CN104816497B - A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage - Google Patents

A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage Download PDF

Info

Publication number
CN104816497B
CN104816497B CN201510207215.5A CN201510207215A CN104816497B CN 104816497 B CN104816497 B CN 104816497B CN 201510207215 A CN201510207215 A CN 201510207215A CN 104816497 B CN104816497 B CN 104816497B
Authority
CN
China
Prior art keywords
pressure equipment
manual pressure
rocking bar
ratchet
cuff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510207215.5A
Other languages
Chinese (zh)
Other versions
CN104816497A (en
Inventor
薛勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201510207215.5A priority Critical patent/CN104816497B/en
Publication of CN104816497A publication Critical patent/CN104816497A/en
Application granted granted Critical
Publication of CN104816497B publication Critical patent/CN104816497B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage, comprising Manual pressure equipment, the Manual pressure equipment is connected with Manual pressure equipment support, the Manual pressure equipment manually pressure equipment Stent Implantation on Manual pressure equipment bearing, and can move along Manual pressure equipment bearing, the Manual pressure equipment connects Manual pressure equipment push rod, manually pressure equipment push rod holds out against sealing cuff to the Manual pressure equipment, so as to compress rubber water-proof bar, the treating seepage to wall pipe is completed.The present invention can more conveniently and effectively to carrying out improvement maintenance to underground chamber wall pipe seepage.

Description

A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage
Technical field
The present invention relates to a kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage.
Background technology
Underground chamber include underground transportation facilities such as tunnel and industry and civil buildings basement etc. be required to arrange power supply, The pipelines such as plumbing, pipeline are both needed to pass through the embedded wall pipe of underground chamber wallboard requirement, often have underground water edge to wear during use Wall coil permeates the ground cavern, and needs take measures to be administered, and have some administering methods at present, and general conventional improvement is through walls The design period of service of the materials'use life-span of pipe seepage far fewer than underground traffic tunnels etc., the normal maintenances of Jing are needed, and is keeped in repair Process is not numerous and diverse convenient.
The content of the invention
The present invention provides a kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage, more convenient can have Effect ground is to carrying out improvement maintenance to underground chamber wall pipe seepage.
In order to achieve the above object, the present invention provides a kind of Manual pressure equipment for administering underground chamber wall pipe seepage and sets Standby, comprising Manual pressure equipment, the Manual pressure equipment is connected with Manual pressure equipment support, and the Manual pressure equipment passes through hand Dynamic pressure equipment Stent Implantation is on Manual pressure equipment bearing, and can move along Manual pressure equipment bearing, the Manual pressure Equipment connects Manual pressure equipment push rod, and manually pressure equipment push rod holds out against sealing cuff to the Manual pressure equipment, so as to Rubber water-proof bar is compressed, the treating seepage to wall pipe is completed;
Described Manual pressure equipment is included:
Main shaft;
Ratchet, which is fixedly installed on main shaft;
Rocking bar, which is arranged on main shaft, can be rotated around the spindle;
Ratchet, its contact ratchet, and be fixedly connected with the rockers;
Shell, which is set on main shaft, is wrapped ratchet and pawl, and is connected with rocking bar and ratchet.
The Manual pressure equipment equipment of described improvement underground chamber wall pipe seepage is also included:
Handle, its connection rocking bar;
Rocking bar limit assembly;
Ratchet positioning and and rocking bar fixation kit;
And, shell fixation kit.
Described ratchet is included:
Ratchet body;
Ratchet through hole, which is located on Ratchet body, for through main shaft;
Limiting through hole, which is located on Ratchet body, and it is spacing which is used for rocking bar.
Described ratchet is included:
Ratchet body;
Ratchet button, is exposed to outside shell;
Ratchet spring tongue, which is located in ratchet body, is provided with ratchet spring;
Ratchet through hole, which is located in ratchet body, for through ratchet positioning and and rocking bar fixation kit.
Described main shaft is included:
Spindle main body;
Pressure equipment support alignment pin, which is located in spindle main body, for positioning Manual pressure equipment support;
Ratchet alignment pin, which is located in spindle main body, for fixed ratchet wheel;
Main shaft clamp nut, which is threadedly coupled with spindle main body, for compressing Manual pressure equipment support.
Described shell includes embedded shell and outer envelope;
Described embedded shell is included:
Embedded shell main body;
Rocking bar spacing hole, which is located in embedded shell main body, spacing for rocking bar;
Shell fixing hole, which is located in embedded shell main body, fixes for shell;
Embedded shell through hole, which is located in embedded shell main body, for through main shaft;
Described outer envelope is included:
Outer envelope main body;
Outer envelope link bolt hole, which is located in outer envelope main body, fixes for shell;
Outer envelope through hole, which is located in outer envelope main body, for through main shaft.
Described rocking bar is included:
Rocking bar connecting portion, its connection main shaft;
Rocker upper arm, its connection rocking bar connecting portion, for connected with outer casing and ratchet;
Rocker lower arm, its connection rocking bar connecting portion, for connecting Manual pressure equipment push rod;
Described rocking bar connecting portion is included:Bearing, wherein with rocking bar through hole, for through main shaft(1-5);
Described rocker upper arm is included:
Rocking bar rotary spacing bolt hole, it is spacing for rocking bar;
Ratchet positions simultaneous and rocking bar fixed bolt hole, fixes for ratchet positioning and with rocking bar;
Handle socket, for connecting handle;
Described rocker lower arm is included:Push rod jack, for connecting Manual pressure equipment push rod.
Described handle is included:
Handle main body;
Handle plug, which is arranged on handle main body lower end, for inserting handle socket.
Described rocking bar limit assembly is included:
Rocking bar rotary spacing bolt, which passes through rocking bar rotary spacing bolt hole and rocking bar spacing hole;
Rocking bar rotary spacing nut, which is connected with rocking bar rotary spacing bolt thread.
Described ratchet positioning is simultaneous to be included with rocking bar fixation kit:
Ratchet positions simultaneous and rocking bar fixing bolt, and which passes through ratchet positioning and and rocking bar fixed bolt hole, shell fixing hole With outer envelope link bolt hole;
Limit casing, which is set in ratchet and positions on simultaneous and rocking bar fixing bolt;
Shell and rocking bar attaching nut, which is positioned and is threadedly coupled with rocking bar fixing bolt with ratchet.
Described shell fixation kit is included:
Cage connection bolt, which passes through outer envelope link bolt hole and shell fixing hole;
Limit casing, which is set on cage connection bolt;
Outer envelope attaching nut, which is connected with cage connection bolt thread.
Described Manual pressure equipment support casing is located on the main shaft of Manual pressure equipment, the Manual pressure equipment support bag Contain:
Base plate, its connection Manual pressure equipment bearing, can move along Manual pressure equipment bearing;
Pole, which is fixedly connected base plate;
Axle sleeve, which is fixedly connected pole, for through main shaft;
Axle sleeve cotter way, which is arranged in axle sleeve, and the axle sleeve cotter way is matched with the pressure equipment support alignment pin on main shaft, is used In positioning Manual pressure equipment support.
In the push rod jack of the rocking bar of described Manual pressure equipment push rod insertion Manual pressure equipment, the hand press Tool push rod is included:
Push rod main body;
Push rod plug, which is arranged on the lower end of push rod main body, for inserting in the push rod jack of rocking bar;
Push rod comes directly towards, and which is arranged on the upper end of push rod main body, for holding out against sealing cuff.
Described Manual pressure equipment bearing is included:
Cuff in bearing, which is used to be set in wall pipe;In the bearing, cuff can be manufactured using engineering plastics, its internal diameter Alterable is adapting to the pipeline of various outer diameter;
The outer cuff of bearing, which is arranged and is fixed in bearing outside cuff;
In described bearing, cuff is included:
Cuff main body in bearing;
Cuff frictional resistance rubber strip in bearing, which is embedded in and is arranged in bearing in the inboard groove of cuff main body, for increasing Frictional force, prevents slip between Manual pressure equipment bearing and wall pipe;
The outer cuff of described bearing is included:
The outer cuff main body of bearing;
Deep floor, which is arranged in the outer cuff main body of bearing, for strengthening the intensity of the outer cuff of bearing;
The outer cuff of bearing holds bolt tightly, and which is arranged in the outer cuff main body of bearing, for adjusting the elastic of the outer cuff of bearing Degree;
The outer cuff connecting portion of bearing, which is arranged in the outer cuff main body of bearing, for connecting Manual pressure equipment support.
Described sealing cuff is included:
Cuff main body, wherein with through hole, for being set in wall pipe;
Cuff projection ring flat-plate, which is arranged on cuff body top;
Cuff frictional resistance rubber strip, which is embedded in and is arranged in the through-hole wall groove of cuff main body, for increasing frictional force, prevents Sliding stop;
Cuff holds bolt tightly, and which is arranged in cuff main body, for adjusting the elasticity of sealing cuff.
Described rubber water-proof bar is wedge shaped, and the rubber water-proof bar is included:
Pore, wherein filling with sealant;
Flange, seals.
The present invention can more conveniently and effectively to carrying out improvement maintenance to underground chamber wall pipe seepage.
Description of the drawings
Fig. 1 is that a kind of structure of the Manual pressure equipment equipment of improvement underground chamber wall pipe seepage that the present invention is provided is shown It is intended to.
Fig. 2 is the structural representation of Manual pressure equipment in the present invention.
Fig. 3 be in Fig. 2 K-K to sectional view.
Fig. 4 is the structural representation of ratchet in Manual pressure equipment.
Fig. 5 be in Fig. 4 A-A to sectional view.
Fig. 6 is the structural representation of ratchet in Manual pressure equipment.
Fig. 7 is the sectional view of B-B direction in Fig. 6.
Fig. 8 is the front view of main shaft in Manual pressure equipment.
Fig. 9 is the top view of main shaft.
Figure 10 be in Fig. 8 H-H to sectional view.
Figure 11 be in Fig. 8 J-J to sectional view.
Figure 12 is the structural representation for embedding shell in Fig. 3 in Manual pressure equipment.
Figure 13 be in Figure 12 C-C to sectional view.
Figure 14 is the partial enlarged drawing in Figure 13.
Figure 15 is the structural representation of Manual pressure equipment China and foreign countries involucrum in Fig. 3.
Figure 16 be in Figure 15 D-D to sectional view.
Figure 17 is the structural representation of rocking bar in Manual pressure equipment.
Figure 18 be in Figure 17 E-E to sectional view.
Figure 19 is the structural representation of handle in Manual pressure equipment.
Figure 20 is the profile of handle in Manual pressure equipment.
Figure 21 is the sectional view of limit casing in Manual pressure equipment.
Figure 22 is the side view of limit casing in Manual pressure equipment.
Figure 23 is the sectional view of Manual pressure equipment support in Fig. 3.
Figure 24 be in Figure 23 G-G to sectional view.
Figure 25 be in Figure 23 F-F to sectional view.
Figure 26 is the front view of Manual pressure equipment push rod.
Figure 27 is the side sectional view of Manual pressure equipment push rod.
Figure 28 is the installation exemplary steps figure of each part in Manual pressure equipment.
Figure 29 is the side sectional view of Manual pressure equipment bearing.
Figure 30 is the top view of Manual pressure equipment bearing.
Figure 31 is the side sectional view of cuff in the bearing of Manual pressure equipment bearing.
Figure 32 is the top view of cuff in the bearing of Manual pressure equipment bearing.
Figure 33 is the side sectional view of the outer cuff of bearing of Manual pressure equipment bearing.
Figure 34 is the top view and partial sectional view of the outer cuff of bearing of Manual pressure equipment bearing.
Figure 35 is the side view of sealing cuff.
Figure 36 is the top view and partial sectional view of sealing cuff.
Figure 37 is the profile of rubber water-proof bar.
Figure 38 is the finished product structure schematic diagram of rubber water-proof bar.
Specific embodiment
Below according to Fig. 1~Figure 38, presently preferred embodiments of the present invention is illustrated.
As shown in figure 1, the present invention provides a kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage, comprising Manual pressure equipment 1, the Manual pressure equipment 1 are connected with Manual pressure equipment support 2, and the Manual pressure equipment 1 is manually Pressure equipment support 2 is placed on Manual pressure equipment bearing 4, and can be moved along Manual pressure equipment bearing 4, the Manual pressure The connection Manual pressure equipment of equipment 1 push rod 3, manually pressure equipment push rod 3 holds out against sealing cuff 5 to the Manual pressure equipment 1, So as to compress rubber water-proof bar 6, the treating seepage to wall pipe 8 is completed.
As shown in Fig. 2, Fig. 3 and Figure 28, described Manual pressure equipment 1 is included:
Main shaft 1-5;
Ratchet 1-1, which is fixedly installed on main shaft 1-5;
Rocking bar 1-4, which is arranged on main shaft 1-5, can be rotated around main shaft 1-5;
Ratchet 1-2, its contact ratchet 1-1, and be fixedly connected with rocking bar 1-4;
Shell 1-6, which is set on main shaft 1-5, wraps ratchet 1-1 and ratchet 1-2, and with rocking bar 1-4 and ratchet 1-2 Connection;
Handle 1-7, its connection rocking bar 1-4.
Described Manual pressure equipment 1 is also comprising rocking bar limit assembly, simultaneous ratchet positioning and rocking bar fixation kit and outward Shell fixation kit.
As shown in Figure 4 and Figure 5, described ratchet 1-1 is included:
Ratchet body 1-1-3;
Ratchet through hole 1-1-1, which is located on Ratchet body 1-1-3, for through main shaft 1-5;
Limiting through hole 1-1-2, which is located on Ratchet body 1-1-3, and it is spacing which is used for rocking bar.
As shown in Figure 6 and Figure 7, described ratchet 1-2 is included:
Ratchet body 1-2-4;
Ratchet button 1-2-1, is exposed to outside shell 1-6;
Ratchet spring tongue 1-2-2, which is located in ratchet body 1-2-4, is provided with ratchet spring 1-10;
Ratchet through hole 1-2-3, which is located in ratchet body 1-2-4, for through ratchet positioning and and rocking bar fixing bolt 1-3-1。
As shown in Fig. 8~Figure 11, Figure 28, described main shaft 1-5 is included:
Spindle main body 1-5-4;
Pressure equipment support alignment pin 1-5-1, which is located in spindle main body 1-5-4, for positioning Manual pressure equipment Frame 2;
Ratchet alignment pin 1-5-2, which is located in spindle main body 1-5-4, for fixed ratchet wheel 1-2;
Main shaft clamp nut 1-5-3, which is threadedly coupled with spindle main body 1-5-4, for compressing Manual pressure equipment support 2。
As shown in Fig. 3 and Figure 28, described shell 1-6 is comprising embedded shell 1-6-1 and outer envelope 1-6-2.
As shown in figure 12, described embedded shell 1-6-1 is included:
Embedded shell main body 1-6-10;
Rocking bar spacing hole 1-6-6, which is located in embedded shell main body 1-6-10, spacing for rocking bar;
Shell fixing hole 1-6-7, which is located in embedded shell main body 1-6-10, fixes for shell;
Embedded shell through hole 1-6-8, which is located in embedded shell main body 1-6-10, for through main shaft 1-5.
As shown in Figure 15 and Figure 16, described outer envelope 1-6-2 is included:
Outer envelope main body 1-6-11;
Outer envelope link bolt hole 1-6-5, which is located in outer envelope main body 1-6-11, fixes for shell;
Outer envelope through hole 1-6-9, which is located in outer envelope main body 1-6-11, for through main shaft 1-5.
As shown in Figure 17 and Figure 18, described rocking bar 1-4 is included:
Rocking bar connecting portion 1-4-7, its connection main shaft 1-5;
Rocker upper arm 1-4-8, its connection rocking bar connecting portion 1-4-7, for connected with outer casing 1-6 and ratchet 1-2;
Rocker lower arm 1-4-9, its connection rocking bar connecting portion 1-4-7, for connecting Manual pressure equipment push rod 3.
Described rocking bar connecting portion 1-4-7 is included:Bearing 1-4-1, wherein with rocking bar through hole 1-4-6, for through master Axle 1-5 and with main shaft 1-5 close-fittings.
Described rocker upper arm 1-4-8 is included:
Rocking bar rotary spacing bolt hole 1-4-2, it is spacing for rocking bar;
Ratchet positions simultaneous and rocking bar fixed bolt hole 1-4-3, fixes for ratchet positioning and with rocking bar;
Handle socket 1-4-4, for connecting handle 1-7.
Described rocker lower arm 1-4-9 is included:Push rod jack 1-4-5, for connecting Manual pressure equipment push rod 3.
As illustrated in figures 19 and 20, described handle 1-7 is included:
Handle main body 1-7-2;
Handle plug 1-7-1, which is arranged on handle main body 1-7-2 lower end, for inserting handle socket 1-4-4.
As shown in Fig. 3, Figure 13, Figure 14 and Figure 28, described rocking bar limit assembly is included:
Rocking bar rotary spacing bolt 1-8, which passes through rocking bar rotary spacing bolt hole 1-4-2 and rocking bar spacing hole 1-6-6;
Rocking bar rotary spacing nut 1-6-4, which is threadedly coupled with rocking bar rotary spacing bolt 1-8.
Described ratchet positioning is simultaneous to be included with rocking bar fixation kit:
Ratchet positioning and with rocking bar fixing bolt 1-3-1, its pass through ratchet positioning and with rocking bar fixed bolt hole 1-4-3, Shell fixing hole 1-6-7 and outer envelope link bolt hole 1-6-5;
Limit casing 1-9-1(As shown in figure 21 and figure), which is set in ratchet positioning and and rocking bar fixing bolt 1-3-1 On;
Shell and rocking bar attaching nut 1-3-2, which is positioned and is threadedly coupled with rocking bar fixing bolt 1-3-1 with ratchet.
As shown in Figure 13, Figure 14, described shell fixation kit is included:
Cage connection bolt 1-9-2, which passes through outer envelope link bolt hole 1-6-5 and shell fixing hole 1-6-7;
Limit casing 1-9-1(As shown in figure 21 and figure), which is set on cage connection bolt 1-9-2;
Outer envelope attaching nut 1-6-3, which is threadedly coupled with cage connection bolt 1-9-2.
As shown in Fig. 2, Fig. 3, Figure 23~Figure 25, Figure 28, described Manual pressure equipment support 2 is set in hand press On the main shaft 1-5 of tool 1, the Manual pressure equipment support 2 is included:
Base plate 2-1-1, its connection Manual pressure equipment bearing 4, can move along Manual pressure equipment bearing 4;
Pole 2-1, which is fixedly connected base plate 2-1-1;
Axle sleeve 2-1-2, which is fixedly connected pole 2-1, for through main shaft 1-5;
Axle sleeve cotter way 2-1-3, which is arranged in axle sleeve 2-1-2, the forcing press on the axle sleeve cotter way 2-1-3 and main shaft 1-5 Tool support alignment pin 1-5-1 matchings, for positioning Manual pressure equipment support 2.
As shown in Fig. 2, Fig. 3, Figure 26 and Figure 27, described Manual pressure equipment push rod 3 inserts shaking for Manual pressure equipment 1 In the push rod jack 1-4-5 of bar 1-4, the Manual pressure equipment push rod 3 is included:
Push rod main body 3-3;
Push rod plug 3-1, which is arranged on the lower end of push rod main body 3-3, for inserting the push rod jack 1-4-5 of rocking bar 1-4 In;
Push rod comes directly towards 3-2, and which is arranged on the upper end of push rod main body 3-3, for holding out against sealing cuff 5.
As shown in Figure 29 and Figure 30, described Manual pressure equipment bearing 4 is included:
Cuff 4-1 in bearing, which is used to be set in wall pipe 8;In the bearing, cuff 4-1 can adopt engineering plastics system Make, its internal diameter alterable is adapting to the pipeline of various outer diameter;
The outer cuff 4-3 of bearing, which is arranged and is fixed in bearing outside cuff 4-1.
As shown in Figure 29~Figure 32, in described bearing, cuff 4-1 is included:
Cuff main body 4-1-1 in bearing;
Cuff frictional resistance rubber strip 4-2 in bearing, which is embedded in and is arranged in bearing in the inboard groove of cuff main body 4-1-1, For increasing frictional force, prevent between Manual pressure equipment bearing 4 and wall pipe 8, slip.
As shown in Figure 29, Figure 30, Figure 33 and Figure 34, the outer cuff 4-3 of described bearing is included:
Outer cuff main body 4-6 of bearing;
Deep floor 4-4, which is arranged in outer cuff main body 4-6 of bearing, for strengthening the intensity of the outer cuff 4-3 of bearing;
The outer cuff of bearing holds bolt 4-5 tightly, and which is arranged in outer cuff main body 4-6 of bearing, for adjusting the outer cuff of bearing The elasticity of 4-3;
The outer cuff connecting portion 4-7 of bearing, which is arranged in outer cuff main body 4-6 of bearing, for connecting Manual pressure equipment Support 2.
As shown in Fig. 1, Figure 35 and Figure 36, described sealing cuff 5 is included:
Cuff main body 5-4, wherein with through hole, for being set in wall pipe 8;
Cuff projection ring flat-plate 5-1, which is arranged at the top of cuff main body 5-4;
Cuff frictional resistance rubber strip 5-2, which is embedded in and is arranged in the through-hole wall groove of cuff main body 5-4, rubs for increasing Wipe power, anti-sliding stop;
Cuff holds bolt 5-3 tightly, and which is arranged in cuff main body 5-4, for adjusting the elasticity of sealing cuff 5.
As shown in Figure 37 and Figure 38, described rubber water-proof bar 6 is wedge shaped, and the rubber water-proof bar 6 is included:
Pore 6-1, wherein filling with sealant;
Flange 6-2, seals.
In the present embodiment, ratchet 1-1 and ratchet 1-2 adopts steelwork, and ratchet button 1-2-1 can adopt engineering plastics, main Axle 1-5 adopts steelwork, shell 1-6 to adopt sheet metal, rocking bar 1-4 to adopt steelwork and weld to be formed, and bearing 1-4-1 is using mark Quasi- product, Manual pressure equipment support 2 adopt steelwork and weld to be formed, and pressure equipment push rod 3 is steelwork, handle 1-7 Grip section part adopts vulcanie, and remaining adopts steelwork, limit casing 1-9-1 to adopt steelwork, ratchet spring 1-10 Cuff 4-1 in standard component, sealing cuff 5 and Manual pressure equipment bearing is adopted to adopt engineering plastics with all kinds of bolt and nuts Make, rubber water-proof bar 6 can be fabricated to continuous annular strip, can form product.
As shown in Figure 28 and Fig. 1, the operation principle of the assembling process and improvement underground chamber wall pipe seepage of the present invention It is as follows:
1st, the installation ratchet alignment pin 1-5-2 and ratchet 1-1 on main shaft 1-5;
2nd, outer envelope 1-6-2 is inserted by ratchet positioning and with rocking bar fixing bolt 1-3-1 and cage connection bolt 1-9-2, Limit casing 1-9-1 is inserted in into above-mentioned bolt then, and ratchet 1-2 is inserted in outside limit casing 1-9-1, and by ratchet spring 1- 10 are inserted in ratchet spring tongue 1-2-2, and then outer envelope 1-6-2, embedded shell 1-6-1 are inserted in centered on ratchet 1-1 main shaft 1- 5, finally cage connection bolt 1-9-2 is connected with corresponding outer envelope attaching nut 1-6-3;
3rd, by bearing 1-4-1 embedded rocking bar 1-4, and rocking bar 1-4 is inserted in into main shaft 1-5;
4th, rocking bar rotary spacing bolt 1-8 is screwed into into rocking bar rotary spacing nut 1-6-4, and shell is connected into spiral shell with rocking bar Female 1-3-2 and ratchet positioning and and rocking bar fixing bolt 1-3-1(Limit casing 1-9-1 is inserted in thereon)Connection;
5th, pressure equipment support alignment pin 1-5-1 is installed on into main shaft 1-5, then Manual pressure equipment support 2 is inserted in Main shaft clamp nut 1-5-3 is finally screwed into main shaft 1-5 by main shaft 1-5;
6th, in underground chamber body of wall(Underground chamber body of wall includes exterior wall 9 and the outer soil body 10 of wall)9 side of exterior wall, along through walls 8 periphery of pipe cuts a small amount of concrete, forms triangular groove 7;
7th, the fluid sealant with sealing efficiency, such as high modulus polyurethane are applied along the concrete chisel removal face of 8 periphery of wall pipe Fluid sealant;
8th, rubber water-proof bar 6 is intercepted by 8 girth of wall pipe, clog a certain amount of in 6 two pore 6-1 of rubber water-proof bar Fluid sealant with sealing efficiency, such as high modulus polyurethane fluid sealant, rubber water-proof bar 6 are filled in triangular groove 7, and are faced When be adhesively fixed in tube wall through walls formed rubber O-ring seal;
9th, by 5 trap of sealing cuff is in wall pipe 8 and which is made close to underground chamber wallboard, just twist only cuff and hold bolt 5- tightly 3, sealing cuff 5 is tentatively fixed on tube wall through walls by the frictional resistance produced with wall pipe 8 by cuff frictional resistance rubber strip 5-2;
10th, by 4 trap of Manual pressure equipment bearing in wall pipe 8 make its keep with underground chamber wall pipe it is certain away from From cuff holds bolt 4-5 bolts tightly outward to tighten bearing, by the friction that cuff frictional resistance rubber strip 4-2 in bearing is produced with wall pipe 8 Manual pressure equipment bearing 4 is fixed on tube wall through walls by resistance;
11st, by Manual pressure equipment 1, manually pressure equipment support 2 is placed on Manual pressure equipment bearing 4;
The 12nd, the push rod plug 3-1 of Manual pressure equipment push rod 3 is inserted the push rod jack 1-4-5 of rocking bar 1-4, by push rod Top 3-2 props up sealing cuff 5;
13rd, push the handle 1-7 of Manual pressure equipment 1, by rocking bar 1-4, ratchet 1-2, ratchet 1-1 transmission, make hand Dynamic pressure equipment push rod 3 can hold out against sealing cuff 5, and Manual pressure equipment 1 is carried out annular movement along Manual pressure equipment bearing 4 Sealing cuff 5 is uniformly held out against, makes sealing cuff 5 compress rubber O-ring seal, while to being packed to 6 two pore of rubber water-proof bar The fluid sealant in 6-1 with sealing efficiency produces extruding, makes 6 seam of sealant sealing apolipsis rubber water-proof bar of extrusion and forms envelope Rubber O-ring seal is closed, cuff is then tightened and is held bolt 5-3 tightly, complete wall pipe treating seepage;
14th, ratchet button 1-2-1 is pinned, upwards turn handle 1-7, removal Manual pressure equipment push rod 3 holds out against water-baffling sleeve The pressure of hoop 5 simultaneously releases Manual pressure equipment push rod 3 from push rod jack 1-4-4, unloads Manual pressure equipment 1 and extracts handle 1-7, removal Manual pressure equipment bearing 4.
The present invention more convenient can ground-to-ground descend cavern's wall pipe to carry out treating seepage maintenance, when rubber O-ring seal it is aging And during impermeable failure, easily which can be carried out keeping in repair replacing and be reinstalled.
Although present disclosure has been made to be discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's Various modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (10)

1. it is a kind of administer underground chamber wall pipe seepage Manual pressure equipment equipment, it is characterised in that comprising hand press Tool(1), the Manual pressure equipment(1)With Manual pressure equipment support(2)Connection, the Manual pressure equipment(1)Manually press Power equipment support(2)It is placed in Manual pressure equipment bearing(4)On, and can be along Manual pressure equipment bearing(4)Mobile, this is manual Pressure equipment(1)Connection Manual pressure equipment push rod(3), the Manual pressure equipment(1)Manually pressure equipment push rod(3)Top Tight sealing cuff(5), so as to compress rubber water-proof bar(6), complete to wall pipe(8)Treating seepage;
Described Manual pressure equipment(1)Comprising:
Main shaft(1-5);
Ratchet(1-1), which is fixedly installed on main shaft(1-5)On;
Rocking bar(1-4), which is arranged on main shaft(1-5)On, can be around main shaft(1-5)Rotation;
Ratchet(1-2), its contact ratchet(1-1), and and rocking bar(1-4)It is fixedly connected;
Shell(1-6), which is set in main shaft(1-5)On, wrap ratchet(1-1)And ratchet(1-2), and and rocking bar(1-4)With Ratchet(1-2)Connection;
Handle(1-7), its connection rocking bar(1-4);
Rocking bar limit assembly;
Ratchet positioning and and rocking bar fixation kit;
And, shell fixation kit.
2. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 1, it is characterised in that institute The ratchet stated(1-1)Comprising:
Ratchet body(1-1-3);
Ratchet through hole(1-1-1), which is located at Ratchet body(1-1-3)On, for through main shaft(1-5);
Limiting through hole(1-1-2), which is located at Ratchet body(1-1-3)On, it is spacing which is used for rocking bar;
Described ratchet(1-2)Comprising:
Ratchet body(1-2-4);
Ratchet button(1-2-1), it is exposed to shell(1-6)Outside;
Ratchet spring tongue(1-2-2), which is located at ratchet body(1-2-4)On, it is provided with ratchet spring(1-10);
Ratchet through hole(1-2-3), which is located at ratchet body(1-2-4)On, for through ratchet positioning and and rocking bar fixation kit.
3. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 2, it is characterised in that institute The main shaft stated(1-5)Comprising:
Spindle main body(1-5-4);
Pressure equipment support alignment pin(1-5-1), which is located at spindle main body(1-5-4)On, for positioning Manual pressure equipment Frame(2);
Ratchet alignment pin(1-5-2), which is located at spindle main body(1-5-4)On, for fixed ratchet wheel(1-2);
Main shaft clamp nut(1-5-3), itself and spindle main body(1-5-4)Threaded connection, for compressing Manual pressure equipment support (2).
4. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 3, it is characterised in that institute The shell stated(1-6)Comprising embedded shell(1-6-1)And outer envelope(1-6-2);
Described embedded shell(1-6-1)Comprising:
Embedded shell main body(1-6-10);
Rocking bar spacing hole(1-6-6), which is located at embedded shell main body(1-6-10)On, it is spacing for rocking bar;
Shell fixing hole(1-6-7), which is located at embedded shell main body(1-6-10)On, fix for shell;
Embedded shell through hole(1-6-8), which is located at embedded shell main body(1-6-10)On, for through main shaft(1-5);
Described outer envelope(1-6-2)Comprising:
Outer envelope main body(1-6-11);
Outer envelope link bolt hole(1-6-5), which is located at outer envelope main body(1-6-11)On, fix for shell;
Outer envelope through hole(1-6-9), which is located at outer envelope main body(1-6-11)On, for through main shaft(1-5).
5. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 4, it is characterised in that institute The rocking bar stated(1-4)Comprising:
Rocking bar connecting portion(1-4-7), its connection main shaft(1-5);
Rocker upper arm(1-4-8), its connection rocking bar connecting portion(1-4-7), for connected with outer casing(1-6)And ratchet(1-2);
Rocker lower arm(1-4-9), its connection rocking bar connecting portion(1-4-7), for connecting Manual pressure equipment push rod(3);
Described rocking bar connecting portion(1-4-7)Comprising:Bearing(1-4-1), wherein with rocking bar through hole(1-4-6), for through Main shaft(1-5), and and main shaft(1-5)Close-fitting;
Described rocker upper arm(1-4-8)Comprising:
Rocking bar rotary spacing bolt hole(1-4-2), it is spacing for rocking bar;
Ratchet positioning and and rocking bar fixed bolt hole(1-4-3), fix for ratchet positioning and with rocking bar;
Handle socket(1-4-4), for connecting handle(1-7);
Described rocker lower arm(1-4-9)Comprising:Push rod jack(1-4-5), for connecting Manual pressure equipment push rod(3).
6. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 5, it is characterised in that institute The handle stated(1-7)Comprising:
Handle main body(1-7-2);
Handle plug(1-7-1), which is arranged on handle main body(1-7-2)Lower end, for inserting handle socket(1-4-4);
Described rocking bar limit assembly is included:
Rocking bar rotary spacing bolt(1-8), which passes through rocking bar rotary spacing bolt hole(1-4-2)With rocking bar spacing hole(1-6-6);
Rocking bar rotary spacing nut(1-6-4), itself and rocking bar rotary spacing bolt(1-8)Threaded connection;
Described ratchet positioning is simultaneous to be included with rocking bar fixation kit:
Ratchet positioning and and rocking bar fixing bolt(1-3-1), which passes through ratchet positioning and and rocking bar fixed bolt hole(1-4-3)、 Shell fixing hole(1-6-7), ratchet through hole(1-2-3)With outer envelope link bolt hole(1-6-5);
Limit casing(1-9-1), which is set in ratchet positioning and and rocking bar fixing bolt(1-3-1)On;
Shell and rocking bar attaching nut(1-3-2), itself and ratchet positioning and with rocking bar fixing bolt(1-3-1)Threaded connection;
Described shell fixation kit is included:
Cage connection bolt(1-9-2), which passes through outer envelope link bolt hole(1-6-5)With shell fixing hole(1-6-7);
Limit casing(1-9-1), which is set in cage connection bolt(1-9-2)On;
Outer envelope attaching nut(1-6-3), itself and cage connection bolt(1-9-2)Threaded connection.
7. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 6, it is characterised in that institute The Manual pressure equipment support stated(2)It is set in Manual pressure equipment(1)Main shaft(1-5)On, the Manual pressure equipment support (2)Comprising:
Base plate(2-1-1), its connection Manual pressure equipment bearing(4), can be along Manual pressure equipment bearing(4)It is mobile;
Pole(2-1), which is fixedly connected base plate(2-1-1);
Axle sleeve(2-1-2), which is fixedly connected pole(2-1), for through main shaft(1-5);
Axle sleeve cotter way(2-1-3), which is arranged on axle sleeve(2-1-2)It is interior, the axle sleeve cotter way(2-1-3)With main shaft(1-5)On pressure Power equipment support alignment pin(1-5-1)Matching, for positioning Manual pressure equipment support(2).
8. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 7, it is characterised in that institute The Manual pressure equipment push rod stated(3)Insertion Manual pressure equipment(1)Rocking bar(1-4)Push rod jack(1-4-5)In, the hand Dynamic pressure equipment push rod(3)Comprising:
Push rod main body(3-3);
Push rod plug(3-1), which is arranged on push rod main body(3-3)Lower end, for inserting rocking bar(1-4)Push rod jack(1- 4-5)In;
Push rod comes directly towards(3-2), which is arranged on push rod main body(3-3)Upper end, for holding out against sealing cuff(5).
9. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 8, it is characterised in that institute The Manual pressure equipment bearing stated(4)Comprising:
Cuff in bearing(4-1), which is used to be set in wall pipe(8)On;Cuff in the bearing(4-1)Using engineering plastics system Make, its internal diameter alterable is adapting to the pipeline of various outer diameter;
The outer cuff of bearing(4-3), which is arranged and is fixed on cuff in bearing(4-1)It is outside;
Cuff in described bearing(4-1)Comprising:
Cuff main body in bearing(4-1-1);
Cuff frictional resistance rubber strip in bearing(4-2), which is embedded in and is arranged on cuff main body in bearing(4-1-1)Inboard groove in, For increasing frictional force, Manual pressure equipment bearing is prevented(4)With wall pipe(8)Between occur slide;
The outer cuff of described bearing(4-3)Comprising:
The outer cuff main body of bearing(4-6);
Deep floor(4-4), which is arranged on the outer cuff main body of bearing(4-6)On, for strengthening the outer cuff of bearing(4-3)It is strong Degree;
The outer cuff of bearing holds bolt tightly(4-5), which is arranged on the outer cuff main body of bearing(4-6)On, for adjusting the outer cuff of bearing (4-3)Elasticity;
The outer cuff connecting portion of bearing(4-7), which is arranged on the outer cuff main body of bearing(4-6)On, for connecting Manual pressure equipment Support(2).
10. the Manual pressure equipment equipment of underground chamber wall pipe seepage is administered as claimed in claim 9, it is characterised in that Described sealing cuff(5)Comprising:
Cuff main body(5-4), wherein with through hole, for being set in wall pipe(8)On;
Cuff projection ring flat-plate(5-1), which is arranged on cuff main body(5-4)Top;
Cuff frictional resistance rubber strip(5-2), which is embedded in and is arranged on cuff main body(5-4)Through-hole wall groove in, for increase rub Wipe power, anti-sliding stop;
Cuff holds bolt tightly(5-3), which is arranged on cuff main body(5-4)On, for adjusting sealing cuff(5)Elasticity;
Described rubber water-proof bar(6)It is wedge shaped, the rubber water-proof bar(6)Comprising:
Pore(6-1), wherein filling with sealant;
Flange(6-2), seal.
CN201510207215.5A 2015-04-28 2015-04-28 A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage Active CN104816497B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510207215.5A CN104816497B (en) 2015-04-28 2015-04-28 A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510207215.5A CN104816497B (en) 2015-04-28 2015-04-28 A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage

Publications (2)

Publication Number Publication Date
CN104816497A CN104816497A (en) 2015-08-05
CN104816497B true CN104816497B (en) 2017-04-05

Family

ID=53727090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510207215.5A Active CN104816497B (en) 2015-04-28 2015-04-28 A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage

Country Status (1)

Country Link
CN (1) CN104816497B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU521145A1 (en) * 1973-10-09 1976-07-15 Предприятие П/Я М-5671 Eccentric Press Actuator
CN2444105Y (en) * 2000-11-08 2001-08-22 居焕兴 Leaking stoppage device for slot by binding press
CN201391715Y (en) * 2009-04-29 2010-01-27 谈宏洲 Pipeline leak stoppage steel-strip strainer
CN202082553U (en) * 2011-06-13 2011-12-21 鞍钢集团房产物业公司 Pressure pipeline leakage-mending straining device
CN204604974U (en) * 2015-04-28 2015-09-02 上海市政工程设计研究总院(集团)有限公司 A kind of Manual pressure facility equipment administering underground chamber wall pipe seepage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU521145A1 (en) * 1973-10-09 1976-07-15 Предприятие П/Я М-5671 Eccentric Press Actuator
CN2444105Y (en) * 2000-11-08 2001-08-22 居焕兴 Leaking stoppage device for slot by binding press
CN201391715Y (en) * 2009-04-29 2010-01-27 谈宏洲 Pipeline leak stoppage steel-strip strainer
CN202082553U (en) * 2011-06-13 2011-12-21 鞍钢集团房产物业公司 Pressure pipeline leakage-mending straining device
CN204604974U (en) * 2015-04-28 2015-09-02 上海市政工程设计研究总院(集团)有限公司 A kind of Manual pressure facility equipment administering underground chamber wall pipe seepage

Also Published As

Publication number Publication date
CN104816497A (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN104568418B (en) Packer performance detecting device
CN204604974U (en) A kind of Manual pressure facility equipment administering underground chamber wall pipe seepage
CN104816497B (en) A kind of Manual pressure equipment equipment for administering underground chamber wall pipe seepage
CN111828067A (en) Expansion anchoring bolt for controlling roadway surrounding rock and using method thereof
CN202273649U (en) Forced automatic grouting one-way valve
CN202831759U (en) Air inflation steel tube constructional element
CN201503337U (en) Hydraulic internal expanding plug device
CN102296975A (en) Bolt-prestressing device
CN105257926B (en) The seals and its encapsulating method of adjustable sealing bore
CN201650189U (en) Double-stage sealing device
CN209642271U (en) A kind of blank pipe pipeline packer of good seal performance
CN111119961B (en) High-prestress applying device for anchor rod and using method
CN109853709B (en) Working method of septic tank hole digger
CN203475306U (en) Replaceable external anchor cable
CN202901690U (en) Buried pipeline repair device
CN206555595U (en) A kind of direct insertion quick filling adaptor
CN201756953U (en) Underground throttle of gas well
CN205677618U (en) A kind of outer tube sleeve of disposable carbon dioxide blasting cartridge band special valve
CN205136914U (en) Connect reducer union of bamboo -shaped prestressing force plastic tubing
CN207095992U (en) A kind of combined pipeline hydraulic test tool
CN206600156U (en) Rod-pumped well determines moment of torsion packing box
CN201787219U (en) Rubbery delivery pipeline
CN204238127U (en) A kind of post stretching box girder pre-stressed mud jacking anchor head sealing device
CN103851198B (en) High pressure dynamic seal (packing) method and the sealing device of large-scale blast wave analogue means
CN204040038U (en) A kind of high pressure grouting plugging head

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant