CN104836190B - A kind of relay protection setting calculation method of power plant electric system - Google Patents

A kind of relay protection setting calculation method of power plant electric system Download PDF

Info

Publication number
CN104836190B
CN104836190B CN201510244269.9A CN201510244269A CN104836190B CN 104836190 B CN104836190 B CN 104836190B CN 201510244269 A CN201510244269 A CN 201510244269A CN 104836190 B CN104836190 B CN 104836190B
Authority
CN
China
Prior art keywords
network model
power plant
electric network
fault branch
relay protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510244269.9A
Other languages
Chinese (zh)
Other versions
CN104836190A (en
Inventor
李雪冬
蔡宁宁
杨敏
胡凯波
于乐
屈国际
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd
Zhejiang Co Ltd Of Zhe Neng Institute For Research And Technology
Original Assignee
BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd
Zhejiang Co Ltd Of Zhe Neng Institute For Research And Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd, Zhejiang Co Ltd Of Zhe Neng Institute For Research And Technology filed Critical BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201510244269.9A priority Critical patent/CN104836190B/en
Publication of CN104836190A publication Critical patent/CN104836190A/en
Application granted granted Critical
Publication of CN104836190B publication Critical patent/CN104836190B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of computerized algorithms of the relay protection setting calculation of power plant electric system; when using computerized algorithm; electric network model (the primary connection relationships of electric power networks) is needed to be converted into the mathematical model of electric power networks; the method of generally use is the whole electric network model of conversion, and the present invention is using only transform portion electric network model.Which greatly reduce the sizes of loading mathematical model, reduce the dimension of node admittance battle array, shorten the time of matrix inversion, greatly accelerate arithmetic speed.The relay protection setting calculation method of this power plant electric system; this method loads electric network model according to the upward load layer in position of fault branch; electric network model is not loaded with for the equipment of same layer or a low load layer, electric network model is all loaded for main electrical scheme part.

Description

A kind of relay protection setting calculation method of power plant electric system
Technical field
The invention belongs to the technical field of electric system adaptive setting, more particularly to a kind of power plant electric system after Electric protection synchronizing calculation method.
Background technology
For a long time, factory's net integration operation, power plant relay protection management are calculated with fixed value adjusting always by mutually powered-down Net protection profession is responsible for, so power plant is to the calculation of fault of relay protection profession is analyzed, fixed value adjusting calculates and management work weight Visual range degree is inadequate, causes after separating the factory and network, and relay protection profession in power plant becomes a weak link.
At present, in transmission line of electricity adaptive setting all using software is adjusted, the rapidity and accuracy calculated obtains general Time accreditation.And shortcoming is also compared in the work in terms of power plant protection seting, most of power plant still uses artificial hand computation Mode carry out fault analysis and protection and adjust, epoch that this and computer nowadays rapidly develop are not suitable with.
Now power plant is modeled, carries out setting parameter calculating.Since power plant is mainly made of three digest journals, fire coal system System, boiler circuit and electrical system.When modeling, electrical system is called main electrical scheme part, coal burning system and carbonated drink system It is referred to as the loaded portion of power plant.Each part is made of many mini systems, wherein combustion system include fuel system, Boiler combustion system, dedusting ash disposal system and ventilating system;Boiler circuit includes water supply system, cooling water system and moisturizing system System;Electrical system includes turbine control system, Auxiliary Power Control System, directly sends out circuit or boosting transformation stand control System.Therefore, the electric parameter of power plant is numerous and complicated, and calculating process is obviously also extremely complex.It is born in one power plant Lotus layer is more, and with the increase of load layer, and number of nodes sharply increases during calculation of fault, for computer, causes very Big workload.
Invention content
The technology of the present invention solves the problems, such as:Overcome the deficiencies of the prior art and provide a kind of power plant electric system after Electric protection synchronizing calculation method, which greatly reduce the sizes of loading electric network model, reduce the dimension of node admittance battle array, shorten Time of matrix inversion, greatly accelerate arithmetic speed.
The present invention technical solution be:The relay protection setting calculation method of this power plant electric system, the party Method loads electric network model according to the upward load layer in position of fault branch, for the equipment of same layer or a low load layer Electric network model is not loaded with, electric network model is all loaded for main electrical scheme part.
This method loads electric network model according to the upward load layer in fault branch position, and same layer or low one are born For the equipment of lotus layer, impedance value and the method for operation will not have an impact result of calculation, so not needing to load this part electricity Pessimistic concurrency control all loads main electrical scheme part.Due to when calculating, first having to generation bus admittance matrix, then to admittance Node impedance matrix is obtained after matrix inversion, because being related to a large amount of calculating operation to inverting for matrix, with the increase of number of nodes Its used time exponentially rising of inverting, the operation of number of nodes is reduced by loading section electric network model, greatly reduces loading mould The size of type reduces the dimension of node admittance battle array, shortens the time of matrix inversion, greatly accelerates arithmetic speed.
Description of the drawings
Fig. 1 shows the flow chart of the relay protection setting calculation method of power plant electric system according to the present invention;
Fig. 2 shows the primary connection figures of certain power plant.
Specific embodiment
The relay protection setting calculation method of this power plant electric system, this method are upward according to the position of fault branch One load layer loads electric network model, and electric network model is not loaded with for the equipment of same layer or a low load layer, and master is connect Line part all loads electric network model.
This method loads electric network model according to the upward load layer in fault branch position, and same layer or low one are born For the equipment of lotus layer, impedance value and the method for operation will not have an impact result of calculation, so not needing to load this part electricity Pessimistic concurrency control all loads main electrical scheme part.Due to when calculating, first having to generation bus admittance matrix, then to admittance Node impedance matrix is obtained after matrix inversion, because being related to a large amount of calculating operation to inverting for matrix, with the increase of number of nodes Its used time exponentially rising of inverting, the operation of number of nodes is reduced by loading section electric network model, greatly reduces loading electricity The size of pessimistic concurrency control reduces the dimension of node admittance battle array, shortens the time of matrix inversion, greatly accelerates operation speed Degree.
Preferably, as shown in Figure 1, this method includes the following steps:
(1) start;
(2) fault branch is determined;
(3) judge whether the fault branch is located in the range of main electrical scheme, if it is perform step (6), otherwise perform step Suddenly (4);
(4) using the busbar as starting point, upper level busbar is checked;
(5) judge whether upper level busbar is located in the range of main electrical scheme, if it is perform step (6), otherwise perform step Suddenly (4);
(6) whole electric network models of main wiring diagram are loaded;
(7) mathematical model generation is completed.
A specific embodiment is given below.The primary connection figure of certain power plant as shown in Figure 2 is omitted in figure The loaded portion of 6kV1B, 6kV2A and 6kV2B and defeated coal PC1 sections and 400V defeated coal PC2 sections of PC sections of 400V steam turbines, 400V's Loaded portion.As failure is happened at PC sections of 400V steam turbines, then the higher level's busbar for finding trouble point upwards is 6kV1A sections, mother PC sections of line 400V steam turbines and the change of 1# steam turbines are loaded into and calculate in mathematical model, because 6kV1A sections of busbar is the main wiring diagram of power plant, The mathematical model directly main wiring diagram all loaded with regard to being this calculating is no longer searched upwards, then the number of final loading It learns model and removes dotted portion for attached drawing 2.
The above is only presently preferred embodiments of the present invention, not makees limitation in any form to the present invention, it is every according to According to any simple modification, equivalent change and modification that the technical spirit of the present invention makees above example, still belong to the present invention The protection domain of technical solution.

Claims (2)

  1. A kind of 1. relay protection setting calculation method of power plant electric system, it is characterised in that:This method is according to fault branch Position upward load layer loading electric network model, power grid mould is not loaded with for the equipment of same layer or a low load layer Type, for main electrical scheme part, all loading electric network model, final computation model are the superior load layer of fault branch, fault branch Model and main electrical scheme part.
  2. 2. the relay protection setting calculation method of power plant electric system according to claim 1, it is characterised in that:The party Method includes the following steps:
    (1) start;
    (2) fault branch is determined;
    (3) judge whether the fault branch is located in the range of main electrical scheme, if it is perform step (6), otherwise perform step (4);
    (4) using the fault branch as starting point, upper level busbar is checked;
    (5) judge whether upper level busbar is located in the range of main electrical scheme, if it is perform step (6), otherwise perform step (4);
    (6) whole models of load fault branch, the superior load layer model of fault branch and main wiring diagram;
    (7) mathematical model generation is completed.
CN201510244269.9A 2015-05-13 2015-05-13 A kind of relay protection setting calculation method of power plant electric system Expired - Fee Related CN104836190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510244269.9A CN104836190B (en) 2015-05-13 2015-05-13 A kind of relay protection setting calculation method of power plant electric system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510244269.9A CN104836190B (en) 2015-05-13 2015-05-13 A kind of relay protection setting calculation method of power plant electric system

Publications (2)

Publication Number Publication Date
CN104836190A CN104836190A (en) 2015-08-12
CN104836190B true CN104836190B (en) 2018-06-15

Family

ID=53813893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510244269.9A Expired - Fee Related CN104836190B (en) 2015-05-13 2015-05-13 A kind of relay protection setting calculation method of power plant electric system

Country Status (1)

Country Link
CN (1) CN104836190B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108233324A (en) * 2017-12-29 2018-06-29 国家电网公司 Electric network model and computational methods based on more power type relay protection setting calculations
CN112366665B (en) * 2020-11-05 2022-07-12 北京中恒博瑞数字电力科技有限公司 Method and device for quickly breaking N-1 turns of line in relay protection setting calculation
CN112417372B (en) * 2020-12-07 2024-02-09 国网新疆电力有限公司 Fixed value setting calculation method and system suitable for power grid of any scale

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103227452A (en) * 2012-01-31 2013-07-31 上海利乾电力科技有限公司 Computing method of protection fixed value of relay of power plant
CN103001170A (en) * 2012-11-15 2013-03-27 宁波天灵信息科技有限公司 Setting calculation method and system of power grid relay protection setting values
CN103632308B (en) * 2013-11-01 2017-06-16 广东电网公司电力调度控制中心 She Wang power plant relay protection constant value risk evaluating system based on expert system
CN104392065A (en) * 2014-12-08 2015-03-04 国网甘肃省电力公司刘家峡水电厂 Method for generating model of power protection device

Also Published As

Publication number Publication date
CN104836190A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104836190B (en) A kind of relay protection setting calculation method of power plant electric system
CN111008468A (en) Test method and test system of comprehensive energy management system
US11616365B2 (en) Decentralized hardware-in-the-loop scheme
CN109918762B (en) AC/DC power grid hybrid simulation comparison model construction method
CN109217295B (en) Load flow sensitivity calculation method for preventing system overload and computer device
CN109713716B (en) Opportunity constraint economic dispatching method of wind power grid-connected system based on security domain
CN108388688A (en) A kind of active distribution network reliability estimation method
CN112287540B (en) Electromagnetic transient joint simulation method for accessing wind power plant to power grid
CN107784168A (en) The full working scope analogue system of nuclear power station half speed turbine system
CN104485661B (en) A kind of trend automatic adjusting method based on node type conversion
CN115470678A (en) Automatic machine position optimization method and device based on wind power plant noise evaluation
CN112072692A (en) Impedance equivalence method and device for new energy power generation station
CN110120673A (en) Distributed transmission & distribution collaboration idle work optimization method and system based on Thevenin's equivalence parameter identification
CN112182905B (en) Heat supply pipe network simulation method and device for comprehensive energy system
CN111339624A (en) Short-circuit current direct-current component calculation method based on PSASP and EMTP/ATP
CN103729574B (en) The in-circuit emulation computational methods of offshore oilfield cluster power grid anticipation operation
KR101759893B1 (en) Virtual device management apparatus based on scenario for distributed energy resources
CN103904649B (en) A kind of electromotor polymerization suitable for the models of the order containing difference
CN109977595B (en) Multi-energy-flow simultaneous calculation method of comprehensive energy system based on universal energy bus
CN103928941B (en) A kind of Analytical Solution method of electromotor polymerization
CN107069806A (en) Uncertain and AC power flow constraint the Unit Combination method of wind-powered electricity generation is considered simultaneously
Yunus et al. Simulation System for PeLUIt 150 MW Nuclear Reactor by using vPower
Xu et al. Security analysis of integrated energy system under complex network
Xie et al. Power System Frequency Dynamic Simulation Analysis and Tool Development of PSS/E
CN110689209A (en) Method for synchronously optimizing wind power tolerance interval and expected generating cost of unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

CF01 Termination of patent right due to non-payment of annual fee