CN104815373B - Lung ventilator and its Poewr control method and system - Google Patents

Lung ventilator and its Poewr control method and system Download PDF

Info

Publication number
CN104815373B
CN104815373B CN201510181542.8A CN201510181542A CN104815373B CN 104815373 B CN104815373 B CN 104815373B CN 201510181542 A CN201510181542 A CN 201510181542A CN 104815373 B CN104815373 B CN 104815373B
Authority
CN
China
Prior art keywords
power
blower fan
instantaneous
heater
predetermined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510181542.8A
Other languages
Chinese (zh)
Other versions
CN104815373A (en
Inventor
苏厚城
庄志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ka Yip Yee Medical Polytron Technologies Inc
Original Assignee
Beijing Ka Yip Yee Medical Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ka Yip Yee Medical Polytron Technologies Inc filed Critical Beijing Ka Yip Yee Medical Polytron Technologies Inc
Priority to CN201510181542.8A priority Critical patent/CN104815373B/en
Publication of CN104815373A publication Critical patent/CN104815373A/en
Application granted granted Critical
Publication of CN104815373B publication Critical patent/CN104815373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Humidification (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of Poewr control method of lung ventilator, the lung ventilator includes power supply, heater and blower fan, and this method includes:The power supply is powered for the heater and blower fan simultaneously when, the instantaneous power of the blower fan is monitored in real time;Compare the instantaneous power and the first predetermined power of the blower fan;When the instantaneous power of the blower fan is more than or equal to first predetermined power, the instantaneous power of the heater is reduced to the second power.Embodiments of the invention, by reducing the instantaneous power consumption of heater to meet instantaneous power required when blower fan instantaneously accelerates, reduce the requirement to power supply general power, have saved energy expenditure under the working condition that blower fan instantaneously accelerates.It is that the development that lung ventilator is further minimized is laid a good foundation and the use of small-power power also reduces the volume of whole lung ventilator.

Description

Lung ventilator and its Poewr control method and system
Technical field
The present invention relates to breathing apparatus, more particularly to a kind of lung ventilator and its Poewr control method and system.
Background technology
At present, lung ventilator has the function that flowing gas in corrugated hose (such as air) is humidified and pressurizeed.Exhale Suction machine is internally provided with heater, and heater to the water (or other aqueous solution) in water pot by constantly heating Afterwards, gas, which flows through the water surface, will become moistening, while being heated to gas, thus being brought for user more comfortably makes With experience.It is additionally provided with blower fan inside lung ventilator, extraneous gas can be drawn into inside lung ventilator and while can be with by blower fan Certain pressure is applied to the gas entered in corrugated hose, so contributes to further enhance using effect.Go out in user When now breathing is stagnated, blower fan can further raise the pressure into the gas of breathing machine pipeline by increasing rotating speed Power, to maintain the gas exchanges between user and lung ventilator, it is ensured that still maintaining just when breathing is stagnated occurs in user Normal gaseous metabolism.
When the heater in lung ventilator is heated, rated power is generally kept in tens watts (such as 30W), so It can ensure that the evaporation rate of moisture is maintained near a steady state value so that the gas in breathing machine pipeline is maintained at a conjunction Near suitable humidity, usage experience reaches most preferably.Too high power may be such that the evaporation rate of moisture is too fast, cause breathing Gas in machine pipeline, which is excessively moistened, or gas temperature is too high causes patient to be in dangerous situation, and usage experience is deteriorated.It is too low Power then may be such that the evaporation rate of moisture is too low, cause gas in breathing machine pipeline excessively to be dried or gas temperature It is too low, equally also usage experience can be deteriorated.
The blower fan pressurizeed for the gas in breathing machine pipeline, in normal operation, rated power is typically kept In smaller performance number (such as twenties watts), it can so ensure to maintain a steady state value to the pressure value that gas applies Near, and the gas in breathing machine pipeline is maintained near a suitable pressure value, usage experience reaches most preferably.It is too high Power may be such that the rotating speed of blower fan is too high, cause the gas pressure value in breathing machine pipeline too high, can to user with Carry out uncomfortable experience.Too low power then may be such that the rotating speed of blower fan is too low, cause the gas pressure in breathing machine pipeline Force value is too low, can reduce the using effect of lung ventilator, does not have the effect for maintaining the normal gaseous metabolism of user.
But the rotating speed in some cases, accelerating blower fan with the gas pressure value improved in breathing machine pipeline be it is necessary, For example, when there is breathing stagnation in user.When, which there is breathing, in user to stagnate, it is necessary to which the external world carries the gas of high pressure values To aid in maintaining gas exchanges.In this case, blower fan needs to accelerate in a moment (be usually several seconds or zero point several seconds) Rotating speed improves the pressure value of the gas in breathing machine pipeline, and now the instantaneous power of blower fan can be increased to very big numerical value (such as 50W).
General inside lung ventilator only to set a power supply, the power supply is that heater and blower fan provide electric power simultaneously.So, Just there is certain requirement to power, ensure that blower fan can be smoothly complete again while heater normal work is both met In the case of accelerating into moment, power is at least blower fan instantaneous power and heater rated power sum (such as 80W). However, such power supply can increase electric energy loss, it is unfavorable for saving the energy, while can also make it that the volume of lung ventilator is larger, no The design requirement of compactedness is met beneficial to lung ventilator overall structure.
The content of the invention
The technical problems to be solved by the invention are to overcome the lung ventilator of prior art instantaneously to add to meet blower fan Speed, and the power supply of relatively high power need to be configured, cause to increase the deficiency of power supply electric energy loss.
In order to solve the above-mentioned technical problem, embodiments of the invention provide firstly a kind of Power Control side of lung ventilator Method, the lung ventilator includes power supply, heater and blower fan, wherein, this method includes:The power supply is simultaneously the heating dress Put and when blower fan is powered, the instantaneous power of the blower fan is monitored in real time;Compare the instantaneous power and the first default work(of the blower fan Rate;When the instantaneous power of the blower fan is more than or equal to first predetermined power, the instantaneous work(of the heater is reduced Rate is to the second power.
Preferably, this method includes:Compare the instantaneous power and the 3rd predetermined power of the blower fan;When the wink of the blower fan When power when being less than three predetermined power, raise the instantaneous power of the heater to the 4th power;Wherein, described One predetermined power is more than or equal to the 3rd predetermined power, and second power is less than the 4th power.
Preferably, second power is 0.
Preferably, the instantaneous power of the blower fan is monitored in real time by monitoring the operating current of the blower fan in real time.
Embodiments of the invention additionally provide a kind of power control system of lung ventilator, and the lung ventilator includes power supply, added Thermal and blower fan;Wherein, the system includes:Monitor, is that the heater and blower fan are powered simultaneously for the power supply When, the instantaneous power of the blower fan is monitored in real time;First comparator, the instantaneous power for comparing the blower fan is preset with first Power;Controller, for when the instantaneous power of the blower fan is more than or equal to first predetermined power, reducing the heating The instantaneous power of device is to the second power.
Preferably, the system includes:Second comparator, instantaneous power and the 3rd default work(for comparing the blower fan Rate;The controller is additionally operable to, when the instantaneous power of the blower fan is less than three predetermined power, raise the heating dress The instantaneous power put is to the 4th power;Wherein, first predetermined power is more than or equal to the 3rd predetermined power, described second Power is less than the 4th power.
Preferably, the controller is used for when the instantaneous power of the blower fan is more than or equal to first predetermined power When, the instantaneous power of the heater is reduced to 0.
Preferably, the monitor includes current monitoring module, the operating current for monitoring the blower fan in real time.
Embodiments of the invention additionally provide a kind of lung ventilator, including power supply, heater and blower fan, in addition to as above institute The power control system stated.
Compared with prior art, embodiments of the invention compared with prior art, under the working condition that blower fan instantaneously accelerates, By reducing the instantaneous power consumption of heater to meet instantaneous power required when blower fan instantaneously accelerates, reduce to power supply total work The requirement of rate, has saved energy expenditure.It is that lung ventilator enters and the use of small-power power also reduces the volume of whole lung ventilator The development of one step miniaturization is laid a good foundation.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification Obtain it is clear that or being understood by implementing technical scheme.The purpose of the present invention and other advantages can by Specifically noted structure and/or flow are realized and obtained in specification, claims and accompanying drawing.
Brief description of the drawings
Accompanying drawing is used for providing to the technical scheme of the application or further understanding for prior art, and constitutes specification A part.Wherein, the accompanying drawing of expression the embodiment of the present application is used for the technical side for explaining the application together with embodiments herein Case, but do not constitute the limitation to technical scheme.
Fig. 1 is the schematic flow sheet of the Poewr control method of the lung ventilator of the embodiment of the present invention.
Fig. 2 is the schematic flow sheet of the Poewr control method of the lung ventilator of another embodiment of the present invention.
Fig. 3 is the organigram of the power control system of the lung ventilator of the embodiment of the present invention.
Embodiment
Describe embodiments of the present invention in detail below with reference to drawings and Examples, how the present invention is applied whereby Technological means solves technical problem, and reaches the implementation process of relevant art effect and can fully understand and implement according to this.This Shen Each feature that please be in embodiment and embodiment, can be combined with each other under the premise of not colliding, the technical scheme formed Within protection scope of the present invention.
In addition, the flow of accompanying drawing the step of illustrate can such as one group computer executable instructions computer system It is middle to perform.And, although logical order is shown in flow charts, but in some cases, can be with different from herein Order performs shown or described step.
Solve lung ventilator inner heating device and blower fan has to rely on large power supply when meeting job requirement and powered Problem, the present inventor passes through in-depth study, has searched out the rational technique scheme that can be solved the above problems.Because The course of work that blower fan moment accelerates typically all maintains shorter, in a period of this is shorter, even if stopping to the wet of gas Degree, which is adjusted, will not also produce more obvious change there is provided the humidity of the gas to user.Even if moreover, being user The humidity of the gas of offer can produce certain change, and the gas relative to moistening is the comfortable experience that brings of user, far not Blower fan can be offset can not accelerate brought potential risk in the acceleration.
Therefore, in the demand that blower fan has moment to accelerate, more inessential is just become to the demand that water is heated.Based on this Analysis, can accelerate both demands to carry out Time-sharing control heating and blower fan, can temporarily be controlled when accelerating demand there is blower fan Refrigerating/heating apparatus stops the power of heating or reduction heater, resumes work again after blower fan completes acceleration demand.
In the Poewr control method of the lung ventilator of the embodiment of the present invention, the lung ventilator includes power supply, heater and wind Machine.As shown in figure 1, the Poewr control method of the lung ventilator of the embodiment of the present invention, mainly comprises the following steps.
Step S110, power supply is powered for heater and blower fan simultaneously when, monitors the instantaneous work(during blower fan operation in real time Rate.
Step S120, compares the instantaneous power of blower fan and the size of the first predetermined power in real time, if the instantaneous work(of blower fan Rate is more than or equal to the first predetermined power, then goes to step S130, otherwise go to step S140.Wherein, the first predetermined power quilt It is preset as recognizing whether blower fan enters the working condition instantaneously accelerated.If the instantaneous power for real-time monitoring blower fan exceedes First predetermined power, then illustrate that blower fan just enters the working condition instantaneously accelerated.Generally, the appearance of such case be for The pressure value of the gas in breathing machine pipeline is improved, thinks that the user of lung ventilator maintains normal gas exchanges, it is to avoid make There are the situations such as apnea in user.
Step S130, when the instantaneous power for comparing blowing machine is more than or equal to first predetermined power, reduction heating The instantaneous power of device, such as, the second power is reduced to by heater from previous a certain power.Now, heater is produced Raw heat will decline.Heat produced by heater declines, and only can somewhat change by water pot to a certain extent Other moistening degree, will not significantly affect the use feeling of user.
Step S140, when the instantaneous power for not comparing blowing machine is more than or equal to first predetermined power, explanation The power and job state for maintaining blower fan previous, it is not necessary to reduce the instantaneous power of heater, maintain heater to work as Preceding heating-up temperature and power output.
For the instantaneous acceleration of blower fan short time, heater suitably reduces working power or directly stops heating, warp The moistening degree for crossing the gas of water pot also only has human body slight change inconspicuous, and this slight change is unlikely to substantially to change Become the impression that user moistens degree to gas, also do not interfere with the using effect that user uses lung ventilator.Therefore, it is of the invention Embodiment, when blower fan instantaneously accelerates, actively reduce the instantaneous power of heater, do not changing user's usage experience In the case of, it is possible to prevente effectively from the events such as apnea occurs in user, the security function of lung ventilator is improved, while also reducing The high power requirement of power supply in lung ventilator, the power of power supply need not meet instantaneous acceleration and the heater of blower fan simultaneously Normal heating.So as to reduce the requirement in terms of power compared with prior art so that slightly low power power supply also can The work of blower fan and heater in competent lung ventilator, it is only necessary to which the power of power supply can match the instantaneous acceleration demand of blower fan And demand when heater and the equal normal work of blower fan (work of non-momentary boost phase), it is not necessary to can simultaneously The normal operation of instantaneous acceleration and heater with extension set.Moreover, it is contemplated that typically also being got over to the smaller power volume of power It is small, therefore embodiments of the invention also reduce the volume of power supply in lung ventilator, so as to be beaten for the further miniaturization of lung ventilator Good basis down.
In embodiments of the invention, when blower fan instantaneously accelerates to maintain the normal gas exchanges of user to be used to avoid Person occurs after the situations such as apnea, and the instantaneous power of blower fan can lower again, it is to avoid provide pressure for a long time for user Higher gas can bring discomfort for user.
Contrast, as shown in Fig. 2 the present invention other embodiments in, can also on the basis of embodiment illustrated in fig. 1, It can also be continued to adjust the instantaneous power of heater according to follow-up service condition.
Step S210~step S240, with abovementioned steps S110~step S140.
Step S250, compares the instantaneous power and the 3rd predetermined power of blower fan, if the instantaneous power of blower fan is less than the 3rd Predetermined power then goes to step S260, otherwise goes to step S270.This step is undertaken on execution after step S230.
Step S260, when the instantaneous power for comparing blowing machine is less than three predetermined powers, raises the wink of heater When power to the 4th power be operated.Wherein, first predetermined power is more than or equal to the 3rd predetermined power, second power Less than the 4th power.
Step S270, when the instantaneous power of real-time judge blowing machine is not less than the 3rd predetermined power, then illustrates wind Machine is still within the job state accelerated, now maintains the job state and instantaneous power of heater.
Embodiments of the invention as shown in Figure 2, blower fan instantaneously accelerates after the pressure to increase gas, it becomes possible to effectively User is avoided the events such as apnea occur.The risk of the events such as apnea perhaps will occur for user, because of lung ventilator wink When accelerate be able to effectively alleviate.Hereafter, blower fan avoids the need for continuing to run at high speed maintaining the high pressure values of gas, returns The instantaneous Accelerating running state of blower fan (comparatively, can be referred to as tightly by the normal job state before to instantaneous accelerate Anxious job state), it now will suitably reduce power.If that is, the instantaneous power of blower fan is less than the 3rd predetermined power, said Bright blower fan has been completed the sessions instantaneously accelerated, now, and heater can be just returned to before the instantaneous acceleration of blower fan Normal heating state, raise instantaneous power, namely from blower fan instantaneously accelerate when the second power to be increased to can be user 4th power of the gas of good moistening degree and preference temperature is provided.
In order to after preventing blower fan from completing the job task that instantaneously accelerates and being adjusted under normal job state, heating dress Instantaneous power can not be raised in time by putting, and embodiments of the invention are also lasting after the job task that blower fan completion instantaneously accelerates Ground monitors the instantaneous power of blower fan in real time, and is kept during by the instantaneous power of blower fan with showing that blower fan returns to normal operation condition 3rd predetermined power of operating is compared.When the instantaneous power of relatively blowing machine is less than three predetermined powers, just illustrate wind Machine has had logged out the urgent job state of instantaneous acceleration, can be to raise the heating power of heater in time now The gas of the good moistening degree of user's supply and preference temperature.
In embodiments of the invention, the instantaneous power of heater is reduced, can according to circumstances directly stop heating dress The heating work put, namely control power supply stop being powered heater.Now, the instantaneous power of heater is 0. That is, in embodiments of the invention, when the instantaneous power of blower fan is more than or equal to the first predetermined power, reduce heater Instantaneous power to 0 (the second power is 0).So, power supply only can provide the energy to blower fan, reduce further the property of power supply It can require.Moreover, the work of short time heating-stopping apparatus, by water pot gas moistening degree also will not significant change, So that user is also difficult to substantially perceive the difference that gas moistens degree, the usage experience of user is not interfered with.
Embodiments of the invention, can to monitor the instantaneous work(of blower fan in real time by monitoring the operating current of blower fan in real time Rate.
As shown in figure 3, the power control system 300 of the lung ventilator of the embodiment of the present invention, including monitor 310, first compare Compared with device 320 and controller 330.The lung ventilator mainly include heater 391, blower fan 392 and with heater 391 and Blower fan 392 is connected and is the power supply 393 of the two power supply.
Monitor 310 is connected with blower fan 392, for power supply 393 simultaneously for heater 391 and blower fan 392 power supply when, The instantaneous power of blower fan 392 is monitored in real time.
First comparator 320 is connected with monitor 310, instantaneous power and the first predetermined power for comparing blower fan 392 Size.
Controller 330 is connected with first comparator 320 and heater 391, compares blowing machine for first comparator 320 When 392 instantaneous power is more than or equal to the first predetermined power, the instantaneous power for reducing the heater 391 is the second work( Rate.
In embodiments of the invention, controller 330 is more than in the instantaneous power that first comparator 320 compares blowing machine 392 Or during equal to the first predetermined power, the first control instruction is sent to heater 391, to notify heater 391 to reduce wink When power to the second power.Heater 391 is received after first control instruction, according to the instruction of first control instruction, Instantaneous power is reduced to the second power and carries out operation.
As shown in figure 3, other embodiments of the present invention also include the second comparator 340, with monitor 310 and controller 330 are connected, and it is used for size of the instantaneous power with the 3rd predetermined power for comparing blower fan 392.Controller 330 is in the second comparator When 340 instantaneous powers for comparing blowing machine 392 are less than three predetermined powers, the instantaneous power of heater 391 is raised to the Four power.Wherein, first predetermined power is more than or equal to the 3rd predetermined power, and second power is less than the 4th power.Than Such as, controller 330 the second comparator 340 compare blowing machine 392 instantaneous power be more than or equal to the first predetermined power when, The second control instruction is sent to heater 391, to notify heater 391 to raise instantaneous power to the 4th power.Heating dress Put 391 receive second control instruction after, according to the instruction of second control instruction, instantaneous power is increased to the 4th power Carry out operation.Certainly, in embodiments of the invention, first comparator 320 can also be integrated with the second comparator 340.
In some embodiments of the present invention, the controller 330 can compare the wink of blowing machine 392 in first comparator 320 When power be more than or equal to the first predetermined power when, reduce the heater 391 instantaneous power be 0.Such as, control heating Device 391 disconnects the electrical connection with power supply 393, or is directly connected and receives the control of the instruction of controller 330 with controller 330 Power supply 393 stops being powered heater 391.If what first control instruction that controller is sent was indicated is will be instantaneous Power is reduced to 0 or indicates that heater is standby or even shuts down, and heater can be just indicated wink according to corresponding When power be reduced to 0, or in standby or even shut down, to stop heating the liquid in water pot.
In other embodiments of the present invention, controller 330 can also accelerate to make when blower fan instantaneously accelerates and/or instantaneously After industry is completed, corresponding instruction is sent to power supply 393, the instantaneous power for reducing the heater 391 to indicate power supply 393 is Second power (when blower fan instantaneously accelerates), to the 4th power, (blower fan instantaneously accelerates operation complete to the instantaneous power of rise heater After).
Embodiments of the invention, controller 330 sends an instruction to heater 391 or power supply 393, such as by first Control instruction and/or the second control instruction are sent to heater 391, can be first that will directly be locally stored or generate Control instruction and/or the second control instruction are transmitted directly to heater 391, can also indicate that special commander sender by phase The instruction answered is sent to heater 391 or power supply 393, and the commander sender is connected with controller 330, goes back and heater At least one of 391 and power supply 393 are connected.
Such as, when the instantaneous power of blower fan is more than or equal to the first predetermined power, controller 330 is sent out to commander sender Send power decrease command.The commander sender is received after the power decrease command, into heater 391 and power supply 393 extremely Few one sends the instruction that the instantaneous power of heater 391 is reduced to the second power, receive instruction heater 391 or Person's power supply 393, it is possible to which the instantaneous power of heater 391 is reduced to the second power.Similarly, when the instantaneous power of blower fan is small When three predetermined powers, controller 330 is just to commander sender transmit power increase instruction.The commander sender receives the work( After rate increase instruction, sent at least one of heater 391 and power supply 393 by the instantaneous power liter of heater 391 The up to instruction of the 4th power, receives the heater 391 or power supply 393 of instruction, it is possible to by the instantaneous of heater 391 Power is increased to the 4th power.
In embodiments of the invention, monitor 310 also includes current monitoring module, for by monitoring blower fan 392 in real time Operating current, to monitor the instantaneous power of blower fan 392 in real time.
The lung ventilator of the embodiment of the present invention, including power supply, heater and blower fan, in addition to Power Control as described above System.Power supply, heater, blower fan and power control system included by the lung ventilator of the embodiment of the present invention are each other Annexation and signal transitive relation, refer to the Poewr control method and power control system of the foregoing embodiment of the present invention.
In the application example of lung ventilator one of the present invention, blower fan is that the gas in pipeline is pressurizeed, in normal operating conditions Under, the instantaneous power of blower fan is generally kept in smaller performance number.The blower fan of common home ventilator, in normal work shape Power ratio under state is more typically 15 watts (W) or so.Similarly, the heater in home ventilator, rated power is general It is 30W or so.When there is breathing stagnation in user, it is necessary to which blower fan provides the gas of high pressure values to aid in maintaining gas to hand over Change.Now, moment revs up to improve to the gas pressure value in pipeline blower fan needs in a short time.Correspondingly, blower fan Instantaneous power also can quickly rise and arrive 50W or so.Now, the monitor in lung ventilator can real-time monitor this change.When First comparator in lung ventilator has exceeded default 30W in the instantaneous power for comparing blowing machine in real time, and (i.e. foregoing first is pre- If power).The instantaneous power that controller will reduce the heater is 10W (the second i.e. foregoing power), or directly closed Power supply of the power down source to heater, the second now foregoing power is 0.Instantaneous power of second comparator in relatively blowing machine During less than 20W (namely the 3rd foregoing predetermined power), the instantaneous power of heater will be raised, control heater recovers Power to 30W (the 4th i.e. foregoing power) is operated.
Embodiments of the invention use Time-sharing control theory to the blower fan and heater in lung ventilator, accelerate in blower fan When, the power even work of heating-stopping apparatus of appropriate reduction heater significantly reduce the power requirement of power supply.With reference to Power (50W) under foregoing application example of the invention, blower fan accelerating operation, now the instantaneous power of heater be 10W (or being 0);When blower fan and the equal normal work of heater, blower fan 15W or so, heater 30W or so.Due to wind Total energy consumption both when machine and the equal normal work of heater is about 45W (15W+30W=45W) left and right, and work is accelerated less than blower fan Make the power (50W) under state, again smaller than heater under the power (50W) and corresponding states under blower fan accelerating operation Power (10W even 0W) sum, therefore, the power supply of supporting this lung ventilator, peak power only needs to meet blower fan acceleration work The energy consumption 50W or blower fan of blower fan and both heaters total energy consumption 60W under state, the power supply in the prior art that compares are needed Meet power (30W) sum under power (50W) and the heater normal operating conditions under blower fan accelerating operation For the requirement of (80W), the power requirement of power supply is reduced.If the work of direct heating-stopping apparatus when blower fan accelerates, The power requirement of power supply can further be reduced.
Those skilled in the art should be understood that each of the device that above-mentioned the embodiment of the present application provided and/or system Each step in part, and method, they can be concentrated on single computing device, or are distributed in multiple calculating On the network that device is constituted.Alternatively, they can be realized with the executable program code of computing device.It is thus possible to It is stored in storage device by computing device to perform, or they is fabricated to each integrated circuit modules respectively, Or be fabricated to single integrated circuit module to realize by the multiple modules or step in them.So, the present invention is not restricted to Any specific hardware and software is combined.
Although disclosed herein embodiment as above, described content is only to readily appreciate technical solution of the present invention And the embodiment used, it is not limited to the present invention.Technical staff in any art of the present invention, is not departing from this On the premise of the disclosed spirit and scope of invention, any modification and change can be carried out in the form and details of implementation, But the scope of patent protection of the present invention, still should be subject to the scope of the claims as defined in the appended claims.

Claims (7)

1. a kind of Poewr control method of lung ventilator, the lung ventilator includes power supply, heater and blower fan, wherein, this method Including:
The power supply is powered for the heater and blower fan simultaneously when, the instantaneous power of the blower fan is monitored in real time;
Compare the instantaneous power and the first predetermined power of the blower fan, first predetermined power is predetermined to be for recognizing blower fan Whether the working condition for apnea situation occur in order to avoid user and instantaneously accelerating is entered;
When the instantaneous power of the blower fan is more than or equal to first predetermined power, the instantaneous work(of the heater is reduced Rate is to the second power;
Compare the instantaneous power and the 3rd predetermined power of the blower fan;
When the instantaneous power of the blower fan is less than three predetermined power, the instantaneous power of the heater is raised to the Four power;
Wherein, first predetermined power is more than or equal to the 3rd predetermined power, and second power is less than the 4th work( Rate;The power of the power supply is configured to match the instantaneous acceleration demand and the heater and blower fan of the blower fan Demand during equal normal work, and need not match simultaneously the blower fan instantaneous acceleration and the heater it is normal The demand of operation.
2. according to the method described in claim 1, it is characterised in that
Second power is 0.
3. according to the method described in claim 1, it is characterised in that:
The instantaneous power of the blower fan is monitored in real time by monitoring the operating current of the blower fan in real time.
4. a kind of power control system of lung ventilator, the lung ventilator includes power supply, heater and blower fan;Wherein, the system Including:
Monitor, when being powered for the power supply for the heater and blower fan simultaneously, monitors the instantaneous of the blower fan in real time Power;
First comparator, instantaneous power and the first predetermined power for comparing the blower fan, first predetermined power is pre- It is set to for recognizing whether blower fan enters the working condition for apnea situation occur in order to avoid user and instantaneously accelerating;
Controller, for when the instantaneous power of the blower fan is more than or equal to first predetermined power, reducing the heating The instantaneous power of device is to the second power;And
Second comparator, instantaneous power and the 3rd predetermined power for comparing the blower fan;
The controller is additionally operable to, when the instantaneous power of the blower fan is less than three predetermined power, raise the heating dress The instantaneous power put is to the 4th power;
Wherein, first predetermined power is more than or equal to the 3rd predetermined power, and second power is less than the 4th work( Rate, the power of the power supply is configured to match the instantaneous acceleration demand and the heater and blower fan of the blower fan Demand during equal normal work, and need not match simultaneously the blower fan instantaneous acceleration and the heater it is normal The demand of operation.
5. system according to claim 4, it is characterised in that:
The controller is used for when the instantaneous power of the blower fan is more than or equal to first predetermined power, and reduction is described to be added The instantaneous power of thermal is to 0.
6. system according to claim 4, it is characterised in that:
The monitor includes current monitoring module, the operating current for monitoring the blower fan in real time.
7. a kind of lung ventilator, including power supply, heater and blower fan, in addition to according to any one of claim 4 to 6 Power control system.
CN201510181542.8A 2015-04-16 2015-04-16 Lung ventilator and its Poewr control method and system Active CN104815373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510181542.8A CN104815373B (en) 2015-04-16 2015-04-16 Lung ventilator and its Poewr control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510181542.8A CN104815373B (en) 2015-04-16 2015-04-16 Lung ventilator and its Poewr control method and system

Publications (2)

Publication Number Publication Date
CN104815373A CN104815373A (en) 2015-08-05
CN104815373B true CN104815373B (en) 2017-10-20

Family

ID=53726005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510181542.8A Active CN104815373B (en) 2015-04-16 2015-04-16 Lung ventilator and its Poewr control method and system

Country Status (1)

Country Link
CN (1) CN104815373B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3069781A1 (en) * 2017-08-01 2019-02-08 Air Liquide Medical Systems RESPIRATORY ASSISTING APPARATUS WITH CONTROL OF THE POWER CONSUMED BY THE MICRO-BLOWER AND THE HUMIDIFIER
JP7177837B2 (en) * 2017-12-19 2022-11-24 コーニンクレッカ フィリップス エヌ ヴェ Ventilation system with cold pass humidification control
CN108273174A (en) * 2017-12-29 2018-07-13 北京怡和嘉业医疗科技股份有限公司 Power regulating method, device and ventilator humidifier

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132825A (en) * 2005-03-04 2008-02-27 Map医药-技术有限责任公司 Device for administering a breathing gas and method for adjusting breathing gas pressures that alternate at least in some phases

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2621113C (en) * 1997-06-17 2011-10-11 Fisher & Paykel Healthcare Limited Respiratory humidification system
US6644310B1 (en) * 2000-09-29 2003-11-11 Mallinckrodt Inc. Apparatus and method for providing a breathing gas employing a bi-level flow generator with an AC synchronous motor
CA2753378C (en) * 2003-06-20 2016-01-19 Resmed Limited Breathable gas apparatus with humidifier
CN101252966B (en) * 2005-05-26 2012-07-18 菲舍尔和佩克尔保健有限公司 Breathing assistance apparatus
US20080178879A1 (en) * 2007-01-29 2008-07-31 Braebon Medical Corporation Impeller for a wearable positive airway pressure device
CN101244305A (en) * 2007-12-03 2008-08-20 王鸿庆 Breathing machine and pressure control method
EP2231246A1 (en) * 2007-12-28 2010-09-29 Nellcor Puritan Bennett LLC Systems and methods for controlling a heated humidifier
CN101537221A (en) * 2008-03-06 2009-09-23 雷斯梅德有限公司 Humidification of breathable gas
PT3756719T (en) * 2008-05-27 2024-04-16 Fisher & Paykel Healthcare Ltd Control of humidifier chamber temperature for accurate humidity control
WO2010028427A1 (en) * 2008-09-10 2010-03-18 Resmed Ltd Improved power management in respiratory treatment apparatus
CA2784852C (en) * 2009-12-23 2018-02-27 Fisher & Paykel Healthcare Limited Humidified gases delivery apparatus and methods for controlling same
DE102011118265B4 (en) * 2011-11-11 2016-06-30 Drägerwerk AG & Co. KGaA breathing device
WO2014031010A1 (en) * 2012-08-23 2014-02-27 Fisher & Paykel Healthcare Limited Respiratory assistance apparatus
US20140060533A1 (en) * 2012-08-31 2014-03-06 Fisher & Paykel Healthcare Limited Methods and system for humidifier control using enthalpy-based calculation
CN203379444U (en) * 2013-05-30 2014-01-08 中山大学 Breathing machine highly synchronous with breathing

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132825A (en) * 2005-03-04 2008-02-27 Map医药-技术有限责任公司 Device for administering a breathing gas and method for adjusting breathing gas pressures that alternate at least in some phases

Also Published As

Publication number Publication date
CN104815373A (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN104180464B (en) Linkage control method for fresh air machine and air conditioner
CN104815373B (en) Lung ventilator and its Poewr control method and system
CN107062518A (en) A kind of air-conditioner control method and control device
CN104596039B (en) Control method and device for operation mode of air conditioner and air conditioner
CN108375175A (en) air conditioning system control method and device
CN107152746A (en) A kind of method and apparatus for controlling indoor humidity
CN108361924A (en) Air conditioner control method for frequency
CN101893303A (en) Method for controlling comfortable cooling and warming of air conditioner
CN105674477B (en) Control method and device for auxiliary electric heating of air conditioner
CN204424752U (en) A kind of Xiang Bian transformer room heat abstractor
CN104728926B (en) Temperature adjusting method and device of floor heating system
WO2018177080A1 (en) Heating control method and device for air conditioner
CN106871354A (en) Power control method and system of variable frequency air conditioner
WO2019128069A1 (en) Adaptive generator and air conditioner control method and device
CN103836770A (en) Air conditioner with temperature regulated based on indoor relative humidity and control method thereof
WO2019034124A1 (en) Method for controlling automatic temperature-adjustment air conditioner and air conditioner
CN109612047A (en) The supply air temperature control method of air conditioning system with variable
CN104713204B (en) air conditioning unit and control method
CN113639428A (en) Air conditioner energy-saving control method and device and air conditioner
CN206861813U (en) A kind of heat-air conditioner energy-saving control system
CN107270582B (en) Control method of heat pump unit and heat pump system
CN111076316A (en) Humidity control method
CN106918114A (en) The communication means and device of multi-online air-conditioning system
CN106288143A (en) A kind of air conditioner intelligent control system and method
CN104069574A (en) Method and device for controlling turbines in order to control output pressures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100043 Beijing City, Shijingshan District, West Street, building No. 19, the main floor of the five

Applicant after: Beijing Ka Yip Yee medical Polytron Technologies Inc

Address before: 100043 Beijing City, Shijingshan District, West Street, building No. 19, the main floor of the five

Applicant before: Beijing delightful harmony Jia Ye medical science and technology company limited

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant