CN104807382A - 后注水式高效安全环保的静态爆破方法及使用该方法的注水装置 - Google Patents

后注水式高效安全环保的静态爆破方法及使用该方法的注水装置 Download PDF

Info

Publication number
CN104807382A
CN104807382A CN201510140675.0A CN201510140675A CN104807382A CN 104807382 A CN104807382 A CN 104807382A CN 201510140675 A CN201510140675 A CN 201510140675A CN 104807382 A CN104807382 A CN 104807382A
Authority
CN
China
Prior art keywords
water
hole
pipe
water filling
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510140675.0A
Other languages
English (en)
Other versions
CN104807382B (zh
Inventor
李建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rain Intelligence Science And Technology Ltd Is Herded In Hunan
Original Assignee
Rain Intelligence Science And Technology Ltd Is Herded In Hunan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rain Intelligence Science And Technology Ltd Is Herded In Hunan filed Critical Rain Intelligence Science And Technology Ltd Is Herded In Hunan
Priority to CN201510140675.0A priority Critical patent/CN104807382B/zh
Publication of CN104807382A publication Critical patent/CN104807382A/zh
Application granted granted Critical
Publication of CN104807382B publication Critical patent/CN104807382B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及静态爆破领域,具体说是后注水式高效安全环保的静态爆破方法及使用该方法注水装置,其包括在待静态爆破场所临空的作业面上按设计间隔钻数个孔;在每一孔内插入一注水管,注水管一端靠近对应的孔底,另一端伸出孔口;向孔内填装膨胀剂,填装快速凝固混合料将孔口密封,出气管的插入端与膨胀剂界面之间留有间隙;孔口密封凝固后向孔内注水。本静态破碎方法在作业面上采用潜孔钻大孔径阵列钻孔、筒状膨胀剂填装、后注水技术,适合在城市高楼旁、运行中的铁路、高速公路、高压输电铁塔旁的石方工程施工,达到了无震动、无飞石、无声响、无粉尘、安全环保的大工程量石方及混凝土拆除的静态爆破施工的目的。

Description

后注水式高效安全环保的静态爆破方法及使用该方法的注水装置
技术领域
本发明涉及静态爆破领域,具体说是一种高效安全环保的静态爆破方法及使用该方法的注水装置。
背景技术
静态爆破相对于炸药爆破而言,没有震动、没有飞石、声响、灰尘和环境污染,适合于紧靠建筑物旁的石方破碎拆除,运行中的铁路、公路、高压输电铁塔旁的石方等破碎拆除,是最环保的破碎拆除方式。
传统静态爆破方法是把膨胀剂与水按比例调和、充分搅拌成流体状后,由工人手工操作倒入孔径不大于50毫米,深度不大于3000毫米的孔中,膨胀剂与水产生化学反应引起体积膨胀使被拆除物体变形开裂,从而达到静态破碎目的。这种传统静态破碎技术只适合局部的、量小的花岗石、大理石荒料开片或需要局部移除的石方的拆除施工,其缺点是:1、由于膨胀剂与水调和成流体状后灌入孔中,灌入难度大且速度慢,为使灌入孔内的膨胀剂能同时反应膨胀,每次调和的膨胀剂数量受限,造成操作费时费工、效率低下;2、因膨胀剂与水经调和后是流体,在给孔内灌装的过程中容易产生水化反应发热汽化,经常出现不可控制的冲孔现象,操作人员眼睛受伤的情况经常发生。
发明内容
有鉴于此,本发明提供一种后注水式高效安全环保的静态爆破方法,该方法是可控制的,适合大工程量的石方破碎工程施工。
本发明所采用的技术方案为:后注水式高效安全环保的静态爆破方法,包括以下步骤:
(1)在待静态爆破场所临空的作业面上按设计间隔钻数个孔;
(2)在每一孔内插入一注水管,注水管一端插入孔底,另一端伸出孔口,在注水管所述一端的管壁上设置有开口,该开口可为设置在注水管所述一端端面的十字切口、V型切口或其他方式的开口,通过该开口可使注水管内的水快速流向孔底,从而使水从孔底逐渐向孔口蔓延,将孔内的膨胀剂侵泡的同时,挤压孔内空气往外排出;
(3)向孔内填装膨胀剂,待膨胀剂填至靠近孔口后,在孔口插入与该孔连通的出气管,并通过填装快速凝固混合料将孔口密封,出气管的插入端与膨胀剂界面之间留有间隙,该间隙可以保证孔内的空气从出气管排出,使水可以顺利注入孔内;
(4)孔口密封凝固后,通过注水管所述另一端向孔内注水,使膨胀剂和水发生化学反应,从而使膨胀剂产生膨胀作用;
(5)注水完成后,在膨胀剂的膨胀力作用下使被破碎体破碎。
作为优选,在插入注水管之前,先向每一孔内沿轴向插接数个防漏承插套管,再将注水管所述一端插入孔内底端的防漏承插套管中,该底端的防漏承插套管底端端面封闭。这样在有地质裂缝、有渗水的情况下,防漏承插套管可密封膨胀剂,使渗水不流入防漏承插套管内,也可保证防漏承插套管内的注水不从裂缝中流出。实施过程中,在无地质裂缝、无渗水的情况下在,可免去防漏承插套管,直接在孔内填装膨胀剂。膨胀剂最好是采用后注水式专用膨胀剂,当然也可采用普通膨胀剂。
作为优选,所述膨胀剂采用筒状包装,沿该膨胀剂轴向方向中心开具有通孔、圆周方向开有透水细孔,将每一个膨胀剂的通孔穿过注水管使膨胀剂填装入防漏承插套管内。在实施过程中,膨胀剂包装采用软硬包装均可,当采用软包装时,无需在其轴向方向中心开通孔,在操作时,只需直接用注水管刺破并穿过软包装膜使膨胀剂填入孔内。
作为优选,在相邻的两上下防漏承插套管中,上侧防漏承插套管的下端插入下侧防漏承插套管的上端的承插口内,可保证两防漏承插套管的插接处密封。
作为优选,注水时,待各出气管都出水时,继续注水一段时间以完成注水,待膨胀剂水化反应膨胀时,可从出气管排出热气,避免气体积累。在不同地区、不同季节、不同环境温度时,调整注水水池的水温,进而使所填装膨胀剂得到可控制的水化时间,产生最佳的破碎效果。
本静态破碎方法在作业面上采用潜孔钻大孔径阵列钻孔、筒状膨胀剂填装、后注水技术,适合在城市高楼旁、运行中的铁路、高速公路、高压输电铁塔旁的石方工程施工,达到了无震动、无飞石、无声响、无粉尘、安全环保的大工程量石方拆除的静态爆破施工的目的。
本发明还提供一种静态爆破的注水装置,其包括高压水泵,所述高压水泵通过进水管与水源连通,该高压水泵通过出水管将水输送至一注水分配器,该注水分配器通过数个注水软管将水分配至各个所述注水管,从而可通过一个注水分配器向各个孔内同时注水,不仅提高了效率,而且节省了成本。
作为优选,所述注水分配器包括一主水管,该主水管一端封闭,另一端连通所述出水管,在该主水管管壁安装有数个快速接头,每一快速接头与一所述注水软管一端连接,从而使得安装快捷,操作方便。
作为优选,每一所述注水软管另一端通过活动接头与对应的注水管连接,在注水完成后,可通过活动接头将注水软管拆卸,供下次使用。
本注水装置不仅结构简单,而且加工制作容易,成本低。
附图说明
图1是使用本发明方法时的操作示意图。
图2是本发明中防漏承插套管的放大图。
图3是本发明中筒状硬料膨胀剂的示意图。
具体实施方式
下面结合图1、图2和图3对本发明进一步详细说明:
在实施过程中,按现场实际地质及工作面情况,在有临空作业面的情况下,设计计算好钻孔排距与行间距后,再进行钻孔1,孔深应比注水管2短约300mm,在钻孔到一定排数时,可开始填装膨胀剂3。
一般地,在填装膨胀剂前,先向每一孔内沿轴向插接数个防漏承插套管4,作用是:(1)由于地质情况的不确定性,可能存在裂缝,易造成裂缝中的渗水流入孔内,导致膨胀剂过早膨胀;(2)防止由于地质裂缝漏水而不能使膨胀剂充分水化。在实施过程中,相邻的两上下防漏承插套管中,上侧防漏承插套管的下端插入下侧防漏承插套管的上端的承插口41内,这样一方面便于插接,另一方面插接处密封较严。
在实施过程中,可先将注水管2插入底端的防漏承插套管4,再将数个所述筒状膨胀剂的通孔31穿过注水管填装入防漏承插套管内。填充膨胀剂时,当膨胀剂填装至距孔口约400mm为止,靠孔边缘插入出气管5,填装快速凝固混合料,迅速填装孔口并夯实,待快速凝固混合料6凝固后,把准备好的高压水泵7的出水管71与注水分配器8连接好,高压水泵进水管72接入作为水源9的储水池,再将分配器通过快速接头81与各个注水软管82一端连接,每一注水软管的另一端通过活动接头83与插入孔内的各个注水管连接。在准备注水时,查看各接头是否连接牢固,确定无误,启动高压水泵进行注水,等到各出气管都出水时,继续注水约2-5分钟,以完成注水,再拆卸活动接头和注水软管。
本发明可根据施工现场的情况,设计好钻孔的排距与行间距阵列,用潜孔钻大量钻孔,同时分批装填、分批高压注水,各个孔内膨胀剂同时反应膨胀,极大的提高了静态破碎效益,同时避免了事故的发生,适合大量石方与混凝土静态破碎拆除工程要求,解决了传统静态爆破的技术不能大量拆除石方及混凝土的难题。
上述实施方式仅供说明本发明之用,而并非是对发明的限制,有关技术领域的普通技术人员,在不脱离本发明精神和范围的情况下,还可以作出各种变化和变型,因此所有等同的技术方案也应属于本发明的范畴。

Claims (8)

1.后注水式高效安全环保的静态爆破方法,包括以下步骤:
(1)在需要进行静态爆破施工的作业面上按设计间隔钻数个孔;
(2)在每一孔内插入一注水管,注水管一端插入孔底,另一端伸出孔口,在注水管所述一端的管壁上设置有开口;
(3)向孔内填装膨胀剂,待膨胀剂填至靠近孔口后,在孔口插入与该孔连通的出气管,并通过填装快速凝固混合料将孔口密封,出气管的插入端与膨胀剂界面之间留有间隙;
(4)孔口密封凝固后,通过注水管所述另一端向孔内注水;
(5)完成注水使被破碎体破碎。
2.如权利要求1所述静态爆破方法,其特征在于:在插入注水管之前,先向每一孔内沿轴向插接数个防漏承插套管,再将注水管所述一端插入孔内底端的防漏承插套管中,该底端的防漏承插套管底端端面封闭。
3.如权利要求2所述静态爆破方法,其特征在于:所述膨胀剂采用筒状包装,沿该膨胀剂轴向方向中心开有通孔、圆周方向开有透水细孔,将每一个膨胀剂的通孔穿过注水管使膨胀剂填装入防漏承插套管内。
4.如权利要求2或3所述静态爆破方法,其特征在于:在相邻的两上下防漏承插套管中,上侧防漏承插套管的下端插入下侧防漏承插套管的上端的承插口内。
5.如权利要求1所述静态爆破方法,其特征在于:注水时,待各出气管都出水时,继续注水一段时间以完成注水。
6.一种使用权利要求1-5中任意一项所述方法的注水装置,包括高压水泵,其特征在于:所述高压水泵通过进水管与水源连通,该高压水泵通过出水管将水输送至一注水分配器,该注水分配器通过数个注水软管将水分配至各个所述注水管。
7.如权利要求6所述的注水装置,其特征在于:所述注水分配器包括一主水管,该主水管一端封闭,另一端连通所述出水管,在该主水管管壁安装有数个快速接头,每一快速接头与一所述注水软管一端连接。
8.如权利要求7所述的注水装置,其特征在于:每一所述注水软管另一端通过活动接头与对应的注水管连接。
CN201510140675.0A 2015-03-27 2015-03-27 后注水式高效安全环保的静态爆破方法及使用该方法的注水装置 Expired - Fee Related CN104807382B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510140675.0A CN104807382B (zh) 2015-03-27 2015-03-27 后注水式高效安全环保的静态爆破方法及使用该方法的注水装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510140675.0A CN104807382B (zh) 2015-03-27 2015-03-27 后注水式高效安全环保的静态爆破方法及使用该方法的注水装置

Publications (2)

Publication Number Publication Date
CN104807382A true CN104807382A (zh) 2015-07-29
CN104807382B CN104807382B (zh) 2017-01-18

Family

ID=53692430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510140675.0A Expired - Fee Related CN104807382B (zh) 2015-03-27 2015-03-27 后注水式高效安全环保的静态爆破方法及使用该方法的注水装置

Country Status (1)

Country Link
CN (1) CN104807382B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767214A (zh) * 2017-01-13 2017-05-31 中国矿业大学(北京) 一种静态爆破防喷孔发明方法
CN107976130A (zh) * 2017-12-12 2018-05-01 中国冶集团有限公司 岩石快速无声破碎方法
CN109405691A (zh) * 2018-12-24 2019-03-01 石家庄铁道大学 大孔径静态爆破防冲孔装置和爆破方法
CN109459174A (zh) * 2018-12-24 2019-03-12 石家庄铁道大学 静态破碎剂膨胀力测试装置及测试方法
CN109489513A (zh) * 2018-11-30 2019-03-19 吕梁学院 大孔径静破剂定向破岩及防喷孔一体化装置及其施工方法
CN110779408A (zh) * 2019-10-29 2020-02-11 辽宁工程技术大学 一种综合降温和定向的静态爆破装置
CN110823037A (zh) * 2019-11-19 2020-02-21 余天哲 一种静态爆破用便携式膨胀剂浆体注入器
CN112985204A (zh) * 2021-02-04 2021-06-18 胡静雯 一种岩石基坑爆破施工方法
CN113122665A (zh) * 2021-04-16 2021-07-16 广东韶钢松山股份有限公司 一种高炉停炉后炉缸死铁层的处理方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132860A (zh) * 2005-03-28 2008-02-27 住友大阪水泥股份有限公司 静态破碎工作法及其所利用的静态破碎用辅助器具以及填充用工具
CN201787870U (zh) * 2010-06-28 2011-04-06 黄义干 液压静态爆破设备
CN103224349A (zh) * 2013-04-12 2013-07-31 泰安市华硕能源科技有限公司 矿用静态碎裂剂及使用方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132860A (zh) * 2005-03-28 2008-02-27 住友大阪水泥股份有限公司 静态破碎工作法及其所利用的静态破碎用辅助器具以及填充用工具
CN201787870U (zh) * 2010-06-28 2011-04-06 黄义干 液压静态爆破设备
CN103224349A (zh) * 2013-04-12 2013-07-31 泰安市华硕能源科技有限公司 矿用静态碎裂剂及使用方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767214A (zh) * 2017-01-13 2017-05-31 中国矿业大学(北京) 一种静态爆破防喷孔发明方法
CN106767214B (zh) * 2017-01-13 2019-02-15 中国矿业大学(北京) 一种静态爆破防喷孔发明方法
CN107976130A (zh) * 2017-12-12 2018-05-01 中国冶集团有限公司 岩石快速无声破碎方法
CN107976130B (zh) * 2017-12-12 2019-12-06 中国一冶集团有限公司 岩石快速无声破碎方法
CN109489513A (zh) * 2018-11-30 2019-03-19 吕梁学院 大孔径静破剂定向破岩及防喷孔一体化装置及其施工方法
CN109489513B (zh) * 2018-11-30 2023-12-19 吕梁学院 大孔径静破剂定向破岩及防喷孔一体化装置及其施工方法
CN109405691A (zh) * 2018-12-24 2019-03-01 石家庄铁道大学 大孔径静态爆破防冲孔装置和爆破方法
CN109459174A (zh) * 2018-12-24 2019-03-12 石家庄铁道大学 静态破碎剂膨胀力测试装置及测试方法
CN110779408A (zh) * 2019-10-29 2020-02-11 辽宁工程技术大学 一种综合降温和定向的静态爆破装置
CN110823037A (zh) * 2019-11-19 2020-02-21 余天哲 一种静态爆破用便携式膨胀剂浆体注入器
CN112985204A (zh) * 2021-02-04 2021-06-18 胡静雯 一种岩石基坑爆破施工方法
CN113122665A (zh) * 2021-04-16 2021-07-16 广东韶钢松山股份有限公司 一种高炉停炉后炉缸死铁层的处理方法

Also Published As

Publication number Publication date
CN104807382B (zh) 2017-01-18

Similar Documents

Publication Publication Date Title
CN104807382B (zh) 后注水式高效安全环保的静态爆破方法及使用该方法的注水装置
CN102121395B (zh) 低渗透单一煤层瓦斯综合治理一体化的方法
CN111536839B (zh) 一种用于节理裂隙发育岩体隧道的水压爆破施工方法
CN105651132B (zh) 基坑岩层定向静态爆破施工方法及其组合导向装置
CN109322699B (zh) 一种矿井下污染隔离封堵技术
CN101666234B (zh) 破碎岩体无止浆墙复合式注浆施工方法
AU2020257049B2 (en) Construction method for forming water-proof grouting curtain in water-rich porous rock stratum by blasting
CN101191415A (zh) 煤矿中岩层破碎的方法
CN105003296A (zh) 一种处理低透气性煤层瓦斯排放的方法
CN111396086A (zh) 一种套管法帷幕注浆施工方法
CN103743303B (zh) 一种大孔径静态爆破堵孔方法
CN105114117A (zh) 一种基于膨胀材料的瓦斯抽采方法
CN114233385B (zh) 一种斜井井筒突泥涌水的治理方法
CN110630211B (zh) 一种超声波原位造浆封堵覆岩采动裂隙方法
CN102704936A (zh) 综采工作面端头回采巷道顶板控制垮落法
KR102131823B1 (ko) 코어장비를 이용한 무진동 굴착 방법
CN113154979B (zh) 一种大倾角湿法钻孔膨胀剂静态破岩施工方法
US20230407746A1 (en) Method for filling deformable karst cave
CN103868418B (zh) 动量平衡密封装置
CN108756883A (zh) 一种煤矿坚硬顶板注浆压裂方法及系统
CN109236231A (zh) 一种矿井钻孔内封堵裸孔段裂隙涌水的注浆装置
CN108547617A (zh) 一种静力破岩柔性套筒装药法
CN103322414B (zh) 一种快速安全开挖油气管道石方段抢修工作坑的方法
CN107907018A (zh) 一种静力破岩任意孔封孔装药法
CN204825911U (zh) 双液型高压旋喷机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20190327

CF01 Termination of patent right due to non-payment of annual fee