CN109784699B - Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation - Google Patents

Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation Download PDF

Info

Publication number
CN109784699B
CN109784699B CN201811643186.7A CN201811643186A CN109784699B CN 109784699 B CN109784699 B CN 109784699B CN 201811643186 A CN201811643186 A CN 201811643186A CN 109784699 B CN109784699 B CN 109784699B
Authority
CN
China
Prior art keywords
phase
information
voltage
flow direction
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811643186.7A
Other languages
Chinese (zh)
Other versions
CN109784699A (en
Inventor
宁楠
宗志亚
刘兴艳
姚璐
杨鹏
黎华龙
宋达
王师国
易可
罗金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201811643186.7A priority Critical patent/CN109784699B/en
Publication of CN109784699A publication Critical patent/CN109784699A/en
Application granted granted Critical
Publication of CN109784699B publication Critical patent/CN109784699B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/18Systems supporting electrical power generation, transmission or distribution using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a method for checking the correctness of an interval SCD file of a 110kV line of an intelligent substation, and belongs to the field of power grids. The method comprises the following steps: checking the integrity of the configuration; checking the correctness of SV and GOOSE information flow direction; checking information between the protection device and the merging unit; checking information between the protection device and the intelligent terminal; checking information between the protection device and the measurement and control device; checking information between the merging unit and the intelligent terminal; checking information between the merging unit and the measurement and control device; checking information between the intelligent terminal and the measurement and control device; and when the checking is finished respectively according to the third step to the eighth step and the results are correct, judging that the secondary virtual circuit of the 110kV line interval SCD file is correct. The method of the invention enables the correctness of the secondary virtual circuit of the SCD file to be standardized and normalized, and eliminates the hidden trouble of safe operation of the power grid.

Description

Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation
Technical Field
The invention belongs to the field of power grids, and relates to a method for checking the correctness of an SCD (substation configuration description) file in an interval of 110kV lines of an intelligent substation.
Background
An intelligent substation system configuration file (SCD), which is called a total station system configuration file for short, describes example configurations and communication parameters of all IEDs, communication configurations among intelligent Electronic devices IEDs (intelligent Electronic devices), and a primary system structure of a substation, wherein example configurations, i.e., secondary virtual circuits, including current and voltage channels, tripping and closing circuits, signal circuits, alarm signals, and the like, are the core of the configuration file, and the correctness of the secondary virtual circuit configuration of the SCD file is very important for the safe operation of the substation.
At present, the file is usually completed by a design unit and a system integration manufacturer, a unified technical method is lacked to check the correctness of the secondary virtual loop of the SCD file, difficulties are brought to interval operation and maintenance, extension and the like of a 110kV line of an intelligent substation, and hidden dangers are left for safe operation of a power grid.
In order to solve the above problems, a method for checking the correctness of the secondary virtual loop of the 110kV line interval SCD file needs to be researched, so as to standardize and standardize the secondary virtual loop.
Disclosure of Invention
In view of this, the present invention provides a method for checking correctness of an SCD file in an interval between 110kV lines of an intelligent substation.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for checking the correctness of an SCD file in a 110kV line interval of an intelligent substation comprises the following steps:
the method comprises the following steps: checking the integrity of the configuration;
step two: checking the correctness of SV and GOOSE information flow direction;
step three: checking information between the protection device and the merging unit;
step four: checking information between the protection device and the intelligent terminal;
step five: checking information between the protection device and the measurement and control device;
step six: checking information between the merging unit and the intelligent terminal;
step seven: checking information between the merging unit and the measurement and control device;
step eight: checking information between the intelligent terminal and the measurement and control device;
step nine: and when the checking is finished respectively according to the third step to the eighth step and the results are correct, judging that the secondary virtual circuit of the 110kV line interval SCD file is correct.
Further, the first step specifically comprises: checking the integrality of the line protection device, the line measurement and control device, the line interval merging unit and the intelligent terminal; if any intelligent electronic device IED is absent, the judgment is wrong, otherwise, the judgment is correct; when the protection device and the measurement and control device are combined into a whole, the protection device is a protection measurement and control integrated device.
Further, the second step specifically comprises: the flow direction of input/output information of SV and GOOSE between intelligent electronic equipment IEDs needs to be correct, and inspection and judgment are respectively carried out according to the mutual logic relationship among the protection device, the merging unit, the measurement and control device and the intelligent terminal.
