CN104809339A - 基于有功平衡的scada系统电网有功坏数据识别方法 - Google Patents

基于有功平衡的scada系统电网有功坏数据识别方法 Download PDF

Info

Publication number
CN104809339A
CN104809339A CN201510190568.9A CN201510190568A CN104809339A CN 104809339 A CN104809339 A CN 104809339A CN 201510190568 A CN201510190568 A CN 201510190568A CN 104809339 A CN104809339 A CN 104809339A
Authority
CN
China
Prior art keywords
data
active
meritorious
sigma
add
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510190568.9A
Other languages
English (en)
Other versions
CN104809339B (zh
Inventor
张勇军
陈艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201510190568.9A priority Critical patent/CN104809339B/zh
Publication of CN104809339A publication Critical patent/CN104809339A/zh
Application granted granted Critical
Publication of CN104809339B publication Critical patent/CN104809339B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了基于有功平衡的SCADA系统电网有功坏数据识别方法。其具体步骤为:(1)设定采集电网有功数据的时刻,获取该时刻下电网变电站的数量m;(2)获取第f个变电站的总主变容量,设定测量误差和各个有功损耗误差系数,获取所有主变各侧及出线的有功数据;(3)设置变电站的有功数据的有功坏数据度的初始值为0;(4)对有功数据进行有功平衡校验;(5)列出变电站所有有功数据的有功坏数据度,有功坏数据度为3对应的有功数据为有功坏数据;(6)判断f是否等于m,否则令f=f+1,返回步骤(2);是则结束对电网有功坏数据的识别。本发明的方法,能有效识别SCADA系统中的有功坏数据,防止有功坏数据对电网运行分析的不良影响。

Description

基于有功平衡的SCADA系统电网有功坏数据识别方法
技术领域
本发明涉及电力系统技术领域,特别涉及SCADA系统平台的电网有功坏数据识别技术。
背景技术
SCADA(Supervisory Control And Data Acquisition)系统,即数据采集与监视控制系统发挥着至关重要的作用。SCADA系统是以计算机为基础的DCS与电力自动化监控系统;它应用领域很广,可以应用于电力、冶金、石油、化工、燃气、铁路等领域的数据采集与监视控制以及过程控制等诸多领域。
在电力系统中,SCADA系统应用最为广泛,技术发展也最为成熟。它在远动系统中占重要地位,可以对现场的运行设备进行监视和控制,以实现数据采集、设备控制、测量、参数调节以及各类信号报警等各项功能。
对电网的历史运行情况进行分析,或对未来的负荷进行预测,都需要从SCADA系统中导出历史数据。然而,在数据采集的过程中,测量装置异常或数据传输错误都可能造成坏数据。由于电网设备多、数据量庞大,历史数据中往往存在大量的坏数据,这些坏数据将影响电网的运行分析和规划,使电网的运行分析和规划偏离实际情况,严重时会导致错误的结论。
SCADA系统中采集到的变电站有功数据,往往是调度运行、规划研究中最关心的。因此本文着重研究如何识别有功坏数据,从有功平衡入手,结合有功平衡校验提出了一套切实可行的方法。
发明内容
本发明的目的在于克服现有技术的缺点与不足,提供一种电网SCADA系统有功坏数据识别方法。
本发明的目的通过以下的技术方案实现:
基于有功平衡校验的SCADA系统电网有功坏数据识别方法,其特征在于,包含以下顺序的步骤:
S1.设定采集电网有功数据的历史时刻T,获取T时刻下电网变电站的数量m,并对变电站从1至m进行编号;定义f=1~m,且f的初始值为1;
S2.获取第f个变电站的总主变容量SN,设定测量误差系数ε0、主变有功损耗误差系数ε1、高压侧出线有功损耗误差系数εg、中压侧出线有功损耗误差系数εz和低压侧出线有功损耗误差系数εd;获取第f个变电站的主变台数n,令l=1~n,l表示主变的序号;获取第f个变电站所有主变高、中和低压侧的有功数据Pgl、Pzl和Pdl;获取第f个变电站高、中和低压侧的出线数a、b和c,令i=1~a,i表示高压侧出线的序号,令j=1~b,j表示中压侧出线的序号,令k=1~c,k表示低压侧出线的序号;获取第f个变电站高、中和低压侧出线的有功数据Pgxi、Pzxj和Pdxk,以及连接这些出线另外的变电站同一出线的有功数据P′gxi、P′zxj和P′dxk;以上获取的有功数据均为T时刻下电网的运行数据;
S3.设置第f个变电站的有功数据的有功坏数据度为0;所述有功坏数据度包括:主变高、中和低压侧的有功坏数据度Hgl、Hzl和Hdl,主变高、中和低压侧出线的有功坏数据度Hgxi、Hzxj和Hdxk
S4.对S2中的有功数据进行有功平衡校验;
S5.列出第f个变电站高、中和低压侧及其出线的所有有功坏数据度Hgl、Hzl、Hdl、Hgxi、Hzxj和Hdxk,有功坏数据度为3对应的有功数据,均为有功坏数据;
S6.判断f是否等于m,若f不等于m,令f=f+1,返回步骤S2;若f等于m,结束对电网有功坏数据的识别。
所述的有功坏数据,是指从SCADA系统中采集到的变电站主变高、中和低压侧及其各条出线的有功功率数据中,由于测量装置损坏、通信设备中断或存储出错等原因,与真实值的误差超出了电网运行分析和规划所允许的误差范围的异常运行数据;有功坏数据会导致电网运行分析和规划偏离实际情况,甚至导致错误的结论,因此需要进行识别和剔除。
所述的有功坏数据度,是用来判断变电站主变和出线的有功数据是否为有功坏数据的条件,当某个有功坏数据度为3时,则判断其对应的有功数据是有功坏数据。
所述的有功平衡校验,是用来计算有功坏数据度的方法,有功平衡校验具体如下:
A.对l从1到n,判断式(1)是否成立:
|Pgl+Pzl+Pdl1SN|<ε0SN    (1)
若不成立,则将Hgl、Hzl和Hdl分别加1;若成立,则Hgl、Hzl和Hdl保持原值;
B.对i从1到a,判断式(2)是否成立:
|Pgxi+P′gxigSN|<ε0SN    (2)
若不成立,则将Hgxi加1;若成立,则Hgxi保持原值;
C.对j从1到b,判断式(3)是否成立:
|Pzxj+P′zxjzSN|<ε0SN    (3)
若不成立,则将Hzxj加1;若成立,则Hzxj保持原值;
D.对k从1到c,判断式(4)是否成立:
|Pdxk+P′dxkdSN|<ε0SN    (4)
若不成立,则将Hdxk加1;若成立,则Hdxk保持原值;
E.判断式(5)是否成立:
       | &Sigma; l = 1 n P gl + &Sigma; i = 1 a P gxi | < &epsiv; 0 S N - - - ( 5 )
若不成立,则对l从1到n,将Hgl加1,对i从1到a,将Hgxi加1;若成立,则Hgl和Hgxi保持原值;
F.判断式(6)是否成立:
       | &Sigma; l = 1 n P zl + &Sigma; j = 1 b P zxj | < &epsiv; 0 S N - - - ( 6 )
若不成立,则对l从1到n,将Hzl加1,对j从1到b,将Hzxj加1;若成立,则Hzl和Hzxj保持原值;
G.判断式(7)是否成立:
       | &Sigma; l = 1 n P dl + &Sigma; k = 1 c P dxk | < &epsiv; 0 S N - - - ( 7 )
若不成立,则对l从1到n,将Hdl加1,对k从1到c,将Hdxk加1;若成立,则Hdl和Hdxk保持原值;
H.判断式(8)是否成立:
       | &Sigma; l = 1 n P gl - &Sigma; i = 1 a P gxi &prime; + a &epsiv; g S N | < &epsiv; 0 S N - - - ( 8 )
若不成立,则对l从1到n,将Hgl加1;若成立,则Hgl保持原值;
I.判断式(9)是否成立:
       | &Sigma; l = 1 n P zl - &Sigma; j = 1 b P zxj &prime; + b &epsiv; z S N | < &epsiv; 0 S N - - - ( 9 )
若不成立,则对l从1到n,将Hzl加1;若成立,则Hzl保持原值;
J.判断式(10)是否成立:
       | &Sigma; l = 1 n P dl - &Sigma; k = 1 c P dxk &prime; + c &epsiv; d S N | < &epsiv; 0 S N - - - ( 10 )
若不成立,则对l从1到n,将Hdl加1;若成立,则Hdl保持原值;
K.判断式(11)是否成立:
       | &Sigma; i = 1 a P gxi + &Sigma; j = 1 b P zxj + &Sigma; k = 1 c P dxk - &epsiv; 1 S N | < &epsiv; 0 S N - - - ( 11 ) .
若不成立,则对i从1到a,将Hgxi加1,对j从1到b,将Hzxj加1,对k从1到c,将Hdxk加1;若成立,则Hgxi、Hzxj和Hdxk保持原值。
在进行上述的有功平衡校验时,变电站高、中和低压侧及其出线的所有有功数据均分别进行了3次校验,当某个有功数据都不满足这3次校验时,才可判断其为有功坏数据。因此,有功坏数据度为3对应的有功数据,才能被判断为有功坏数据。
本发明与现有技术相比,具有如下优点和有益效果:
(1)本发明给出了具体的识别SCADA系统电网有功坏数据的方法,为剔除历史有功坏数据,提供了方便、有效的识别方法。
(2)本发明所提供的识别方法,基于有功平衡和误差理论,并提出了评价指标有功坏数据度,通过对主变高、中和低压侧以及出线的有功坏数据度进行了三次计算,最终识别有功坏数据,结果更可靠。
附图说明
图1为本发明所述的基于有功平衡校验的SCADA系统电网有功坏数据识别方法的流程图;
图2为图1所述方法的计算实施例变电站示意图。
具体实施方式
下面结合实施例及附图对本发明作进一步详细的描述,但本发明的实施方式不限于此。
某220kV变电站由2台变压器组成,高压侧有2条出线,中和低压侧分别有3条出线,其示意图如图2所示。
结合图1规划流程,基于有功平衡校验的电网SCADA系统有功坏数据识别方法,包括以下步骤:
(1)设定采集电网有功数据的历史时刻T,获取T时刻下电网变电站的数量m,并对变电站从1至m进行编号;定义f=1~m,且f的初始值为1;
本实施例中,采集电网有功数据的历史时刻为2013年2月11日5:00,变电站的个数为1。
(2)获取第f个变电站的总主变容量SN,设定测量误差系数ε0、主变有功损耗误差系数ε1、高压侧出线有功损耗误差系数εg、中压侧出线有功损耗误差系数εz和低压侧出线有功损耗误差系数εd;获取第f个变电站的主变台数n,令l=1~n,l表示主变的序号;获取第f个变电站所有主变高、中和低压侧的有功数据Pgl、Pzl和Pdl;获取第f个变电站高、中和低压侧的出线数a、b和c,令i=1~a,i表示高压侧出线的序号,令j=1~b,j表示中压侧出线的序号,令k=1~c,k表示低压侧出线的序号;获取第f个变电站高、中和低压侧出线的有功数据Pgxi、Pzxj和Pdxk,以及连接这些出线另外的变电站同一出线的有功数据P′gxi、P′zxj和P′dxk
本实施例中,SN=480MVA,设定ε0=0.01,ε1=0.002,εg=0.002,εz=0.001,εd=0.001;n=2,所有主变高、中和低压侧的有功数据如表1所示;a=2,b=3,c=3,主变高、中和低压侧的出线以及连接这些出线另外的变电站同一出线的有功数据如表2所示。
表1主变的有功数据(单位:MW)
      
表2主变出线及对端出线的有功数据(单位:MW)
      
(3)设置第f个变电站的有功坏数据度为0;所述有功坏数据度包括:主变高、中和低压侧的有功坏数据度Hgl、Hzl和Hdl,主变高、中和低压侧出线的有功坏数据度Hgxi、Hzxj和Hdxk
(4)对(2)中的有功数据进行有功平衡校验;
A.对l从1到n,判断式(1)是否成立:
|Pgl+Pzl+Pdl1SN|<ε0SN    (1)若不成立,则将Hgl、Hzl和Hdl分别加1;若成立,则Hgl、Hzl和Hdl保持原值;本实施例中,
ε0SN=0.01×480=4.8MW
|Pg1+Pz1+Pd11SN|=|60.4-54.1-8.0-0.002×480|=2.66MW<ε0SN
|Pg2+Pz2+Pd21SN|=|32.3-58.6-4.2-0.002×480|=31.46MW>ε0SN
因此,Hg1=Hzl=Hdl=0,Hg2=Hz2=Hd2=1;
B.对i从1到a,判断式(2)是否成立:
|Pgxi+P′gxigSN|<ε0SN    (2)若不成立,则将Hgxi加1;若成立,则Hgxi保持原值;
本实施例中,
|Pgx1+P′gx1gSN|=|173.5-176.6-0.002×480|=4.06MW<ε0SN
|Pgx2+P′gx2gSN|=|-304.6+305.7-0.002×480|=0.14MW<ε0SN
因此,Hgx1=Hgx2=0;
C.对j从1到b,判断式(3)是否成立:
|Pzxj+P′zxjzSN|<ε0SN    (3)若不成立,则将Hzxj加1;若成立,则Hzxj保持原值;
本实施例中,
|Pzx1+P′zx1zSN|=|32.5-31.8-0.001×480|=0.22MW<ε0SN
|Pzx2+P′zx2zSN|=|60.8-58.4-0.001×480|=1.92MW<ε0SN
|Pzx3+P′zx3zSN|=|-20.2-18.6-0.001×480|=39.28MW>ε0SN
因此,Hzx1=Hzx2=0,Hzx3=1;
D.对k从1到c,判断式(4)是否成立:
|Pdxk+P′dxkdSN|<ε0SN    (4)若不成立,则将Hdxk加1;若成立,则Hdxk保持原值;
本实施例中,
|Pdx1+P′dx1dSN|=|4.6-4.5-0.001×480|=0.38MW<ε0SN
|Pdx2+P′dx2dSN|=|3.8-3.9-0.001×480|=0.58MW<ε0SN
|Pdx3+P′dx3dSN|=|3.6-3.2-0.001×480|=0.08MW<ε0SN
因此,Hdx1=Hdx2=Hdx3=0;
E.判断式(5)是否成立:
       | &Sigma; l = 1 n P gl + &Sigma; i = 1 a P gxi | < &epsiv; 0 S N - - - ( 5 )
若不成立,则对l从1到n,将Hgl加1,对i从1到a,将Hgxi加1;若成立,则Hgl和Hgxi保持原值;
本实施例中,
       | &Sigma; l = 1 n P gl + &Sigma; i = 1 a P gxi | = | 60.4 + 32.3 + 173.5 - 304.6 | = 38.6 MW > &epsiv; 0 S N
因此,Hg1=Hgx1=Hgx2=1,Hg2=2;
F.判断式(6)是否成立:
       | &Sigma; l = 1 n P zl + &Sigma; j = 1 b P zxj | < &epsiv; 0 S N - - - ( 6 )
若不成立,则对l从1到n,将Hzl加1,对j从1到b,将Hzxj加1;若成立,则Hzl和Hzxj保持原值;
本实施例中,
       | &Sigma; l = 1 n P zl + &Sigma; j = 1 b P zxj | = | - 54.1 - 58.6 + 32.5 + 60.8 - 20.2 | = 39.6 MW > &epsiv; 0 S N
因此,Hz1=Hzx1=Hzx2=1,Hz2=Hzx3=2;
G.判断式(7)是否成立:
       | &Sigma; l = 1 n P dl + &Sigma; k = 1 c P dxk | < &epsiv; 0 S N - - - ( 7 )
若不成立,则对l从1到n,将Hdl加1,对k从1到c,将Hdxk加1;若成立,则Hdl和Hdxk保持原值;
本实施例中,
       | &Sigma; l = 1 n P dl + &Sigma; k = 1 c P dxk | = | - 8 . 0 - 4.2 + 4 . 6 + 3.8 + 3.6 | = 0 . 2 MW > &epsiv; 0 S N
因此,Hd1=Hdx1=Hdx2=Hdx3=0,Hd2=1;
H.判断式(8)是否成立:
       | &Sigma; l = 1 n P gl - &Sigma; i = 1 a P gxi &prime; + a &epsiv; g S N | < &epsiv; 0 S N - - - ( 8 )
若不成立,则对l从1到n,将Hgl加1;若成立,则Hgl保持原值;
本实施例中,
       | &Sigma; l = 1 n P gl - &Sigma; i = 1 a P gxi &prime; + a &epsiv; g S N | = | 60.4 + 32.3 - ( - 176.6 + 305.7 ) + 2 &times; 0.002 &times; 480 | = 34.48 MW > &epsiv; 0 S N
因此,Hg1=2,Hg2=3;
I.判断式(9)是否成立:
       | &Sigma; l = 1 n P zl - &Sigma; j = 1 b P zxj &prime; + b &epsiv; z S N | < &epsiv; 0 S N - - - ( 9 )
若不成立,则对l从1到n,将Hzl加1;若成立,则Hzl保持原值;
本实施例中,
       | &Sigma; l = 1 n P zl - &Sigma; j = 1 b P zxj &prime; + b &epsiv; z S N | = | - 54.1 - 58.6 - ( - 31.8 - 58.4 - 18.6 ) + 3 &times; 0.001 &times; 480 | = 2.46 MW < &epsiv; 0 S N
因此,Hz1=1,Hz2=2;
J.判断式(10)是否成立:
       | &Sigma; l = 1 n P dl - &Sigma; k = 1 c P dxk &prime; + c &epsiv; d S N | < &epsiv; 0 S N - - - ( 10 )
若不成立,则对l从1到n,将Hdl加1;若成立,则Hdl保持原值;
本实施例中,
       | &Sigma; l = 1 n P dl - &Sigma; k = 1 c P dxk &prime; + c &epsiv; d S N | = | - 8.0 - 4.2 - ( - 4.5 - 3 . 9 - 3.2 ) + 3 &times; 0.001 &times; 480 | = 0 . 84 MW < &epsiv; 0 S N
因此,Hd1=0,Hd2=1;
K.判断式(11)是否成立:
       | &Sigma; i = 1 a P gxi + &Sigma; j = 1 b P zxj + &Sigma; k = 1 c P dxk - &epsiv; 1 S N | < &epsiv; 0 S N - - - ( 11 ) .
若不成立,则对i从1到a,将Hgxi加1,对j从1到b,将Hzxj加1,对k从1到c,将Hdxk加1;若成立,则Hgxi、Hzxj和Hdxk保持原值。
本实施例中,
       | &Sigma; i = 1 a P gxi + &Sigma; j = 1 b P zxj + &Sigma; k = 1 c P dxk - &epsiv; 1 S N | = 173.5 - 304.6 + 32.5 + 60.8 - 20.2 + 4.6 + 3.8 + 3.6 - 0.002 &times; 480 = 46.96 MW > &epsiv; 0 S N
因此,Hgx1=Hgx2=Hzx1=Hzx2=2,Hzx3=3,Hdx1=Hdx2=Hdx3=1。
(5)列出第f个变电站高、中和低压侧及其出线的所有有功坏数据度Hgl、Hzl、Hdl、Hgxi、Hzxj和Hdxk,有功坏数据度为3对应的有功数据,均为有功坏数据;
本实施例中,
Hd1=0;Hz1=Hd2=Hdx1=Hdx2=Hdx3=1;Hg1=Hz2=Hgx1=Hgx2=Hzx1=Hzx2=2;Hg2=Hzx3=3;其中Hg2和Hzx3的值为3,由此可见,Pg2=32.3MW和Pzx3=﹣20.2MW为有功坏数据。
可见,采用本发明所提出的基于有功平衡校验的SCADA系统电网有功坏数据识别方法,能有效地识别SCADA系统采集的有功坏数据,对更好地分析电网历史运行情况提供较为准确的数据支撑。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他任何未背离本发明的精神实质和原理下所作的修改、修饰、替代、组合、简化,均应为等效的置换方式,都应包含在本发明的保护范围之内。

Claims (3)

1.基于有功平衡的SCADA系统电网有功坏数据识别方法,其特征在于,包含以下步骤:
S1.设定采集电网有功数据的历史时刻T,获取T时刻下电网变电站的数量m,并对变电站从1至m进行编号;定义f=1~m,且f的初始值为1;
S2.获取第f个变电站的总主变容量SN,设定测量误差系数ε0、主变有功损耗误差系数ε1、高压侧出线有功损耗误差系数εg、中压侧出线有功损耗误差系数εz和低压侧出线有功损耗误差系数εd;获取第f个变电站的主变台数n,令l=1~n,l表示主变的序号;获取第f个变电站所有主变高、中和低压侧的有功数据Pgl、Pzl和Pdl;获取第f个变电站高、中和低压侧的出线数a、b和c,令i=1~a,i表示高压侧出线的序号,令j=1~b,j表示中压侧出线的序号,令k=1~c,k表示低压侧出线的序号;获取第f个变电站高、中和低压侧出线的有功数据Pgxi、Pzxj和Pdxk,以及连接这些出线另外的变电站同一出线的有功数据P′gxi、P′zxj和P′dxk;以上获取的有功数据均为T时刻下电网的运行数据;
S3.设置第f个变电站的有功数据的有功坏数据度为0;所述有功坏数据度包括:主变高、中和低压侧的有功坏数据度Hgl、Hzl和Hdl,主变高、中和低压侧出线的有功坏数据度Hgxi、Hzxj和Hdxk
S4.对步骤S2中的有功数据进行有功平衡校验;
S5.列出第f个变电站高、中和低压侧及其出线的所有有功坏数据度Hgl、Hzl、Hdl、Hgxi、Hzxj和Hdxk,有功坏数据度为3对应的有功数据,均为有功坏数据;
S6.判断f是否等于m,若f不等于m,令f=f+1,返回步骤S2;若f等于m,结束对电网有功坏数据的识别。
2.根据权利要求1所述的基于有功平衡校验的电网SCADA系统有功坏数据识别方法,其特征在于,所述的有功坏数据度是用来判断变电站主变和出线的有功数据是否为有功坏数据的条件,当某个有功坏数据度为3时,则判断其对应的有功数据是有功坏数据。
3.根据权利要求1所述的基于有功平衡校验的SCADA系统电网有功坏数据识别方法,其特征在于,所述的有功平衡校验,是用来计算有功坏数据度的方法,有功平衡校验具体如下:
A.对l从1到n,判断式(1)是否成立:
|Pgl+Pzl+Pdl1SN|<ε0SN    (1)
若不成立,则将Hgl、Hzl和Hdl分别加1;若成立,则Hgl、Hzl和Hdl保持原值;
B.对i从1到a,判断式(2)是否成立:
|Pgxi+P′gxigSN|<ε0SN    (2)
若不成立,则将Hgxi加1;若成立,则Hgxi保持原值;
C.对j从1到b,判断式(3)是否成立:
|Pzxj+P′zxjzSN|<ε0SN    (3)
若不成立,则将Hzxj加1;若成立,则Hzxj保持原值;
D.对k从1到c,判断式(4)是否成立:
|Pdxk+P′dxkdSN|<ε0SN    (4)
若不成立,则将Hdxk加1;若成立,则Hdxk保持原值;
E.判断式(5)是否成立:
| &Sigma; l = 1 n P gl + &Sigma; i = 1 a P gxi | < &epsiv; 0 S N - - - ( 5 )
若不成立,则对l从1到n,将Hgl加1,对i从1到a,将Hgxi加1;若成立,则Hgl和Hgxi保持原值;
F.判断式(6)是否成立:
| &Sigma; l = 1 n P zl + &Sigma; j = 1 b P zxj | < &epsiv; 0 S N - - - ( 6 )
若不成立,则对l从1到n,将Hzl加1,对j从1到b,将Hzxj加1;若成立,则Hzl和Hzxj保持原值;
G.判断式(7)是否成立:
| &Sigma; l = 1 n P dl + &Sigma; k = 1 c P dxk | < &epsiv; 0 S N - - - ( 7 )
若不成立,则对l从1到n,将Hdl加1,对k从1到c,将Hdxk加1;若成立,则Hdl和Hdxk保持原值;
H.判断式(8)是否成立:
| &Sigma; l = 1 n P gl - &Sigma; i = 1 a P gxi &prime; + a&epsiv; g S N | < &epsiv; 0 S N - - - ( 8 )
若不成立,则对l从1到n,将Hgl加1;若成立,则Hgl保持原值;
I.判断式(9)是否成立:
| &Sigma; l = 1 n P zl - &Sigma; j = 1 b P zxj &prime; + b&epsiv; z S N | < &epsiv; 0 S N - - - ( 9 )
若不成立,则对l从1到n,将Hzl加1;若成立,则Hzl保持原值;
J.判断式(10)是否成立:
| &Sigma; l = 1 n P dl - &Sigma; k = 1 c P dxk &prime; + c&epsiv; d S N | < &epsiv; 0 S N - - - ( 10 )
若不成立,则对l从1到n,将Hdl加1;若成立,则Hdl保持原值;
K.判断式(11)是否成立:
| &Sigma; i = 1 a P gxi + &Sigma; j = 1 b P zxj + &Sigma; k = 1 c P dxk - &epsiv; 1 S N | &epsiv; 0 S N - - - ( 11 )
若不成立,则对i从1到a,将Hgxi加1,对j从1到b,将Hzxj加1,对k从1到c,将Hdxk加1;若成立,则Hgxi、Hzxj和Hdxk保持原值。
CN201510190568.9A 2015-04-22 2015-04-22 基于有功平衡的scada系统电网有功坏数据识别方法 Active CN104809339B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510190568.9A CN104809339B (zh) 2015-04-22 2015-04-22 基于有功平衡的scada系统电网有功坏数据识别方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510190568.9A CN104809339B (zh) 2015-04-22 2015-04-22 基于有功平衡的scada系统电网有功坏数据识别方法

Publications (2)

Publication Number Publication Date
CN104809339A true CN104809339A (zh) 2015-07-29
CN104809339B CN104809339B (zh) 2018-01-05

Family

ID=53694155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510190568.9A Active CN104809339B (zh) 2015-04-22 2015-04-22 基于有功平衡的scada系统电网有功坏数据识别方法

Country Status (1)

Country Link
CN (1) CN104809339B (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5638378A (en) * 1994-12-22 1997-06-10 Motorola, Inc. Method of operating a communication system
US5808902A (en) * 1996-05-23 1998-09-15 Basic Measuring Instruments Power quality transducer for use with supervisory control systems
CN102636706A (zh) * 2012-03-12 2012-08-15 河海大学 一种电网中参数误差支路的辨识方法
CN102723711A (zh) * 2012-06-08 2012-10-10 陕西电力科学研究院 一种基于可信度的电缆配电网状态估计方法
CN102855296A (zh) * 2012-08-14 2013-01-02 中国电力科学研究院 可再生能源发电历史数据预处理方法和系统
CN103324847A (zh) * 2013-06-17 2013-09-25 西南交通大学 电力系统动态不良数据检测与辨识方法
JP2013219902A (ja) * 2012-04-06 2013-10-24 Fuji Electric Co Ltd 電力系統の状態推定方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5638378A (en) * 1994-12-22 1997-06-10 Motorola, Inc. Method of operating a communication system
US5808902A (en) * 1996-05-23 1998-09-15 Basic Measuring Instruments Power quality transducer for use with supervisory control systems
CN102636706A (zh) * 2012-03-12 2012-08-15 河海大学 一种电网中参数误差支路的辨识方法
JP2013219902A (ja) * 2012-04-06 2013-10-24 Fuji Electric Co Ltd 電力系統の状態推定方法
CN102723711A (zh) * 2012-06-08 2012-10-10 陕西电力科学研究院 一种基于可信度的电缆配电网状态估计方法
CN102855296A (zh) * 2012-08-14 2013-01-02 中国电力科学研究院 可再生能源发电历史数据预处理方法和系统
CN103324847A (zh) * 2013-06-17 2013-09-25 西南交通大学 电力系统动态不良数据检测与辨识方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
L.MILI,ET AL.: "《A robust estimation method for topology error identification》", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
SALEHFAR H,ET AL.: "《A Neutral Network Pre-estimation Filter for Bad Data Detection and Identification in Power System State Estimation》", 《ELECTRIC POWER SYSTEM RESEARCH》 *
周小宝: "《电力系统状态估计不良数据检测与辨识方法研究与应用》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
邹贤: "《基于GSA的昆明电网不良数据辨识与修正研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Also Published As

Publication number Publication date
CN104809339B (zh) 2018-01-05

Similar Documents

Publication Publication Date Title
Gautam et al. Resilience assessment of distribution systems integrated with distributed energy resources
CN101425681B (zh) 电网系统继电保护在线校核方法
CN104392391A (zh) 一种电网运行安全风险量化方法
CN102819813B (zh) 一种智能变电站自动化系统的安全风险评估方法
CN110322135A (zh) 一种电网设备安全运行状态的实时监控方法及系统
CN104299116A (zh) 一种电网运行安全风险定量评估方法
CN105678469A (zh) 一种应用于智能变电站继电保护设备的风险评估方法
CN108985602B (zh) 一种计及风险的电网分类项目的投入产出评价方法及系统
CN103606048A (zh) 基于oms系统的继电保护在线复核方法及其系统
CN104917085A (zh) 一种优化可靠性与经济性的变压器检修决策方法
CN104820884A (zh) 一种结合电力系统特征的电网调度实时数据稽查方法
CN104750976A (zh) 一种输电线路状态评价参数体系的构建方法
CN112116276B (zh) 一种计及电气主设备时变状态的变电站运行风险评估方法
CN104091289A (zh) 基于接线模式规则的大规模配电网n-1快速校验方法
CN110542879A (zh) 电容式电压互感器运行性能变化趋势预测方法与系统
Catterson et al. The impact of smart grid technology on dielectrics and electrical insulation
CN202004534U (zh) 一种电网风险监控系统
CN109376421A (zh) 一种智能变电站保护设备的故障率评估方法
CN106845757B (zh) 一种电网潮流转移危害度评估方法
CN105205732A (zh) 一种基于设备风险特征模型的风险评估和检修方法
Okoye et al. A study and evaluation of power outages on 132 kv transmission network in Nigeria for grid security
CN103049661B (zh) Gis剩余使用寿命评估方法和系统
CN107611940A (zh) 一种基于历史数据分析的配电网异常监测方法与系统
CN104063757B (zh) 一种适应电网不同发展阶段的变电站电气主接线评估方法
CN109377044A (zh) 一种智能变电站保护设备的故障检修成本分析方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant