
The step 30) in, setting power nargin limit value derives corresponding modulus of impedance metrics-thresholds, and in this, as node Whether voltage reaches the criterion of the state of emergency, as shown in formula (401):
Can obtain:
V i n d e x &GreaterEqual; 0.413 V i n d e x &GreaterEqual; 0.358
Modulus of impedance metrics-thresholds are 0.358;
Step 40) by step 10) the modulus of impedance desired value and step 30 of all weak nodes in the partition power grid that measures) measure Modulus of impedance metrics-thresholds are compared, if the modulus of impedance desired value of any one weak node is less than modulus of impedance in partition power grid Metrics-thresholds, then start dynamic partition scheme;Otherwise the partition power grid voltage security at the moment, return to step 10).
CN201510305457.8A 2015-06-05 2015-06-05 A kind of method of the startup dynamic partition scheme under the power network state of emergency Active CN104868478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510305457.8A CN104868478B (en) 2015-06-05 2015-06-05 A kind of method of the startup dynamic partition scheme under the power network state of emergency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510305457.8A CN104868478B (en) 2015-06-05 2015-06-05 A kind of method of the startup dynamic partition scheme under the power network state of emergency

Publications (2)

Publication Number Publication Date
CN104868478A CN104868478A (en) 2015-08-26
CN104868478B true CN104868478B (en) 2017-07-07

Family

ID=53914111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510305457.8A Active CN104868478B (en) 2015-06-05 2015-06-05 A kind of method of the startup dynamic partition scheme under the power network state of emergency

Country Status (1)

Country Link
CN (1) CN104868478B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105811404B (en) * 2016-03-22 2018-01-19 山东大学 A kind of distribution static voltage stability situation monitoring method of transmission & distribution collaboration
CN106684859B (en) * 2016-11-24 2019-07-12 东南大学 A kind of grid short circuit electric current suppressing method based on Dynamic partitioning techniques
CN108631290A (en) * 2017-03-21 2018-10-09 国家电网公司 A kind of multi-infeed DC receiving end power grid direct current drop point screening technique
CN108493979B (en) * 2018-03-28 2021-01-26 国电南瑞科技股份有限公司 Extra-high voltage direct current access provincial power grid partition optimization operation control method
CN116937576B (en) * 2023-09-15 2023-11-24 国网山西省电力公司运城供电公司 Large-scale active power distribution network stability evaluation method, system and equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1324458A2 (en) * 2001-12-24 2003-07-02 ABB Technology AG A method of the identification of weak and/or strong branches of an electric power transmission system
CN101118265A (en) * 2007-09-17 2008-02-06 重庆大学 Process for real time recognizing voltage stability of electrified wire netting trough recognizing weak links of electric network
CN102055191A (en) * 2010-12-31 2011-05-11 重庆大学 Wide area load shedding control method for quiescent voltage stabilization considering external power grid equivalence
CN103944170A (en) * 2014-04-16 2014-07-23 西安交通大学 Self-adaption urgent load shedding method based on electric system response information

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1324458A2 (en) * 2001-12-24 2003-07-02 ABB Technology AG A method of the identification of weak and/or strong branches of an electric power transmission system
CN101118265A (en) * 2007-09-17 2008-02-06 重庆大学 Process for real time recognizing voltage stability of electrified wire netting trough recognizing weak links of electric network
CN102055191A (en) * 2010-12-31 2011-05-11 重庆大学 Wide area load shedding control method for quiescent voltage stabilization considering external power grid equivalence
CN103944170A (en) * 2014-04-16 2014-07-23 西安交通大学 Self-adaption urgent load shedding method based on electric system response information

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电力系统电压控制区域的研究;冯光明;《CNKI优秀硕士论文全文数据库》;20071231;全文 *

Also Published As

Publication number Publication date
CN104868478A (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN104868478B (en) A kind of method of the startup dynamic partition scheme under the power network state of emergency
Fuerte-Esquivel et al. Unified power flow controller: a critical comparison of Newton–Raphson UPFC algorithms in power flow studies
Zhang et al. On the impedance modeling and equivalence of AC/DC-side stability analysis of a grid-tied type-IV wind turbine system
WO2018129842A1 (en) Pilot protection method for transmission line of new energy station based on current waveform similarity
CN103606921B (en) Based on the Transient Voltage Stability determination methods of real-time broad sense Thevenin&#39;s equivalence
CN105182189B (en) The inverter combined based on electric voltage frequency and measurement impedance disturbs formula isolated island detection method
Ohuchi et al. Stability assessment of a high-voltage DC transmission system using MIMO-and SISO-Based impedances
Sundararaju et al. Modelling and analysis of real time power system with cascaded multilevel STATCOM using fuzzy controller
CN110504664A (en) Power distribution network containing distributed generation resource adaptively prescribe a time limit forward-order current fast tripping protection method
Sazli et al. A brief review of power quality issues in smart grid and a simple user friendly software
CN106340906A (en) AC and DC system low voltage load shedding optimization method based on improved genetic algorithm
CN110768285A (en) Method for obtaining strength of alternating current-direct current hybrid direct current multi-feed-in receiving-end power grid
CN116247713A (en) Track sensitivity-based two-stage control method for transient voltage of AC/DC receiving end system
Luo et al. Internal modal resonance analysis for full converter-based wind generation using analytical inertia model
CN112510685B (en) Urban power grid risk avoidance prediction control method and device
Bimenyimana et al. Fault Ride-Through (FRT) Behavior in VSC-HVDC as Key Enabler of Transmission Systems Using SCADA Viewer Software
Kumar et al. A Solution to Islanding Event Detection Using Superimposed Negative Sequence Components-Based Scheme
Li et al. Online Power System Voltage Stability Index for LCC HVDC Using Local Measurements
Yu et al. MMC‐HVDC system oscillation suppression control strategy based on state feedback decoupling control
Zhang Analysis and control of resonances in HVDC connected DFIG-based offshore wind farm
Li et al. An improved quantitative analysis method of oscillation mode for DFIG-based wind power base with LCC-HVDC transmission considering frequency coupling characteristic
CN113991673B (en) Multi-port common high frequency electric energy router control method and system
Lu et al. Locating Sources of Sub-Synchronous Oscillations in Wind Farms Based on Instantaneous Energy Supply on Port and Bicoherence
CN113054655B (en) Receiving-end power grid strength evaluation method for high-proportion direct current high-proportion new energy
Li et al. A disturbance source location method on the low frequency oscillation with time-varying steady-state points

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant