CN104834978A - 一种负荷修复及预测的方法 - Google Patents

一种负荷修复及预测的方法 Download PDF

Info

Publication number
CN104834978A
CN104834978A CN201510263909.0A CN201510263909A CN104834978A CN 104834978 A CN104834978 A CN 104834978A CN 201510263909 A CN201510263909 A CN 201510263909A CN 104834978 A CN104834978 A CN 104834978A
Authority
CN
China
Prior art keywords
sigma
load
alpha
epsiv
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510263909.0A
Other languages
English (en)
Inventor
王文红
董雨
李惊涛
肖坚红
李春生
陈驰
孙广中
麦鸿坤
赵永红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology of China USTC
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Original Assignee
University of Science and Technology of China USTC
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology of China USTC, State Grid Corp of China SGCC, State Grid Anhui Electric Power Co Ltd filed Critical University of Science and Technology of China USTC
Priority to CN201510263909.0A priority Critical patent/CN104834978A/zh
Publication of CN104834978A publication Critical patent/CN104834978A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种负荷修复及预测的方法,由一定时间内采集时点的负荷数据得到其负荷的变化情况,观察负荷的变化率,发现其呈现出一种时间序列的变化规律,采用GARCH模型得到缺失时点处的负荷变化率,并预测未来的负荷变化率。

Description

一种负荷修复及预测的方法
技术领域
本发明涉及数据处理技术领域,尤其涉及一种负荷修复及预测的方法。
背景技术
全面建设用电信息采集系统是实现智能电网信息化的关键所在,通过实现透彻的信息感知、及时可靠的数据传榆、多级数据的高效处理和海量信息的智能分析,满足了信息获取的实时性、准确性和全面性。在实际应用中,由于远程无线通信不够稳定、现场终端运行不够稳定、本地载波通信不够稳定等原因,会造成采集的数据有缺失或异常。这些数据的缺失和异常严重制约了基于采集数据的高级决策分析。因此,实现一个电力数据计量异常监测、预测分析系统,不仅可以检测异常数据,判别导致异常的原因,给出维护建议,减少人工工作量,降低管理成本,还可以根据电力负荷预测,为用电决策分析提供良好的数据支持,提高经济效益和社会效益。
目前,较流行的负荷缺失值填充方法主要有:回归分析法,主要利用其他影响因子,比如国民生产总值,人口,气候等,对电力负荷进行回归,然后进行预测。此方法考虑影响因子过多,参数复杂。指数平滑法,该方法根据以往的数据,取加权平均值。虽然简单,但是预测不准确。
发明内容
本发明目的就是为了弥补已有技术的缺陷,提供一种负荷修复及预测的方法。
本发明是通过以下技术方案实现的:
一种负荷修复及预测的方法,由一定时间内采集时点的负荷数据得到其负荷的变化情况,观察负荷的变化率,发现其呈现出一种时间序列的变化规律,采用GARCH模型得到缺失时点处的负荷变化率,并预测未来的负荷变化率,具体步骤如下:
S1:任意选取一个存在负荷缺失的采集点,该采集点每天的负荷数据中包含96个采集时点;
S2:选择该采集点t天的数据,则共有96t个采集时点,将所有采集点按照时间先后关系排成一行,作为坐标轴的横轴,每个时点的负荷作为纵轴;
S3:刻画出未缺失的负荷数据的变化率,然后采用GARCH模型预测缺失时点的负荷变化率,并且预测未来时间内负荷的变化情况;
S4:根据负荷变化率得到所需时点的负荷数据;具体公式如下:
εx=lg yx-lg yx-1    (1)
其中x表示采集时点的序数,x=1,2,…,96t-1,96t;yx表示x点处的负荷;εx为x点处的负荷变化率;
公式(1)中,yx-1为已知量,为了得到yx的值,需要求出εx
展开分析;
ARCH模型:
εx=σxzx      (2)
其中,εx为时间序列残差项,也即上述的负荷变化率,其被分成两部分,zx代表随机部分,σx代表时间决定项,满足:
σ x 2 = α 0 + α 1 ϵ x - 1 2 + . . . + α q ϵ x - q 2 = α 0 + Σ i = 1 q α i ϵ x - i 2 - - - ( 3 )
其中,i=1,2,…,q,q、α0、αi都为参数,且满足α0>0,αi≥0;
GARCH模型:
改变ARCH模型对残差方差的假设,使其成为ARMA模式,就可以得到GARCH模型;GARCH(p,q)模型的残差方差假设为:
σ x 2 = α 0 + α 1 ϵ x - 1 2 + . . . + α q ϵ x - q 2 + β 1 σ x - 1 2 + . . . + β p σ x - p 2 = α 0 + Σ i = 1 q α i ϵ x - i 2 + Σ j = 1 p β j σ x - j 2 - - - ( 4 )
其中,j=1,2,…,p,p、βj为参数,且βj≥0
估计方法:
假设当x≤0时,(均值、方差均为0);对于可由递归逼近,
σ ~ x 2 = α 0 + Σ i = 1 q α i ϵ ~ x - i 2 + Σ i = 1 p β i σ ~ x - i 2 - - - ( 5 )
这个表达式带入如下式所示的对数似然函数中,并将其最大化;
lgf ( ϵ n , . . . , ϵ 1 | ϵ 0 ) = - n 2 lg 2 π - 1 2 Σ x = 1 n ( lg σ x 2 + ϵ x 2 σ t 2 ) - - - ( 6 )
即得到极大似然估计的数值解εx
根据公式(2)-(6),得到εx的值,由公式(1)得到yx的值。
本发明的优点是:(申请人补充优点)
附图说明
图1为本发明方法的流程图。
具体实施方式
如图1所示,一种负荷修复及预测的方法,由一定时间内采集时点的负荷数据得到其负荷的变化情况,观察负荷的变化率,发现其呈现出一种时间序列的变化规律,采用GARCH模型得到缺失时点处的负荷变化率,并预测未来的负荷变化率,具体步骤如下:
S1:任意选取一个存在负荷缺失的采集点,该采集点每天的负荷数据中包含96个采集时点;
S2:选择该采集点t天的数据,则共有96t个采集时点,将所有采集点按照时间先后关系排成一行,作为坐标轴的横轴,每个时点的负荷作为纵轴;
S3:刻画出未缺失的负荷数据的变化率,然后采用GARCH模型预测缺失时点的负荷变化率,并且预测未来时间内负荷的变化情况;
S4:根据负荷变化率得到所需时点的负荷数据;具体公式如下:
εx=lg yx-lg yx-1    (1)
其中x表示采集时点的序数,x=1,2,…,96t-1,96t;yx表示x点处的负荷;εx为x点处的负荷变化率;
公式(1)中,yx-1为已知量,为了得到yx的值,需要求出εx
展开分析;
ARCH模型:
εx=σxzx   (2)
其中,εx为时间序列残差项,也即上述的负荷变化率,其被分成两部分,zx代表随机部分,σx代表时间决定项,满足:
σ x 2 = α 0 + α 1 ϵ x - 1 2 + . . . + α q ϵ x - q 2 = α 0 + Σ i = 1 q α i ϵ x - i 2 - - - ( 3 )
其中,i=1,2,…,q,q、α0、αi都为参数,且满足α0>0,αi≥0;
GARCH模型:
改变ARCH模型对残差方差的假设,使其成为ARMA模式,就可以得到GARCH模型;GARCH(p,q)模型的残差方差假设为:
σ x 2 = α 0 + α 1 ϵ x - 1 2 + . . . + α q ϵ x - q 2 + β 1 σ x - 1 2 + . . . + β p σ x - p 2 = α 0 + Σ i = 1 q α i ϵ x - i 2 + Σ j = 1 p β j σ x - j 2 - - - ( 4 )
其中,j=1,2,…,p,p、βj为参数,且βj≥0
估计方法:
假设当x≤0时,(均值、方差均为0);对于可由递归逼近,
σ ~ x 2 = α 0 + Σ i = 1 q α i ϵ ~ x - i 2 + Σ i = 1 p β i σ ~ x - i 2 - - - ( 5 )
这个表达式带入如下式所示的对数似然函数中,并将其最大化;
lgf ( ϵ n , . . . , ϵ 1 | ϵ 0 ) = - n 2 lg 2 π - 1 2 Σ x = 1 n ( lg σ x 2 + ϵ x 2 σ t 2 ) - - - ( 6 )
即得到极大似然估计的数值解εx
根据公式(2)-(6),得到εx的值,由公式(1)得到yx的值。

Claims (1)

1.一种负荷修复及预测的方法,其特征在于:由一定时间内采集时点的负荷数据得到其负荷的变化情况,观察负荷的变化率,发现其呈现出一种时间序列的变化规律,采用GARCH模型得到缺失时点处的负荷变化率,并预测未来的负荷变化率,具体步骤如下:
S1:任意选取一个存在负荷缺失的采集点,该采集点每天的负荷数据中包含96个采集时点;
S2:选择该采集点t天的数据,则共有96t个采集时点,将所有采集点按照时间先后关系排成一行,作为坐标轴的横轴,每个时点的负荷作为纵轴;
S3:刻画出未缺失的负荷数据的变化率,然后采用GARCH模型预测缺失时点的负荷变化率,并且预测未来时间内负荷的变化情况;
S4:根据负荷变化率得到所需时点的负荷数据;具体公式如下:
εx=lgyx-lgyx-1        (1)
其中x表示采集时点的序数,x=1,2,…,96t-1,96t;yx表示x点处的负荷;εx为x点处的负荷变化率;
公式(1)中,yx-1为已知量,为了得到yx的值,需要求出εx
展开分析;
ARCH模型:
εx=σxzx             (2)
其中,εx为时间序列残差项,也即上述的负荷变化率,其被分成两部分,zx代表随机部分,σx代表时间决定项,满足:
σ x 2 = α 0 + α 1 ϵ x - 1 2 + . . . + α q ϵ x - q 2 = α 0 + Σ i = 1 q α i ϵ x - i 2 - - - ( 3 )
其中,i=1,2,…,q,q、α0、αi都为参数,且满足α0>0,αi≥0;
GARCH模型:
改变ARCH模型对残差方差的假设,使其成为ARMA模式,就可以得到GARCH模型;GARCH(p,q)模型的残差方差假设为:
σ x 2 = α 0 + α 1 ϵ x - 1 2 + . . . + α q ϵ x - q 2 + β 1 σ x - 1 2 + . . . + β p σ x - p 2 = α 0 + Σ i = 1 q α i ϵ x - i 2 + Σ j = 1 p β j σ x - j 2
其中,j=1,2,…,p,p、βj为参数,且βj≥0
估计方法:
假设当x≤0时,(均值、方差均为0);对于可由递归逼近,
σ ~ x 2 = α 0 + Σ i = 1 q α i ϵ ~ x - i 2 + Σ i = 1 p β i σ ~ x - i 2 - - - ( 5 )
这个表达式带入如下式所示的对数似然函数中,并将其最大化;
lgf ( ϵ n , . . . , ϵ 1 | ϵ 0 ) = - n 2 lg 2 π - 1 2 Σ x = 1 n ( lg σ x 2 + ϵ x 2 σ t 2 ) - - - ( 6 )
即得到极大似然估计的数值解εx
根据公式(2)-(6),得到εx的值,由公式(1)得到yx的值。
CN201510263909.0A 2015-05-21 2015-05-21 一种负荷修复及预测的方法 Pending CN104834978A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510263909.0A CN104834978A (zh) 2015-05-21 2015-05-21 一种负荷修复及预测的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510263909.0A CN104834978A (zh) 2015-05-21 2015-05-21 一种负荷修复及预测的方法

Publications (1)

Publication Number Publication Date
CN104834978A true CN104834978A (zh) 2015-08-12

Family

ID=53812852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510263909.0A Pending CN104834978A (zh) 2015-05-21 2015-05-21 一种负荷修复及预测的方法

Country Status (1)

Country Link
CN (1) CN104834978A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818678A (zh) * 2017-10-27 2018-03-20 武汉大学 用于用电信息采集系统的实时在线修正方法及装置
CN109472111A (zh) * 2018-11-29 2019-03-15 重庆大学 一种基于arch模型的非线性结构损伤识别方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521674A (zh) * 2011-12-07 2012-06-27 福建省电力有限公司 电力用户用电信息采集系统中夏季短期负荷预测的计算机生成方法
CN102869033A (zh) * 2012-09-21 2013-01-09 西南交通大学 基于arma-arch模型族的gsm通信系统gprs数据业务的预测方法
CN103295075A (zh) * 2013-04-01 2013-09-11 沈阳航空航天大学 一种超短期电力负荷预测与预警方法
CN103633739A (zh) * 2013-11-28 2014-03-12 中国科学院广州能源研究所 一种微电网能量管理系统和方法
CN103745417A (zh) * 2014-01-27 2014-04-23 国家电网公司 一种电网负荷特征曲线分析方法
CN104504475A (zh) * 2014-12-24 2015-04-08 上海大学 基于ar*-svm混合建模的雾霾时间序列预测方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521674A (zh) * 2011-12-07 2012-06-27 福建省电力有限公司 电力用户用电信息采集系统中夏季短期负荷预测的计算机生成方法
CN102869033A (zh) * 2012-09-21 2013-01-09 西南交通大学 基于arma-arch模型族的gsm通信系统gprs数据业务的预测方法
CN103295075A (zh) * 2013-04-01 2013-09-11 沈阳航空航天大学 一种超短期电力负荷预测与预警方法
CN103633739A (zh) * 2013-11-28 2014-03-12 中国科学院广州能源研究所 一种微电网能量管理系统和方法
CN103745417A (zh) * 2014-01-27 2014-04-23 国家电网公司 一种电网负荷特征曲线分析方法
CN104504475A (zh) * 2014-12-24 2015-04-08 上海大学 基于ar*-svm混合建模的雾霾时间序列预测方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
王玉荣,万秋兰,陈昊: "基于两重门限GARCH模型的短期负荷预测", 《东南大学学报》 *
蒋雯倩: "面向负荷建模的变电站日负荷曲线在线分类方法及应用", 《中国优秀硕士学位论文全文数据库》 *
陈昊: "基于广义自回归条件异方差模型的负荷预测新方法", 《电力系统自动化》 *
陈昊: "基于非高斯分布GARCH模型的复核预测", 《电力自动化设备》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818678A (zh) * 2017-10-27 2018-03-20 武汉大学 用于用电信息采集系统的实时在线修正方法及装置
CN107818678B (zh) * 2017-10-27 2019-10-11 武汉大学 用于用电信息采集系统的实时在线修正方法及装置
CN109472111A (zh) * 2018-11-29 2019-03-15 重庆大学 一种基于arch模型的非线性结构损伤识别方法

Similar Documents

Publication Publication Date Title
Yang et al. Probabilistic short-term wind power forecast using componential sparse Bayesian learning
CN102779223B (zh) 短期电力负荷预测的方法及装置
Dong et al. Frequency prediction of power systems in FNET based on state-space approach and uncertain basis functions
CN105260803A (zh) 一种系统用电量预测方法
KR102482043B1 (ko) 소규모 이력 데이터에서 냉방부하를 예측하기 위한 학습 방법 및 장치
CN102426674A (zh) 一种基于马尔科夫链的电力系统负荷预测方法
CN103413253A (zh) 一种基于经济、气象因素的年最大负荷分类预测方法
CN109461091B (zh) 考虑光伏和冷负荷相关性的用电负荷计算方法及信息系统
CN104537429A (zh) 一种基于数据仓库与数据挖掘技术的短期负荷预测方法及装置
CN103606022A (zh) 一种短期负荷预测方法
CN107748972A (zh) 一种基于双能源指标预测全社会用电量的方法
CN111008727A (zh) 一种配电台区负荷预测方法及装置
CN104361233A (zh) 分布式电源入网情况下的反窃电管理方法
CN107862391A (zh) 一种基于云计算的设备运行状况测试系统
CN116303391A (zh) 一种智能电表远传电能时间序列数据的处理方法
CN110673081B (zh) 基于边缘计算的智能电表误差在线估计方法
CN104899435A (zh) 计及零注入约束的电力系统动态状态估计方法
CN112653241A (zh) 电网监测方法和装置、物联计量单元
CN204557190U (zh) 基于物联网技术的小麦加工过程能耗监测系统
CN106529747A (zh) 一种基于大数据的电力负荷预测方法与系统
CN104834978A (zh) 一种负荷修复及预测的方法
CN108154259B (zh) 热泵的负荷预测方法及装置、存储介质、处理器
CN105574325A (zh) 一种结合人口指标的中长期用电量预测方法
CN104252647A (zh) 基于反距离权重插值法的用电负荷预测方法
CN105242610A (zh) 一种接地线监管系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xiao Jianhong

Inventor after: Dong Yu

Inventor after: Li Jingtao

Inventor after: Li Chunsheng

Inventor after: Chen Chi

Inventor after: Sun Guangzhong

Inventor after: Mai Hongkun

Inventor after: Zhao Yonghong

Inventor after: Zhuang Lei

Inventor before: Wang Wenhong

Inventor before: Dong Yu

Inventor before: Li Jingtao

Inventor before: Xiao Jianhong

Inventor before: Li Chunsheng

Inventor before: Chen Chi

Inventor before: Sun Guangzhong

Inventor before: Mai Hongkun

Inventor before: Zhao Yonghong

COR Change of bibliographic data
CB03 Change of inventor or designer information

Inventor after: Xiao Jianhong

Inventor after: Dong Yu

Inventor after: Li Jingtao

Inventor after: Zhao Yonghong

Inventor after: Chen Jiageng

Inventor after: Li Chunsheng

Inventor after: Chen Chi

Inventor after: Mai Hongkun

Inventor after: Zhuang Lei

Inventor before: Xiao Jianhong

Inventor before: Dong Yu

Inventor before: Li Jingtao

Inventor before: Li Chunsheng

Inventor before: Chen Chi

Inventor before: Sun Guangzhong

Inventor before: Mai Hongkun

Inventor before: Zhao Yonghong

Inventor before: Zhuang Lei

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20150812

RJ01 Rejection of invention patent application after publication