Further, the third step is specifically:
s31: checking SV information flow direction; when the information flow directions of the line protection device and the merging unit meet the requirements of the table 1, judging the information flow directions to be correct, otherwise, judging the information flow directions to be wrong;
SV information flow direction table between table 1110 kV line protection device and merging unit
Merging units, i.e. transmitting ends Protective devices, i.e. receivers
Rated time delay Rated time delay
Protection of phase a current 1 Protection of phase A current 1
Protection of phase a current 2 Protection of phase a current 2
Protection of phase B current 1 Protection of phase B current 1
Protection of phase B current 2 Protection of phase B current 2
Protection of C-phase current 1 Protection of C-phase current 1
Protection of C-phase current 2 Protection of C-phase current 2
Protecting A-phase voltage 1, i.e. post-switching bus voltage Protecting A-phase voltage 1
Protecting A-phase voltage 2, i.e. post-switching bus voltage Protecting A-phase voltage 2
Protecting the B-phase voltage 1, i.e. the switched bus voltage Protecting phase-B voltage 1
Protecting the B-phase voltage 2, i.e. the switched bus voltage Protecting the B-phase voltage 2
Protecting the C-phase voltage 1, i.e. the switched bus voltage Protecting C-phase voltage 1
Protecting the C-phase voltage 2, i.e. the switched bus voltage Protecting the C-phase voltage 2
Line extraction voltage 1 Line voltage 1
Line extraction voltage 2 Line voltage 2
S32: and checking the flow direction of the GOOSE information, judging that the GOOSE information is correct when no GOOSE information exists between the line protection device and the merging unit, and judging that the GOOSE information is wrong if no GOOSE information exists between the line protection device and the merging unit.
Further, the fourth step is specifically:
s41: checking SV information flow direction, judging that the SV information is correct when no SV information exists between the line protection device and the intelligent terminal, and judging that the SV information is wrong if the SV information does not exist between the line protection device and the intelligent terminal;
s42: checking the flow direction of GOOSE information; when the information flow directions of the line protection device and the intelligent terminal meet the requirements of the table 2, judging the information flow directions to be correct, otherwise, judging the information flow directions to be wrong;
table 2110 kV gate wire protector and intelligent terminal GOOSE information flow direction table
Intelligent terminals, i.e. transmitting terminals Protective devices, i.e. receivers
The circuit breaker A is in phase position and has two points Phase A of circuit breaker
The phase of the breaker B is two points Phase B of circuit breaker
The C phase of the circuit breaker is double-point C phase position of circuit breaker
Locking reclosing lock Intelligent terminal locking reclosing lock
Low-pressure locking reclosing switch Low-pressure locking reclosing switch
Protective devices, i.e. transmitting ends Intelligent terminals, i.e. receiving terminals
Protection of C-phase current 1 Breaker phase a trip TJQ
Protection tripping circuit breaker A phase Breaker phase B trip TJQ
Protection tripping breaker B phase Breaker C-phase trip TJQ
Protective tripping breaker C phase Three-phase closing of circuit breaker
Reclosing lock of circuit breaker Circuit breaker locking reclosing
Locking reclosing lock Three-phase tripping TJF of circuit breaker
Three-phase inconsistent outlet of circuit breaker Protecting C-phase voltage 1
Protecting the C-phase voltage 2, i.e. the switched bus voltage Protecting the C-phase voltage 2
Line extraction voltage 1 Line voltage 1
Line extraction voltage 2 Line voltage 2
Further, the fifth step is specifically: and if no SV or GOOSE information exists between the line protection device and the measurement and control device, judging the result to be correct, otherwise, judging the result to be wrong.
