CN104863625A - Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam - Google Patents

Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam Download PDF

Info

Publication number
CN104863625A
CN104863625A CN201410059823.1A CN201410059823A CN104863625A CN 104863625 A CN104863625 A CN 104863625A CN 201410059823 A CN201410059823 A CN 201410059823A CN 104863625 A CN104863625 A CN 104863625A
Authority
CN
China
Prior art keywords
hole
sealing
inner support
coal
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410059823.1A
Other languages
Chinese (zh)
Inventor
王玉杰
张建国
吕有厂
吴建亭
黄春明
王晓文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410059823.1A priority Critical patent/CN104863625A/en
Publication of CN104863625A publication Critical patent/CN104863625A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Abstract

The invention discloses a method for extracting gas from an underground coal mine by adopting an internal support pipe through drilling along a coal seam, and provides a method for extracting coal seam gas through drilling along the coal seam by burying a polyvinyl chloride pipe adopting an internal support structure. According to the method, a hole for extracting gas along the seam is drilled in an underground coal seam of the coal mine along the tendency or trend of the coal seam, after the hole is drilled, coal dust in the drilled hole is blown off by compressed air, the internal support polyvinyl chloride pipe is lowered to a designed position, the hole is sealed, and the coal seam gas is extracted in a networking manner. The compressive strength of the internal support polyvinyl chloride pipe reaches 25 MPa, so that the designed section of the coal seam drilled hole is kept for 1 year, and a smooth channel is provided for gas flow and extraction; the technical problem that the drilled hole along the seam is difficult to protect due to loose coal seam and high stress can be solved, the effective service time of the drilled hole can be as long as 1 year, and the engineering requirement for gas extraction is met. The internal support pipe is simple in structure, easy to machine, simple and convenient to operate, high in compressive strength, low in cost and high in efficiency; the novel method can reduce the cost and improve the efficiency for extraction work of the underground coal mine gas.

Description

Underground coal mine is along the method for coal bed drilling inner support tube mash gas extraction
Technical field
The present invention relates to the method for a kind of underground coal mine along coal bed drilling inner support tube mash gas extraction.
Background technology
China's coal-mine underground gas extraction technology is widely used, and concordant can be divided into hole and layer-through drilling two kinds of extraction borehole arrangements according to boring and coal seam spatial relation.At present, the on-the-spot general gas pumping technological process of underground coal mine is: first construction is along coal seam or wear coal bed drilling, directly enter down the hollow polyvinyl chloride pipe of hard thin-wall in the borehole, the methods such as organic material, the direct shutoff of inorganic material or hole packer shutoff are adopted to carry out sealing of hole, mash gas extraction of then networking.Its basic characteristics support boring by polyvinyl chloride pipe self anti-pressure ability and boring self-stable ability, maintain boring basic configuration, for Gas Flow and extraction provide passage.
By geostatic stress effect, after coal bed drilling construction, around boring, defining stress concentrate circle, be subject to the effect of circle stress concentrated stress, hole wall shrinks, collapsing to arriving completely densified.After coal bed drilling construction grouting, along with the continuous shrinkage strain of surrounding medium, it acts on load on pipe laying wall and progressively raises, and pipe laying is deformed.Progressively development tube wall along with distortion cracks and occurs damage, and the stressed damage of pipe laying is the inevitable outcome of boring surrounding concentrated stress effect, finally causing pipe laying to be destroyed completely to causing by pressure break, even occurring the phenomenon be fully densified of holing.
Because coal seam non-deformability is lower, the tunnel arranged along coal seam mostly needs to adopt special supporting measure ability engineering demands, also has the stress characteristic identical with coal heading along coal bed drilling.Comparatively speaking, metal pipe material has advantages of higher compressive strength, and boring can be made to keep unimpeded for a long time, but a large amount of layout will produce unthinkable adverse effect to later stage mining work in coal seam.
At present, coal mine underground coal bed mash gas pumping drilling all adopts the method for the hollow polyvinyl chloride pipe pipe laying of hard thin-wall to carry out gas pumping, compressive strength 2.5MPa ~ the 6MPa of the hollow polyvinyl chloride pipe pipe laying of hard thin-wall, around boring under concentrated stress effect, pipe laying can be produced by pressure break very soon and destroy until boring is fully densified, enclose the passage of Gas Flow and extraction, make gas pumping work be difficult to carry out for a long time, seriously constrain carrying out smoothly of coal bed gas extraction work.Meet the requirement of gas pumping prescribed time-limit, necessary rationally raising pipe laying intensity or modified node method pattern are with the development speed of effective keyhole shrinkage strain.
Summary of the invention
In view of prior art Problems existing, the object of this invention is to provide a kind of coal seam feature request, with low cost, handling ease, underground coal mine easy to use of being suitable for along the method for coal bed drilling inner support polyvinyl chloride pipe pipe laying mash gas extraction.
The present invention has the polyvinyl chloride pipe of inner supporting structure according to People's Republic of China (PRC) coal industry standard MT 558.2-2005 " plastic pipe for coal mine material+part 2+polychloroethylene pipes " design processing, invent the method for a kind of underground coal mine along coal bed drilling inner support tube mash gas extraction: (1) holes, with the hydraulic drill rig of large torque (T >=2000KN) along seam inclination or move towards the boring of direction construction concordant, hole depth 60 ~ 85m:(2) aperture blowing, after Completion of Drilling Hole, with coal dust in pressure wind clear opening; (3) screen casing under, screen casing and common inner support tube connect lower at the bottom of hole section by section, and screen casing is that the small-bore Drilling operation boring respective numbers on common inner support tube tube wall forms; (4) upper pipe collar, pipe collar machining internal thread is connected with inner support tube; (5) connect interior stay tube section by section, common inner support tube external diameter and single-unit length can according to extraction main networking requirements processing in coal mine down-hole tunnel, general single-unit length 2 ~ 3m, and pipe two ends respectively process outer connecting thread; (6) sealing of hole, in hole under pipe after design attitude, employing micro-expansion cement mortar, polyurethane carry out sealing of hole, or adopt underground mine use sealing of hole utensil to carry out injection hole sealing with pressure, sealed borehole length 20 ~ 35m:(7) mash gas extraction of networking, after sealing of hole, treat sealing of hole slurry consolidation more than 24 hours, pressure testing checks that sealing quality reaches requirement and can to network mash gas extraction.
Result of use: the compressive strength of the polyvinyl chloride pipe of inner supporting structure reaches 25MPa, makes boring active time reach 1 year, can reduce material consumption, improve gas pumping efficiency.
method is implemented
the specific embodiment of the invention: (1) holes, with the hydraulic drill rig of large torque (T>=2000KN) along seam inclination or move towards the boring of direction construction concordant, hole depth 60 ~ 85m:(2) aperture blowing, after Completion of Drilling Hole, with coal dust in pressure wind clear opening; (3) screen casing under, screen casing and common inner support tube connect lower at the bottom of hole section by section, and screen casing is that the small-bore Drilling operation boring respective numbers on common inner support tube tube wall forms; (4) upper pipe collar, pipe collar machining internal thread is connected with inner support tube; (5) connect interior stay tube section by section, common inner support tube external diameter and single-unit length can according to extraction main networking requirements processing in coal mine down-hole tunnel, general single-unit length 2 ~ 3m, and pipe two ends respectively process outer connecting thread; (6) sealing of hole, in hole under pipe after design attitude, employing micro-expansion cement mortar, polyurethane carry out sealing of hole, or adopt underground mine use sealing of hole utensil to carry out injection hole sealing with pressure, sealed borehole length 20 ~ 35m:(7) mash gas extraction of networking, after sealing of hole, treat sealing of hole slurry consolidation 24 hours, pressure testing checks that sealing quality reaches requirement and can to network mash gas extraction, to drainage holes routine test extraction parameter, investigates extracting result.
Underground coal mine is connected with (4) pipe collar and (5) interior stay tube section by section along method (3) screen casing of coal bed drilling inner support tube mash gas extraction, then tightens before docking at the even daub in connecting thread place, prevents gas leakage.(7) grouting pump is utilized before networking extraction, by gas pumping pipe to injected clear water in extraction borehole, grouting pump pressure show value rises to regulation and requires and stablize to the stipulated time, and anhydrous around leaking out of holing, then drilling and sealing is up-to-standard, mash gas extraction of can networking.
Accompanying drawing explanation
Fig. 1 is inner support polyvinyl chloride tubular structure cut away view; Fig. 2 is along coal bed drilling inner support tube installation drawing.

Claims (4)

1. a underground coal mine is along the method for coal bed drilling inner support pipe laying mash gas extraction, (1) hole, with the hydraulic drill rig of large torque (T >=2000KN) along seam inclination or move towards the boring of direction construction concordant, hole depth 60 ~ 85m:(2) aperture blowing, after Completion of Drilling Hole, with coal dust in pressure wind clear opening; (3) screen casing under, screen casing and common inner support tube connect lower at the bottom of hole section by section, and screen casing is that the small-bore Drilling operation boring respective numbers on common inner support tube tube wall forms; (4) upper pipe collar, pipe collar machining internal thread is connected with inner support tube; (5) connect interior stay tube section by section, common inner support tube external diameter and single-unit length can according to extraction main networking requirements processing in coal mine down-hole tunnel, general single-unit length 2 ~ 3m, and pipe two ends respectively process outer connecting thread; (6) sealing of hole, in hole under pipe after design attitude, employing micro-expansion cement mortar, polyurethane carry out sealing of hole, or adopt underground mine use sealing of hole utensil to carry out injection hole sealing with pressure, sealed borehole length 20 ~ 35m:(7) mash gas extraction of networking, after sealing of hole, treat sealing of hole slurry consolidation more than 24 hours, pressure testing checks that sealing quality reaches requirement and can to network mash gas extraction.
2. underground coal mine according to claim 1 is along the method for coal bed drilling inner support tube mash gas extraction, it is characterized in that: screen casing (3), pipe collar (4), inner support tube (5) enter the interior also sealing of hole of coal bed drilling under connecting successively, connecting thread place uniform gluing, prevents gas leakage.
3. the underground coal mine according to claim 1,2 is along the method for coal bed drilling inner support tube mash gas extraction, it is characterized in that: after (7) sealing of hole, before extraction, answer testing bore holes airtight quality, the boring networking mash gas extraction meeting sealing quality requirement, routine test extraction parameter, investigation extracting result.
4. the underground coal mine according to claim 1,2,3 is along the method for coal bed drilling inner support tube mash gas extraction, it is characterized in that: inner support pipe laying high compressive strength reaches 25MPa, the development speed of controlling drilling hole shrinkage strain, the coal bed drilling maintenance design section time is made to reach 1 year, for Gas Flow and extraction provide unimpeded channel, it is the new method that coal mine gas extraction work reduces costs, raises the efficiency.
CN201410059823.1A 2014-02-21 2014-02-21 Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam Pending CN104863625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410059823.1A CN104863625A (en) 2014-02-21 2014-02-21 Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410059823.1A CN104863625A (en) 2014-02-21 2014-02-21 Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam

Publications (1)

Publication Number Publication Date
CN104863625A true CN104863625A (en) 2015-08-26

Family

ID=53909748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410059823.1A Pending CN104863625A (en) 2014-02-21 2014-02-21 Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam

Country Status (1)

Country Link
CN (1) CN104863625A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988777A (en) * 2017-05-02 2017-07-28 阳泉煤业集团华越机械有限公司 A kind of method that utilization screen casing draws out methane
CN107143374A (en) * 2017-06-29 2017-09-08 张海轩 The gas production method and system of belt pressing type drilling malleation mining
CN109030054A (en) * 2018-08-17 2018-12-18 西安科技大学 This coal seam directional drilling process simulation experimental rig of one kind and method
CN111119978B (en) * 2019-12-04 2021-12-14 湖南科技大学 Method for extracting coal seam gas by drilling holes in bedding and hydraulically cutting seams

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1252482A1 (en) * 1984-11-29 1986-08-23 Kramarenko Aleksandr Flexible seal for blast holes and wells
CN202360037U (en) * 2011-09-30 2012-08-01 安阳鑫龙煤业(集团)有限责任公司 Anti-collapse porous blocking pipe
CN202441416U (en) * 2011-11-18 2012-09-19 山西青科恒安矿业新材料有限公司 Gas drainage pipeline for coal mine
CN203430466U (en) * 2013-09-05 2014-02-12 西安科技大学 Drill hole sealing device for gas extraction of coal mine
CN203441525U (en) * 2013-05-06 2014-02-19 中国平煤神马能源化工集团有限责任公司天成实业分公司 Support type special pipe for gas drainage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1252482A1 (en) * 1984-11-29 1986-08-23 Kramarenko Aleksandr Flexible seal for blast holes and wells
CN202360037U (en) * 2011-09-30 2012-08-01 安阳鑫龙煤业(集团)有限责任公司 Anti-collapse porous blocking pipe
CN202441416U (en) * 2011-11-18 2012-09-19 山西青科恒安矿业新材料有限公司 Gas drainage pipeline for coal mine
CN203441525U (en) * 2013-05-06 2014-02-19 中国平煤神马能源化工集团有限责任公司天成实业分公司 Support type special pipe for gas drainage
CN203430466U (en) * 2013-09-05 2014-02-12 西安科技大学 Drill hole sealing device for gas extraction of coal mine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋承林等: "《矿井瓦斯灾害防治与利用》", 30 June 2013, 中国矿业大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988777A (en) * 2017-05-02 2017-07-28 阳泉煤业集团华越机械有限公司 A kind of method that utilization screen casing draws out methane
CN107143374A (en) * 2017-06-29 2017-09-08 张海轩 The gas production method and system of belt pressing type drilling malleation mining
CN107143374B (en) * 2017-06-29 2019-03-05 张海轩 The gas production method and system of belt pressing type drilling positive pressure mining
CN109030054A (en) * 2018-08-17 2018-12-18 西安科技大学 This coal seam directional drilling process simulation experimental rig of one kind and method
CN109030054B (en) * 2018-08-17 2020-05-19 西安科技大学 Simulation test device and method for directional drilling process of local coal seam
CN111119978B (en) * 2019-12-04 2021-12-14 湖南科技大学 Method for extracting coal seam gas by drilling holes in bedding and hydraulically cutting seams

Similar Documents

Publication Publication Date Title
CN201757686U (en) Hydraulic fracturing crustal stress measuring apparatus
CN104141470A (en) Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine
CN103195390B (en) The nearly horizontal mash gas pumping drilling encapsulating method in this coal seam a kind of
CN102242621B (en) Negative pressure de-plugging and oil extraction process and device
CN104863625A (en) Method for extracting gas from underground coal mine by adopting internal support pipe through drilling along coal seam
CN110939407B (en) Double-deck overlapping goaf ground drainage well structure and recovery unit
WO2019169734A1 (en) Integrated apparatus and method for long-distance downhole drilling and fracturing
CN104763368A (en) Orifice seal device for large-diameter downhole hammer and reverse circulation construction technology for orifice seal device
CN103912304A (en) Method for locally extracting gas of soft coal seams
CN104213896A (en) Fracturing and cavern integrated completion method for coal-bed gas reservoir
CN109098750B (en) Device for underground gas extraction hole to be used as coal seam water injection hole and construction method
CN104405434A (en) Hypotonic coal seam region mineshaft gas phase fracturing and rapid coal uncovering method and hypotonic coal seam region mineshaft gas phase fracturing and rapid coal uncovering device
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN103233694B (en) Transfer the method and casing bit that hang minery ground coal bed gas well production casing
CN103089183A (en) Double bellmouth type expansion sleeve packing tool and operating method thereof
CN112647902A (en) In-situ leaching uranium mining drilling filter and well completion method
CN203201486U (en) Casing pipe device for mining area coal-bed gas well on ground
CN109322621B (en) Broken layer pipe fixing and grouting method
CN107120070B (en) Drilling structure and construction method thereof
RU2533470C2 (en) Procedure for recovery of tightness in flow strings
CN110939408A (en) Optimized goaf coalbed methane ground extraction well body structure and well cementation method
CN204457462U (en) Well casing device
CN205189801U (en) Oil well pipeline maintenance device
CN110725664A (en) Slurry stopping mechanism for well sealing and well sealing method thereof
CN111472685A (en) Intermittent dynamic condensation deep hole drilling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150826