CN104809545B - 一种虚拟电厂运行建模方法 - Google Patents
一种虚拟电厂运行建模方法 Download PDFInfo
- Publication number
- CN104809545B CN104809545B CN201510094719.0A CN201510094719A CN104809545B CN 104809545 B CN104809545 B CN 104809545B CN 201510094719 A CN201510094719 A CN 201510094719A CN 104809545 B CN104809545 B CN 104809545B
- Authority
- CN
- China
- Prior art keywords
- msub
- virtual plant
- robust
- mrow
- electricity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明提供了一种虚拟电厂运行建模方法,包括以下步骤:1)建立以参与电力市场运行的虚拟电厂的利润最大为目标函数的鲁棒混合整数线性规划模型,在数学模型中采用鲁棒区间优化法处理电价的不确定性;2)以电价的上下限为边界建立鲁棒区间模型;3)设定迭代次数、迭代步长和鲁棒系数;4)使用IBM CPLEX软件求解得出参与市场运行的虚拟电厂最优竞标结果。与现有技术相比,本发明具有经济效益好、计算效率高等优点。
Description
技术领域
本发明涉及一种虚拟电厂运行建模方法,属于虚拟电厂运行领域。
背景技术
近年来,随着不断增长的能源需求和化石燃料日益紧缺,世界各国正在积极倡导高效环保的能源供应形式,许多具有挑战性的新型能源供应方式正在世界范围内兴起,其中常见的形式为聚合分布式的可再生能源参与大电网和电力市场运行。在不同种类的可再生能源中,风力发电是众多组织形式中最为可靠、稳定的一种。欧盟的风机容量由1990年的1.743GW迅速增长为2010年的194GW,同时,世界范围内约占12%的能源由风电提供。由于可再生自身存在的随机性与间歇性,可再生能源单独参与大电网和电力市场运行会对其造成极大的冲击,因此可以以可再生能源发电联合传统发电及储能形式,以虚拟电厂(virtualpower plant,VPP)的形式参与大电网和电力市场的运行,可有效克服上述缺点,提高可再生能源发电的利用率和整体的经济收益。但是在虚拟电厂运行过程中,传统发电机组的二次发电成本曲线的建模过程比较复杂,计算时间较长。
发明内容
发明目的:本发明提供了一种虚拟电厂运行建模方法,简化建模过程,减少计算时间。
发明内容:本发明采用的技术方案是一种虚拟电厂运行建模方法,包括以下步骤:
建立鲁棒混合整数线性规划模型;
建立电力系统运行满足的成本约束、出力约束、启停时间约束,其中传统能源发电的成本约束为:
ct(pt)=a*ut+b*p1,t+c*p2,t
pt=p1,t+p2,t
ut∈{0,1}
式中:pt为t时段虚拟电厂的出力,ct为t时段的成本,a、b、c为t时段成本分段线性化系数,p1,t、p2,t为t时段分段1、分段2的出力,ut表示发电机t时刻是否工作,若是则置1,否则置0;
设定迭代次数、迭代步长和鲁棒系数;
求解得出参与市场运行的虚拟电厂最优竞标结果。
优选地,所述的虚拟电厂由风电、燃气轮机组、抽水蓄能电站组成的传统能源与可再生能源联合的新型发电形式。
优选地,所述的虚拟电厂可参与大电网与电力市场的运行。通过求解一系列的鲁棒混合整数线性规划模型,可以得出虚拟电厂参与市场运行的时竞标曲线。同时在平衡市场中,当虚拟电厂实际出力小于合约时可购买电能以平衡不平衡功率或接受不平衡处罚。
优选地,所述的目标函数中,虚拟电厂参与市场运行的目标函数为:
式中:NT为总时段数,λt为t时段的市场电价,pt为t时段虚拟电厂的出力,ct为t时段的成本函数,z0和q0t为鲁棒区间优化法中的对偶变量,Γ0为鲁棒系数。
优选地,与采用电价的预测值作为模型的输入不同,而是通过确定电价的置信区间,利用鲁棒区间优化法处理电价的不确定性。
有益效果:本发明将传统发电机组的二次发电成本曲线等虚拟电厂运行中的相关约束分段线性化,建立了鲁棒混合整数线性规划模型,方便于采用CPLEX等优化软件直接建模求解,简化了建模过程,大大减少了计算时间。
附图说明
图1为本发明的流程图;
图2为迭代计算的流程图。
具体实施方式
下面结合附图和具体实施例,进一步阐明本发明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落于本申请所附权利要求所限定的范围。
本发明提供的一种虚拟电厂运行建模方法,该方法的流程图如图1所示,包括:
步骤1),建立以参与电力市场运行的虚拟电厂的利润最大为目标函数的鲁棒混合整数线性规划模型,在数学模型中采用鲁棒区间优化法处理电价的不确定性:
上式中:NT为总时段数,λt为t时段的市场电价,pt为t时段虚拟电厂的出力,ct为t时段的成本,z0和q0t为鲁棒区间优化法中的对偶变量,Γ0为鲁棒系数。
而约束条件包括:
(1)传统能源发电形式的成本约束:
ct(pt)=a*ut+b*p1,t+c*p2,t
pt=p1,t+p2,t
ut∈{0,1}
式中:pt为t时段虚拟电厂的出力,ct为t时段的成本,a、b、c为t时段成本分段线性化系数,p1,t、p2,t为t时段分段1、分段2的出力,ut表示发电机t时刻是否工作,若是则置1,否则置0。
(2)传统能源发电形式的最大/最小出力约束:
Pminut≤pt≤Pmax,t=1,...,NT
式中:Pmax/Pmin为虚拟电厂的最大/最小出力,为t时段的最大出力,NT为总时段数。
(3)传统能源发电形式的爬坡率、启停时间约束:
pt max≤pt-1+Ruput-1+RSU[ut-ut-1]+Pmax[1-ut],t=1,...,NT
pt max≤Pmaxut+1+RSD[ut-ut-1],t=1,...,NT
pt-1-pt≤Rdownut+RSD[ut-1-ut],t=1,...,NT
其中:
式中:Rup/Rdown为机组的向上/向下爬坡率,RSU/RSD为机组的启/停向上/向下爬坡率,为机组的最小启/停时间,为机组连续工作/停机时段数。
(4)鲁棒区间优化的辅助条件:
z0+q0t≥dtyt,t∈J0
q0t≥0,t=1,...,NT
yt≥0,t=1,...,NT
z0≥0
pt≤yt,t=1,...,NT
式中:z0和q0t为考虑电价确定性区间边界的对偶变量,yt为是约束条件线性化的附加变量,dt为电价预测值的偏差,J0={j|dj>0}为考虑电价预测存在偏差的时间段集合。
步骤2),以电价的上下限为边界建立鲁棒区间模型:
步骤3),设定迭代次数、迭代步长和鲁棒系数,按下式取值:
k=1
Gk=0
Γ0=24
式中:k为迭代次数,Gk为在[0,1]区间取值的因子,λt为t时段的电价,λt max为t时段电价置信区间的上限值。
步骤4)如图2所示,使用IBM CPLEX软件求解得出参与市场运行的虚拟电厂最优竞标结果。
下面介绍本发明的一个实施例:
虚拟电厂中可再生能源发电形式选定为风电,传统能源发电形式选定为型号不同的三台燃气轮机,储能形式选定为抽水蓄能电站。将三台燃气轮机的成本曲线分两段线性化,其发电参数如表1。基于欧洲电能交易中心(European energy exchange,EEX)2014年5月24日前两周的电价历史数据,采用人工神经网络算法,预测得出2014年5月24日的电价数据。在获得电价预测值的基础上,采用置信区间处理电价的不确定性,同时将鲁棒区间优化法与置信区间相结合。基于新疆某小型风电场2013年5月24日前两周的风电历史数据,采用人工神经网络算法,预测2014年5月24日的风机出力数据。
表1燃气轮机的参数
采用IBM公司的优化软件CPLEX12.5在四核3.30GHzCPU和4GB内存的个人计算机上对上述鲁棒混合整数线性规划问题进行求解,得到虚拟电厂参与电力市场竞标计划和收益情况。
当选取电价预测值进行竞标时,相应的问题转化为确定性规划问题。对(1)确定性(2)采用鲁棒区间优化法处理电价不确定性,分别模拟虚拟电厂一周内五天的运行情况,得到下一交易日的实际利润和计算时间如表2所示,其中利润2为采用本发明得出的实际利润的期望值,利润1为转化为确定性规划问题得出的实际利润的期望值。
表2两种模型的利润比较
从仿真结果可以看出,本发明的方法具有计算效率高、经济效益好的优势,克服了确定性条件下规划结果经济效益差、计算时间长的缺点。
Claims (4)
1.一种虚拟电厂运行建模方法,其特征在于,包括以下步骤:
1)建立以参与电力市场运行的虚拟电厂的利润最大为目标函数的鲁棒混合整数线性规划模型,在数学模型中采用鲁棒区间优化法处理电价的不确定性:
<mrow>
<mi>min</mi>
<mo>-</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mi>T</mi>
</msub>
</munderover>
<mo>&lsqb;</mo>
<msub>
<mi>&lambda;</mi>
<mi>t</mi>
</msub>
<msub>
<mi>p</mi>
<mi>t</mi>
</msub>
<mo>-</mo>
<msub>
<mi>c</mi>
<mi>t</mi>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>p</mi>
<mi>t</mi>
</msub>
<mo>)</mo>
</mrow>
<mo>&rsqb;</mo>
<mo>+</mo>
<msub>
<mi>z</mi>
<mn>0</mn>
</msub>
<msub>
<mi>&Gamma;</mi>
<mn>0</mn>
</msub>
<mo>+</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mi>T</mi>
</msub>
</munderover>
<msub>
<mi>q</mi>
<mrow>
<mn>0</mn>
<mi>t</mi>
</mrow>
</msub>
</mrow>
上式中:NT为总时段数,λt为t时段的市场电价,pt为t时段虚拟电厂的出力,ct为t时段的成本,z0和q0t为鲁棒区间优化法中的对偶变量,Γ0为鲁棒系数,min为时间分钟;
2)建立电力系统运行满足的成本约束、出力约束、启停时间约束,其中传统能源发电的成本约束为:
ct(pt)=a*ut+b*p1,t+c*p2,t
pt=p1,t+p2,t
ut∈{0,1}
式中:pt为t时段虚拟电厂的出力,ct为t时段的成本,a、b、c为t时段成本分段线性化系数,p1,t、p2,t为t时段分段1、分段2的出力,ut表示发电机t时刻是否工作,若是则置1,否则置0;
3)设定迭代次数、迭代步长和鲁棒系数;
4)求解得出参与市场运行的虚拟电厂最优竞标结果。
2.根据权利要求1所述的虚拟电厂运行建模方法,其特征在于,所述的虚拟电厂是由风电、燃气轮机组、抽水蓄能电站组成的传统能源与可再生能源联合的新型发电形式。
3.根据权利要求1所述的虚拟电厂运行建模方法,其特征在于,所述的虚拟电厂可参与大电网与电力市场的运行,通过求解鲁棒混合整数线性规划模型,可以得出虚拟电厂参与市场运行的时竞标曲线,同时在平衡市场中,当虚拟电厂实际出力小于合约时可购买电能以平衡不平衡功率或接受不平衡处罚。
4.根据权利要求1所述的虚拟电厂运行建模方法,其特征在于,与采用电价的预测值作为模型的输入不同,而是通过确定电价的置信区间,利用鲁棒区间优化法处理电价的不确定性。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510094719.0A CN104809545B (zh) | 2015-03-03 | 2015-03-03 | 一种虚拟电厂运行建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510094719.0A CN104809545B (zh) | 2015-03-03 | 2015-03-03 | 一种虚拟电厂运行建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104809545A CN104809545A (zh) | 2015-07-29 |
CN104809545B true CN104809545B (zh) | 2018-04-20 |
Family
ID=53694353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510094719.0A Active CN104809545B (zh) | 2015-03-03 | 2015-03-03 | 一种虚拟电厂运行建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104809545B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107292383B (zh) * | 2017-07-06 | 2019-12-03 | 郑保宁 | 基于深度学习算法与混合整数线性规划相结合的水质波动区间预测方法 |
CN107909509A (zh) * | 2017-10-25 | 2018-04-13 | 广东电网有限责任公司电力调度控制中心 | 一种用于信息协同交互的电力与天然气联合调度方法 |
CN107730050A (zh) * | 2017-10-31 | 2018-02-23 | 天津大学 | 一种面向家庭综合能源管理系统的鲁棒优化调度方法 |
CN108960510B (zh) * | 2018-07-04 | 2021-11-26 | 四川大学 | 一种基于两阶段随机规划的虚拟电厂优化交易策略装置 |
DE102018129810A1 (de) | 2018-11-26 | 2020-05-28 | Technische Universität Darmstadt | Verfahren und Vorrichtung zur Steuerung einer Anzahl von energieeinspeisenden und/oder energieverbrauchender Einheiten |
CN111179110B (zh) * | 2019-12-06 | 2023-09-05 | 清华-伯克利深圳学院筹备办公室 | 虚拟电厂可变阶聚合等效鲁棒动态模型建模方法及装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102402725A (zh) * | 2011-10-24 | 2012-04-04 | 上海交通大学 | 用于虚拟电厂的多目标优化能量管理信息处理方法 |
CN103825279A (zh) * | 2014-02-21 | 2014-05-28 | 华南理工大学 | 基于鲁棒控制的微电网系统电压稳定控制方法 |
CN103824134A (zh) * | 2014-03-06 | 2014-05-28 | 河海大学 | 一种用于虚拟电厂的两阶段优化调度方法 |
CN103971181A (zh) * | 2014-05-20 | 2014-08-06 | 河海大学 | 一种用于虚拟电厂的日前经济调度方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101496187B1 (ko) * | 2014-04-29 | 2015-02-27 | (주)대연씨앤아이 | 가상 발전소 서비스 장치 및 방법 |
-
2015
- 2015-03-03 CN CN201510094719.0A patent/CN104809545B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102402725A (zh) * | 2011-10-24 | 2012-04-04 | 上海交通大学 | 用于虚拟电厂的多目标优化能量管理信息处理方法 |
CN103825279A (zh) * | 2014-02-21 | 2014-05-28 | 华南理工大学 | 基于鲁棒控制的微电网系统电压稳定控制方法 |
CN103824134A (zh) * | 2014-03-06 | 2014-05-28 | 河海大学 | 一种用于虚拟电厂的两阶段优化调度方法 |
CN103971181A (zh) * | 2014-05-20 | 2014-08-06 | 河海大学 | 一种用于虚拟电厂的日前经济调度方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104809545A (zh) | 2015-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104809545B (zh) | 一种虚拟电厂运行建模方法 | |
CN107276127B (zh) | 考虑联络线电力交易计划的多区域互联电力系统的风电消纳优化方法 | |
CN103971181B (zh) | 一种用于虚拟电厂的日前经济调度方法 | |
JP6646182B2 (ja) | 省跨ぎ連通水力発電所群の長期間連合ピーキングスケジューリング方法 | |
CN106058941B (zh) | 一种基于场景分析的风电场随机优化调度方法 | |
CN107910883B (zh) | 基于抽水蓄能电站修正时序负荷曲线的随机生产模拟方法 | |
CN106327091A (zh) | 基于鲁棒联络线计划的多区域异步协调动态经济调度方法 | |
CN107154648B (zh) | 一种风电场双层有功分配控制方法 | |
CN103699941A (zh) | 一种电力系统调度运行年方案的制定方法 | |
CN104537428B (zh) | 一种计及风电接入不确定性的经济运行评估方法 | |
CN106953363A (zh) | 一种风电场限功率运行状态下电网旋转备用优化配置方法 | |
CN108039737A (zh) | 一种源网荷协调运行模拟系统 | |
CN104124685A (zh) | 基于样板风机法的风电场理论功率计算方法 | |
CN112909933B (zh) | 现货市场环境下含抽水蓄能机组的日内滚动优化调度方法 | |
CN109286208A (zh) | 一种综合能源系统调度方法和系统 | |
CN113988714A (zh) | 计及多重不确定性的园区综合能源系统动态规划方法、设备及介质 | |
CN108667077A (zh) | 一种风蓄联合系统优化调度方法 | |
CN114792994A (zh) | 一种新能源与外送联络线时序生产模拟优化方法和系统 | |
CN118074107A (zh) | 一种考虑需求响应贡献度与电网安全的光伏消纳方法及装置 | |
CN111799793B (zh) | 一种源网荷协同的输电网规划方法与系统 | |
Jing et al. | Benefit compensation of hydropower-wind-photovoltaic complementary operation in the large clean energy base | |
CN109976155A (zh) | 参与气电市场的虚拟电厂内部随机优化控制方法及系统 | |
CN117973886A (zh) | 含氢能全链路的综合能源系统协同规划运行方法及系统 | |
CN104659818B (zh) | 一种正负旋转备用容量在含风电系统中的最优分配方法 | |
CN115496378B (zh) | 一种计入风能减排效益的电力系统经济调度方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |