CN104842323B - A kind of tunnel porous type punches and plants bolt precision control device - Google Patents

A kind of tunnel porous type punches and plants bolt precision control device Download PDF

Info

Publication number
CN104842323B
CN104842323B CN201510256065.7A CN201510256065A CN104842323B CN 104842323 B CN104842323 B CN 104842323B CN 201510256065 A CN201510256065 A CN 201510256065A CN 104842323 B CN104842323 B CN 104842323B
Authority
CN
China
Prior art keywords
checking
hole
top plate
lower plywood
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510256065.7A
Other languages
Chinese (zh)
Other versions
CN104842323A (en
Inventor
张桂平
金刚刚
侯绪永
袁海林
万德会
滑明辉
王强
苏成
秦俊非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN201510256065.7A priority Critical patent/CN104842323B/en
Publication of CN104842323A publication Critical patent/CN104842323A/en
Application granted granted Critical
Publication of CN104842323B publication Critical patent/CN104842323B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of tunnel porous type punches and plants bolt precision control device, it is made up of with device II device I, device I is the flat board that a center offers perforate I, flat board arranges multiple checking bar being perpendicular to platen surface and multiple sign hole, device II is combined by guide pipe with lower plywood by the top plate being parallel to each other, top plate lateral surface is vertically arranged fixing bar, perforate II is offered at the center of top plate and lower plywood respectively, on top plate and lower plywood, offer the checking hole that multiple and described checking bar matches respectively, described guide pipe is vertically fixed on top plate and lower plywood between the checking hole being oppositely arranged, and it is collectively forming punching with checking hole, checking passage.Assembly of the invention I and device II are by " fixing checking correction " operation, and the precision controlling the most just can complete the punching before installing porous flange base in the way of alternate verification, planting bolt process works, and simple to operate, effect is notable.

Description

A kind of tunnel porous type punches and plants bolt precision control device
Technical field
The invention belongs to tunnel construction field, related generally to the porous type punching of a kind of tunnel and planted bolt precision controlling Device, ensures porous flange base punching in a pre-installation in tunnel by the way of alternate verification and implants the essence of crab-bolt process Degree.
Background technology
In tunnel, porous flange base needs to carry out punching and implanting crab-bolt in a pre-installation, and porous type punches, planting bolt need to By corresponding mould, its precision is controlled, but, in current work progress, mostly general mould is in punching Before play sign pitch-row effect, be difficult to the direction to punching, pitch of holes carries out the process control of precision, more cannot before planting bolt, Carry out planting bolt compliance test result.
Summary of the invention
It is an object of the invention to provide the porous type punching of a kind of tunnel and plant bolt precision control device, utilizing this device to pass through The mode of alternate verification solves tunnel porous flange base and installs front punching and plant bolt because of low the caused rework problems of precision, carries The accuracy rate of high engineering construction and efficiency.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is: a kind of tunnel porous type punches and plants bolt Precision control device, is used for installing porous flange base, is made up of with device II device I, and device I and device II orthographic projection Shape, size all with the shape of porous flange base to be installed, equivalently-sized, device I is that a center offers perforate I Flat board, arranges the many auxiliary rods I intersecting at same point in perforate I, and its intersection point is auxiliary with what this flat board geometric center overlapped Help center, flat board arranges multiple checking bar being perpendicular to platen surface, at the bottom of the quantity of checking bar and porous flange to be installed The quantity in the hole on seat is identical, and verifies that bar can be inserted simultaneously in the hole on porous flange base to be installed, on flat board Offer multiple sign hole, in the scope of operation, get the fixing hole for fixing device II, described device for drill bit through indicating hole II is combined by guide pipe with lower plywood by top plate arranged in parallel, is vertically arranged can insert at top plate lateral surface Perforate II is offered at the center of the fixing bar being located in described fixing hole, top plate and lower plywood respectively, and arranges in perforate II The many auxiliary rods II intersecting at same point, its intersection point geometric center with top plate and lower plywood respectively overlaps, auxiliary to be formed Help center, on top plate and lower plywood, offer the checking hole that multiple and described checking bar matches respectively, wear for checking bar Crossing, described guide pipe is vertically fixed on top plate and lower plywood between the checking hole being oppositely arranged, and common with checking hole Forming punching, checking passage, many described fixing bars are inserted simultaneously into described sign Kong Zhonghou, described checking bar is from institute's shape The punching of one-tenth, checking passage pass.
The shape of described perforate I is consistent with described writing board shape.
The shape of described perforate II is consistent with the shape of top plate or lower plywood.
The described quantity indicating hole is three, and three indicate hole the most on the same line.
The diameter of described checking bar and the length crab-bolt implanted pre-with on porous flange base to be installed are consistent.
Compared with prior art, the method have the advantages that
First, in the present invention, device I and device II are by " fixing checking correction " operation, in the way of alternate verification The most just can complete to porous flange base install before punching, plant bolt process precision controlling work, simple to operate, Effect is notable;
Second, the centrally disposed sectional center of device I and auxiliary rod are conducive to precise positioning during position, picture hole, on device II Fixing bar realize device II fix self, prevent in drill process occur offset, the setting of guide pipe is the most permissible Ensure drill bit direction, maintenance of pitch-row during boring;
3rd, owing to checking bar parameter in every respect is identical with the crab-bolt of implantation, therefore can be in order to after punching completes With device I, verified in the hole that bar is all inserted into accomplishing fluently, carried out the compliance test result before planting bolt, and after planting bolt, it is possible to use dress Put the correction on the guide pipe of the II crab-bolt travel direction to exposing;
4th, the present invention uses and hollows out formula design, significantly reduces the weight of device, and, facility of drawing materials, low cost Honest and clean, simple in construction, it is simple to operating personnel grasp use;
5th, every three holes and the punching construction of above flange base, all can carry out precision controlling by the present invention, should With in extensive range;
6th, in the present invention, device I can be overlapped with device II built up an entirety by checking bar and checking hole, is depositing Put, transportation is not susceptible to deformation or damage.
Accompanying drawing explanation
Fig. 1 is the side structure schematic diagram after the present invention combines.
Fig. 2 is the structural representation of device I in the present invention.
Fig. 3 is the side view of device I in the present invention.
Fig. 4 is the structural representation of device II in the present invention.
Fig. 5 is the side view of device II in the present invention.
Figure marks: 1, device I, 101, flat board, 102, checking bar, 103, indicate hole, 104, perforate I, 105, auxiliary rod I, 2, device II, 201, top plate, 202, lower plywood, 203, guide pipe, 204, checking hole, 205, fixing bar, 206, perforate II, 207, auxiliary rod II.
Detailed description of the invention
Below in conjunction with the accompanying drawings, by detailed description of the invention, the present invention is further illustrated.
A kind of tunnel porous type punches and plants bolt precision control device, is used for the punching before installing porous flange base, plants The precision controlling of bolt process, sits in isosceles trapezoid at the bottom of porous flange to be installed, is provided with three holes, described precision control device It is made up of with device II 2 device I 1, and device I 1 and the orthographic projection shape of device II 2, size and porous flange to be installed The shape of base, equivalently-sized, the big isosceles trapezoid, wherein, the flat board that described device I 1 is made up of steel plate such as it is 101, offer the perforate I 104 of a triangle at the center of this flat board 101, in perforate I 104, weld many and intersect at same The auxiliary rod I 105 of point, its crosspoint is sectional center, and this sectional center overlaps with the geometric center of flat board 101, wherein An auxiliary rod I 105 be on the center line of flat board 101, described flat board 101 one side weld three be perpendicular to platen surface Checking bar 102, the position between each hole on the checking position of bar 102, spacing and porous flange base to be installed, Away from consistent, in order to many checking bars 102 can be inserted simultaneously in the hole on porous flange base to be installed, and two are tested Offering one on the centre position of card bar 102 line and indicate hole 103, the quantity therefore indicating hole 103 is three, and triangular in shape Arrangement, described device II 2 is made up of double-layer plate, and wherein top plate 201 be arranged in parallel with lower plywood 202, and by being perpendicular to, The guide pipe 203 that lower plywood is arranged is supported, and the center of top plate 201 or lower plywood 202 is offered and described perforate I 104 shape The perforate II 206 that shape is identical, and the many auxiliary rods II 207 intersecting at same point are set in perforate II 206, its crosspoint is Sectional center, this sectional center overlaps with the geometric center of top plate 201 or lower plywood 202, at top plate 201 and lower plywood Offering three checking holes 204 matched with described checking bar 102 on 202, described guide pipe 203 is vertically fixed on top plate 201 and lower plywood 202 between the checking hole 204 that is oppositely arranged, and be collectively forming punching with checking hole 204, verify passage, Arrange outside described top plate 201 three by the fixing bar 205 of round steel vertical welding, and these three fixing bars 205 are inserted simultaneously After entering three sign holes 103 on flat board 101, the checking bar 102 on flat board 101 passes from above-mentioned punching, checking passage.
Described checking bar 102 in spacing, direction, diameter and length with on flange base to be installed the pre-anchor implanted Bolt is consistent.
Firm with the central Tianshan tunnel overhead contact of 22.5 kilometers, South Sinkiang Railway Tu Ku two wires in Xinjiang Uygur Autonomous Regions below Property hang punching cast-in fixing bolt be that the using method of the present invention is further detailed by example.
(1) the fixing and punching of device: survey crew by measuring instrument first by flange base central point and upper and lower auxiliary magnet Measuring, and paint and mark at tunnel vault, operator takes railcar job platform (tower wagon) by the flat board of device I 1 101 sides are adjacent to tunnel wall, and the sectional center on this flat board 101 is directed at the central point that paint marks, the center of flat board 101 The straight line that line determines with described upper and lower auxiliary magnet overlaps, and then indicates holes 103 by flat board 101 three and marks position, and This position is beaten and is taken fixing hole, and the degree of depth of fixing hole is consistent with the length fixing bar 205 on device II 2, then carries out device II 2 Installation, fixing for three on device II 2 bar 205 is inserted in above-mentioned fixing hole, with fixing device II 2, then uses electric hammer Drill bit stretches into guide pipe 203 carry out drilling operation from checking hole 204 successively, by guide pipe 203 control whole punching direction, The precision of pitch-row;
(2) verify before planting bolt: after punching completes, take off device II 2, insert with the checking bar 102 of device I 1 and beaten Hole carrying out the checking of the whole structure before planting bolt, and undesirable hole is modified, planting bolt requirement until all meeting;
(3) planting bolt post-equalization: after planting bolt, crab-bolt exposes boring, is directed at by fixing for three on device II 2 bar 205 simultaneously After above-mentioned fixing hole, three checking holes 204 of top plate 201 side are enclosed within corresponding crab-bolt, make crab-bolt pass described Punching, checking passage, in order to the direction of crab-bolt is corrected, and trimming process must be strict controlled in chemical anchoring jelly Within the time allowed, finally meet the installation accuracy of porous flange base finally by aforesaid operations process.

Claims (3)

1. tunnel porous type punches and plants a bolt precision control device, is used for installing porous flange base, it is characterised in that: by Device I (1) forms with device II (2), and device I (1) and the shape of device II (2) orthographic projection, size are all with to be installed The shape of porous flange base, equivalently-sized, device I (1) is the flat board (101) that a center offers perforate I (104), perforate I (104) shape is consistent with the shape of flat board (101), arranges the many auxiliary rods I intersecting at same point in perforate I (104) (105), its intersection point is the sectional center overlapped with this flat board (101) geometric center, arranges multiple being perpendicular on flat board (101) The checking bar (102) of platen surface, the quantity of checking bar (102) is identical with the quantity in the hole on porous flange base to be installed, And verifying that bar (102) can be inserted simultaneously in the hole on porous flange base to be installed, flat board (101) is provided with multiple mark Show hole (103), in the scope of operation, get the fixing hole for fixing device II (2), described dress for drill bit through indicating hole (103) Put II (2) to be combined, on upper strata by guide pipe (203) with lower plywood (202) by top plate (201) arranged in parallel Plate (201) lateral surface is vertically arranged the many fixing bars (205) being plugged in the described scope of operation in fixing hole, top plate (201) offer perforate II (206) respectively with the center of lower plywood (202), the shape of perforate II (206) and top plate (201) or The shape of lower plywood (202) is consistent, and arranges the many auxiliary rods II (207) intersecting at same point in perforate II (206), its Intersection point geometric center with top plate (201) and lower plywood (202) respectively overlaps, to form sectional center, in top plate (201) With on lower plywood (202), offer the checking hole (204) that multiple and described checking bar (102) is matched, described guide pipe respectively (203) be vertically fixed on top plate (201) and lower plywood (202) between the checking hole (204) being oppositely arranged, and with checking hole (204) it is collectively forming punching, checking passage, many described fixing bars (205) are inserted simultaneously in described sign hole (103) After, described checking bar (102) passes from the punching formed, checking passage.
A kind of tunnel the most according to claim 1 porous type punches and plants bolt precision control device, it is characterised in that: described The quantity indicating hole (103) is three, and three indicate hole (103) the most on the same line.
A kind of tunnel the most according to claim 1 porous type punches and plants bolt precision control device, it is characterised in that: described The diameter of checking bar (102) and the length crab-bolt implanted pre-with on porous flange base to be installed are consistent.
CN201510256065.7A 2015-05-20 2015-05-20 A kind of tunnel porous type punches and plants bolt precision control device Active CN104842323B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510256065.7A CN104842323B (en) 2015-05-20 2015-05-20 A kind of tunnel porous type punches and plants bolt precision control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510256065.7A CN104842323B (en) 2015-05-20 2015-05-20 A kind of tunnel porous type punches and plants bolt precision control device

Publications (2)

Publication Number Publication Date
CN104842323A CN104842323A (en) 2015-08-19
CN104842323B true CN104842323B (en) 2016-08-17

Family

ID=53842503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510256065.7A Active CN104842323B (en) 2015-05-20 2015-05-20 A kind of tunnel porous type punches and plants bolt precision control device

Country Status (1)

Country Link
CN (1) CN104842323B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826560B (en) * 2019-01-21 2020-08-07 何一当 Tunnel drilling device capable of controlling drilling depth and using method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3741439A1 (en) * 1987-12-08 1989-06-22 Festo Kg Guide device for a motor-driven drilling arrangement
CN201872163U (en) * 2010-11-18 2011-06-22 中铁十七局集团第三工程有限公司 Drilling positioner for connecting steel plates of arch steel frame
CN102108836B (en) * 2010-12-30 2012-12-26 中铁三局集团电务工程有限公司 Punch die
CN204267059U (en) * 2014-12-08 2015-04-15 中国铁建电气化局集团第五工程有限公司 A kind of with beating the crab-bolt device for casting of filling with template
CN204673569U (en) * 2015-05-20 2015-09-30 中国铁建电气化局集团第一工程有限公司 A kind of tunnel porous type punches and plants bolt precision control device

Also Published As

Publication number Publication date
CN104842323A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104110140B (en) Net rack node location adjusting device and location adjusting method
CN201692901U (en) Artificial simulated rainfall experiment device
EP3327214A1 (en) Framework structure and construction method for same
CN203284785U (en) Verticality-adjusting fixing system of reverse steel pipe column
CN106638318A (en) Method for positioning anchor point of beam end of cable stayed bridge and installation method of cable guide pipe
CN104842323B (en) A kind of tunnel porous type punches and plants bolt precision control device
KR101266700B1 (en) Apparatus for aligning flange bolt hole of pipe which penetrate internal partition of ship block
CN101892672A (en) Integral fixed installation method of embedded steel pipe on roof of coal furnace foundation
CN204673569U (en) A kind of tunnel porous type punches and plants bolt precision control device
CN107003127B (en) It can show the laser level irradiation unit of grid
CN202099239U (en) Accurate positioning device for pre-embedded pipes on coke oven basis top plate
CN109898776A (en) A kind of more curved surface aluminium sheet construction methods of assembled
CN105040719A (en) Construction positioning device for photovoltaic pile foundation and construction method for photovoltaic pile foundation
CN201377173Y (en) Foundation bolt positioning template of steel-structure building
CN109826560B (en) Tunnel drilling device capable of controlling drilling depth and using method
CN218059932U (en) Steel anchor box installation mechanism
CN110130390A (en) Raft foundation bolt embedment structure and installation method
CN206289653U (en) New contact net foundation construction mould
CN105513652B (en) Dynamic limiting device for multi-point excitation seismic test of reactor control rod drive line
CN202466590U (en) Ground grouped regularly-distributed pipe pile construction device
CN207502284U (en) A kind of adjustable positioning freely-supported distribution beam
CN205012360U (en) Photovoltaic pile foundation construction positioner
CN105484114B (en) A kind of line style positioner of the F types section of track
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN202926318U (en) Inclination measuring baffle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 18 Baima Temple, Luolong District, Luoyang City, Henan Province, 471000

Patentee after: No.1 Engineering Co., Ltd. of China Railway Construction Electrification Bureau Group

Address before: No. 18 Baima Temple, Luolong District, Luoyang City, Henan Province, 471000

Patentee before: The First Engineering Co., Ltd. of China Railway Construction Electrification Bureau Group Co., Ltd.

CP01 Change in the name or title of a patent holder