CN104831292A - Heat treatment technique for steel tie rod ends - Google Patents

Heat treatment technique for steel tie rod ends Download PDF

Info

Publication number
CN104831292A
CN104831292A CN201510241462.7A CN201510241462A CN104831292A CN 104831292 A CN104831292 A CN 104831292A CN 201510241462 A CN201510241462 A CN 201510241462A CN 104831292 A CN104831292 A CN 104831292A
Authority
CN
China
Prior art keywords
steel rod
temperature
incubated
steel tie
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510241462.7A
Other languages
Chinese (zh)
Inventor
吴光英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510241462.7A priority Critical patent/CN104831292A/en
Publication of CN104831292A publication Critical patent/CN104831292A/en
Pending legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Forging (AREA)

Abstract

The invention provides a heat treatment technique for steel tie rod ends. The heat treatment technique comprise the steps: heating a forged steel tie rod to 980 DEG C and holding the temperature for 1-2 hours; cooling with oil the temperature is lower than or equal to 100 DEG C, then re-heating the steel tie rod to 700-720 DEG C and holding the temperature for 2 hours, and then performing water cooling; after performing a tempering process, heating the head of the steel tie rod to 330-370 DEG C, holding the temperature for 4-5 hours, performing a spraying cooling process, heating the tail of the steel tie rod to 920-1000 DEG C, holding the temperature for 6-8 hours, and then performing air cooling. According to the heat treatment technique for the steel tie rod ends, the whole structure is scientific and reasonable; in use, when different types of steel tie rods different in length are produced due to the suitability of regulating different types, a shaft head only needs to be heated to a temperature required by the technique once, the steel tie rods can be formed at one time; therefore, the problems of multiple heating and multiple forging in the traditional technique are reduced.

Description

A kind of Steel Rod termination thermal treatment process
Technical field
The present invention relates to a kind of Steel Rod termination thermal treatment process, belong to casting technology field.
Background technology
Engine steel pull bar is as important moving parts, and design requirements is high, simultaneously because of Steel Rod operating mode and severe, thus requires very strict to Steel Rod material, Steel Rod dimensional precision, surfaceness, thermal treatment and surface strengthening, transient equilibrium etc.Under the condition produced in enormous quantities, traditional technology can not meet current design and Production requirement, long-time, run up under, as easy as rolling off a log too early appearances of Steel Rod was lost efficacy or ruptured, and had a strong impact on life-span and the whole aircraft reliability of Steel Rod.
Summary of the invention
The invention provides a kind of Steel Rod termination thermal treatment process, the above defect can be overcome.
For solving above technical problem, the invention provides following technical scheme: a kind of Steel Rod termination thermal treatment process, comprises the following steps:
A, thermal treatment
Steel Rod after forging is heated to 980 DEG C and is incubated 1-2h, and oil cooling is to higher than reheating the temperature range to 700 DEG C-720 DEG C after 100 DEG C and being incubated 2h, water-cooled afterwards; After temper, again the head of Steel Rod is heated to 330-370 DEG C, insulation 4-5 hour, then spray cooling process, the afterbody of Steel Rod, at 920-1000 DEG C, is incubated 6-8 hour, then air cooling, heating to temperature in the middle part of last Steel Rod is again 160 ~ 180 DEG C, and insulation 2-3 hour, puts into iron case cooling in heap;
B, bonderizing, be 280-300 DEG C by workpiece at showing tremendous enthusiasm closure temperature at normal temperatures, employing pH value is the surface conditioner process 1-2min of 8, after dripping empty 1-2min, adopt phosphorization agent process 15-20min, then after dripping empty 1-2min, adopt clean water 1-2min, after dripping empty 1-2min again, process 0.5-1min with hot water workpiece being placed in 80-90 DEG C;
C, by the workpiece Shot Blasting after bonderizing;
The head of the Steel Rod after Shot Blasting is heated to 350 DEG C, is incubated 4.5 hours, then spray cooling process, the afterbody of Steel Rod, at 990 DEG C, is incubated 7 hours, then air cooling, heating to temperature in the middle part of last Steel Rod is again 170 DEG C, is incubated 2.5 hours, puts into iron case cooling in heap.
Steel Rod termination provided by the invention thermal treatment process, one-piece construction is scientific and reasonable, during use, only need by the Steel Rod of different model, according to length, owing to having the adaptability of adjustable different model, during production, only once spindle nose need be heated to technique temperature required, just can once shaped, thus, the traditional technology trouble decreasing heating for multiple times and repeatedly forge.
Embodiment
A kind of Steel Rod termination thermal treatment process, comprises the following steps:
A, thermal treatment
Steel Rod after forging is heated to 980 DEG C and is incubated 1-2h, and oil cooling is to higher than reheating the temperature range to 700 DEG C-720 DEG C after 100 DEG C and being incubated 2h, water-cooled afterwards; After temper, again the head of Steel Rod is heated to 330-370 DEG C, insulation 4-5 hour, then spray cooling process, the afterbody of Steel Rod, at 920-1000 DEG C, is incubated 6-8 hour, then air cooling, heating to temperature in the middle part of last Steel Rod is again 160 ~ 180 DEG C, and insulation 2-3 hour, puts into iron case cooling in heap;
B, bonderizing, be 280-300 DEG C by workpiece at showing tremendous enthusiasm closure temperature at normal temperatures, employing pH value is the surface conditioner process 1-2min of 8, after dripping empty 1-2min, adopt phosphorization agent process 15-20min, then after dripping empty 1-2min, adopt clean water 1-2min, after dripping empty 1-2min again, process 0.5-1min with hot water workpiece being placed in 80-90 DEG C;
C, by the workpiece Shot Blasting after bonderizing;
The head of the Steel Rod after Shot Blasting is heated to 350 DEG C, is incubated 4.5 hours, then spray cooling process, the afterbody of Steel Rod, at 990 DEG C, is incubated 7 hours, then air cooling, heating to temperature in the middle part of last Steel Rod is again 170 DEG C, is incubated 2.5 hours, puts into iron case cooling in heap.
Steel Rod termination provided by the invention thermal treatment process, one-piece construction is scientific and reasonable, during use, only need by the Steel Rod of different model, according to length, owing to having the adaptability of adjustable different model, during production, only once spindle nose need be heated to technique temperature required, just can once shaped, thus, the traditional technology trouble decreasing heating for multiple times and repeatedly forge.
Embodiment of the present invention does not form the restriction to the application's scope; within every spirit in the present invention's design and principle, any amendment that one of skill in the art can make, equivalent to replace and improvement etc. all should be included within protection scope of the present invention.

Claims (1)

1. a Steel Rod termination thermal treatment process, is characterized in that, comprises the following steps:
A, thermal treatment
Steel Rod after forging is heated to 980 DEG C and is incubated 1-2h, and oil cooling is to higher than reheating the temperature range to 700 DEG C-720 DEG C after 100 DEG C and being incubated 2h, water-cooled afterwards; After temper, again the head of Steel Rod is heated to 330-370 DEG C, insulation 4-5 hour, then spray cooling process, the afterbody of Steel Rod, at 920-1000 DEG C, is incubated 6-8 hour, then air cooling, heating to temperature in the middle part of last Steel Rod is again 160 ~ 180 DEG C, and insulation 2-3 hour, puts into iron case cooling in heap;
B, bonderizing, be 280-300 DEG C by workpiece at showing tremendous enthusiasm closure temperature at normal temperatures, employing pH value is the surface conditioner process 1-2min of 8, after dripping empty 1-2min, adopt phosphorization agent process 15-20min, then after dripping empty 1-2min, adopt clean water 1-2min, after dripping empty 1-2min again, process 0.5-1min with hot water workpiece being placed in 80-90 DEG C;
C, by the workpiece Shot Blasting after bonderizing;
The head of the Steel Rod after Shot Blasting is heated to 350 DEG C, is incubated 4.5 hours, then spray cooling process, the afterbody of Steel Rod, at 990 DEG C, is incubated 7 hours, then air cooling, heating to temperature in the middle part of last Steel Rod is again 170 DEG C, is incubated 2.5 hours, puts into iron case cooling in heap.
CN201510241462.7A 2015-05-13 2015-05-13 Heat treatment technique for steel tie rod ends Pending CN104831292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510241462.7A CN104831292A (en) 2015-05-13 2015-05-13 Heat treatment technique for steel tie rod ends

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510241462.7A CN104831292A (en) 2015-05-13 2015-05-13 Heat treatment technique for steel tie rod ends

Publications (1)

Publication Number Publication Date
CN104831292A true CN104831292A (en) 2015-08-12

Family

ID=53809481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510241462.7A Pending CN104831292A (en) 2015-05-13 2015-05-13 Heat treatment technique for steel tie rod ends

Country Status (1)

Country Link
CN (1) CN104831292A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106756438A (en) * 2016-12-05 2017-05-31 安徽永川电气设备有限公司 A kind of AC low-tension switch cabinet preparation
CN106764175A (en) * 2016-12-27 2017-05-31 怀宁县鑫泰钢结构有限公司 A kind of anti-dropout metal hose joint

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886646A (en) * 2012-09-11 2013-01-23 昌利锻造有限公司 Process for forging end head of electric upset steel pull rod
EP2596902A1 (en) * 2011-11-28 2013-05-29 General Electric Company Method for decarburization of a rotor forging
CN104480477A (en) * 2014-11-20 2015-04-01 海盐汇联通用配件有限公司 Production process of corrosion-resistant high-strength hexagon bolts

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2596902A1 (en) * 2011-11-28 2013-05-29 General Electric Company Method for decarburization of a rotor forging
CN102886646A (en) * 2012-09-11 2013-01-23 昌利锻造有限公司 Process for forging end head of electric upset steel pull rod
CN104480477A (en) * 2014-11-20 2015-04-01 海盐汇联通用配件有限公司 Production process of corrosion-resistant high-strength hexagon bolts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106756438A (en) * 2016-12-05 2017-05-31 安徽永川电气设备有限公司 A kind of AC low-tension switch cabinet preparation
CN106764175A (en) * 2016-12-27 2017-05-31 怀宁县鑫泰钢结构有限公司 A kind of anti-dropout metal hose joint

Similar Documents

Publication Publication Date Title
US6127044A (en) Method for producing titanium alloy turbine blades and titanium alloy turbine blades
CN103849746A (en) Thermal treatment process for 40CrNiMoA core rod and 40CrNiMoA core rod obtained through process
CN101285113B (en) Control method for quenching buckling distortion of elongated metal shear-blade
CN104128750A (en) Torsion rod spring manufacturing technology
CN104372148A (en) Heat treatment process of bearing steel
CN102965576B (en) Preparation method of pump shaft of oil feed pump
CN104791564A (en) C276 Hastelloy alloy flange and production technology thereof
CN104831292A (en) Heat treatment technique for steel tie rod ends
CN105441844B (en) A kind of extrusion blooming method of male sportsman ingot casting
CN102989983A (en) Forging method of automobile engine crankshaft
CN104226722A (en) Machining method of TB3 bar for aerospace electric explosion valve
CN104694861A (en) Forging and thermal treatment method of GH4169G alloy
CN106435404A (en) Low wind speed wind power unit low-carbon alloy steel wind power main shaft manufacturing method
CN106435405A (en) 42CrMo4 wind power main shaft after-forging heat treatment method of low-wind-speed wind turbine generator
CN102886646A (en) Process for forging end head of electric upset steel pull rod
CN111451425B (en) Forging method for controlling white point defect
CN106425285A (en) 34CrNiMo6 wind power main shaft forging forming method for low wind speed wind turbine set
CN102994906B (en) A kind of method of ball valve body
CN104889680A (en) Steel tie rod end socket manufacturing technology
CN110079753A (en) A kind of forging method for eliminating TiAl alloy remnants lamella
CN109261865A (en) A kind of quasi- β forging deformation control method of TC18 titanium alloy die forging part
CN110306014A (en) A kind of electric motor shaft forgeable piece normalizing and tempering process
CN109182689A (en) A kind of axle journal class precision forged blade fixture of heat treatment and heat treatment process
CN102936693B (en) Drawing die mold steel processing method
CN103846635A (en) Forging method for automotive engine crankshaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150812