CN104868451B - Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply - Google Patents

Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply Download PDF

Info

Publication number
CN104868451B
CN104868451B CN201510169841.XA CN201510169841A CN104868451B CN 104868451 B CN104868451 B CN 104868451B CN 201510169841 A CN201510169841 A CN 201510169841A CN 104868451 B CN104868451 B CN 104868451B
Authority
CN
China
Prior art keywords
bus
differential
fault
interval
tripping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510169841.XA
Other languages
Chinese (zh)
Other versions
CN104868451A (en
Inventor
李乃永
林勇
吴金玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Shandong Electric Power Co Ltd, Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510169841.XA priority Critical patent/CN104868451B/en
Publication of CN104868451A publication Critical patent/CN104868451A/en
Application granted granted Critical
Publication of CN104868451B publication Critical patent/CN104868451B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of GIS of realization fault precisely to excise and the bus protection algorithm of automatic recovery of power supply, comprising: calculate bus differential current, bus differential current and interval differential current among a small circle on a large scale respectively; According to the whether action of large poor ratio element, distinguish bus external area error and bus troubles inside the sample space; When large poor ratio element movement, by little poor ratio element, whether action determines which section bus is fault occur in; Whether action determines between-failures to clearance ratio difference element; According to the action situation of large poor ratio element, little poor ratio element and clearance ratio difference element, failure judgement type also makes response to fault.Beneficial effect of the present invention: energy is failure judgement position accurately; quick excision isolated fault, when preventing monospace internal fault, bus protection is by equal for all connection elements tripping, ensure that the selectivity of bus protection action; reduction accident scope, improves system run all right.

Description

Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply
Technical field
The present invention relates to Relay Protection Technology in Power System field, particularly a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply.
Background technology
When electric power system is broken down; the selectivity of relaying protection requires in minimum scope, may be minimum to systematic influence place; realize the control operation of circuit breaker; fault is opened from system break; with the development of termination failure or systematic failures, in guarantee system to greatest extent, no failure part still can continue safe operation.Bus protection action to excise on fault bus connect whole element; once there is erroneous judgement or malfunction in bus protection; light then lose load, affect device security, heavy then cause large-area power-cuts, even cause system stability problem to cause operation of power networks to be collapsed and disintegrate.Further investigation bus protection selectivity stroking technique and principle, change traditional extensive busbar fault diagnosis discrimination model, control large scale electric network ability to lifting, improve system run all right, Accident prevention expands significant.
The route protection now run and the algorithm principle of bus protection and secondary circuit design; all according to power grid GIS equipment actual conditions; namely circuit breaker line side, each interval and bus bar side all configure current transformer; line side electric current introduces bus protection; bus bar side current lead-ins road is protected; by the intersection of protection range, ensure that any position failures of element such as circuit, bus, circuit breaker, current transformer all have protection act tripping circuit breaker to excise.Particularly break down between line side and bus bar side current transformer, route protection and the equal action of bus protection, ensure that fault is reliably excised.Though this configuration ensure that reliability, selectivity requirement cannot be met.Break down between line side and bus bar side current transformer; still belong to monospace internal fault; it not real busbar fault; fault between line side current transformer and circuit breaker, only needing to pull open monospace circuit breaker can isolate, fault between circuit breaker and bus bar side current transformer; only need to pull open monospace disconnecting link can isolate; now run bus protection action and bus is joined the equal tripping of all elements, in fact cause fault coverage to expand, lose selectivity.
Summary of the invention
Object of the present invention is exactly to solve the problem; propose a kind of GIS of realization fault precisely to excise and the bus protection algorithm of automatic recovery of power supply; the method arranges the little difference of bus accessing all interval bus bar side CT; access the large difference of bus of all septal line trackside CT; and the interval accessing each interval bus bar side CT and line side CT is differential; according to three differential computational discrimination results, accurate fault point position, and adopt different fault isolation schemes for diverse location fault.
For achieving the above object, the present invention adopts following technical scheme:
Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply, it is characterized in that, comprise the following steps:
(1) for double-bus or two mother partition main electrical scheme, to suppose on two buses that each linkage unit is that to flow out sense of current from bus be positive direction; Calculate bus differential current, bus differential current and interval differential current among a small circle on a large scale respectively, according to bus differential current, bus differential current and the interval differential current among a small circle on a large scale calculated, judge the whether action of corresponding ratio element;
(2) according to the whether action of large poor ratio element, bus external area error and bus troubles inside the sample space is distinguished; When large poor ratio element movement, by little poor ratio element, whether action determines which section bus is fault occur in; Whether action determines between-failures to clearance ratio difference element;
(3) according to the action situation of large poor ratio element, little poor ratio element and clearance ratio difference element, failure judgement type also makes response to fault;
In described step (3); if break down between bus bar side CT to bus; differential action on a large scale; differential action among a small circle; all intervals are differential is all failure to actuate; judge that route protection is failure to actuate really as busbar fault, bus protection tripping bus connects all elements and jumping circuit offside circuit breaker far away.
In described step (1), bus differential current calculating on a large scale scope is all septal line trackside CT; Bus among a small circle differential current calculating scope is all interval bus bar side CT; It is between each interval bus bar side CT and line side CT that interval differential current calculates scope.
The computational methods of described step (1) median generatrix differential current are on a large scale:
I c d = | I · 1 L + I · 2 L + ... + I · n L | ;
In formula, represent each branch line trackside CT current phasor.
The computational methods of described step (1) median generatrix differential current are among a small circle:
(1) I female little spill current: I c d 1 = | I · 1 B S 11 + I · 2 B S 12 + ... + I · n B S 1 n + I · M L 1 S M L | ;
(2) II female little spill currents: I c d 2 = | I · 1 B S 21 + I · 2 B S 22 + ... + I · n B S 2 n - I · M L 2 S M L | ;
In formula, represent each branch road bus bar side CT current phasor; represent the female side of mother I, II female side CT current phasor respectively; S 11, S 12..., S 1nrepresent the female disconnecting link position of each branch road I; S 21, S 22..., S 2nrepresent the female disconnecting link position of each branch road II; S mLrepresent bus paired running state.
In described step (1), the computational methods of interval differential current are:
(1) branch road interval differential current:
L c d i = | I · i B + I · i L |
Wherein, i=1,2 ... n; be respectively i-th interval bus bar side and line side CT secondary current vector; I cdibe i-th branch road interval differential current;
(2) mother interval differential current:
I c d M L = | I · M L 1 + I · M L 2 | ;
Wherein, be respectively mother I bus bar side and II bus bar side CT secondary current vector; I cdMLfor mother interval differential current.
The concrete grammar of described step (3) is:
(1) if break down between line side CT and switch, differential action on a large scale, differentially among a small circle to be failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate, this interval switch of interval differential protection tripping is jumping circuit offside switch far away also, bus protection adds little time delay and is first failure to actuate, after the switch tripping of circuit both sides, fault point isolate, on a large scale differential, among a small circle the differential equal indifference stream in differential and all intervals return, be judged as line side dead-zone fault, bus protection is failure to actuate, and other elements of bus continue to run;
(2) if break down between bus bar side CT and switch, differential action on a large scale, differentially among a small circle to be failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate, this interval switch of interval differential protection tripping is jumping circuit offside switch far away also, bus protection adds little time delay and is first failure to actuate, after the switch tripping of circuit both sides, fault point still exists, the differential difference stream that still has of differential and between-failures does not return on a large scale, differentially among a small circle still to be failure to actuate, be judged as bus bar side dead-zone fault, other elements of bus protection action tripping bus, through the isolated fault of predetermined time delay tripping between-failures bus bar side disconnecting link after bus tripping, other bus bar elements use bus reclose sequence to close non-faulting interval circuit breaker, bus continues to run.
The concrete grammar of described step (3) is:
If break down between bus and II bus bar side CT, on a large scale differential action, to be differentially among a small circle failure to actuate, mother interval differential action, judges really as mother fault, the differential tripping bus connection switch in interval, after bus connection switch tripping, II is female littlely differentially makes tripping II bus, and I bus normally runs;
If break down between bus and I bus bar side CT, on a large scale differential action, to be differentially among a small circle failure to actuate, mother interval differential action, judges really as mother fault, the differential tripping bus connection switch in interval, after bus connection switch tripping, I is female littlely differentially makes tripping I bus, and II bus normally runs.
The concrete grammar of described step (3) is:
If break down between the L2 line side CT of the L2 line side CT of circuit transformer station A and circuit transformer station B, differential, differential and all intervals are differential is all failure to actuate, route protection action tripping circuit both sides switch among a small circle on a large scale.
Bus bar side CT is installed near circuit breaker air chamber place in 1 disconnecting link air chamber, or installs bus bar side CT additional separately between 1 disconnecting link air chamber and circuit breaker air chamber.
The invention has the beneficial effects as follows:
The realized GIS fault that the present invention proposes precisely is excised and the bus protection algorithm of automatic recovery of power supply; compared with traditional protection philosophy; the method energy accurately failure judgement position; quick excision isolated fault; when preventing monospace internal fault, bus protection is by equal for all connection elements tripping; ensure that the selectivity of bus protection action, reduction accident scope, improves system run all right.
The bus protection new principle that the present invention proposes and regulation and control operation control program, achieve when being precisely judged as fault between line side current transformer and circuit breaker, protection act only tripping between-failures circuit breaker realizes Fault Isolation; When being precisely judged as fault between circuit breaker and bus bar side current transformer, automatic/hand pulls open monospace disconnecting link isolated fault, and all non-faulting that bus runs perfect element maintenance and run; When being precisely judged as real busbar fault, by all connection elements of bus protection correct operation tripping.
The inventive method solve inside, current GIS operational outfit monospace break down and the non-selective action of bus protection, tripping all bus Connection Elements expansion accident range problem; fundamentally change traditional extensive busbar fault diagnosis discrimination model; avoid the serious consequence causing system crash to disintegrate, ensure that power grid operation.Solve and control the key problem of bulk power grid in the urgent need to process, there is extremely strong actual application value, possess boundless industry and popularize prospect in an all-round way.
Accompanying drawing explanation
Fig. 1 is traditional double bus special mother tie;
Fig. 2 is bus protection new principle schematic diagram of the present invention;
Fig. 3 is that bus bar side CT of the present invention is arranged on Z1 air chamber schematic diagram;
Fig. 4 is embodiment of the present invention abort situation analysis chart;
Fig. 5 is embodiment of the present invention fault location and process chart.
Embodiment
Below in conjunction with accompanying drawing and example, the present invention will be further described.
1, conventional busbars protection philosophy
Sectionalized bus, as the main electrical scheme such as double-bus, two mother partitions as shown in Figure 1, differential protection use large poor percentage differential element as troubles inside the sample space discriminating element; Use little poor percentage differential element as fault bus selectors.Namely by the whether action of large poor ratio element, bus external area error and bus troubles inside the sample space is distinguished; When large poor ratio element movement, by little poor ratio element, whether action determines which section bus is fault occur in.
The failure response behavior of conventional busbars protection philosophy and power failure range as follows:
(1) fault point (see k1 fault point in Fig. 1) between bus protection CT and circuit breaker
Bus protection and the equal action of route protection, tripping faulty line switch and other operation intervals of place bus, expand power failure range, only tripping circuit L2 both sides circuit breaker gets final product isolated fault.
(2) fault point (in see Fig. 1 k2 fault point) between circuit breaker and route protection CT
Bus protection and the equal action of route protection, tripping faulty line switch and place bus other run intervals, expand power failure range, only tripping circuit L2 both sides circuit breaker pull open I, II bus isolation switch and get final product isolated fault.
(3) fault point is at disconnecting link air chamber or bus (in see Fig. 1 k3 fault point)
Bus protection action, all operation intervals of tripping fault bus, do not expand power failure range.
2, the present invention realizes GIS fault and precisely excises and the bus protection algorithm of automatic recovery of power supply
As shown in Figure 2, percentage differential element is as troubles inside the sample space discriminating element on a large scale for the main electrical scheme such as double-bus, two mother partitions; Percentage differential element is as fault bus selectors among a small circle; Clearance ratio is differential as between-failures selectors.Namely by the whether action of large poor ratio element, bus external area error and bus troubles inside the sample space is distinguished; When large poor ratio element movement, by little poor ratio element, whether action determines which section bus is fault occur in; Whether action determines between-failures to clearance ratio difference element.
2.1 general principle
If two on bus each linkage unit be from bus flow out sense of current be positive direction, as shown in Figure 3.
First bus on a large scale differential computer capacity is all septal line trackside CT; Second bus among a small circle differential computer capacity is all interval bus bar side CT; The differential computer capacity in interval is between each interval bus bar side CT and line side CT.
Differential current formula on a large scale:
I c d = | I · 1 L + I · 2 L + ... + I · n L | - - - ( 1 )
In formula, represent each branch line trackside CT current phasor.
Differential current formula among a small circle:
(1) I female little spill current: I c d 1 = | I · 1 B S 11 + I · 2 B S 12 + ... + I · n B S 1 n + I · M L 1 S M L | - - - ( 2 )
(2) II female little spill currents: I c d 2 = | I · 1 B S 21 + I · 2 B S 22 + ... + I · n B S 2 n - I · M L 2 S M L | - - - ( 3 )
In formula, represent each branch road bus bar side CT current phasor; represent the female side of mother I, II female side CT current phasor respectively; S 11, S 12..., S 1nrepresent the female disconnecting link position of each branch road I (0 represents that disconnecting link divides, and 1 represents that disconnecting link closes); S 21, S 22..., S 2nrepresent the female disconnecting link position of each branch road II; S mLrepresent bus paired running state (0 represents split operation, and 1 represents paired running).
Branch road interval differential current formula:
L c d i = | I · i B + I · i L | - - - ( 4 )
Wherein, i=1,2 ... n; be respectively i-th interval bus bar side and line side CT secondary current vector; I cdibe i-th branch road interval differential current.
Mother interval differential current formula:
I c d M L = | I · M L 1 + I · M L 2 | - - - ( 5 )
Wherein, be respectively mother I bus bar side and II bus bar side CT secondary current vector; I cdMLfor mother interval differential current.
The fault actions criterion of the female little spill current of the large spill current of bus, I, II female little spill current, branch road interval differential current and mother interval differential current is respectively:
| I c d | > I c d z d | I c d | > K Σ j = 1 m | I j L | ; | I c d 1 | > I c d z d | I c d 1 | > K Σ j = 1 m | I j B | ; | I c d 2 | > I c d z d | I c d 2 | > K Σ j = 1 m | I j B | ; | I c d i | > I c d z d | I c d i | > K ( | I · i B | + | I · i L | ) ; | I c d M L | > I c d z d | I c d M L | > K ( | I · M L 1 | + | I · M L 2 | ) ;
Wherein, K is ratio brake coefficient; I jLfor the line side CT electric current of a jth connection branch road; I jBfor the bus bar side CT electric current of a jth connection branch road; I cdzdfor differential current starts definite value.
2.2 failure response
(1) if break down (in Fig. 2 k1 point failure) between line side CT and switch, differential action on a large scale, differentially among a small circle to be failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate, this interval switch of interval differential protection tripping is jumping circuit offside switch far away also, bus protection adds little time delay (the switch motion quenching time of hiding is as 160MS) and is first failure to actuate, after the switch tripping of circuit both sides, fault point isolates, differential on a large scale, the differential equal indifference stream in differential and all intervals returns among a small circle, be judged as line side dead-zone fault, bus protection is failure to actuate, other elements of bus continue to run.
(2) if break down (in Fig. 2 k2 point failure) between bus bar side CT and switch, differential action on a large scale, differentially among a small circle to be failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate, this interval switch of interval differential protection tripping is jumping circuit offside switch far away also, bus protection adds little time delay (the switch motion quenching time of hiding is as 160MS) and is first failure to actuate, after the switch tripping of circuit both sides, fault point still exists, the differential difference stream that still has of differential and between-failures does not return on a large scale, differentially among a small circle still to be failure to actuate, be judged as bus bar side dead-zone fault, other elements of bus protection action tripping bus, through the isolated fault of predetermined time delay tripping between-failures bus bar side disconnecting link after bus tripping, other bus bar elements use bus reclose sequence to close non-faulting interval circuit breaker, bus continues to run.
(3) if break down (in Fig. 2 k3 point failure) between bus bar side CT to bus; differential action on a large scale; differential action among a small circle; all intervals are differential is all failure to actuate; judge really as busbar fault; route protection is failure to actuate, and bus protection tripping bus connects all elements and jumping circuit offside circuit breaker far away.
(4) if break down (in Fig. 2 k4 point failure) between bus and II bus bar side CT, differential action on a large scale, differentially among a small circle to be failure to actuate, mother interval differential action, judge really as mother fault, the differential tripping bus connection switch in interval, after bus connection switch tripping, II is female littlely differentially makes tripping II bus, and I bus normally runs.
(5) if break down (in Fig. 2 k5 point failure) between bus and I bus bar side CT, differential action on a large scale, differentially among a small circle to be failure to actuate, mother interval differential action, judge really as mother fault, the differential tripping bus connection switch in interval, after bus connection switch tripping, I is female littlely differentially makes tripping I bus, and II bus normally runs.
(6) (in Fig. 2 k6 point failure) is broken down between circuit transformer station AL2 line side CT and circuit transformer station BL2 line side CT; differential, differential and all intervals are differential is all failure to actuate, route protection action tripping circuit both sides switch among a small circle on a large scale.
3, bus protection CT arranges and improves
GIS is the abbreviation of gas-insulating and fully-enclosed combined electrical apparatus, it transforming plant primary equipment as the components and parts such as circuit breaker, isolating switch, current transformer, bus link together, be sealed in the metal shell of a ground connection, the insulating gas being filled with the SF6 of certain pressure intensity in shell with ensure alternate, and fracture between reliable insulation.
According to actual GIS air chamber structure, if bus bar side CT is arranged near Z1 air chamber place in Z0 air chamber, as shown in Fig. 3 outlet 1.Judge through this method, when being only bus bar side dead-zone fault (as k1), Z1 air chamber no problem, pulls open between-failures bus disconnecting link and gets final product isolated fault, recovers bussed supply.But Z0 air chamber faulty insulator punctures, whole air chamber can be caused to insulate and to reduce, cause the fault of bus bar side CT own, cause each differential judged result mistake.
If bus bar side CT is arranged in Z1 air chamber near Z0 air chamber place; judge through this method; when being only bus bar side dead-zone fault; if only break down (as k2) between bus bar side CT and Z1 air chamber wall; other part fault-free of Z1 air chamber, pulling open after between-failures bus disconnecting link can temporarily isolated fault, but whole air chamber can cause integral insulation to reduce because of a point failure; develop into busbar fault, tripping bus is connected all elements by bus protection.The probability that in air chamber, local fault causes whole air chamber fault is very large, if be only judged to bus bar side dead-zone fault and without busbar fault, then and Z1 air chamber no problem.
Integrated comparative, suggestion bus bar side CT is installed near Z0 air chamber place in Z1 air chamber, or installs bus bar side CT additional separately between Z1 and Z0 air chamber.
4, analysis of cases
For 220kVGIS equipment, occur as shown in Figure 4 position failure time, according to above-mentioned GIS fault accurate isolate bus protection new principle, can realize fault precise positioning and isolation rapidly, the fast quick-recovery of non-faulting part normally runs.
1) A point failure, control procedure:
(1) utilize formula (1)-(5) to calculate the differential current of three scopes, draw differential action on a large scale, to be differentially among a small circle failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate.
(2), after the differential action of interval, bus protection time delay 160ms starts, and avoids the circuit both sides switch motion time.
(3) L1 circuit both sides circuit breaker tripping, as shown in Figure 5, fault point A is isolated, and is judged as fault between circuit breaker and line side CT.On a large scale differential, among a small circle the differential indifference stream in differential and all intervals return, bus protection is failure to actuate, other intervals of bus continue run.
2) B point failure, control procedure:
(1) utilize formula (1)-(5) to calculate the differential current of three scopes, draw differential action on a large scale, to be differentially among a small circle failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate.
(2), after the differential action of interval, bus protection time delay 160ms starts, and avoids the circuit both sides switch motion time.
(3), after the circuit breaker tripping of both sides, L1 interval, as shown in Figure 5, fault point B still exists.Differential and L1 interval is differential on a large scale has difference stream not return, and be differentially among a small circle failure to actuate, bus protection is action after time delay, other elements of tripping I bus.Be judged as fault between circuit breaker and bus bar side CT.
(4) after fault location, automatic/hand pulls open between-failures bus bar side disconnecting link D2 isolated fault, and other bus bar elements use bus reclosing automatic/hand to close circuit breaker, and bus continues to run.
3) C point breaks down, control procedure:
(1) utilize formula (1)-(5) to calculate the differential current of three scopes, draw differential action on a large scale, among a small circle differential action, all intervals are differential is all failure to actuate.
(2) be judged as breaking down between bus bar side CT to bus.Start bus protection tripping I bus and connect all elements, route protection is failure to actuate.
In sum, this fault location and regulation and control scheme flow process are as shown in Figure 5.
Compared with traditional protection philosophy, program energy accurately failure judgement position, excises isolated fault fast; when preventing monospace internal fault, bus protection is by equal for all connection elements tripping; ensure that the selectivity of bus protection action, reduction accident scope, improves system run all right.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (9)

1. realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply, it is characterized in that, comprise the following steps:
(1) for double-bus or two mother partition main electrical scheme, to suppose on two buses that each linkage unit is that to flow out sense of current from bus be positive direction; Calculate bus differential current, bus differential current and interval differential current among a small circle on a large scale respectively, according to bus differential current, bus differential current and the interval differential current among a small circle on a large scale calculated, judge the whether action of corresponding ratio element;
(2) according to the whether action of large poor ratio element, bus external area error and bus troubles inside the sample space is distinguished; When large poor ratio element movement, by little poor ratio element, whether action determines which section bus is fault occur in; Whether action determines between-failures to clearance ratio difference element;
(3) according to the action situation of large poor ratio element, little poor ratio element and clearance ratio difference element, failure judgement type also makes response to fault;
In described step (3); if break down between bus bar side CT to bus; differential action on a large scale; differential action among a small circle; all intervals are differential is all failure to actuate; judge that route protection is failure to actuate really as busbar fault, bus protection tripping bus connects all elements and jumping circuit offside circuit breaker far away.
2. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, it is characterized in that, in described step (1), differential current calculates scope to bus is on a large scale all septal line trackside CT; Bus among a small circle differential current calculating scope is all interval bus bar side CT; It is between each interval bus bar side CT and line side CT that interval differential current calculates scope.
3. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, it is characterized in that, the computational methods of described step (1) median generatrix differential current are on a large scale:
I c d = | I · 1 L + I · 2 L + ... + I · n L | ;
In formula, represent each branch line trackside CT current phasor.
4. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, it is characterized in that, the computational methods of described step (1) median generatrix differential current are among a small circle:
(1) I female little spill current: I c d 1 = | I · 1 B S 11 + I · 2 B S 12 + ... + I · n B S 1 n + I · M L 1 S M L | ;
(2) II female little spill currents: I c d 2 = | I · 1 B S 21 + I · 2 B S 22 + ... + I · n B S 2 n + I · M L 2 S M L | ;
In formula, represent each branch road bus bar side CT current phasor; represent the female side of mother I, II female side CT current phasor respectively; S 11, S 12..., S 1nrepresent the female disconnecting link position of each branch road I; S 21, S 22..., S 2nrepresent the female disconnecting link position of each branch road II; S mLrepresent bus paired running state.
5. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, it is characterized in that, in described step (1), the computational methods of interval differential current are:
(1) branch road interval differential current:
I c d i = | I · i B + I · i L |
Wherein, i=1,2 ... n; be respectively i-th interval bus bar side and line side CT secondary current vector; I cdibe i-th branch road interval differential current;
(2) mother interval differential current:
I c d M L = | I · M L 1 + I · M L 2 | ;
Wherein, be respectively mother I bus bar side and II bus bar side CT secondary current vector; I cdMLfor mother interval differential current.
6. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, and it is characterized in that, the concrete grammar of described step (3) is:
(1) if break down between line side CT and switch, differential action on a large scale, differentially among a small circle to be failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate, this interval switch of interval differential protection tripping is jumping circuit offside switch far away also, bus protection adds little time delay and is first failure to actuate, after the switch tripping of circuit both sides, fault point isolate, on a large scale differential, among a small circle the differential equal indifference stream in differential and all intervals return, be judged as line side dead-zone fault, bus protection is failure to actuate, and other elements of bus continue to run;
(2) if break down between bus bar side CT and switch, differential action on a large scale, differentially among a small circle to be failure to actuate, between-failures differential action, non-faulting interval is differential is failure to actuate, this interval switch of interval differential protection tripping is jumping circuit offside switch far away also, bus protection adds little time delay and is first failure to actuate, after the switch tripping of circuit both sides, fault point still exists, the differential difference stream that still has of differential and between-failures does not return on a large scale, differentially among a small circle still to be failure to actuate, be judged as bus bar side dead-zone fault, other elements of bus protection action tripping bus, through the isolated fault of predetermined time delay tripping between-failures bus bar side disconnecting link after bus tripping, other bus bar elements use bus reclose sequence to close non-faulting interval circuit breaker, bus continues to run.
7. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, and it is characterized in that, the concrete grammar of described step (3) is:
If break down between bus and II bus bar side CT, on a large scale differential action, to be differentially among a small circle failure to actuate, mother interval differential action, judges really as mother fault, the differential tripping bus connection switch in interval, after bus connection switch tripping, II is female littlely differentially makes tripping II bus, and I bus normally runs;
If break down between bus and I bus bar side CT, on a large scale differential action, to be differentially among a small circle failure to actuate, mother interval differential action, judges really as mother fault, the differential tripping bus connection switch in interval, after bus connection switch tripping, I is female littlely differentially makes tripping I bus, and II bus normally runs.
8. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1, and it is characterized in that, the concrete grammar of described step (3) is:
If break down between the L2 line side CT of the L2 line side CT of circuit transformer station A and circuit transformer station B, differential, differential and all intervals are differential is all failure to actuate, route protection action tripping circuit both sides switch among a small circle on a large scale.
9. a kind of GIS of realization fault is precisely excised and the bus protection algorithm of automatic recovery of power supply as claimed in claim 1; it is characterized in that; bus bar side CT is installed near circuit breaker air chamber place in 1 disconnecting link air chamber, or installs bus bar side CT additional separately between 1 disconnecting link air chamber and circuit breaker air chamber.
CN201510169841.XA 2015-04-10 2015-04-10 Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply Expired - Fee Related CN104868451B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510169841.XA CN104868451B (en) 2015-04-10 2015-04-10 Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510169841.XA CN104868451B (en) 2015-04-10 2015-04-10 Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply

Publications (2)

Publication Number Publication Date
CN104868451A CN104868451A (en) 2015-08-26
CN104868451B true CN104868451B (en) 2016-02-03

Family

ID=53914085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510169841.XA Expired - Fee Related CN104868451B (en) 2015-04-10 2015-04-10 Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply

Country Status (1)

Country Link
CN (1) CN104868451B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108493905A (en) * 2018-02-28 2018-09-04 国网山东省电力公司电力科学研究院 A kind of intelligent substation station domain back-up protection method

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105762772B (en) * 2016-05-04 2018-04-20 国电南瑞科技股份有限公司 A kind of method for identifying bus differential region
CN109143057B (en) * 2016-07-28 2020-05-19 国网江苏省电力公司常州供电公司 GIS equipment switch vibration online repair system
CN106549367B (en) * 2016-10-20 2019-03-19 许继集团有限公司 A kind of differential protection method for bus and device for mother CT exception
CN106655113B (en) * 2016-12-29 2018-11-09 许继集团有限公司 A kind of bus tie dead zone fault identification and fault protecting method
CN108281944B (en) * 2018-03-13 2023-11-24 中国电建集团北京勘测设计研究院有限公司 Differential protection connection system suitable for single bus sectionalized wiring and tripping logic method thereof
CN111463759B (en) * 2020-03-18 2022-08-16 广东电网有限责任公司 Power distribution network protection setting method
CN111509672B (en) * 2020-04-24 2022-03-04 东方电子股份有限公司 Quick self-adaptive knife switch position correcting method based on sampling value algorithm
CN114284983B (en) * 2021-12-03 2024-03-19 南京国电南自电网自动化有限公司 Protection method, system and device for offshore wind power collecting circuit and storage medium

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401226B (en) * 2013-08-09 2017-01-11 国网山东省电力公司潍坊供电公司 Substation area differential protection method for intelligent substation
CN103837795B (en) * 2014-02-18 2014-12-03 国网山东省电力公司 Dispatching end grid fault diagnosis method based on wide-area fault recording information

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108493905A (en) * 2018-02-28 2018-09-04 国网山东省电力公司电力科学研究院 A kind of intelligent substation station domain back-up protection method

Also Published As

Publication number Publication date
CN104868451A (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN104868451B (en) Realize GIS fault precisely to excise and the bus protection algorithm of automatic recovery of power supply
CN104701822B (en) Protecting power transmission line
CN104779594B (en) Small current neutral grounding power system phase fault and single-phase grounding comprehensive protecting method
CN102388315A (en) Method for identifying type of fault on power line
CN104198884B (en) Differential principle based large-scale power grid intelligent trouble diagnosis method
Monadi et al. A protection strategy for fault detection and location for multi-terminal MVDC distribution systems with renewable energy systems
CN104539043B (en) A kind of automatic switching device of standby power supply system haul oneself willingly into method
CN106129971B (en) A kind of dual failure fault partition method of busbar protective device breaker and system
CN104638618B (en) A kind of GIS bus equipment tripping operation fast recovery of power supply method
CN107433883B (en) Railway traction power supply arm integrated monitoring system
CN101872964A (en) Wide area measurement system based back-up protection method of multi-terminal high-voltage power transmission area
CN103117532B (en) Zero-sequence voltage trip protection method for low-voltage side of transformers
CN109633247A (en) A kind of over current fault diagnostic system, method and train
CN106058829A (en) Fault protection system for distribution system
CN103580009A (en) Self-adaptive overload recognition system based on composite phasor plane and method thereof
CN107317308A (en) The adaptive locking prepared auto restart guard method of sectionalized single busbar connection 110kV bus differential protections
CN105870887B (en) A kind of method for identifying bus differential region
CN104269824A (en) Fault judgment method and backup protection method for medium-voltage side dead zone in main transformer
Yin et al. The research and the development of the wide area relaying protection based on fault element identification
CN100492801C (en) Method for implementing electrode isolation of super-high voltage DC system
CN112653106B (en) Method for starting failure loop of intelligent hydropower station circuit breaker failure protection device
CN112363005B (en) GIS combined electrical apparatus fault detection and processing method, device and storage medium
CN109800970B (en) Method for checking correctness of secondary virtual loop of SCD file of 110kV bus interval of intelligent substation
CN109784699B (en) Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation
CN108808631B (en) 10kV system reclosing and protection cooperation method based on quick busbar breaker

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Li Naiyong

Inventor after: Lin Yong

Inventor after: Wu Jinyu

Inventor before: Li Naiyong

Inventor before: Liu Guanhong

Inventor before: Wang Juanjuan

Inventor before: Liu Xiaoliang

Inventor before: Liu Zhonghui

Inventor before: Xin Cuiqin

Inventor before: Yang Wenjia

Inventor before: Ma Xianli

Inventor before: Wei Yulian

Inventor before: Wang Junan

Inventor before: Yang Kun

Inventor before: Lin Yong

Inventor before: Guan Zhengxian

Inventor before: Lu Yihan

Inventor before: Zhang Chunming

Inventor before: Huang Haili

Inventor before: Xin Baojiang

Inventor before: Wang Lin

Inventor before: Qiu Yunru

Inventor before: Sun Jilei

Inventor before: Wu Jinyu

Inventor before: Liu Chenglu

Inventor before: Zhang Meiling

Inventor before: Jin Fei

Inventor before: Yang Junren

Inventor before: Chen Xiaodong

Inventor before: Tang Min

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151204

Address after: 250001, No. two, No. 150, Ji'nan, Shandong

Applicant after: State Grid Shandong Electric Power Company

Applicant after: State Grid Shandong Electric Power Company Weifang Power Supply Company

Applicant after: State Grid Corporation of China

Address before: 261014 No. 425 Dongfeng West Street, Weicheng District, Shandong, Weifang

Applicant before: State Grid Shandong Electric Power Company Weifang Power Supply Company

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20210410