CN104849301A - 一种预浸料凝胶时间测试装置 - Google Patents

一种预浸料凝胶时间测试装置 Download PDF

Info

Publication number
CN104849301A
CN104849301A CN201510239073.0A CN201510239073A CN104849301A CN 104849301 A CN104849301 A CN 104849301A CN 201510239073 A CN201510239073 A CN 201510239073A CN 104849301 A CN104849301 A CN 104849301A
Authority
CN
China
Prior art keywords
sample
gel time
prepreg
prepregs
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510239073.0A
Other languages
English (en)
Inventor
李炜
朱家强
王滨
刘凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI CEDAR COMPOSITES TECHNOLOGY Co Ltd
SHANGHAI JIFEI RIJING COMPOSITE MATERIALS Co Ltd
Donghua University
National Dong Hwa University
Original Assignee
SHANGHAI CEDAR COMPOSITES TECHNOLOGY Co Ltd
SHANGHAI JIFEI RIJING COMPOSITE MATERIALS Co Ltd
Donghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CEDAR COMPOSITES TECHNOLOGY Co Ltd, SHANGHAI JIFEI RIJING COMPOSITE MATERIALS Co Ltd, Donghua University filed Critical SHANGHAI CEDAR COMPOSITES TECHNOLOGY Co Ltd
Priority to CN201510239073.0A priority Critical patent/CN104849301A/zh
Publication of CN104849301A publication Critical patent/CN104849301A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Or Analyzing Materials Using Thermal Means (AREA)

Abstract

本发明提供了一种预浸料凝胶时间测试装置,其特征在于,包括帖覆在试样上下两侧的玻纤布,在试样中间插入有热电偶,热电偶与测温仪相连,由热压板从上下两侧对试样施加压力并将试样加热,在试样上下两侧与热压板之间分别设有正电极及负电极,正电极与电源的负极相连,电源的正极连接电阻,电阻与电流表相连后再连接负电极。本发明的预浸料凝胶时间测试准确率高,效率高,同时还可用于树脂的凝胶时间测试。

Description

一种预浸料凝胶时间测试装置
技术领域
本发明涉及一种测试预浸料凝胶时间的装置,主要用于对预浸料的凝胶时间进行测试。
背景技术
预浸料凝胶时间是指在一定条件下预浸料中树脂由粘流态转变为固态的时间,该指标对于预浸料后道工序的固化成型等工艺的选择有重要的影响,同时此项指标在一定程度上可对预浸料的生产工艺进行优化改善。预浸料的性能将直接决定复合材料的最终性能与用途,因此对预浸料质量检测研究具有重大意义。
在预浸料后续的使用及成型过程中其凝胶时间是很重要的技术参数,对于成型工艺有着重大的影响。目前,对于预浸料的凝胶时间,企业一般是很难去测试的。
发明内容
本发明的目的是提供一种能够测试预浸料的凝胶的装置。
为了达到上述目的,本发明的技术方案是提供了一种预浸料凝胶时间测试装置,其特征在于,包括帖覆在试样上下两侧的玻纤布,在试样中间插入有热电偶,热电偶与测温仪相连,由热压板从上下两侧对试样施加压力并将试样加热,在试样上下两侧与热压板之间分别设有正电极及负电极,正电极与电源的负极相连,电源的正极连接电阻,电阻与电流表相连后再连接负电极。
本发明的工作原理是:采用电学方法,将裁切成规定大小的试样,两侧帖覆玻纤布,在试样横截面方向插入热电偶,两侧与电极连接,然后用隔热膜将整个试样包裹,用达到设定温度和压力的热压板对试样集合体进行热压,电极与电源、电阻、及电流表形成一个完整回路,记录加热过程中的电流差变化,电势差由树脂升温时的软化和流动形成。树脂在常温下未固化,其电流差为0,选择电流明显变化的拐点作为凝胶时间。
本发明的预浸料凝胶时间测试准确率高,效率高,同时还可用于树脂的凝胶时间测试。
附图说明
图1为本发明提供的一种预浸料凝胶时间测试装置的结构示意图。
具体实施方式
为使本发明更明显易懂,兹以优选实施例,并配合附图作详细说明如下。
如图1所示,本发明提供了一种预浸料凝胶时间测试装置包括帖覆在试样4上下两侧的玻纤布1,在试样4中间插入有热电偶5,热电偶5与测温仪9相连,由热压板3从上下两侧对试样4施加压力并将试样4加热,在试样4上下两侧与热压板3之间分别设有正电极2-1及负电极2-2,正电极2-1与电源8的负极相连,电源8的正极连接电阻6,电阻6与电流表7相连后再连接负电极2-2。
本发明的工作原理:将试样4裁切成规定大小的尺寸,试样两侧贴玻纤布1,在试样中间插入热电偶5记录试样的温度,用电极将试样与电阻6、电流表7和电源8连接,将电极放置在热压板3之间,可对试样4施以一定温度和压力。当试样4在热压板3一定的温度和压力下树脂由固态变为粘流态,后又固化,此过程中引起电流变化,这一变化由电流表7记录,最终得出预浸料的电流差变化曲线-固化曲线,做曲线上斜率明显变化的那点的斜率,到达此点所用的时间为凝胶时间。
本装置还适用于树脂凝胶时间的测试,具体原理同上。

Claims (1)

1.一种预浸料凝胶时间测试装置,其特征在于,包括帖覆在试样(4)上下两侧的玻纤布(1),在试样(4)中间插入有热电偶(5),热电偶(5)与测温仪(9)相连,由热压板(3)从上下两侧对试样(4)施加压力并将试样(4)加热,在试样(4)上下两侧与热压板(3)之间分别设有正电极(2-1)及负电极(2-2),正电极(2-1)与电源(8)的负极相连,电源(8)的正极连接电阻(6),电阻(6)与电流表(7)相连后再连接负电极(2-2)。
CN201510239073.0A 2015-05-12 2015-05-12 一种预浸料凝胶时间测试装置 Pending CN104849301A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510239073.0A CN104849301A (zh) 2015-05-12 2015-05-12 一种预浸料凝胶时间测试装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510239073.0A CN104849301A (zh) 2015-05-12 2015-05-12 一种预浸料凝胶时间测试装置

Publications (1)

Publication Number Publication Date
CN104849301A true CN104849301A (zh) 2015-08-19

Family

ID=53849106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510239073.0A Pending CN104849301A (zh) 2015-05-12 2015-05-12 一种预浸料凝胶时间测试装置

Country Status (1)

Country Link
CN (1) CN104849301A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613047A (zh) * 2018-12-14 2019-04-12 中国航空工业集团公司基础技术研究院 一种预浸料凝胶时间测试方法
CN109632870A (zh) * 2019-01-24 2019-04-16 贵州恒安工程试验检测有限公司 一种沥青在日温下的软化时间的检测方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06265493A (ja) * 1993-03-11 1994-09-22 Snow Brand Milk Prod Co Ltd 流体の状態の測定方法及びゲル化点・ゾル化点温度の測定方法
CN1851451A (zh) * 2006-06-02 2006-10-25 北京航空航天大学 Lcm工艺直流电阻法实时监测方法
CN101603936A (zh) * 2008-06-12 2009-12-16 北京玻钢院复合材料有限公司 一种lcm成型工艺的实时监测方法
CN102901752A (zh) * 2012-10-24 2013-01-30 中国石油化工股份有限公司 凝胶成胶时间测定方法和装置
US20130112562A1 (en) * 2011-11-04 2013-05-09 Salubris, Inc. Real-time observable electrophoresis system which does not require any kind of light filter
CN103529070A (zh) * 2013-10-25 2014-01-22 黑龙江省科学院科技孵化中心 一种环氧树脂固化程度在线监控系统及采用该系统对环氧树脂固化程度监控的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06265493A (ja) * 1993-03-11 1994-09-22 Snow Brand Milk Prod Co Ltd 流体の状態の測定方法及びゲル化点・ゾル化点温度の測定方法
CN1851451A (zh) * 2006-06-02 2006-10-25 北京航空航天大学 Lcm工艺直流电阻法实时监测方法
CN101603936A (zh) * 2008-06-12 2009-12-16 北京玻钢院复合材料有限公司 一种lcm成型工艺的实时监测方法
US20130112562A1 (en) * 2011-11-04 2013-05-09 Salubris, Inc. Real-time observable electrophoresis system which does not require any kind of light filter
CN102901752A (zh) * 2012-10-24 2013-01-30 中国石油化工股份有限公司 凝胶成胶时间测定方法和装置
CN103529070A (zh) * 2013-10-25 2014-01-22 黑龙江省科学院科技孵化中心 一种环氧树脂固化程度在线监控系统及采用该系统对环氧树脂固化程度监控的方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘宝锋,等: "《中华人民共和国航空行业标准》", 16 February 2004 *
张淑萍,等: "《中华人民共和国建材行业标准》", 3 July 2004 *
郑理,等: "电阻突变法研究厌氧浸渗剂固化的影响因素", 《南京工业大学学报(自然科学版)》 *
陈宏伟: "光纤传感器在LCM工艺监测和性能表征中的应用研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613047A (zh) * 2018-12-14 2019-04-12 中国航空工业集团公司基础技术研究院 一种预浸料凝胶时间测试方法
CN109632870A (zh) * 2019-01-24 2019-04-16 贵州恒安工程试验检测有限公司 一种沥青在日温下的软化时间的检测方法
CN109632870B (zh) * 2019-01-24 2021-06-18 贵州恒安检测科技有限公司 一种沥青在日温下的软化时间的检测方法

Similar Documents

Publication Publication Date Title
CN103335942B (zh) 塑料与金属模具间摩擦系数的测量装置及方法
CN102944824B (zh) 一种整流二极管瞬态高温反向漏电流的测试方法
CN203779867U (zh) 3d打印机挤出机环形加热头
CN105181734A (zh) 一种形状记忆合金热机械疲劳实验装置
CN105806884A (zh) 一种锂离子电池比热容的测定方法
EA201391007A1 (ru) Способ и устройство для сварки труб
CN104849301A (zh) 一种预浸料凝胶时间测试装置
CN205049504U (zh) 一种形状记忆合金热机械疲劳实验装置
CN103713013A (zh) 测试管状材料轴向导热系数的装置
CN103804826A (zh) 一种聚偏氟乙烯/炭黑ptc复合材料及其制备方法
CN102705881B (zh) 一种电磁炉
CN106248731B (zh) 利用热焓值选取模压工艺参数的方法
CN204882213U (zh) 一种用于动态加载过程前样品升温的加载结构
CN202472036U (zh) 一种带实时温度监控的光纤熔融拉锥机热固化系统
CN204914563U (zh) 传感器元件粘接装置
CN105158038A (zh) 一种用于动态加载过程前样品升温的方法
CN105116004A (zh) 一种云母带胶化试验机
CN204701096U (zh) 一种注塑模具热流道的热电偶保护装置
CN203287113U (zh) 电力设备连接部位温度在线监测系统
CN206056809U (zh) 一种用于新能源汽车加热器的温度传感器
CN204945066U (zh) 一种云母带胶化试验机
CN202837079U (zh) 一种古马隆软化点分析测试用熔样装置
CN204026023U (zh) 智能温控预热保温装置
CN104931542A (zh) 利用碳纳米管涂层玻璃纤维监测复合材料固化过程的方法
CN104960198A (zh) 传感器元件粘接装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150819