Further, the sixth step is specifically:
s61: checking SV information flow direction, judging that the SV information is correct when no SV information exists between the line interval merging unit and the intelligent terminal, and judging that the SV information is wrong if the SV information does not exist between the line interval merging unit and the intelligent terminal;
s62: checking the flow direction of GOOSE information, judging that the GOOSE information is correct when the flow directions of the line interval merging unit and the intelligent terminal meet the requirements of the table 3, and otherwise, judging that the GOOSE information is wrong;
GOOSE information flow direction table between table 3110 kV line interval merging unit and intelligent terminal
Intelligent terminals, i.e. transmitting terminals Merging units, i.e. receivers
The position of the bus disconnecting link 1 is double points Bus knife switch 1 position
The position of the bus knife switch 2 is double points Bus knife switch 2 position
Further, the seventh step specifically includes:
s71: checking SV information flow direction, and judging the information flow direction to be correct when the information flow directions of the line interval merging unit and the measurement and control device meet the requirements of the table 4, otherwise, judging the information flow direction to be wrong;
SV information flow direction table between table 4110 kV line interval merging unit and measurement and control device
Figure GDA0003532501010000031
Figure GDA0003532501010000041
S72: checking the flow direction of GOOSE information, and judging that the GOOSE information flow direction is correct when the flow direction of the GOOSE information flow direction accords with the requirements of the table 5 and the descriptions of signals received by the measurement and control device and signals sent by the merging unit are consistent, otherwise, judging that the GOOSE information flow direction is wrong;
GOOSE information flow direction table between table 5110 kV line interval merging unit and measurement and control device
Merging units, i.e. transmitting ends Measurement and control devices, i.e. receiving terminals
Maintenance state Open 1, merging unit service status
Synchronization exception Open 2, i.e. merging unit synchronization exception
Voltage switching to the I-mother Open 3, i.e. merging cell voltage switches to Imother
Voltage switching to the il bus Open 4, i.e. merging cell voltage switches to il mother
Simultaneous action of voltage switching Open 5, i.e. merging cell voltage switching acts simultaneously
Voltage switching with return Open 6, i.e. merging cells voltage switching while returning
GOOSE communication interruption Open 7, i.e. merging cell GOOSE communication interruptions
GOOSE data exception Open 8, merge unit GOOSE data exceptions
GOOSE overhaul inconsistency Open 9, i.e. merge unit GOOSE overhaul inconsistency
SV chain scission Opening 10, i.e. breaking the chain by merging units SV
Further, the step eight specifically includes:
s81: checking SV information flow direction, judging that the SV information is correct when no SV information exists between the line intelligent terminal and the measurement and control device, and judging that the SV information is wrong if the SV information does not exist between the line intelligent terminal and the measurement and control device;
s82: checking the flow direction of GOOSE information, and judging that the GOOSE information flow direction is correct when the flow direction of the intelligent line terminal and the flow direction of the measurement and control device meet the requirements of the table 6.1 and the table 6.2 and the descriptions of signals received and transmitted by the measurement and control device and signals transmitted and received by the intelligent terminal are consistent, otherwise, judging that the GOOSE information flow direction is wrong;
GOOSE information flow direction table from table 6.1110 kV line intelligent terminal to measurement and control device
Figure GDA0003532501010000042
Figure GDA0003532501010000051
GOOSE information flow direction table from table 6.2110 kV line measurement and control device to intelligent terminal
Measurement and control devices, i.e. transmitters Intelligent terminals, i.e. receiving terminals
Remote control opening of circuit breaker Breaker opening operation
Remote control closing switch of circuit breaker Closing operation of circuit breaker
Disconnecting link 1 remote control disconnecting link Bus disconnecting link 1 switching-off operation
Remote control switch-on of knife switch 1 Closing operation of bus knife switch 1
Disconnecting link 2 remote control disconnecting link Bus disconnecting link 2 opening operation
Knife switch 2 remote control closing 2 closing operation of bus knife switch
Disconnecting link 3 remote control disconnecting link Line knife switch opening operation
Disconnecting link 3 remote control switch-on Line knife switch closing operation
Grounding switch 1 remote control switch-off Disconnecting operation of grounding knife switch 1
Remote control switch-on of grounding knife switch 1 Closing operation of grounding knife switch 1
Grounding knife switch 2 remote control separating switch Grounding knife switch 2 is dividedGate operation
Grounding knife switch 2 remote control switch-on Grounding knife switch 2 closing operation
Grounding knife switch 3 remote control separating switch Grounding knife switch 3 switching-off operation
Grounding knife switch 3 remote control switch-on Grounding knife switch 3 closing operation
Intelligent terminal reset External rehabilitation
The invention has the beneficial effects that: the method of the invention enables the correctness of the secondary virtual circuit of the SCD file to be standardized and normalized, and eliminates the hidden trouble of safe operation of the power grid.
Drawings
In order to make the object, technical scheme and beneficial effect of the invention more clear, the invention provides the following drawings for explanation:
FIG. 1 is a schematic diagram illustrating SV information flow between a 110kV line protection device and a merging unit;
FIG. 2 is a schematic diagram of a flow of GOOSE information between the 110kV line protection device and the intelligent terminal;
FIG. 3 is a schematic diagram illustrating a flow of GOOSE information between a 110kV line interval merging unit and an intelligent terminal;
FIG. 4 is a schematic diagram of SV information flow between a 110kV line interval merging unit and a measurement and control device;
FIG. 5 is a schematic diagram of the flow of GOOSE information between the 110kV line interval merging unit and the measurement and control device;
fig. 6(a) is a schematic flow diagram of GOOSE information from the intelligent terminal of the 110kV line to the measurement and control device; fig. 6(b) is a schematic diagram of GOOSE information flow from the 110kV line measurement and control device to the intelligent terminal.
Detailed Description
Preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
The invention provides a method for checking the correctness of an interval SCD (substation configuration description) file secondary virtual circuit of a 110kV line of an intelligent substation, which comprises the following steps:
step one, checking the integrity of the configuration. The intelligent monitoring system comprises a line protection device, a line measurement and control device, a line interval merging unit and an intelligent terminal, wherein if any IED is lacked, the judgment is wrong, and otherwise, the judgment is correct. Under special conditions, the protection device and the measurement and control device are combined into a whole, and the protection device and the measurement and control device are integrated.
And step two, checking the flow direction correctness of SV and GOOSE information. The input/output information flow of SV and GOOSE among the IEDs is correct, and the IEDs are respectively checked and judged according to the mutual logical relationship among the protection device, the merging unit, the measurement and control device and the intelligent terminal.
And step three, checking information between the protection device and the merging unit.
(1) The SV information flows as shown in FIG. 1. When the information flow direction of the line protection device and the merging unit meets the following requirements, the judgment is correct, otherwise, the judgment is wrong.
(2) And the GOOSE information flow direction does not exist between the protection device and the merging unit. And when the GOOSE information does not exist between the line protection device and the merging unit, judging that the GOOSE information is correct, otherwise, judging that the GOOSE information is wrong.
And step four, checking information between the protection device and the intelligent terminal.
(1) And SV information flows to the protection device, and no SV information exists between the protection device and the intelligent terminal. And when no SV information exists between the line protection device and the intelligent terminal, judging the line protection device to be correct, otherwise, judging the line protection device to be wrong.
(2) GOOSE information flow is shown in fig. 2. And when the information flow directions of the line protection device and the intelligent terminal meet the following requirements, judging that the information flow directions are correct, and otherwise, judging that the information flow directions are wrong.
And fifthly, checking information between the protection device and the measurement and control device. SV and GOOSE information does not exist between the protection device and the measurement and control device. And when SV and GOOSE information does not exist between the line protection device and the measurement and control device, judging that the result is correct, otherwise, judging that the result is wrong.
And step six, checking information between the merging unit and the intelligent terminal.
(1) And SV information flows to the merging unit, and no SV information exists between the merging unit and the intelligent terminal. And when no SV information exists between the line interval merging unit and the intelligent terminal, judging that the result is correct, otherwise, judging that the result is wrong.
(2) GOOSE information flows as shown in fig. 3. And when the information flow direction of the line interval merging unit and the intelligent terminal meets the following requirements, judging that the information flow direction is correct, and otherwise, judging that the information flow direction is wrong.
And seventhly, checking information between the merging unit and the measurement and control device.
(1) The SV information flows as shown in FIG. 4. And when the information flow direction of the line interval merging unit and the measurement and control device meets the following requirements, judging that the information flow direction is correct, and otherwise, judging that the information flow direction is wrong.
(2) GOOSE information flow is shown in fig. 5. And when the information flow directions of the line interval merging unit and the measurement and control device meet the following requirements and the descriptions of the signals received by the measurement and control device and the signals sent by the merging unit are consistent, judging that the signals are correct, otherwise, judging that the signals are wrong.
And step eight, checking information between the intelligent terminal and the measurement and control device.
(1) And SV information flows to the intelligent terminal, and no SV information exists between the intelligent terminal and the measurement and control device. And when no SV information exists between the line intelligent terminal and the measurement and control device, judging that the result is correct, otherwise, judging that the result is wrong.
(2) GOOSE information flow is shown in fig. 6(a) (b). And when the information flow directions of the intelligent line terminal and the measurement and control device meet the following requirements and the descriptions of the signals received (transmitted) by the measurement and control device and the signals transmitted (received) by the intelligent terminal are consistent, judging that the signals are correct, otherwise, judging that the signals are wrong.
Step nine, when the checking is finished according to the methods from the step three to the step eight and the results are correct, the secondary virtual circuit of the 110kV line interval SCD file can be judged to be correct.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, while the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (1)

1. A method for checking the correctness of an SCD file at an interval of 110kV lines of an intelligent substation is characterized by comprising the following steps: the method comprises the following steps:
the method comprises the following steps: checking the integrity of the configuration; the method comprises the following specific steps:
checking the integrality of the line protection device, the line measurement and control device, the line interval merging unit and the intelligent terminal; if any intelligent electronic device IED is absent, the judgment is wrong, otherwise, the judgment is correct; when the protection device and the measurement and control device are combined into a whole, the protection device and the measurement and control device are integrated;
step two: checking the correctness of SV and GOOSE information flow direction; the method comprises the following specific steps:
the input/output information flow direction of SV and GOOSE between intelligent electronic equipment IEDs needs to be correct, and inspection and judgment are respectively carried out according to the mutual logic relationship among the protection device, the merging unit, the measurement and control device and the intelligent terminal;
step three: checking information between the protection device and the merging unit;
the method specifically comprises the following steps:
s31: checking SV information flow direction; when the information flow directions of the line protection device and the merging unit meet the requirements of the table 1, judging the information flow directions to be correct, otherwise, judging the information flow directions to be wrong;
SV information flow direction table between table 1110 kV line protection device and merging unit
Merging units, i.e. transmitting ends Protective devices, i.e. receivers Rated time delay Rated time delay Protection of phase A current 1 Protection of phase A current 1 Protection of phase a current 2 Protection of phase a current 2 Protection of phase B current 1 Protection of phase B current 1 Protection of phase B current 2 Protection of phase B current 2 Protection of C-phase current 1 Protection of C-phase current 1 Protection of C-phase current 2 Protection of C-phase current 2 Protecting A-phase voltage 1, i.e. post-switching bus voltage Protecting A-phase voltage 1 Protecting A-phase voltage 2, i.e. post-switching bus voltage Protecting A-phase voltage 2 Protecting the B-phase voltage 1, i.e. the switched bus voltage Protection of phase BVoltage 1 Protecting the B-phase voltage 2, i.e. the switched bus voltage Protecting the B-phase voltage 2 Protecting the C-phase voltage 1, i.e. the switched bus voltage Protecting C-phase voltage 1 Protecting the C-phase voltage 2, i.e. the switched bus voltage Protecting the C-phase voltage 2 Line extraction voltage 1 Line voltage 1 Line extraction voltage 2 Line voltage 2
S32: checking the flow direction of the GOOSE information, judging that the GOOSE information is correct when no GOOSE information exists between the line protection device and the merging unit, and judging that the GOOSE information is wrong if the GOOSE information does not exist between the line protection device and the merging unit;
step four: checking information between the protection device and the intelligent terminal;
the method comprises the following specific steps:
s41: checking SV information flow direction, judging that the SV information is correct when no SV information exists between the line protection device and the intelligent terminal, and judging that the SV information is wrong if the SV information does not exist between the line protection device and the intelligent terminal;
s42: checking the flow direction of GOOSE information; when the information flow directions of the line protection device and the intelligent terminal meet the requirements of the table 2, judging the information flow directions to be correct, otherwise, judging the information flow directions to be wrong;
table 2110 kV gate wire protector and intelligent terminal GOOSE information flow direction table
Intelligent terminals, i.e. transmitting terminals Protective devices, i.e. receivers The circuit breaker A is in phase position and has two points Phase A of circuit breaker The phase of the breaker B is two points Phase B of circuit breaker The C phase of the circuit breaker is double-point C phase position of circuit breaker Locking reclosing lock Intelligent terminal locking reclosing lock Low-pressure locking reclosing switch Low-pressure locking reclosing switch
Protective devices, i.e. transmitting terminals Intelligent terminals, i.e. receiving terminals Protection of C-phase current 1 Breaker phase a trip TJQ Protection tripping circuit breaker A phase Breaker phase B trip TJQ Protection tripping breaker B phase Breaker C-phase trip TJQ Protective tripping breaker C phase Three-phase closing of circuit breaker Reclosing lock of circuit breaker Locking reclosing lock of circuit breaker Locking reclosing lock Three-phase tripping TJF of circuit breaker Three-phase inconsistent outlet of circuit breaker Protecting C-phase voltage 1 Protecting the C-phase voltage 2, i.e. the switched bus voltage Protecting the C-phase voltage 2 Line extraction voltage 1 Line voltage 1 Line extraction voltage 2 Line voltage 2
Step five: checking information between the protection device and the measurement and control device; the method specifically comprises the following steps:
SV and GOOSE information does not exist between the line protection device and the measurement and control device, the judgment is correct, otherwise, the judgment is wrong;
step six: checking information between the merging unit and the intelligent terminal; the method specifically comprises the following steps:
s61: checking SV information flow direction, judging that the SV information is correct when no SV information exists between the line interval merging unit and the intelligent terminal, and judging that the SV information is wrong if the SV information does not exist between the line interval merging unit and the intelligent terminal;
s62: checking the flow direction of GOOSE information, judging that the GOOSE information is correct when the flow directions of the line interval merging unit and the intelligent terminal meet the requirements of the table 3, and otherwise, judging that the GOOSE information is wrong;
GOOSE information flow direction table between table 3110 kV line interval merging unit and intelligent terminal
Intelligent terminals, i.e. transmitting terminals Merging units, i.e. receivers The position of the bus disconnecting link 1 is double points Bus knife switch 1 position The position of the bus knife switch 2 is double points Bus knife switch 2 position
Step seven: checking information between the merging unit and the measurement and control device; the method comprises the following specific steps:
s71: checking SV information flow direction, and judging the information flow direction to be correct when the information flow directions of the line interval merging unit and the measurement and control device meet the requirements of the table 4, otherwise, judging the information flow direction to be wrong;
SV information flow direction table between gauge 4110 kV line interval merging unit and measurement and control device
Merging units, i.e. transmitting ends Measurement and control devices, i.e. receiving terminals Rated time delay Rated time delay Measuring phase A current Measuring phase A current Measuring B-phase current Measuring B-phase current Measuring C-phase current Measuring C-phase current Measuring A-phase voltage, i.e. post-switching bus voltage Measuring A phase voltage Measuring the B-phase voltage, i.e. the switched bus voltage Measuring B-phase voltage Measuring C-phase voltage, i.e. post-switching bus voltage Measuring C-phase voltage Line extraction voltage Synchronous voltage
S72: checking the GOOSE information flow direction, and judging that the GOOSE information flow direction is correct when the information flow directions of the line interval merging unit and the measurement and control device accord with the requirements of the table 5 and the descriptions of signals received by the measurement and control device and signals sent by the merging unit are consistent, otherwise, judging that the GOOSE information flow direction is wrong;
GOOSE information flow direction table between table 5110 kV line interval merging unit and measurement and control device
Merging units, i.e. transmitting ends Measurement and control devices, i.e. receiving terminals Maintenance state Open 1, merging unit service status Synchronization exception Open 2, i.e. merging unit synchronization exception Voltage switching to the I-mother Open 3, i.e. merging cell voltage switches to Imother Voltage switching to the il bus Open 4, i.e. merging cell voltage switches to il mother Voltage switching in the meantimeMovement of Open 5, i.e. merging cell voltage switching acts simultaneously Voltage switching with return Open 6, i.e. merging cells voltage switching while returning GOOSE communication interruption Open 7, i.e. merging cell GOOSE communication interruptions GOOSE data exception Open 8, merge unit GOOSE data exceptions GOOSE overhaul inconsistency Open 9, i.e. merge unit GOOSE overhaul inconsistency SV chain scission Opening 10, i.e. breaking the chain by merging units SV
Step eight: checking information between the intelligent terminal and the measurement and control device; the method comprises the following specific steps:
s81: checking SV information flow direction, judging that the SV information flow direction is correct when no SV information exists between the line intelligent terminal and the measurement and control device, and judging that the SV information flow direction is wrong if the SV information flow direction is not correct;
s82: checking the flow direction of GOOSE information, and judging that the GOOSE information flow direction is correct when the flow direction of the intelligent line terminal and the flow direction of the measurement and control device meet the requirements of the table 6.1 and the table 6.2 and the descriptions of signals received and transmitted by the measurement and control device and signals transmitted and received by the intelligent terminal are consistent, otherwise, judging that the GOOSE information flow direction is wrong;
GOOSE information flow direction table from table 6.1110 kV line intelligent terminal to measurement and control device
Intelligent terminals, i.e. transmitting terminals Measurement and control devices, i.e. receiving terminals The circuit breaker A is in phase position and has two points Opening into 1 The phase of the breaker B is two points Opening into 2 The C phase of the circuit breaker is double-point Opening 3 Three-phase position of circuit breaker, two points Opening into 4 The position of the bus disconnecting link 1 is double points Opening 5 The position of the bus knife switch 2 is double points Opening into 6 Position of line knife-switch is two points Opening 7 The position of the grounding knife switch 1 is double points Opening 8 The position of the grounding knife switch 2 is double points Opening 9 The position of the grounding knife switch 3 is double points Opening 10 Locking reclosing lock Opening 11 Is opened and closed by hand Opening 12 Maintenance state Opening 13 Remote control switch-in Opening 14 With hands simultaneously open and close Opening 15 Spring of circuit breaker not storing energy Opening 16 SF6 barometric low warning Opening 17 SF6 barometric low inhibit operation Opening 18 Three-phase inconsistent tripping outlet Opening 19 Broken control loop Opening 20 Device loses electricity Opening 21 GOOSE chain scission Opening 22
GOOSE information flow direction table from table 6.2110 kV line measurement and control device to intelligent terminal
Measurement and control devices, i.e. transmitters Intelligent terminals, i.e. receiving terminals Remote control opening of circuit breaker Breaker opening operation Remote control closing of circuit breaker Closing operation of circuit breaker Disconnecting link 1 remote control disconnecting link Bus disconnecting link 1 switching-off operation Disconnecting link 1 remote control switch-on Closing operation of bus knife switch 1 Disconnecting link 2 remote control disconnecting link Bus knife switch 2 switching-off operation Knife switch 2 remote control closing Bus knife switch 2 closing operation Disconnecting link 3 remote control disconnecting link Line knife switch opening operation Disconnecting link 3 remote control switch-on Line knife switch closing operation Grounding switch 1 remote control switch-off Disconnecting operation of grounding knife switch 1 Remote control switch-on of grounding knife switch 1 Closing operation of grounding knife switch 1 Grounding knife switch 2 remote control separating switch Grounding switch 2 opening operation Grounding knife switch 2 remote control switch-on 2 closing operation of grounding knife switch Grounding knife switch 3 remote control separating brake Grounding knife switch 3 switching-off operation Grounding knife switch 3 remote control switch-on Grounding knife switch 3 closing operation Intelligent terminal reset External rehabilitation
Step nine: and when the checking is finished respectively according to the third step to the eighth step and the results are correct, judging that the secondary virtual circuit of the 110kV line interval SCD file is correct.
CN201811643186.7A 2018-12-29 2018-12-29 Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation Active CN109784699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811643186.7A CN109784699B (en) 2018-12-29 2018-12-29 Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811643186.7A CN109784699B (en) 2018-12-29 2018-12-29 Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation

Publications (2)

Publication Number Publication Date
CN109784699A CN109784699A (en) 2019-05-21
CN109784699B true CN109784699B (en) 2022-05-20

Family

ID=66499510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811643186.7A Active CN109784699B (en) 2018-12-29 2018-12-29 Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation

Country Status (1)

Country Link
CN (1) CN109784699B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111009966A (en) * 2019-11-22 2020-04-14 贵州电网有限责任公司 Data interaction system, method and device of transformer substation equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100843130B1 (en) * 2007-01-30 2008-07-03 명지대학교 산학협력단 Apparatus and method for diagnosing ied abnormal state on-line in substation automation system based on iec61850
ES2392369T3 (en) * 2007-03-30 2012-12-10 Abb Technology Ag Procedure for setting up an intelligent electronic device
CN104715035A (en) * 2015-03-17 2015-06-17 广东电网有限责任公司电力调度控制中心 Checking method and device for correctness of virtual terminator association configuration of intelligent substation
CN105335342A (en) * 2015-12-01 2016-02-17 国家电网公司 Method for automatic examination of wiring correctness of intelligent substation SCD configuration file virtual terminator
CN105354120A (en) * 2015-12-11 2016-02-24 国网安徽省电力公司淮北供电公司 SCD file document check device for intelligent substation
CN106372301A (en) * 2016-08-29 2017-02-01 西电通用电气自动化有限公司 Method and system for detecting visualization and configuration consistency of configuration file of intelligent substation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100843130B1 (en) * 2007-01-30 2008-07-03 명지대학교 산학협력단 Apparatus and method for diagnosing ied abnormal state on-line in substation automation system based on iec61850
ES2392369T3 (en) * 2007-03-30 2012-12-10 Abb Technology Ag Procedure for setting up an intelligent electronic device
CN104715035A (en) * 2015-03-17 2015-06-17 广东电网有限责任公司电力调度控制中心 Checking method and device for correctness of virtual terminator association configuration of intelligent substation
CN105335342A (en) * 2015-12-01 2016-02-17 国家电网公司 Method for automatic examination of wiring correctness of intelligent substation SCD configuration file virtual terminator
CN105354120A (en) * 2015-12-11 2016-02-24 国网安徽省电力公司淮北供电公司 SCD file document check device for intelligent substation
CN106372301A (en) * 2016-08-29 2017-02-01 西电通用电气自动化有限公司 Method and system for detecting visualization and configuration consistency of configuration file of intelligent substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"基于信息分类提取和语义强度分级的SCD正确性检查技术";王可 等;《电气自动化》;20180130;第40卷(第1期);第77-79页 *

Also Published As

Publication number Publication date
CN109784699A (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN106199341B (en) Fault line identification method and device under single-phase fault grounding working condition
CN102694369B (en) Method for preventing low-voltage protection misoperation of motor caused by PT disconnection
CN101860007B (en) Remote intelligent residual current monitoring and protection system
CN101917064A (en) Back-up protection processing method of digital substation transformer based on GOOSE mode
CN103384058A (en) Substation area protection based integrated failure protection method for substations
CN103117532A (en) Zero-sequence voltage trip protection method for low-voltage side of transformers
CN111799887B (en) 220kV intelligent high-voltage switch control system
CN105871645B (en) Electric network fault automatic information collecting and distributing device
CN104319743B (en) The method and apparatus of the main transformer high-pressure side Fast Operating Backup Protection based on station domain information
CN109839575B (en) Power system fault processing method and device and terminal equipment
CN109784699B (en) Method for checking correctness of SCD (substation configuration description) file between 110kV lines of intelligent substation
CN102005819A (en) Fault isolation method of electric distribution network
CN105024356A (en) Ratio braking type protection method for bus with voltage class of 35 kV or below
CN109800970B (en) Method for checking correctness of secondary virtual loop of SCD file of 110kV bus interval of intelligent substation
CN101958579A (en) Method of treating information loss in centralized protection device of digitalized substation
CN109800481B (en) Method for checking correctness of secondary virtual loop of 110kV backup power automatic switching SCD (substation configuration description) file of intelligent substation
CN201860172U (en) Automatic looped network type distribution network based on reclosers
CN110932247A (en) Intelligent power supply override trip prevention system and method for mine
CN110932244B (en) Relay protection method for no-switching of all-station protection outlet pressure plates of transformer substation
CN109546630B (en) 10kV bus differential protection method based on intelligent substation process layer networking mode
CN101764389B (en) Anti-overvoltage measurement and control system and method
CN107026433B (en) Rapid protection system and method for current collection circuit of new energy power station
CN209329686U (en) A kind of protective relaying device for distinguishing station internal fault and line fault
CN201868854U (en) GIS (gas insulated switchgear) structure changing 500KV main power supply into 66KV side power supply
Ntshiba et al. Digital Implementation of an Auto-Reclose Protection Scheme for a Distribution System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant