CN104863085A - 钢结构导流墙 - Google Patents

钢结构导流墙 Download PDF

Info

Publication number
CN104863085A
CN104863085A CN201510205895.7A CN201510205895A CN104863085A CN 104863085 A CN104863085 A CN 104863085A CN 201510205895 A CN201510205895 A CN 201510205895A CN 104863085 A CN104863085 A CN 104863085A
Authority
CN
China
Prior art keywords
guide wall
guide
diversion seat
revetment
deflector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510205895.7A
Other languages
English (en)
Inventor
龚素华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xunde Technology Co Ltd
Original Assignee
Chengdu Xunde Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xunde Technology Co Ltd filed Critical Chengdu Xunde Technology Co Ltd
Priority to CN201510205895.7A priority Critical patent/CN104863085A/zh
Publication of CN104863085A publication Critical patent/CN104863085A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/06Constructions, or methods of constructing, in water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种钢结构导流墙,包括导流墙,导流墙两侧均设有预制板,预制板通过固定螺栓与导流墙连接,导流墙下表面连接有护墙,护墙与导流墙之间内置钢筋连接条,护墙与导流墙两侧面均位于同一水平线上,护墙与导流墙之间竖向安装有导流板,导流板顶部延伸在导流墙上表面外侧,其底部与一导流座连接,导流座与导流板之间可拆卸,导流板及导流座均为两个,两导流座之间横向连接有地梁,地梁两端固定在导流座上,地梁内置预埋钢管。本钢结构导流墙施工工艺简单,不易受到损坏,可适用于水下及地下室地形平缓的不同水深,更换方便,能起到良好的导流作用,不会出现塌陷现象,减少了施工时间,提高了施工效率。

Description

钢结构导流墙
技术领域
本发明涉及一种导流墙,特别涉及一种钢结构导流墙。
背景技术
导流墙主要设置于河道中,也可应用到地下室导流中,目前使用的导流墙主要有三种结构形式:一、现浇钢筋混凝土形式;二、钢筋混凝土板桩形式;三、临时导流墙。前两种主要用于各类池体、氧化沟、河道、湖泊等水处理构筑物中,用以减少水头损失和弯道淤积,起到引导水流流向的作用,能适用于各种水深断面,但涉及水上沉桩及浇筑作业,施工难度大,建设周期长,投资较大,而临时导流墙主要采用有机高分子合成材料做成,其导流效果存在一定的局限性,不能更好的起到导流作用,因此,现有的导流墙还不够完善,且部分导流墙自身结构复杂,导致施工的繁琐。
发明内容
本发明要解决的技术问题是:克服上述问题,提供一种施工工艺简单,不易受到损坏,可适用于水下及地下室地形平缓的不同水深,更换方便的钢结构导流墙。
为了实现上述目的,本发明采用的技术方案是这样的:本发明的钢结构导流墙,包括导流墙,导流墙两侧均设有预制板,预制板通过固定螺栓与导流墙连接,导流墙下表面连接有护墙,护墙与导流墙之间内置钢筋连接条,护墙与导流墙两侧面均位于同一水平线上,护墙与导流墙之间竖向安装有导流板,导流板顶部延伸在导流墙上表面外侧,其底部与一导流座连接,导流座与导流板之间可拆卸,导流板及导流座均为两个,两导流座之间横向连接有地梁,地梁两端固定在导流座上,地梁内置预埋钢管。
进一步的,作为一种具体的结构形式,本发明所述导流板与导流座之间设有铰接结构连接件。
进一步的,作为一种具体的结构形式,本发明所述预制板采用塑钢板体结构。
进一步的,作为一种具体的结构形式,本发明所述导流座上开有供地梁穿过的通孔。
进一步的,作为一种具体的结构形式,本发明所述导流座与地梁连接处设有钢箍。
进一步的,作为一种具体的结构形式,本发明所述导流墙与护墙之间连接有预埋构件。
与现有技术相比,本发明的优点在于:本钢结构导流墙施工工艺简单,不易受到损坏,可适用于水下及地下室地形平缓的不同水深,更换方便,能起到良好的导流作用,不会出现塌陷现象,减少了施工时间,提高了施工效率。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明的结构示意图;图中:1.导流墙;2.护墙;3.导流板;4.预制板;5.导流座;6.地梁。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示的本发明钢结构导流墙的优选实施例,包括导流墙1,导流墙1两侧均设有预制板4,预制板4通过固定螺栓与导流墙1连接,导流墙1下表面连接有护墙2,护墙2与导流墙1之间内置钢筋连接条,护墙2与导流墙1两侧面均位于同一水平线上,护墙2与导流墙1之间竖向安装有导流板3,导流板3顶部延伸在导流墙1上表面外侧,其底部与一导流座5连接,导流座5与导流板3之间可拆卸,导流板3及导流座5均为两个,两导流座5之间横向连接有地梁6,地梁6两端固定在导流座5上,地梁6内置预埋钢管,所述导流板3与导流座5之间设有铰接结构连接件,所述预制板4采用塑钢板体结构,所述导流座5上开有供地梁6穿过的通孔,所述导流座5与地梁6连接处设有钢箍,所述导流墙1与护墙2之间连接有预埋构件。
本发明的钢结构导流墙施工工艺简单,不易受到损坏,可适用于水下及地下室地形平缓的不同水深,更换方便,能起到良好的导流作用,不会出现塌陷现象,减少了施工时间,提高了施工效率,所述导流板3与导流座5之间设有铰接结构连接件,使其导流板3与导流座5之间可进行铰接连接,提高了使用灵活性;所述预制板4采用塑钢板体结构,不易受到损坏;所述导流座5上开有供地梁6穿过的通孔,地梁6与导流座5之间连接性能更好;所述导流座5与地梁6连接处设有钢箍,不易产生滑落现象;所述导流墙1与护墙2之间连接有预埋构件,能起到预埋作用,减轻了自重。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改,本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (1)

1.一种钢结构导流墙,包括导流墙,其特征在于:导流墙两侧均设有预制板,预制板通过固定螺栓与导流墙连接,导流墙下表面连接有护墙,护墙与导流墙之间内置钢筋连接条,护墙与导流墙两侧面均位于同一水平线上,护墙与导流墙之间竖向安装有导流板,导流板顶部延伸在导流墙上表面外侧,其底部与一导流座连接,导流座与导流板之间可拆卸,导流板及导流座均为两个,两导流座之间横向连接有地梁,地梁两端固定在导流座上,地梁内置预埋钢管,所述导流板与导流座之间设有铰接结构连接件,所述预制板采用塑钢板体结构,所述导流座上开有供地梁穿过的通孔,所述导流座与地梁连接处设有钢箍,所述导流墙与护墙之间连接有预埋构件。
CN201510205895.7A 2015-04-28 2015-04-28 钢结构导流墙 Pending CN104863085A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510205895.7A CN104863085A (zh) 2015-04-28 2015-04-28 钢结构导流墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510205895.7A CN104863085A (zh) 2015-04-28 2015-04-28 钢结构导流墙

Publications (1)

Publication Number Publication Date
CN104863085A true CN104863085A (zh) 2015-08-26

Family

ID=53909225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510205895.7A Pending CN104863085A (zh) 2015-04-28 2015-04-28 钢结构导流墙

Country Status (1)

Country Link
CN (1) CN104863085A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256783A (zh) * 2015-11-03 2016-01-20 交通运输部天津水运工程科学研究所 层叠装配式导流墩结构
CN112810830A (zh) * 2020-12-31 2021-05-18 四川省场道工程有限公司 机场钢筋混凝土折板式导流屏施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248132A (ja) * 2000-03-06 2001-09-14 Shoji Matsushita 流導壁
JP2002356901A (ja) * 2001-05-30 2002-12-13 Maruei Concrete Industries Co Ltd 雨水の流下制御方法および流下制御方法に使用される減速貯留流路体
CN202440787U (zh) * 2012-02-03 2012-09-19 葛洲坝集团第二工程有限公司 一种河道导流装置
CN204151739U (zh) * 2014-09-19 2015-02-11 上海宏辉港务工程有限公司 可移动式水下导流墙
CN204193576U (zh) * 2014-10-15 2015-03-11 四川卓众科技有限公司 一种具有可移动式柔性水下导流墙的污水预处理池

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248132A (ja) * 2000-03-06 2001-09-14 Shoji Matsushita 流導壁
JP2002356901A (ja) * 2001-05-30 2002-12-13 Maruei Concrete Industries Co Ltd 雨水の流下制御方法および流下制御方法に使用される減速貯留流路体
CN202440787U (zh) * 2012-02-03 2012-09-19 葛洲坝集团第二工程有限公司 一种河道导流装置
CN204151739U (zh) * 2014-09-19 2015-02-11 上海宏辉港务工程有限公司 可移动式水下导流墙
CN204193576U (zh) * 2014-10-15 2015-03-11 四川卓众科技有限公司 一种具有可移动式柔性水下导流墙的污水预处理池

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256783A (zh) * 2015-11-03 2016-01-20 交通运输部天津水运工程科学研究所 层叠装配式导流墩结构
CN105256783B (zh) * 2015-11-03 2017-03-22 交通运输部天津水运工程科学研究所 层叠装配式导流墩结构
CN112810830A (zh) * 2020-12-31 2021-05-18 四川省场道工程有限公司 机场钢筋混凝土折板式导流屏施工方法

Similar Documents

Publication Publication Date Title
CN102086634B (zh) 一种海洋水下拼装式取水口及其施工方法
CN108425341B (zh) 一种生态河道用阶梯式景观挡墙及其施工方法
CN107747308B (zh) 一种地下连续墙及施工方法
CN102677592B (zh) 在浅海裸露基岩上搭设深水钢栈桥及平台的方法
CN104695380B (zh) 一种塑钢板桩与混凝土组合的护岸结构
CN210887094U (zh) 一种重力式码头升级结构
CN101666101A (zh) 可移动预制多筒型重力式混合基础
CN110485443A (zh) 8字形双壁钢围堰及施工操作工艺
CN204000905U (zh) 一种带系梁深水承台施工的双壁钢围堰
CN104863085A (zh) 钢结构导流墙
CN201713761U (zh) 空腹封闭式钢沉箱围堰
CN104480907B (zh) 一种液压型可升降箱式挡水坝
CN103276752A (zh) 一种地下连续墙膨胀混凝土接头的施工方法
CN203429665U (zh) 一种沉管隧道轴线干坞坞口结构
CN202000306U (zh) 一种全直桩码头结构
CN201915442U (zh) 一种海洋水下拼装式取水口
CN202787235U (zh) 一种钢筋混凝土变截面扶壁式预制板桩
CN204728264U (zh) 钢结构导流墙
CN203603143U (zh) 一种变截面式空心u型预制板桩
CN210887256U (zh) 挡水围堰平直组合板桩地连墙式框架
CN209958290U (zh) 一种带桩基的护岸结构
CN208650011U (zh) 一种堆石坝坝身溢洪道阻滑结构
CN110339603B (zh) 一种增加过流能力的定期冲洗式沉沙池
CN207812470U (zh) 一种带注浆孔的塑料板桩
CN110565666A (zh) 一种平直组合板桩地连墙式挡水围堰施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150826