CN104846809B - It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased - Google Patents

It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased Download PDF

Info

Publication number
CN104846809B
CN104846809B CN201510150002.3A CN201510150002A CN104846809B CN 104846809 B CN104846809 B CN 104846809B CN 201510150002 A CN201510150002 A CN 201510150002A CN 104846809 B CN104846809 B CN 104846809B
Authority
CN
China
Prior art keywords
pile
prefabricated tubular
tubular pile
geotextile
aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510150002.3A
Other languages
Chinese (zh)
Other versions
CN104846809A (en
Inventor
唐晓武
俞悦
周力沛
李姣阳
王恒宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201510150002.3A priority Critical patent/CN104846809B/en
Publication of CN104846809A publication Critical patent/CN104846809A/en
Application granted granted Critical
Publication of CN104846809B publication Critical patent/CN104846809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Draining and the prefabricated tubular pile and its construction method of frictional resistance can be increased the invention discloses a kind of.Aperture is provided with the side surface of prefabricated tubular pile, aperture is in dislocation Arbitrary distribution.Geotextile will be put on prefabricated tubular pile, in implantation soil;Water in soil around pile carries out draining after geotextile penetrates into inner tube by the aperture that prefabricated tubular pile side surface is distributed;After after discharging consolidation, geotextile is punctured, soil around pile enters inner tube through the aperture of prefabricated tubular pile side surface;Continue to pour into soil around pile to inner tube from prefabricated tubular pile top, blotter and grid are backfilled after smooth, the height of top layer grid is identical with designed elevation after backfill.The available low pile driving pressure construction of the present invention obtains high-bearing capacity stake, realizes the purpose for effectively improving bearing capacity of pile foundation and efficiency of construction;Increased the side friction of stake, construction noiselessness, mud contamination and small to ground perturbation;Simple structure, speed of application fast period are short, and efficient, quick result can be reached in emergency work.

Description

It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased
Technical field
The invention belongs to a kind of prefabricated tubular pile and its construction method, being related to the one kind in engineering construction technology field can arrange Water simultaneously increases the prefabricated tubular pile and its construction method of frictional resistance, can reach draining and lifting frictional resistance effect.
Background technology
Now with the high speed development of China's economic construction, east prosperity coastal area land resource is limited, Perioperative cardiac events work The engineering construction of journey, major port and new airport, high-speed railway and new coastal city area enters brand-new fast-developing period, Especially with Bohai Rim economy-zone, Yangtze River Delta, the Delta of the Pearl River these be prevalent in it is coastal in weak soil environment Industry cluster district is Typical Representative.But now although cheap pile strength is low for conventional flexible pile composite foundation, reinforce deep Degree is limited;Rigid pile pile strength is high, but reinforcement depth is big costly.And cast-in-place concrete large diameter pipe now newly developed Stake(PCC)Although combining the advantage of both the above stake, there is work progress again and produce mud contamination, efficiency of construction is not High the shortcomings of.
Therefore develop it is a kind of can produce in batches and largely save concrete amount and effectively improve the pre- of bearing capacity of pile foundation Tubulation stake and its construction method have great importance.
The content of the invention
It is an object of the invention to provide it is a kind of can reach accelerate draining and lifting frictional resistance effect prefabricated tubular pile and its Construction method such that it is able to realize effectively improving the purpose of bearing capacity of pile foundation and efficiency of construction.
The present invention proposes a kind of energy draining lifting frictional resistance prefabricated tubular pile, and its structure composition is as follows:
A kind of energy draining lifting frictional resistance prefabricated tubular pile:It is provided with the side surface of prefabricated tubular pile for draining and soil around pile The aperture of entrance, aperture is in dislocation Arbitrary distribution.
A kind of draining of energy lifts the construction method of frictional resistance prefabricated tubular pile, using following steps:
The first step:Special geotextile will be put on prefabricated tubular pile described in claim 1, it is deep to designing in implantation soil Degree;
Second step:Because the soil body is squeezed, what the water in soil around pile was distributed by geotextile by prefabricated tubular pile side surface Aperture carries out draining after penetrating into inner tube;
3rd step:After after discharging consolidation, geotextile is punctured, soil around pile enters interior through the aperture of prefabricated tubular pile side surface Pipe, pile side friction increases, and soil compaction effect relaxes;
4th step:From prefabricated tubular pile top continue to pour into enough soil around pile to inner tube, after smooth backfill blotter and Grid, the height of top layer grid is identical with designed elevation after backfill.
Described geotextile can use non-woven geotextile.
As the existing pile foundation in soft soil foundation treatment composite foundation, usually based on friction pile, bearing capacity of single pile Based on pile side friction.Therefore the bearing capacity of stake is improved, it is necessary to improve foundation pile surface area as far as possible and realize.Such as Fig. 6, same volume Hollow concrete pile increase more obvious than solid concrete pile bearing capacity.And draining lifting frictional resistance prefabricated pipe proposed by the present invention The aperture internal surface area punched on side surface is counted in stake in, not only bigger than hollow concrete pile in total surface area and with holes Prefabricated tubular pile also save concrete amount.
Additionally, prefabricated tubular pile is first covered special geotextile in work progress using the present invention reduces the friction resistance of stake week Power can with less pile driving pressure by pile tube be implanted into soil in, after discharging consolidation for a period of time afterwards puncture geotextile, then cause Soil around pile enters inner tube by aperture, greatly reduces soil arching effect, while also increasing frictional force in side-pile, and then greatly increases The bearing capacity of pile foundation.
It is to sum up above-mentioned, the invention has the advantages that and effect:
(1)Can be constructed with low pile driving pressure and obtain high-bearing capacity stake.
(2)By extruding, pore water can be reached weak soil by prefabricated tubular pile side hole into inner tube around in the implantation process To the effect of consolidation draining, stake soil entered in prefabricated tubular pile by cavity from around, increased again due to having withdrawn geotextile the later stage The side friction of stake is added.
(3)Construction noiselessness, mud contamination and small to ground perturbation.
(4)Simple structure, speed of application fast period are short, and efficient, quick result can be reached in emergency work.
Brief description of the drawings
Fig. 1 is the structural representation of prefabricated tubular pile of the present invention.
Fig. 2 is the structural representation that prefabricated tubular pile puts geotextile.
Fig. 3 is draining process schematic after prefabricated tubular pile implantation.
Fig. 4 is that soil around pile enters pile tube to increase the process schematic of frictional resistance.
Fig. 5 is to be backfilled with the structural representation after blotter and grid after stake soil enters in prefabricated tubular pile.
Fig. 6 is the schematic diagram of prefabricated tubular pile of the present invention.
In figure:1st, prefabricated tubular pile, 2, geotextile, 3, soil around pile, 4, blotter and grid, a, solid prefabricated tubular pile, B, hollowcore precast pile tube, c, hollow prefabricated tubular pile with holes.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Embodiments of the invention are as follows:
The first step:Prefabricated tubular pile 1 as shown in Figure 1 is first made, side surface stamps some apertures, will be as shown in Figure 1 pre- Special geotextile 2 is put in tubulation stake 1, geotextile 2 can adopt non-woven geotextile, to projected depth in implantation soil, such as Fig. 2 institutes Show;
Second step:Because the soil body is squeezed, the water in soil around pile is distributed by geotextile 2 by the side surface of prefabricated tubular pile 1 Aperture penetrate into inner tube after carry out draining, as shown in Figure 3;
3rd step:After after discharging consolidation, geotextile 2 is punctured, soil around pile enters through the aperture of the side surface of prefabricated tubular pile 1 Inner tube, pile side friction increases, and soil compaction effect relaxes, as shown in Figure 4;
4th step:Continue to pour into enough soil around pile 3 to inner tube from the top of prefabricated tubular pile 1, blotter is backfilled after smooth And grid 4, the height of top layer grid is identical with designed elevation after backfill, as shown in Figure 5.
Embodiment one:
Engineering ground upper strata is stream plastic state silt clay.Contrast test is using hollow prefabricated tubular pile b and hollow arbor braid in Fig. 6 Hole prefabricated tubular pile c.
Prefabricated tubular pile is made according to using aluminium alloy, external diameterD 0 =80mm, internal diameterD i =65mm, designing pile length is 1m.Wherein Hollow prefabricated tubular pile c with holes is in surface opening diameterd=16mm apertures 20, precompressed is implanted into clay after putting non-woven geotextile. The results showed, the pile driving pressure of the hollow prefabricated tubular pile c with holes of pile driving pressure ≈ of hollowcore precast pile tube b, wherein non-woven geotextile rise The effect for reducing frictional force has been arrived, but it is unobvious.Discharging consolidation is carried out according to above-mentioned second.In 3rd step, hollowcore precast pipe Stake b soil compaction effects are significantly stronger than solid prefabricated tubular pile a.The carrying of hollow prefabricated tubular pile c with holes is tested after the completion of 4th step after 48h Power is higher than hollowcore precast pile tube b by about 10%.
Embodiment two:
Engineering ground upper strata is mouldable state silty clay.Contrast test is still using hollow prefabricated tubular pile b and hollow arbor braid in Fig. 6 Hole prefabricated tubular pile c.
Prefabricated tubular pile is made according to using low-alloy carbon steel, external diameterD 0 =100mm, internal diameterD i =80mm, designing pile length is 1.2m.Wherein hollow prefabricated tubular pile c with holes is in surface opening diameterd=20mm apertures 20, put pre- press planting after non-woven geotextile In entering clay.The results showed, the pile driving pressure of the hollow prefabricated tubular pile c with holes of pile driving pressure ≈ of hollowcore precast pile tube b is hollow with holes The pile driving pressure of prefabricated tubular pile c is slightly less than hollowcore precast pile tube b, and wherein non-woven geotextile serves the work for significantly reducing frictional force With.Discharging consolidation is carried out according to above-mentioned second.In 3rd step, hollowcore precast pile tube b soil compaction effects are significantly stronger than solid prefabricated Pile tube a.The bearing capacity ratio hollowcore precast pile tube b for testing hollow prefabricated tubular pile c with holes after the completion of 4th step after 48h is high by about 8%.
In Practical Project, the low-alloy carbon steel in the aluminum alloy material and embodiment two that are used in embodiment one is all Can be converted into the concrete precast pipe pile of different reinforcing bar proportionings.From embodiment one, two, in prefabricated tubular pile overcoat nonwoven with holes Geotextiles are reduced the effect of pile driving pressure really, and after the completion of step 3, soil compaction effect substantially relaxes, finally as friction pile Bearing capacityQAlso there is 8% ~ 10% increase.
As can be seen here, simple structure of the present invention is realized to be constructed with low pile driving pressure and obtains high-bearing capacity stake, increased stake Side friction;And noiselessness of constructing, mud contamination and small to ground perturbation, the speed fast period is short, can in emergency work To reach efficient, quick result, with the significant technique effect of protrusion.
Above-mentioned specific embodiment is used for illustrating the present invention, rather than limiting the invention, of the invention In spirit and scope of the claims, any modifications and changes made to the present invention both fall within protection model of the invention Enclose.

Claims (3)

1. a kind of energy draining lifts frictional resistance prefabricated tubular pile, it is characterised in that:It is provided with for draining on the side surface of prefabricated tubular pile And soil around pile enter aperture, aperture in dislocation Arbitrary distribution, prefabricated tubular pile overcoat have for draining then at aperture pierce The broken geotextile to improve prefabricated tubular pile bearing capacity, prefabricated tubular pile is made of that, using concrete, prefabricated tubular pile is pierced at aperture After broken from top to pipe in poured into soil around pile, carry out consolidation draining and improve by the combination of aperture and geotextile to carry Power.
2. a kind of energy draining lifts the construction method of frictional resistance prefabricated tubular pile, it is characterised in that use following steps:
The first step:Prefabricated tubular pile described in claim 1 is put into geotextile, in implantation soil, prefabricated tubular pile is to use coagulation Soil is made;
Second step:Water in soil around pile is penetrated into laggard in pipe by geotextile by the aperture that prefabricated tubular pile side surface is distributed Row draining;
3rd step:After after discharging consolidation, geotextile is punctured, soil around pile enters in pipe through the aperture of prefabricated tubular pile side surface;
4th step:Soil around pile is poured into from prefabricated tubular pile top to pipe, blotter and grid are backfilled after smooth, pushed up after backfill The height of layer grid is identical with designed elevation.
3. a kind of energy according to claim 2 draining lifts the construction method of frictional resistance prefabricated tubular pile, it is characterised in that:Institute The geotextile stated uses non-woven geotextile.
CN201510150002.3A 2015-03-31 2015-03-31 It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased Active CN104846809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510150002.3A CN104846809B (en) 2015-03-31 2015-03-31 It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510150002.3A CN104846809B (en) 2015-03-31 2015-03-31 It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased

Publications (2)

Publication Number Publication Date
CN104846809A CN104846809A (en) 2015-08-19
CN104846809B true CN104846809B (en) 2017-06-16

Family

ID=53846768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510150002.3A Active CN104846809B (en) 2015-03-31 2015-03-31 It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased

Country Status (1)

Country Link
CN (1) CN104846809B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256790B (en) * 2015-11-10 2017-03-22 浙江大学 Prefabricated skirt type pipe pile used for drainage and added with pile body inclined support and construction method thereof
CN108396728B (en) * 2018-04-16 2023-03-10 浙江大学 Construction device and construction method of multifunctional pipe pile for sea filling and island building and capable of draining water
CN109914392A (en) * 2019-02-22 2019-06-21 浙江大学 Upper section draining is lower to save not drain combination type prefabricated tubular pile and construction method
CN110397021A (en) * 2019-08-12 2019-11-01 上海建工二建集团有限公司 Prefabricated variable-diameter hole tubular pile structure for soft foundation treatment and construction method thereof
CN111424634A (en) * 2019-11-18 2020-07-17 国网浙江省电力有限公司建设分公司 Foundation structure of soft soil stratum and construction method thereof
CN114517473B (en) * 2022-02-10 2023-03-28 江苏开放大学(江苏城市职业学院) Prefabricated pipe pile capable of effectively enhancing bearing capacity in soft soil stratum and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN102433873A (en) * 2011-09-13 2012-05-02 青岛理工大学 Hollow pile with multiple holes on lateral wall
CN202380458U (en) * 2011-09-13 2012-08-15 青岛理工大学 Hollow pile with porous side walls
CN103243703A (en) * 2013-04-18 2013-08-14 浙江大学宁波理工学院 Soft soil consolidation processing method by utilizing hard hollow tubes with pores reserved on side walls
CN204000859U (en) * 2014-07-22 2014-12-10 冠鲁建设股份有限公司 The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098541A (en) * 1999-09-29 2001-04-10 Kubota Corp Steel pipe soil cement composite pile, and construction method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN102433873A (en) * 2011-09-13 2012-05-02 青岛理工大学 Hollow pile with multiple holes on lateral wall
CN202380458U (en) * 2011-09-13 2012-08-15 青岛理工大学 Hollow pile with porous side walls
CN103243703A (en) * 2013-04-18 2013-08-14 浙江大学宁波理工学院 Soft soil consolidation processing method by utilizing hard hollow tubes with pores reserved on side walls
CN204000859U (en) * 2014-07-22 2014-12-10 冠鲁建设股份有限公司 The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer

Also Published As

Publication number Publication date
CN104846809A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104846809B (en) It is a kind of draining and the prefabricated tubular pile and its construction method of frictional resistance to be increased
CN104131556B (en) The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN105386433B (en) A kind of microorganism soil-fixing CFG pile composite foundations and construction method
CN103061328B (en) Post-grouting gravel pile with sand wall wing plates and construction method
CN102493437A (en) Grouting-type micro steel pipe pile and grouting reinforcement method
CN103321203B (en) Taper hammer ram brute force develops a method
CN102359096A (en) Method for strengthening deep soft soil foundation by sealing
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN204000859U (en) The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN104196013B (en) A kind of composite Y shape stake and construction method thereof
CN104141304A (en) Extrusion formed precast pile stiffness core and cement soil combined Y-shaped pile and construction method thereof
CN105297737A (en) Grouting scope-controllable bag type micro bearing pile
CN202787246U (en) Flexible pile and drainage body integral combination pile
CN111851516A (en) PHC pipe pile reverse-sequence construction method suitable for complex environment
CN205276254U (en) Drainage is and add prefabricated skirt tubular pile of pile body bearing diagonal
CN206477351U (en) Element earth pile for the high collapsible loess foundation of big thickness
CN109914392A (en) Upper section draining is lower to save not drain combination type prefabricated tubular pile and construction method
CN216839384U (en) Expansion end plate of precast concrete pile
CN208056052U (en) A kind of Bamboo-shaped is two-way to bodkin-column combination pile pile
CN206667225U (en) A kind of novel solid drainage system of reinforcing soft ground
CN201520973U (en) Precast pile with grouting hole
CN209975507U (en) Upper-section drainage and lower-section non-drainage combined prefabricated pipe pile
CN212129194U (en) Composite foundation of fast consolidation combined pile
CN201650154U (en) Adjustable multi-stage helical extruding type drilling tool
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant