CN104797775A - 用于压裂的井眼的增产方法 - Google Patents

用于压裂的井眼的增产方法 Download PDF

Info

Publication number
CN104797775A
CN104797775A CN201380057916.4A CN201380057916A CN104797775A CN 104797775 A CN104797775 A CN 104797775A CN 201380057916 A CN201380057916 A CN 201380057916A CN 104797775 A CN104797775 A CN 104797775A
Authority
CN
China
Prior art keywords
packer
sleeve
glass
methods
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201380057916.4A
Other languages
English (en)
Other versions
CN104797775B (zh
Inventor
M·H·约翰逊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Publication of CN104797775A publication Critical patent/CN104797775A/zh
Application granted granted Critical
Publication of CN104797775B publication Critical patent/CN104797775B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Filtration Of Liquid (AREA)
  • Treatment Of Liquids With Adsorbents In General (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

通过在管柱上安置裸眼封隔器来压裂井眼,通过在所安置的封隔器之间的管柱上的阀可进出所述管柱。通过安置封隔器,形成井眼应力,使得不管井孔的朝向如何,都趋向于优先在封隔器附近形成裂缝。当进行压裂并且井投入生产时,一些支撑剂返回到井眼中,并与固体一起充填在封隔器周围,所述固体可以由地层产生、由流动流体携带。在封隔器附近形成环形通道,以允许产出流体绕过所充填的支撑剂及其它固体进入到生产管柱中。一筛件保护该通道不被堵塞,从而提高产量。

Description

用于压裂的井眼的增产方法
技术领域
本发明的技术领域是在生产前利用装载支撑剂的流体进行压裂的井眼,更尤其是被位于裸眼中的间隔开的封隔器分成多个区域的井眼,其中阀位于连接封隔器的管柱中,用于在封隔器对之间的最终生产。
背景技术
当前,多区域压裂技术利用了通过封隔器隔离的多个套筒,目的是打开套筒以压裂封隔器之间的区域。已经指出,封隔器在井孔上施加力,以便形成封闭通过所打开的套筒施加的压裂压力的密封件。如果封隔器不施加一定的力,则将不存在压裂流体和压力的密封或封闭。封隔器所施加的力多次叠加至流体压力,裂缝将在密封压裂套筒周围的区域的封隔器中的一个或两个处引发。由此,裂缝在离开压裂套筒一定距离处形成,所述压裂套筒用作在井处于生产时的生产进入点。当流体或气体从裂缝产生时,支撑剂可以从裂缝流出来,并充填生产管道和井孔之间的环形空间,从而对流体或气体生产造成堵塞或附加压降。该问题可以通过在生产管道外部放置一遮蔽盖来减轻或减少,所述遮蔽盖将允许一无阻碍流动路径供生产管道/井眼环空中的产出流体流入到套筒中。这不但将减轻压力损失,而且还会减少支撑剂在环形空间中的阻力,也有助于减轻支撑剂的生产,否则支撑剂可能导致生产管道受限或支撑剂进入生产设施的问题。
图1示出了在水平或竖直井眼中压裂及随后生产的现有技术存在的问题。裸眼井孔10被分成多个区域,例如限定在裸眼封隔器14和16之间的区域12。如前所述,所安置的裸眼封隔器在井孔上施加应力以保持密封位置,不管井孔10的朝向是竖直还是水平或两者之间,这都优先地促使裂缝18形成在封隔器14或16附近。随着压裂开始,支撑剂20按期望进入裂缝中,以保持裂缝敞开以便最终生产。当该区域接着投入生产时,裂缝18中靠近封隔器14或16的一些支撑剂20将回流到封隔器之间的井眼10中,并在22处所示蓄积而增大流体流动的阻力,因而限制随后的生产。
本发明通过给予所生产的流体一替代路径以绕过从封隔器14或16附近的裂缝18被携带到井眼10中的蓄积支撑剂或砂或其它固体,解决了在限定隔离区域的一个或两个封隔器处可能出现的这种产量减少现象。
USP 6,409,219以及该专利中引用的参考文献应用管道来传送砂桥周围的砾石以在筛件周围得到完全的砾石充填。砾石的沉积还可以包括被称作压裂/充填的方法中的压裂,其中,来自用于包括砾石泥浆的液体的筛件的流体回流被阻挡,迫使流体与一些砾石或支撑剂进入地层,以保持裂缝敞开,同时将砾石沉积在筛件区段周围的周围环空中。本发明在不同的语境中采用了"绕过或旁通"概念,从而通过由于生产阶段的启动而在井眼10中所蓄积的且压实的支撑剂的旁通,使得产出流体可以更容易地生产。USP 6,253,851应用筛件的设置来最小化砾石沉积期间砾石形成砂桥。
分流器在排放语境中使用,例如USP 6,289,990。
本领域技术人员通过阅读优选实施例的详细描述以及相关附图将更容易领会本发明的更多个方面,同时应当明白本发明的全部范围都由所附带的权利要求书确定。
发明内容
通过在管柱上安置裸眼封隔器来压裂井眼,通过在所安置的封隔器之间的管柱上的阀可进出所述管柱。通过安置封隔器,形成井眼应力,使得不管井孔的朝向如何,都趋向于优先在封隔器附近形成裂缝。当进行压裂并且井投入生产时,一些支撑剂返回到井眼中,并与固体一起充填在封隔器周围,所述固体可以由地层产生、由流动流体携带。在封隔器附近形成环形通道,以允许产出流体绕过所充填的支撑剂及其它固体进入到生产管柱中。一筛件保护该通道不被堵塞,从而提高产量。
附图说明
图1是压裂后的井眼中的一区域的视图,显示了由于随后的生产而在封隔器附近累积的支撑剂;
图2是图1的视图,添加了绕过所充填的支撑剂以及生产期间由地层产生的其它固体的流体旁通。
具体实施方式
参照图2,隔离的裸眼区域40由一对裸眼封隔器42和44限定。区域40可以是由至少一个封隔器或一对封隔器所隔离的井孔中的许多区域中的一个。裸眼封隔器42和44的安置形成局部应力,该局部应力导致优先在封隔器附近形成裂缝46,如封隔器42处所示,而在封隔器44处同样如此。携带支撑剂48的流体在压力下通过管柱50输送,所述管柱50将封隔器支撑在井眼中。在封隔器对之间,例如在封隔器42和44之间,设有滑动套筒或其它阀,所述滑动套筒或其它阀可以通过球落在支座上而打开,这使套筒移动而打开孔口52。然后,流体进入到用高压产生的裂缝中,并且将支撑剂48带入到诸如46的裂缝中以及所有其它由通过孔口52压力泵送而形成的裂缝中。
当生产开始时,一些支撑剂48和来自地层的固体进入到区域40中,因为速度太慢以致于不能携带这些固体到达孔口52,所以这些支撑剂48和固体充填在诸如42的封隔器附近。但是,固体在54处的充填对由箭头56表示的流产生大的阻力。为了维持从裂缝46的生产,一分流管58放置在管柱50周围,从而形成其中具有筛件66的旁通通道64,所述筛件66使旁通通道64保持没有固体,所述分流管58具有上端部66,所述上端部与预期固体累积的顶部62间隔开。所述筛件66可以是金属丝缠绕物、或烧结金属、泡沫或编织物(仅举几个例子)。该流来自于裂缝46并在封隔器42的本体周围,如箭头68所示。箭头70和72表示流进入管58中,而固体被筛件66拦阻,允许流体从上端部60离开,去到孔口52。更大阻力的路径通过管58外面的所蓄积的固体而变成更大阻力的路径,并可见流减小,但是通过套筒58的流动路径的存在不只是对通过54处的固体充填而增加的阻力的补偿。
虽然套筒58显示为圆筒形管,但是,壁可以具有锥形形状,并且壁也可以具有开口,所述开口带有防止固体进入到管柱50与套筒58之间限定的环形通道中的内部筛件66。可选地,在套筒58中可以设有通向该环形通道的底部入口以及穿过该套筒58中的壁开口的侧部入口,其中筛件66位于套筒58的内部或外部或内部和外部以便筛滤,无论哪一种旁通方式都用来提高固体充填54周围的流量。
上文的说明书示出了优选实施例,本领域技术人员可以进行许多修改而不脱离本发明,本发明的范围由下文权利要求的文字和等同范围确定:

Claims (16)

1.一种用于井孔的完井和生产方法,该方法包括:
在管柱上,下入至少一对间隔开的封隔器,所述管柱具有在所述封隔器之间的至少一个孔口;
将封隔器安置在井孔中,以在封隔器之间限定一区域;
利用压力泵送泥浆,压裂该区域;
在所述压裂之后,使所述区域投入生产;
提供一区域旁通通道,用于使流体从之前在所述封隔器中的至少一个附近形成的裂缝流出,同时阻挡蓄积在这里的泥浆固体或由地层产生的固体。
2.如权利要求1所述的方法,其包括:
将一套筒设置在所述管柱周围,以限定所述旁通通道。
3.如权利要求2所述的方法,其包括:
为所述旁通通道设置筛件,以大致排除所述固体,但允许流体流过。
4.如权利要求1所述的方法,其包括:
利用所述旁通通道,减小对来自封隔器附近的裂缝的流体流的阻力。
5.如权利要求3所述的方法,其包括:
将所述筛件定位在所述套筒内部。
6.如权利要求3所述的方法,其包括:
将所述筛件定位在所述套筒外部。
7.如权利要求1所述的方法,其包括:
使用裸眼封隔器来限定位于所述封隔器之间的裸眼区域。
8.如权利要求1所述的方法,其包括:
使井孔水平地定向、或竖直地定向、或在水平和竖直之间倾斜地定向。
9.如权利要求1所述的方法,其包括:
设置与所述孔口相关联的滑动套筒。
10.如权利要求1所述的方法,其包括:
用支撑剂进行所述压裂。
11.如权利要求2所述的方法,其包括:
在所述套筒的壁中设置带筛件的开口。
12.如权利要求3所述的方法,其包括:
使用裸眼封隔器来限定位于所述封隔器之间的裸眼区域。
13.如权利要求3所述的方法,其包括:
使井孔水平地定向、或竖直地定向、或在水平和竖直之间倾斜地定向。
14.如权利要求13所述的方法,其包括:
设置与所述孔口相关联的滑动套筒。
15.如权利要求14所述的方法,其包括:
用支撑剂进行所述压裂。
16.如权利要求15所述的方法,其包括:
在所述套筒的壁中设置带筛件的开口。
CN201380057916.4A 2012-11-08 2013-10-29 用于压裂的井眼的增产方法 Expired - Fee Related CN104797775B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US13/671,735 US9187995B2 (en) 2012-11-08 2012-11-08 Production enhancement method for fractured wellbores
US13/671,735 2012-11-08
PCT/US2013/067230 WO2014074348A1 (en) 2012-11-08 2013-10-29 Production enhancement method for fractured wellbores

Publications (2)

Publication Number Publication Date
CN104797775A true CN104797775A (zh) 2015-07-22
CN104797775B CN104797775B (zh) 2017-07-21

Family

ID=50621300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201380057916.4A Expired - Fee Related CN104797775B (zh) 2012-11-08 2013-10-29 用于压裂的井眼的增产方法

Country Status (11)

Country Link
US (1) US9187995B2 (zh)
EP (1) EP2917464B1 (zh)
CN (1) CN104797775B (zh)
AP (1) AP2015008417A0 (zh)
AU (1) AU2013341567B2 (zh)
BR (1) BR112015010071B1 (zh)
CA (1) CA2888487C (zh)
DK (1) DK2917464T3 (zh)
MY (1) MY175782A (zh)
NO (1) NO3004792T3 (zh)
WO (1) WO2014074348A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153169B (zh) * 2021-05-20 2023-07-21 辽宁工程技术大学 一种适用于破碎围岩钻孔塌陷的吸能减震防冲支护装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6220345B1 (en) * 1999-08-19 2001-04-24 Mobil Oil Corporation Well screen having an internal alternate flowpath
CN1369032A (zh) * 1999-08-09 2002-09-11 国际壳牌研究有限公司 多侧向井孔的钻井和完井系统
US20030034160A1 (en) * 2001-08-14 2003-02-20 Nguyen Philip D. Methods and apparatus for completing wells
US20030127223A1 (en) * 2002-01-08 2003-07-10 Branstetter Todd M. Technique for sensing flow related parameters when using an electric submersible pumping system to produce a desired fluid
US20030141061A1 (en) * 2002-01-25 2003-07-31 Hailey Travis T. Sand control screen assembly and treatment method using the same
US20060196660A1 (en) * 2004-12-23 2006-09-07 Schlumberger Technology Corporation System and Method for Completing a Subterranean Well

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5113935A (en) * 1991-05-01 1992-05-19 Mobil Oil Corporation Gravel packing of wells
US5394938A (en) * 1992-07-31 1995-03-07 Atlantic Richfield Company Gravel pack screen for well completions
US5341880A (en) * 1993-07-16 1994-08-30 Halliburton Company Sand screen structure with quick connection section joints therein
CA2302538C (en) 1999-03-24 2005-03-15 Baker Hughes Incorporated Production tubing shunt valve
US6253851B1 (en) 1999-09-20 2001-07-03 Marathon Oil Company Method of completing a well
US6409219B1 (en) 1999-11-12 2002-06-25 Baker Hughes Incorporated Downhole screen with tubular bypass
US6520254B2 (en) * 2000-12-22 2003-02-18 Schlumberger Technology Corporation Apparatus and method providing alternate fluid flowpath for gravel pack completion
US6749023B2 (en) * 2001-06-13 2004-06-15 Halliburton Energy Services, Inc. Methods and apparatus for gravel packing, fracturing or frac packing wells
US7703508B2 (en) * 2006-10-11 2010-04-27 Schlumberger Technology Corporation Wellbore filter for submersible motor-driver pump
US20090288824A1 (en) * 2007-06-11 2009-11-26 Halliburton Energy Services, Inc. Multi-zone formation fluid evaluation system and method for use of same
US7971646B2 (en) * 2007-08-16 2011-07-05 Baker Hughes Incorporated Multi-position valve for fracturing and sand control and associated completion methods
US7814973B2 (en) * 2008-08-29 2010-10-19 Halliburton Energy Services, Inc. Sand control screen assembly and method for use of same
US8567498B2 (en) * 2010-01-22 2013-10-29 Schlumberger Technology Corporation System and method for filtering sand in a wellbore
BR112013013148B1 (pt) * 2010-12-17 2020-07-21 Exxonmobil Upstream Research Company aparelho de furo do poço e métodos para isolamento zonal e controle de fluxo

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1369032A (zh) * 1999-08-09 2002-09-11 国际壳牌研究有限公司 多侧向井孔的钻井和完井系统
US6220345B1 (en) * 1999-08-19 2001-04-24 Mobil Oil Corporation Well screen having an internal alternate flowpath
US20030034160A1 (en) * 2001-08-14 2003-02-20 Nguyen Philip D. Methods and apparatus for completing wells
US20030127223A1 (en) * 2002-01-08 2003-07-10 Branstetter Todd M. Technique for sensing flow related parameters when using an electric submersible pumping system to produce a desired fluid
US20030141061A1 (en) * 2002-01-25 2003-07-31 Hailey Travis T. Sand control screen assembly and treatment method using the same
US20060196660A1 (en) * 2004-12-23 2006-09-07 Schlumberger Technology Corporation System and Method for Completing a Subterranean Well

Also Published As

Publication number Publication date
AU2013341567A1 (en) 2015-04-09
US9187995B2 (en) 2015-11-17
EP2917464A1 (en) 2015-09-16
BR112015010071A2 (pt) 2017-07-11
CA2888487A1 (en) 2014-05-15
AU2013341567B2 (en) 2016-11-17
DK2917464T3 (en) 2018-01-08
AP2015008417A0 (en) 2015-05-31
NO3004792T3 (zh) 2018-05-26
CN104797775B (zh) 2017-07-21
US20140124207A1 (en) 2014-05-08
WO2014074348A1 (en) 2014-05-15
EP2917464A4 (en) 2016-07-20
WO2014074348A8 (en) 2015-05-07
EP2917464B1 (en) 2017-11-29
BR112015010071B1 (pt) 2021-05-18
CA2888487C (en) 2018-02-13
MY175782A (en) 2020-07-08

Similar Documents

Publication Publication Date Title
US10208547B2 (en) Increasing hydrocarbon recovery from reservoirs
US8893794B2 (en) Integrated zonal contact and intelligent completion system
CN105121777B (zh) 井下可膨胀管结构
CN103261579A (zh) 具有方向依赖性流阻的井下流体流动控制系统及方法
CN105134141A (zh) 一种工艺管柱
CN104763389A (zh) 具有可止回端口的高速注入筛组件
CN102041983A (zh) 带有控流能力的控砂滤筛组件
CN102808584A (zh) 套管完井多段压裂水平井多点出水的机械堵水管柱及方法
CN105822253A (zh) 套管滑套和水力桥塞组合式完井管柱及快速压裂方法
CN109138932A (zh) 一种直井充填结合化学封隔体分段控水完井方法
CN105822252A (zh) 固井管柱组合及固井方法
WO2020036493A1 (en) Gas-lift system
CN104797775A (zh) 用于压裂的井眼的增产方法
US7934555B2 (en) Multiple zone isolation method
CN107989572A (zh) 一种小井眼固井防砂完井一体化管柱及施工方法
CN209959218U (zh) 自适应控制筛管
CN107542425A (zh) 一种选择性固井装置
CN207332845U (zh) 防砂装置
CN104453780A (zh) 多级分段压裂滑套及压裂管柱
AU2011354660A1 (en) Gravel packing in lateral wellbore
CN204371227U (zh) 多级分段压裂滑套及压裂管柱
CN221002654U (zh) 一种油水井同层选段水射流精准解堵管柱
AU2012202544B2 (en) Apparatus and methods for allowing fluid flow inside at least one screen and outside a pipe disposed in a well bore
US9556705B2 (en) Casing joint assembly for producing an annulus gas cap
US20160010432A1 (en) Casing Joint Assembly for Producing an Annulus Gas Cap

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721