CN104796329B - A kind of link automatic switching method and device - Google Patents
A kind of link automatic switching method and device Download PDFInfo
- Publication number
- CN104796329B CN104796329B CN201410019427.6A CN201410019427A CN104796329B CN 104796329 B CN104796329 B CN 104796329B CN 201410019427 A CN201410019427 A CN 201410019427A CN 104796329 B CN104796329 B CN 104796329B
- Authority
- CN
- China
- Prior art keywords
- port
- switching equipment
- data frame
- equipment
- cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention relates to communication technical field, more particularly to a kind of link automatic switching method and device, with in the prior art when switching equipment connection transmission equipment port have electric signal but part of links failure when, switching equipment can not detect that active link breaks down, therefore the automatic switchover of link can not be realized, distance transmission system fault time is caused to extend, the problem of stability of a system difference.The present invention does not receive detection data frame using continuous N cycle detection to primary transmission port, it is determined that active link breaks down, and closes active link, enables reserve link work;Avoid switching equipment in the prior art can not automatic identification transmission equipment have electric signal but the abnormal situation of link, shorten the time of distance transmission system failure, improve the reliability of distance transmission system;The state of link is determined by multiple detection cycles simultaneously, reduces and time delay, the probability that erroneous judgement link breaks down occurs because transmission port receives detection data frame.
Description
Technical field
The present invention relates to communication technical field, more particularly to a kind of link automatic switching method and device.
Background technology
With mobile subscriber's quantity be continuously increased and the continuous renewal of user's request, the construction scale of communication system are got over
Come huger, each component in system can not be placed in the computer room of same physical location.But due to business need, entirely
The IP address of system is needed in the same network segment again, therefore generally by long-distance transmission line by strange land equipment access system.
During long-distance transmissions, in order to ensure the reliability of Transmission system, generally use " double first line of a couplet " technology, that is, use and set in exchange
Standby upper active and standby two netting twines of setting are connected to opposite equip., and switching equipment is claimed by link corresponding to major network line peer end of the connection equipment
For active link, switching equipment is connected to link corresponding to opposite equip. by standby netting twine and is referred to as reserve link.When exchange is set
When standby corresponding active link breaks down, switch to reserve link and carry out data transmission.
Distance transmission system concrete example is illustrated below, the system includes the first switching equipment, the first data clothes
Business device, transmission equipment, the second switching equipment and the second data server;Wherein in the first switching equipment and the second switching equipment
Contain two device ports, two transmission ports respectively;Each corresponding transmission port of device port, i.e., in switching equipment
Active link correspondingly uses host apparatus port and primary transmission port, and reserve link correspondingly uses stand-by equipment port and standby
Transmission port;Device port in switching equipment is used to be connected with data server, and transmission port is used to be connected with transmission equipment.
When the first switching equipment is connected with the second switching equipment by active link, the first switching equipment passes through host device interface and the
One data server connects;First switching equipment is connected by primary transmission port with transmission equipment, and by the first switching equipment
The part active link being connected by primary transmission port with transmission equipment is designated as active link section 1;Second switching equipment passes through
Host device interface is connected with the second data server;Second switching equipment is connected by primary transmission port with transmission equipment, and
The part active link that second switching equipment is connected by primary transmission port with transmission equipment is designated as active link section 2.
The method that data transmission system is carried out data transmission by active link is as follows:First data server will receive
Business data frame is sent to the first switching equipment;First switching equipment receives the first data server by host apparatus port
The business data frame of transmission, the business data frame is forwarded to primary transmission port from host apparatus port;First switching equipment
Primary transmission port business data frame sent to transmission equipment, transmission equipment by active link section 1 pass through active link
Section 2 sends business data frame to the second switching equipment;Second switching equipment receives transmission equipment by primary transmission port
The business data frame of transmission, the business data frame is forwarded to host apparatus port from primary transmission port;Second switching equipment
The business data frame is sent to the second data server by host apparatus port.During above-mentioned data transfer, when
When active link section 1 between one switching equipment and transmission equipment is without occurring abnormal, the first switching equipment is with regard to that can detect the
The electric signal of the primary transmission port of one switching equipment;First switching equipment is according to the primary transmission port of the first switching equipment
It is no to have electric signal, determine whether active link breaks down, when the first switching equipment detects the electric signal of primary transmission port
When, it is determined that active link communication is normal.But when event occurs in the active link section 2 between the second switching equipment and transmission equipment
Barrier, or the second switching equipment break down, but the active link section 1 between the first switching equipment and transmission equipment is different without occurring
Chang Shi, it is abnormal that the first switching equipment can not know that active link occurs, and still judges that active link is normal, continues through primary chain
The transmission equipment of road direction second sends business data frame.Only after the complaint of user is received, operation personnel determines active link
Break down, and be manually entered switching command, carry out the switching of main/slave link, the first switching equipment and the second exchange can just set
It is standby that regular traffic is recovered by reserve link.
Therefore, in the prior art when the transmission port of switching equipment has electric signal, but part active link failure, or opposite end
During switch equipment failure, switching equipment can not detect that active link breaks down, and can not also realize the automatic switchover of link, lead
Distance transmission system fault time is caused to extend, the stability of a system is poor.
The content of the invention
The embodiment of the present invention provides a kind of link automatic switching method and device, to solve to work as switching equipment in the prior art
Transmission port have electric signal, but part active link failure, or during the switch equipment failure of opposite end, switching equipment can not detect
Active link breaks down, and can not also realize the automatic switchover of link, causes distance transmission system fault time to extend, system
The problem of stability difference.
The embodiments of the invention provide a kind of link automatic switching method, this method includes:
First switching equipment detects that the primary transmission port continuous N cycle does not receive the inspection of the second switching equipment transmission
After surveying data frame, active link failure is determined;Wherein, first switching equipment and the second switching equipment cycle send to other side
The detection data frame;
First switching equipment closes the active link, enables reserve link work;
Wherein, M is positive integer;The detection data frame is that first switching equipment and second switching equipment are advance
A kind of particular data frame for being different from business data frame of agreement.
The first switching equipment does not receive detection using continuous N cycle detection to primary transmission port in above-described embodiment
Data frame, it is determined that active link breaks down, and closes active link, enables reserve link;Avoid and hand in the prior art
Exchange device can not automatic identification transmission equipment have the abnormal situation of electric signal but link, shorten distance transmission system failure
Time;Detection data frame is not received to primary transmission port by multiple cycle detections simultaneously, just determines that active link occurs
When failure, reducing because network is poor, or causing primary transmission port to receive detection data frame situations such as network delay to occur
Prolong, the probability that erroneous judgement active link breaks down, improve the reliability of distance transmission system.
Each switching equipment has in the embodiment of the present invention uses equipment with active/standby with transmission port is active/standby correspondingly
Port, first switching equipment close the active link, enable reserve link work, specifically include:
The host apparatus port for triggering the first switching equipment stops receiving business data frame, and triggers and close first friendship
The host apparatus port of exchange device;
Continuously N number of cycle is not detected by the electric signal of host apparatus port to first switching equipment, and triggering enables described
The stand-by equipment port of first switching equipment;
The first switching equipment triggering enables the standby transport port transmission business data frame of first switching equipment,
And detection data frame is sent to second switching equipment by the standby transport port cycle;
Wherein, N is positive integer.
By the electric signal of main equipment port in above-described embodiment, the power-on time of stand-by equipment port and primary is determined
The shut-in time of transmission port, the automatic switchover of master and stand-by circuits being realized, it is abnormal that the first switching equipment determines that active link occurs,
Then switch to link corresponding to the second device port, the second transmission port cycle of switching equipment is to opposite end corresponding to switching equipment
Equipment sends detection data frame;Switching equipment is set to realize automatic switchover link, and according to detection data frame after handoff links
It is determined that the state of the link after switching, shortens fault time of Transmission system, the stability of system is improved.
Triggering is closed after the host apparatus port of first switching equipment described in the embodiment of the present invention, in addition to:
The first switching equipment triggering host apparatus port was continuously closed after X cycle, the first equipment triggering
Open host apparatus port;
The continuous Y cycle detection of first switching equipment triggers described first and handed over to the electric signal of host apparatus port
The primary transmission port continuous N cycle of exchange device sends detection data frame to the second switching equipment;
First switching equipment detects that the primary transmission port does not receive the second friendship in the continuous N cycle
The host apparatus port of first switching equipment is closed in the detection data frame that exchange device is sent, triggering, and it is primary to return to triggering
Device port continuously closes X cycle step;
First switching equipment detects that the primary transmission port receives the second exchange in the continuous N cycle
The detection data frame that equipment is sent, it is determined that active link recovers, and triggers the primary transmission port week of first switching equipment
Phase sends detection data frame to second switching equipment;
Wherein, X, Y, M are positive integer, and X is not less than N.
In above-described embodiment after host apparatus port shutdown setting duration, the first switching equipment notice host apparatus port is entered
Enter detection to wait, upper electricity is carried out once to host apparatus port every setting duration, and handed over to second by primary transmission port
Exchange device sends detection data frame, and within the cycle for sending detection data frame, detects whether primary transmission port receives
The detection data frame sent to the second switching equipment, if receiving, it is determined that active link recovers normal;Active link recovers just
Chang Hou, then host apparatus port is opened, and detection data frame is sent to the second switching equipment by the primary transmission port cycle.Make
After active link fault recovery, after reserve link breaks down, active link can be switched at any time.Switching equipment to link
The agreement made an appointment dependent on the first switching equipment and the second switching equipment of switching;Primary transmission port turns off or on
Independent of the electric signal of intermediate conveyor equipment, make judgement of the switching equipment to Link State more accurate.
This method also includes in the embodiment of the present invention:
When detecting the active link fault recovery, and after the stand-by circuit failure, switch back into the active link
Work.
The continuous L cycle detection of first switching equipment does not receive the second switching equipment to standby transport port and sent
Detection data frame, determine reserve link failure;
The first switching equipment triggering stand-by equipment port stops receiving business data frame, and triggers closing described first
The stand-by equipment port of switching equipment;
The first switching equipment continuous P cycle is not detected by the electric signal of stand-by equipment port, and triggering enables described
The host apparatus port of first switching equipment;
The first switching equipment triggering enables the primary transmission port transmission services data frame of first switching equipment,
And detection data frame is sent to second switching equipment by the standby transport port cycle;
Wherein, L, P are positive integer.
By the electric signal of stand-by equipment port in above-described embodiment, the power-on time of host apparatus port is determined, is realized
The automatic switchover of master and stand-by circuits, it is abnormal that the first switching equipment determines that reserve link occurs, then switches to active link, exchange is set
The standby primary transmission port cycle sends detection data frame;Switching equipment is set to realize automatic switchover link, and in handoff links
The state of the link after switching is determined according to detection data frame afterwards, the fault time of Transmission system is shortened, improves system
Stability.
Triggering is closed after the stand-by equipment port of first switching equipment in the embodiment of the present invention, in addition to:
The first switching equipment triggering stand-by equipment port is continuously closed Z cycle, and the first equipment triggering is opened
Stand-by equipment port;
The continuous Q cycle detection of first switching equipment triggers described first and handed over to the electric signal of stand-by equipment port
The standby transport port continuous L cycle of exchange device sends detection data frame to the second switching equipment;
First switching equipment detects in the continuous L cycle that standby transport port does not receive the second exchange and set
The stand-by equipment port of first switching equipment is closed in the detection data frame that preparation is sent, triggering, and returns to triggering stand-by equipment
Z cycle step is continuously closed in port;
First switching equipment detects that the standby transport port receives the second exchange in the continuous L cycle
The detection data frame that equipment is sent, it is determined that reserve link recovers, and triggers the standby transport port week of first switching equipment
Phase sends detection data frame to second switching equipment;
Wherein, Z, L, Q are positive integer, and Z is not less than P.
In above-described embodiment after stand-by equipment port shutdown setting duration, the first switching equipment notice stand-by equipment port is entered
Enter detection to wait, upper electricity is carried out once to stand-by equipment port every setting duration, and handed over to second by standby transport port
Exchange device sends detection data frame, and within the cycle for sending detection data frame, detects whether standby transport port receives
The detection data frame sent to the second switching equipment, if receiving, it is determined that reserve link recovers normal;Reserve link recovers just
Chang Hou, then stand-by equipment port is opened, and detection data frame is sent to the second switching equipment by the standby transport port cycle.Make
After reserve link fault recovery, after active link breaks down, reserve link can be switched at any time.Switching equipment to link
The agreement made an appointment dependent on the first switching equipment and the second switching equipment of switching;Standby transport port turns off or on
Independent of the electric signal of intermediate conveyor equipment, make judgement of the switching equipment to Link State more accurate.
The host apparatus port that the first switching equipment is triggered in the embodiment of the present invention stops after receiving business data frame, touches
Before hair enables the standby transport port transmission business data frame of the first switching equipment, in addition to:
First switching equipment detects that primary transmission port receives the business data frame of the second switching equipment side transmission, will
Business data frame is forwarded to host apparatus port from primary transmission port, and host apparatus port is transmitted place to business data frame
Reason.
In above-described embodiment, after host apparatus port shutdown, when stand-by equipment port does not enable also, is received
The business data frame that two switching equipment are sent, then still it is transmitted by host apparatus port;Reduce business data frame
Lose, improve the reliability of system.
The embodiments of the invention provide a kind of link automatic switching control equipment, passes through active/standby use applied to two switching equipment
The active/standby automatic switchover with link that transmission port is established, the device include:
Detection unit, for detecting that the primary transmission port continuous N cycle of the first switching equipment does not receive second
After the detection data frame that switching equipment is sent, active link failure is determined;Wherein, first switching equipment and the second exchange are set
The standby cycle sends the detection data frame to other side;M is positive integer;The detection data frame is first switching equipment and institute
State a kind of particular data frame for being different from business data frame that the second switching equipment is made an appointment;
Switch unit, for closing the active link, enable reserve link work.
The first switching equipment does not receive detection using continuous N cycle detection to primary transmission port in above-described embodiment
Data frame, it is determined that active link breaks down, and closes active link, enables reserve link;Avoid and hand in the prior art
Exchange device can not automatic identification transmission equipment have the abnormal situation of electric signal but link, shorten distance transmission system failure
Time;Detection data frame is not received to primary transmission port by multiple cycle detections simultaneously, just determines that active link occurs
When failure, reducing because network is poor, or causing primary transmission port to receive detection data frame situations such as network delay to occur
Prolong, the probability that erroneous judgement active link breaks down, improve the reliability of distance transmission system.
Each switching equipment has in the embodiment of the present invention uses equipment with active/standby with transmission port is active/standby correspondingly
Port, the switch unit are specifically used for:
The host apparatus port for triggering the first switching equipment stops receiving business data frame, and triggers and close first friendship
The host apparatus port of exchange device;
The detection unit is specifically used for:Continuous N number of cycle is not detected by the host apparatus end of first switching equipment
The electric signal of mouth;The switch unit is specifically used for:Triggering enables the stand-by equipment port of first switching equipment;Triggering is opened
Open the standby transport port transmission business data frame of first switching equipment, and by the standby transport port cycle to described
Two switching equipment send detection data frame;
Wherein, N is positive integer.
By the electric signal of main equipment port in above-described embodiment, the power-on time of stand-by equipment port and primary is determined
The shut-in time of transmission port, the automatic switchover of master and stand-by circuits being realized, it is abnormal that the first switching equipment determines that active link occurs,
Then switch to link corresponding to the second device port, the second transmission port cycle of switching equipment is to opposite end corresponding to switching equipment
Equipment sends detection data frame;Switching equipment is set to realize automatic switchover link, and according to detection data frame after handoff links
It is determined that the state of the link after switching, shortens fault time of Transmission system, the stability of system is improved.
Switch unit is additionally operable to described in the embodiment of the present invention:
Triggering host apparatus port was continuously closed after X cycle, and host apparatus port is opened in triggering;
The detection unit is additionally operable to, the electric signal of continuous Y cycle detection to host apparatus port, triggering described first
The primary transmission port continuous N cycle of switching equipment sends detection data frame to the second switching equipment;
The detection unit is additionally operable to, and detects that the primary transmission port does not receive in the continuous N cycle
The detection data frame that two switching equipment are sent;The switch unit is additionally operable to, and the primary of first switching equipment is closed in triggering
Device port;
The detection unit is additionally operable to, and detects that the primary transmission port receives second in the continuous N cycle
The detection data frame that switching equipment is sent, it is determined that active link recovers;Trigger the primary transmission end of first switching equipment
The mouth cycle sends detection data frame to second switching equipment;
Wherein, X, Y, M are positive integer, and X is not less than N.
In above-described embodiment after host apparatus port shutdown setting duration, the first switching equipment notice host apparatus port is entered
Enter detection to wait, upper electricity is carried out once to host apparatus port every setting duration, and handed over to second by primary transmission port
Exchange device sends detection data frame, and within the cycle for sending detection data frame, detects whether primary transmission port receives
The detection data frame sent to the second switching equipment, if receiving, it is determined that active link recovers normal;Active link recovers just
Chang Hou, then host apparatus port is opened, and detection data frame is sent to the second switching equipment by the primary transmission port cycle.Make
After active link fault recovery, after reserve link breaks down, active link can be switched at any time.Switching equipment to link
The agreement made an appointment dependent on the first switching equipment and the second switching equipment of switching;Primary transmission port turns off or on
Independent of the electric signal of intermediate conveyor equipment, make judgement of the switching equipment to Link State more accurate.
Detection unit is specifically used for described in the embodiment of the present invention:
Continuous L cycle detection does not receive the detection data frame of the second switching equipment transmission to standby transport port, really
Determine reserve link failure;
The switch unit is specifically used for, and triggering stand-by equipment port stops receiving business data frame, and triggers and close institute
State the stand-by equipment port of the first switching equipment;
The detection unit is specifically used for, and the continuous P cycle is not detected by the electric signal of stand-by equipment port;The switching
Unit is specifically used for, and triggering enables the host apparatus port of first switching equipment;Triggering enables first switching equipment
Primary transmission port transmission services data frame, and notify detection unit by the standby transport port cycle to described second exchange
Equipment sends detection data frame;
Wherein, L, P are positive integer.
By the electric signal of stand-by equipment port in above-described embodiment, the power-on time of host apparatus port is determined, is realized
The automatic switchover of master and stand-by circuits, it is abnormal that the first switching equipment determines that reserve link occurs, then switches to active link, exchange is set
The standby primary transmission port cycle sends detection data frame;Switching equipment is set to realize automatic switchover link, and in handoff links
The state of the link after switching is determined according to detection data frame afterwards, the fault time of Transmission system is shortened, improves system
Stability.
Switch unit is additionally operable to described in the embodiment of the present invention:
Triggering stand-by equipment port is continuously closed Z cycle, and stand-by equipment port is opened in triggering;
The detection unit is additionally operable to continuous Q cycle detection to the electric signal of stand-by equipment port, triggering described first
The standby transport port continuous L cycle of switching equipment sends detection data frame to the second switching equipment;
The detection unit is specifically used for, and detects that standby transport port does not receive second in the continuous L cycle
The detection data frame that switching equipment is sent;The switch unit is used for, and the stand-by equipment of first switching equipment is closed in triggering
Port;
The detection unit is specifically used for, and detects in the continuous L cycle that the standby transport port receives the
The detection data frame that two switching equipment are sent, it is determined that reserve link recovers, and triggers the standby transport of first switching equipment
The port cycle sends detection data frame to second switching equipment;
Wherein, Z, L, Q are positive integer, and Z is not less than P.
In above-described embodiment after stand-by equipment port shutdown setting duration, the first switching equipment notice stand-by equipment port is entered
Enter detection to wait, upper electricity is carried out once to stand-by equipment port every setting duration, and handed over to second by standby transport port
Exchange device sends detection data frame, and within the cycle for sending detection data frame, detects whether standby transport port receives
The detection data frame sent to the second switching equipment, if receiving, it is determined that reserve link recovers normal;Reserve link recovers just
Chang Hou, then stand-by equipment port is opened, and detection data frame is sent to the second switching equipment by the standby transport port cycle.Make
After reserve link fault recovery, after active link breaks down, reserve link can be switched at any time.Switching equipment to link
The agreement made an appointment dependent on the first switching equipment and the second switching equipment of switching;Standby transport port turns off or on
Independent of the electric signal of intermediate conveyor equipment, make judgement of the switching equipment to Link State more accurate.
Switch unit is additionally operable to described in the embodiment of the present invention:
The host apparatus port for triggering the first switching equipment stops after receiving business data frame, and triggering enables the first exchange
Before the standby transport port transmission business data frame of equipment, detect that the primary transmission port of the first switching equipment receives
The business data frame that two switching equipment sides are sent, host apparatus port is forwarded to by business data frame from primary transmission port, main
Processing is transmitted to business data frame with device port.
In above-described embodiment, after host apparatus port shutdown, when stand-by equipment port does not enable also, is received
The business data frame that two switching equipment are sent, then still it is transmitted by host apparatus port;Reduce business data frame
Lose, improve the reliability of system.
The embodiment of the present invention detects that the primary transmission port continuous N cycle does not receive second using the first switching equipment
After the detection data frame that switching equipment is sent, active link failure is determined;First switching equipment closes active link, enables standby
Antenna efficiency;First switching equipment does not receive detection data frame using continuous N cycle detection to primary transmission port, then really
Determine active link failure, and close active link, enable reserve link;Avoiding switching equipment in the prior art can not be certainly
Dynamic identification transmission equipment has the situation of electric signal but link exception, shortens the time of distance transmission system failure;Lead to simultaneously
Cross multiple cycle detections and do not receive detection data frame to primary transmission port, just determine that active link breaks down, reduce
Cause primary transmission port to receive detection data frame because network is poor, or situations such as network delay and time delay occur, erroneous judgement is primary
The probability that link breaks down, improve the reliability of distance transmission system.
Brief description of the drawings
Fig. 1 is a kind of schematic flow sheet of link automatic switching method in the embodiment of the present invention;
Fig. 2 is a kind of schematic flow sheet of the specific method that link automatically switches in the embodiment of the present invention;
Fig. 3 is the schematic flow sheet of the method that another link automatically switches in the embodiment of the present invention;
Fig. 4 is a kind of schematic diagram of link automatic switching control equipment in the embodiment of the present invention.
Embodiment
The embodiments of the invention provide a kind of link automatic switching method and device, the first switching equipment exchanges according to second
The detection data frame that equipment periodic is sent, determines whether active link breaks down, determines that active link breaks down and switch to
Reserve link;Avoid and determine the current work of link by the electric signal of transmission equipment, improve judgement link working state
Accuracy, realize the automatic switchover of link, shorten the time of distance transmission system failure, improve long-distance transmissions
The reliability of system.
The present invention is further described with reference to Figure of description.
As shown in figure 1, for a kind of link automatic switching method in the embodiment of the present invention, pass through applied to two switching equipment
The active/standby active/standby automatic switchover with link established with transmission port, this method include:
Step 101:First switching equipment detects that the primary transmission port continuous N cycle does not receive the second switching equipment
After the detection data frame of transmission, active link failure is determined;Wherein, the first switching equipment and the second switching equipment cycle are to other side
Send the detection data frame;
Step 102:First switching equipment closes active link, enables reserve link work;
Wherein, M is positive integer;It is that the first switching equipment is different from what the second switching equipment was made an appointment to detect data frame
A kind of particular data frame of business data frame.
In step 101, the first switching equipment detects that the primary transmission port continuous N cycle does not receive the second exchange and set
The detection data frame that preparation is sent, is specifically included:First switching equipment detects the detection data frame that primary transmission port receives, when the
One switching equipment detects that primary transmission port is not received by detection data frame in a cycle, then waits shape into logic
State, after the first switching equipment enters logic wait state, -1 cycle detection of continuous N does not receive inspection to primary transmission port
Survey data frame, it is determined that active link breaks down, and wherein M is positive integer.Such as preset the first switching equipment continuous 5 week
Phase detects that primary transmission port does not receive detection data frame, it is determined that active link breaks down;First switching equipment is examined
Measure primary transmission port in current period and do not receive detection data frame, then into logic wait state, the first switching equipment
Into after logic wait state, continuous 4 cycle detections do not receive detection data frame to primary transmission port, it is determined that primary
Link breaks down.
First switching equipment does not receive detection data frame using continuous N cycle detection to primary transmission port, then really
Link corresponding to fixed primary transmission port breaks down, and avoiding switching equipment in the prior art can not automatic identification transmission equipment
There is the situation of electric signal but link exception, shorten the time of distance transmission system failure, improve distance transmission system
Reliability;Detection data frame is not received to primary transmission port by multiple cycle detections simultaneously, just determines active link
Break down, reduce because network is poor, or cause primary transmission port to receive detection data frame situations such as network delay and go out
Prolong now, judge the probability that link corresponding to primary transmission port breaks down by accident.
Each switching equipment has uses device port with active/standby with transmission port is active/standby correspondingly.
In step 102, the first switching equipment closes active link, enables reserve link work, specifically includes:First exchanges
Equipment determines that active link breaks down, and host apparatus port corresponding to primary transmission port is closed in triggering, while first exchanges
Equipment carries out upper electric treatment to stand-by equipment port.After host apparatus port is closed in the triggering of first switching equipment, host apparatus end
Mouth no longer exports electric signal, and the first switching equipment does not detect the electric signal of host apparatus port in continuous N number of cycle, then touched
Hair opens the stand-by equipment port of the first switching equipment;First switching equipment triggering simultaneously enables the standby biography of the first switching equipment
Defeated port transmission business data frame, and detection data frame is sent to the second switching equipment by the standby transport port cycle;Wherein,
N is positive integer.
The triggering of wherein the first switching equipment is closed after the host apparatus port of the first switching equipment, in addition to:First hands over
Exchange device triggering host apparatus port was continuously closed after X cycle, and host apparatus port is opened in the triggering of the first equipment;First hands over
To the electric signal of host apparatus port, the primary transmission port for triggering the first switching equipment connects the continuous Y cycle detection of exchange device
Continue M cycle to the second switching equipment transmission detection data frame;First switching equipment detects primary transmission in the continuous N cycle
Port does not receive the detection data frame of the second switching equipment transmission, and the host apparatus port of the first switching equipment is closed in triggering,
And return to triggering host apparatus port and continuously close X cycle step;First switching equipment detects primary in the continuous N cycle
Transmission port receives the detection data frame of the second switching equipment transmission, it is determined that active link recovers, and triggering first is exchanged and set
The standby primary transmission port cycle sends detection data frame to the second switching equipment;Wherein, X, Y, M are positive integer, and X is not small
In N.
As detected in the first switching equipment continuous 5 cycles, primary transmission port does not receive the transmission of the second switching equipment
Detection data frame, it is determined that host apparatus port is closed in active link failure, triggering;First switching equipment is in a cycle
The electric signal of host apparatus port is not detected by, the triggering of the first switching equipment enables stand-by equipment port;First switching equipment connects
The equipment connect detects that host apparatus port does not have electric signal, then sends business data frame to first by stand-by equipment port
Business data frame is forwarded to standby transport port from stand-by equipment port, passes through standby biography by switching equipment, the first switching equipment
Defeated port sends business data frame to the second switching equipment;First switching equipment continuous two cycles are not detected by primary transmission
Host apparatus port is opened in the electric signal of port, triggering, and the first switching equipment detects the electric signal of host apparatus port, then touched
Sent out for first primary transmission port continuous 5 cycles to the second switching equipment transmission detection data frame, if within this 5 cycles, it is main
Do not receive the detection data frame of the second switching equipment transmission with transmission port, then return to the host apparatus port continuously company of closing
The step of cycle;If within this 5 cycles, primary transmission port receives the detection data frame of the second switching equipment transmission, then
Determine that active link recovers normal, trigger the primary transmission port cycle to the second equipment transmission detection data frame;In order to standby
When link breaks down, active link is switched back into.
It is preferred that this method also includes:When detecting active link fault recovery, and after stand-by circuit failure, switch back into
The active link work.
The continuous L cycle detection of first switching equipment does not receive the inspection of the second switching equipment transmission to standby transport port
Data frame is surveyed, determines reserve link failure;First switching equipment triggering stand-by equipment port stops receiving business data frame, and touches
Hair closes the stand-by equipment port of the first switching equipment;First switching equipment continuous P cycle was not detected by stand-by equipment port
Electric signal, triggering enables the host apparatus port of the first switching equipment;The triggering of first switching equipment enables the first switching equipment
Primary transmission port transmission services data frame, and by the standby transport port cycle to the second switching equipment send detection data
Frame;Wherein, L, P are positive integer.
Wherein triggering is closed after the stand-by equipment port of the first switching equipment, in addition to:The triggering of first switching equipment is standby
Continuously closed with device port Z cycle, stand-by equipment port is opened in the triggering of the first equipment;First switching equipment continuous Q week
Phase detects the electric signal of stand-by equipment port, triggers standby transport port continuous L cycle of the first switching equipment to second
Switching equipment sends detection data frame;First switching equipment detects that standby transport port does not receive in the continuous L cycle
The stand-by equipment port of the first switching equipment is closed in the detection data frame that two switching equipment are sent, triggering, and it is standby to return to triggering
Device port continuously closes Z cycle step;First switching equipment detects that standby transport port receives in the continuous L cycle
The detection data frame that second switching equipment is sent, it is determined that reserve link recovers, and triggers the standby transport end of the first switching equipment
The mouth cycle sends detection data frame to the second switching equipment;Wherein, Z, L, Q are positive integer, and Z is not less than P.
As detected in the first switching equipment continuous 5 cycles, standby transport port does not receive the transmission of the second switching equipment
Detection data frame, determine reserve link failure;First switching equipment triggering stand-by equipment port stops receiving business data frame,
And trigger the stand-by equipment port for closing the first switching equipment;First switching equipment is not detected by stand-by equipment in a cycle
The electric signal of port, the triggering of the first switching equipment enable host apparatus port;The equipment of first switching equipment connection detects standby
There is no electric signal with device port, then business data frame is sent to the first switching equipment, first by host apparatus port and handed over
Business data frame is forwarded to primary transmission port by exchange device from host apparatus port, by primary transmission port by business datum
Frame is sent to the second switching equipment;First switching equipment continuous two cycles are not detected by the electric signal of standby transport port, touch
Hair opens stand-by equipment port, and the first switching equipment detects the electric signal of stand-by equipment port, then triggers the first standby transport
Port continuous 5 cycles send detection data frame to the second switching equipment, if within this 5 cycles, standby transport port does not connect
The detection data frame of the second switching equipment transmission is received, then returns to the step of two cycles are continuously closed in stand-by equipment port;If
Standby transport port receives the detection data frame of the second switching equipment transmission within this 5 cycles, it is determined that reserve link is extensive
Multiple normal, the triggering standby transport port cycle sends detection data frame to the second equipment;When being broken down in order to active link,
Switch back into reserve link.
In the embodiment of the present invention, when sending business data frame by active link, and when reserve link does not break down,
Standby link sends detection data frame by the standby transport port cycle to the second switching equipment, to determine that reserve link is current not
Break down;When sending business data frame by reserve link, and when active link does not break down, primary link passes through master
Detection data frame is sent to the second switching equipment with the transmission port cycle, to determine that active link does not break down currently;So as to
In when a link in the first switching equipment breaks down, can not have faulty link using another.
It is preferred that the equipment of the first switching equipment connection detects that host apparatus port does not have electric signal, then it is automatically stopped
Business data frame is sent to host apparatus port, business data frame is sent to the first switching equipment by stand-by equipment port.
First switching equipment receives the business data frame of the second switching equipment transmission by primary transmission port, will receive
Business data frame send to host apparatus port, the first switching equipment by host apparatus port by business data frame send to
The equipment of first switching equipment connection.First switching equipment detects that host apparatus port receives the industry that the equipment of connection is sent
It is engaged in data frame, the business data frame is sent to primary transmission port, the first switching equipment is by primary transmission port by the industry
Business data frame is sent to the second switching equipment.
First switching equipment triggering host apparatus port stops after receiving business data frame, and triggering enables the first exchange and set
Before standby standby transport port transmission business data frame, in addition to:First switching equipment detects that primary transmission port receives
The business data frame sent to the second switching equipment side, host apparatus end is forwarded to by business data frame from primary transmission port
Mouthful, host apparatus port is transmitted processing to business data frame.
It is preferred that according to IEEE802.3 agreements in the embodiment of the present invention, in the processing by physical layer and logic link layer
Afterwards, the upper-layer protocol specified in type section will be delivered to comprising data in a data frame.Although in Ethernet protocol
Do not make polishing regulation clearly, but the length minimum of data frame should be not less than 46 bytes in ethernet frame, to protect
Demonstrate,prove the byte of data frame length maximum 1518 of 802.3 agreements, the byte of minimum value 64.
To reduce transfer amount, the detection data frame length in the embodiment of the present invention is arranged to 46 bytes, plus testing number
According to the lead code of frame, the fields such as symbol, type, check code are defined, just reach the byte of minimum length 64 of ethernet data frame.This
The detection data frame of 46 bytes in invention can use following form:" 1111000011110000 ... " or
“0xF0F0F0F0F0F0F0F0F0…”.The detection data frame illustrated in above-described embodiment is that relatively there is one kind in the embodiment of the present invention
Detection data frame form, the detection data frame of extended formatting is equally applicable to the present invention.
As shown in Fig. 2 for the specific method that a kind of link automatically switches in the embodiment of the present invention, this method includes:
Step 201:The primary transmission port cycle of first switching equipment receives the testing number of the second switching equipment transmission
According to frame;
Step 202:First switching equipment detects that the second exchange that primary transmission port does not receive in current period is set
The detection data frame that preparation is sent;
Step 203:First switching equipment judges whether primary transmission port connects in continuous 4 cycles after current period
The detection data frame of the second transmission equipment transmission is received, if receiving, return to step 201, otherwise performs step 204;
Step 204:Host apparatus port is closed in the triggering of first switching equipment, while triggering enables the standby of the first switching equipment
Use device port;
Step 205:First switching equipment is not detected by the electric signal of host apparatus port in current period, then triggering is closed
Close primary transmission port;
Step 206:Continuous two cycle detections of first switching equipment trigger first and handed over to the electric signal of stand-by equipment port
Exchange device passes through standby transport port transmission business data frame;
Step 207:First switching equipment triggers the standby transport port cycle to the second switching equipment transmission detection data frame;
And terminate this flow.
Step 205 and step 206 are not strictly sequential in above-described embodiment, can first carry out step 205, then perform step
Rapid 206, can also step 205 and step 206 perform simultaneously.The Cycle Length illustrated in the present embodiment is in the embodiment of the present invention
A kind of preferable Cycle Length, other Cycle Lengths are also applied for the embodiment of the present invention.
As shown in figure 3, include for a kind of detection method of link failure recovery, this method in the embodiment of the present invention:
Step 301:First switching equipment detects that primary transmission port does not receive the second exchange and set in continuous 5 cycles
Host apparatus port is closed in the detection data frame that preparation is sent, triggering;
Step 302:First switching equipment detects the signal of host apparatus port shutdown in continuous two cycles, triggering is opened
Open host apparatus port;
Step 303:First switching equipment detects the signal of host apparatus port open in current period, triggers primary
Transmission port continuous 5 cycles send detection data frame;
Step 304:Whether the first switching equipment detects receives in 5 cycles of primary transmission port transmission detection data frame
The detection data frame sent to the second switching equipment, if not receiving, return to step 301, otherwise perform step 305;
Step 305:First switching equipment determines that active link recovers normal, and by the primary transmission port cycle to second
Switching equipment sends detection data frame, and terminates this flow.
Fig. 2 in the embodiment of the present invention, the embodiment shown in Fig. 3 are the process that active link switches to reserve link, this
In invention reserve link switch to active link process it is similar therewith, will not be repeated here;The cycle set in another embodiment
It is that preferably Cycle Length, other Cycle Lengths for meeting inventive concept are also applied for the present invention in the embodiment of the present invention,
This will not enumerate.
Based on same inventive concept, a kind of link automatic switching control equipment is additionally provided in the embodiment of the present invention, due to the dress
It is similar to a kind of link automatic switching method of the embodiment of the present invention to put the principle solved the problems, such as, therefore the implementation of the device can be joined
The implementation of square method, repeat part and repeat no more.
As shown in figure 4, for a kind of link automatic switching control equipment in the embodiment of the present invention, pass through applied to two switching equipment
The active/standby active/standby automatic switchover with link established with transmission port, the device include detection unit 401, switch unit 402:
Detection unit 401, the primary transmission port continuous N cycle for detecting the first switching equipment do not receive
After the detection data frame that two switching equipment are sent, active link failure is determined;Wherein, the first switching equipment and the second switching equipment
Cycle sends detection data frame to other side;M is positive integer;It is that the first switching equipment and the second switching equipment are advance to detect data frame
A kind of particular data frame for being different from business data frame of agreement;
Switch unit 402, for closing active link, enable reserve link work.
Detection unit 401 is specifically used for, the detection data frame of the primary transmission port reception of the first switching equipment of detection, when
Detect that the primary transmission port of the first switching equipment is not received by detection data frame in a cycle, then into logic etc.
State is treated, into after logic wait state, -1 cycle detection of continuous N does not receive detection data frame to primary transmission port,
Then determine that active link breaks down, wherein M is positive integer.Continuous 5 cycle detections are such as preset to the first switching equipment
Primary transmission port do not receive detection data frame, it is determined that active link breaks down;Detect first in current period
The primary transmission port of switching equipment does not receive detection data frame, then into logic wait state, into logic wait state
Afterwards, continuous 4 cycle detections do not receive detection data frame to primary transmission port, it is determined that active link breaks down.
Detection data frame is not received using the primary transmission port of continuous N cycle detection to the first switching equipment, then
Determine corresponding to primary transmission port that link breaks down, avoid in the prior art switching equipment can not automatic identification transmission set
The situation of electric signal but link exception is had, the time of distance transmission system failure is shortened, improves long-distance transmissions system
The reliability of system;Detection data frame is not received to primary transmission port by multiple cycle detections simultaneously, just determines primary chain
Road is broken down, and is reduced because network is poor, or causes primary transmission port to receive detection data frame situations such as network delay
There is time delay, judge the probability that link corresponding to primary transmission port breaks down by accident.
Each switching equipment has uses device port with active/standby with transmission port is active/standby correspondingly.
Switch unit 402 is specifically used for:Determine that the active link of the first switching equipment breaks down, primary biography is closed in triggering
Host apparatus port corresponding to defeated port, while upper electric treatment is carried out to the stand-by equipment port of the first switching equipment.Triggering is closed
After closing the host apparatus port of the first switching equipment, host apparatus port no longer exports electric signal, is not examined in continuous N number of cycle
The electric signal of the host apparatus port of the first switching equipment is measured, then the stand-by equipment port of the first switching equipment is opened in triggering;
First switching equipment triggering simultaneously enables the standby transport port transmission business data frame of the first switching equipment, and passes through standby biography
The defeated port cycle sends detection data frame to the second switching equipment;Wherein, N is positive integer.
Switch unit 402 is additionally operable to, and triggering host apparatus port was continuously closed after X cycle, and primary set is opened in triggering
Standby port;The continuous Y cycle detection of detection unit 401 to host apparatus port electric signal, trigger the first switching equipment master
With the transmission port continuous N cycle detection data frame is sent to the second switching equipment;Detection unit 401 detects continuous N week
Primary transmission port does not receive the detection data frame of the second switching equipment transmission in phase, and the triggering of switch unit 402 closes first
The host apparatus port of switching equipment, and return to triggering host apparatus port and continuously close X cycle step;Detection unit 401
Detect that primary transmission port receives the detection data frame that the second switching equipment is sent in the continuous N cycle, it is determined that primary
Link-recovery, the primary transmission port cycle for triggering the first switching equipment send detection data frame to the second switching equipment;Wherein,
X, Y, M are positive integer, and X is not less than N.
Sent as detected that primary transmission port does not receive the second switching equipment in 401 continuous 5 cycles of detection unit
Detection data frame, it is determined that host apparatus port is closed in active link failure, the triggering of switch unit 402;Detection unit 401 exists
The electric signal of host apparatus port is not detected by a cycle, the triggering of switch unit 402 enables stand-by equipment port;First hands over
The equipment of exchange device connection detects that host apparatus port does not have electric signal, then sends out business data frame by stand-by equipment port
The first switching equipment is delivered to, business data frame is forwarded to standby transport port by the first switching equipment from stand-by equipment port, is led to
Standby transport port is crossed to send business data frame to the second switching equipment.401 continuous two cycles of detection unit are not detected by
Host apparatus port is opened in the electric signal of primary transmission port, the triggering of switch unit 402;Detection unit 401 detects primary set
The electric signal of standby port, then triggered for first primary transmission port continuous 5 cycles and detect data frame to the transmission of the second switching equipment,
If within this 5 cycles, detection unit 401 detects the detection data that primary transmission port does not receive the transmission of the second switching equipment
Frame, then return host apparatus port continuously company of closing individual cycle the step of;If within this 5 cycles, the detection master of detection unit 401
The detection data frame of the second switching equipment transmission is received with transmission port, it is determined that active link recovers normal, and triggering is primary
The transmission port cycle sends detection data frame to the second equipment;When being broken down in order to reserve link, active link is switched back into.
It is preferred that switch unit 402 is additionally operable to:Active link fault recovery is detected, and after stand-by circuit failure, switching
Return the active link work.
Detection unit 401, continuous L cycle detection to standby transport port do not receive the inspection of the second switching equipment transmission
Data frame is surveyed, determines reserve link failure;Switch unit 402, which triggers stand-by equipment port, to be stopped receiving business data frame, and is touched
Hair closes the stand-by equipment port of the first switching equipment;The continuous P cycle of detection unit 401 is not detected by stand-by equipment port
Electric signal, switch unit 402 trigger the host apparatus port for enabling the first switching equipment;Triggering enables the master of the first switching equipment
With transmission port transmission services data frame, and by the standby transport port cycle detection data frame is sent to the second switching equipment;
Wherein, L, P are positive integer.
Wherein switch unit 402 is additionally operable to:Triggering stand-by equipment port is continuously closed Z cycle, and standby set is opened in triggering
Standby port;The continuous Q cycle detection of detection unit 401 triggers the standby of the first switching equipment to the electric signal of stand-by equipment port
With the transmission port continuous L cycle detection data frame is sent to the second switching equipment;Detection unit 401 detects continuous L week
Standby transport port does not receive the detection data frame of the second switching equipment transmission in phase, and the triggering of switch unit 402 closes first
The stand-by equipment port of switching equipment, and return to triggering stand-by equipment port and continuously close Z cycle;Detection unit 401 detects
The detection data frame of the second switching equipment transmission is received to standby transport port in the continuous L cycle, it is determined that reserve link
Recover, the standby transport port cycle for triggering the first switching equipment sends detection data frame to the second switching equipment;Wherein, Z, L,
Q is positive integer, and Z is not less than P.
Sent as detected that standby transport port does not receive the second switching equipment in 401 continuous 5 cycles of detection unit
Detection data frame, determine reserve link failure;Switch unit 402, which triggers stand-by equipment port, to be stopped receiving business data frame,
And trigger the stand-by equipment port for closing the first switching equipment;Detection unit 401 is not detected by stand-by equipment in a cycle
The electric signal of port, the triggering of switch unit 402 enable host apparatus port;The equipment of first switching equipment connection detects standby
Device port does not have electric signal, then business data frame is sent to the first switching equipment, first by host apparatus port and exchanged
Business data frame is forwarded to primary transmission port by equipment from host apparatus port, by primary transmission port by business data frame
Send to the second switching equipment;401 continuous two cycles of detection unit are not detected by the electric signal of standby transport port, and switching is single
Stand-by equipment port is opened in the triggering of member 402, and detection unit 401 detects the electric signal of stand-by equipment port, then it is standby to trigger first
Detection data frame is sent to the second switching equipment with transmission port continuous 5 cycles, if within this 5 cycles, detection unit 401
Detection standby transport port does not receive the detection data frame of the second switching equipment transmission, then returns to stand-by equipment port and continuously close
Close two cycles;If within this 5 cycles, detection unit 401 detects standby transport port and receives the transmission of the second switching equipment
Detection data frame, it is determined that reserve link recovers normal, and the triggering standby transport port cycle sends testing number to the second equipment
According to frame;When being broken down in order to active link, reserve link is switched back into.
In the embodiment of the present invention, when sending business data frame by active link, and when reserve link does not break down,
Standby link sends detection data frame by the standby transport port cycle to the second switching equipment, to determine that reserve link is current not
Break down;When sending business data frame by reserve link, and when active link does not break down, primary link passes through master
Detection data frame is sent to the second switching equipment with the transmission port cycle, to determine that active link does not break down currently;So as to
In when a link in the first switching equipment breaks down, can not have faulty link using another.
It is preferred that the equipment of the first switching equipment connection detects that host apparatus port does not have electric signal, then it is automatically stopped
Business data frame is sent to host apparatus port, business data frame is sent to the first switching equipment by stand-by equipment port.
First switching equipment receives the business data frame of the second switching equipment transmission by primary transmission port, will receive
Business data frame send to host apparatus port, the first switching equipment by host apparatus port by business data frame send to
The equipment of first switching equipment connection.First switching equipment detects that host apparatus port receives the industry that the equipment of connection is sent
It is engaged in data frame, the business data frame is sent to primary transmission port, the first switching equipment is by primary transmission port by the industry
Business data frame is sent to the second switching equipment.
Switch unit is additionally operable to:Trigger host apparatus port to stop after receiving business data frame, triggering enables the first friendship
Before the standby transport port transmission business data frame of exchange device, detect that primary transmission port receives the second switching equipment side
The business data frame of transmission, business data frame is forwarded to host apparatus port from primary transmission port, passes through host apparatus end
Mouth is transmitted processing to business data frame.
It is preferred that according to IEEE802.3 agreements in the embodiment of the present invention, in the processing by physical layer and logic link layer
Afterwards, the upper-layer protocol specified in type section will be delivered to comprising data in a data frame.Although in Ethernet protocol
Do not make polishing regulation clearly, but the length minimum of data frame should be not less than 46 bytes in ethernet frame, to protect
Demonstrate,prove the byte of data frame length maximum 1518 of 802.3 agreements, the byte of minimum value 64.
To reduce transfer amount, the detection data frame length in the embodiment of the present invention is arranged to 46 bytes, plus testing number
According to the lead code of frame, the fields such as symbol, type, check code are defined, just reach the byte of minimum length 64 of ethernet data frame.This
The detection data frame of 46 bytes in invention can use following form:" 1111000011110000 ... " or
“0xF0F0F0F0F0F0F0F0F0…”.The detection data frame illustrated in above-described embodiment is that relatively there is one kind in the embodiment of the present invention
Detection data frame form, the detection data frame of extended formatting is equally applicable to the present invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.
Claims (10)
1. a kind of link automatic switching method, pass through the active/standby active/standby use established with transmission port applied to two switching equipment
The automatic switchover of link, it is characterised in that this method includes:
First switching equipment detects that the primary transmission port continuous N cycle does not receive the testing number of the second switching equipment transmission
After frame, active link failure is determined;Wherein, described in first switching equipment and the second switching equipment cycle sent to other side
Detect data frame;
First switching equipment closes the active link, enables reserve link work;
Wherein, M is positive integer;The detection data frame is that first switching equipment is made an appointment with second switching equipment
A kind of particular data frame for being different from business data frame;
Wherein, each switching equipment have with it is active/standby with transmission port it is one-to-one it is active/standby use device port, described first
Switching equipment closes the active link, enables reserve link work, specifically includes:
The host apparatus port for triggering the first switching equipment stops receiving business data frame, and triggers closing first exchange and set
Standby host apparatus port;
Continuously N number of cycle is not detected by the electric signal of host apparatus port to first switching equipment, and triggering enables described first
The stand-by equipment port of switching equipment;
The first switching equipment triggering enables the standby transport port transmission business data frame of first switching equipment, and leads to
The standby transport port cycle is spent to second switching equipment transmission detection data frame;
Wherein, N is positive integer;
The triggering is closed after the host apparatus port of first switching equipment, in addition to:
The first switching equipment triggering host apparatus port was continuously closed after X cycle, the first switching equipment triggering
Open host apparatus port;
To the electric signal of host apparatus port, triggering described first, which exchanges, to be set for the continuous Y cycle detection of first switching equipment
The standby primary transmission port continuous N cycle sends detection data frame to the second switching equipment;
First switching equipment detects in the continuous N cycle that the primary transmission port does not receive the second exchange and set
The host apparatus port of first switching equipment is closed in the detection data frame that preparation is sent, triggering, and returns to triggering host apparatus
X cycle step is continuously closed in port;
First switching equipment detects that the primary transmission port receives the second switching equipment in the continuous N cycle
The detection data frame of transmission, it is determined that active link recovers, trigger primary transmission port cycle of first switching equipment to
Second switching equipment sends detection data frame;
Wherein, X, Y, M are positive integer, and X is not less than N.
2. the method as described in claim 1, it is characterised in that this method also includes:
When detecting the active link fault recovery, and after the stand-by circuit failure, the active link work is switched back into.
3. method as claimed in claim 2, it is characterised in that specifically include:
The continuous L cycle detection of first switching equipment does not receive the inspection of the second switching equipment transmission to standby transport port
Data frame is surveyed, determines reserve link failure;
The first switching equipment triggering stand-by equipment port stops receiving business data frame, and triggers and close first exchange
The stand-by equipment port of equipment;
The first switching equipment continuous P cycle is not detected by the electric signal of stand-by equipment port, and triggering enables described first
The host apparatus port of switching equipment;
The first switching equipment triggering enables the primary transmission port transmission services data frame of first switching equipment, and leads to
The standby transport port cycle is spent to second switching equipment transmission detection data frame;
Wherein, L, P are positive integer.
4. method as claimed in claim 3, it is characterised in that the stand-by equipment of first switching equipment is closed in the triggering
After port, in addition to:
The first switching equipment triggering stand-by equipment port is continuously closed Z cycle, and the first switching equipment triggering is opened
Stand-by equipment port;
To the electric signal of stand-by equipment port, triggering described first, which exchanges, to be set for the continuous Q cycle detection of first switching equipment
The standby standby transport port continuous L cycle sends detection data frame to the second switching equipment;
First switching equipment detects that standby transport port does not receive the second switching equipment hair in the continuous L cycle
The stand-by equipment port of first switching equipment is closed in the detection data frame sent, triggering, and returns to triggering stand-by equipment port
Continuously close Z cycle step;
First switching equipment detects that the standby transport port receives the second switching equipment in the continuous L cycle
The detection data frame of transmission, it is determined that reserve link recovers, trigger standby transport port cycle of first switching equipment to
Second switching equipment sends detection data frame;
Wherein, Z, L, Q are positive integer, and Z is not less than P.
5. the method as described in Claims 1 to 4 is any, it is characterised in that the host apparatus port of the first switching equipment of triggering
Stop after receiving business data frame, before triggering enables the standby transport port transmission business data frame of the first switching equipment,
Also include:
First switching equipment detects that primary transmission port receives the business data frame of the second switching equipment side transmission, by business
Data frame is forwarded to host apparatus port from primary transmission port, and host apparatus port is transmitted processing to business data frame.
6. a kind of link automatic switching control equipment, pass through the active/standby active/standby use established with transmission port applied to two switching equipment
The automatic switchover of link, it is characterised in that the device includes:
Detection unit, for detecting that the primary transmission port continuous N cycle of the first switching equipment does not receive the second exchange
After the detection data frame that equipment is sent, active link failure is determined;Wherein, the first switching equipment and the second switching equipment week
Phase sends the detection data frame to other side;M is positive integer;The detection data frame is first switching equipment and described the
What two switching equipment were made an appointment is different from a kind of particular data frame of business data frame;
Switch unit, for closing the active link, enable reserve link work;
Wherein, each switching equipment has uses device port, the switching with active/standby with transmission port is active/standby correspondingly
Unit is specifically used for:
The host apparatus port for triggering the first switching equipment stops receiving business data frame, and triggers closing first exchange and set
Standby host apparatus port;
The detection unit is specifically used for:Continuous N number of cycle is not detected by the host apparatus port of first switching equipment
Electric signal;The switch unit is specifically used for:Triggering enables the stand-by equipment port of first switching equipment;Institute is opened in triggering
The standby transport port transmission business data frame of the first switching equipment is stated, and detection trigger unit passes through the standby transport port cycle
Detection data frame is sent to second switching equipment;
Wherein, N is positive integer;
The switch unit is additionally operable to:
Triggering host apparatus port was continuously closed after X cycle, and host apparatus port is opened in triggering;
The detection unit is additionally operable to, the electric signal of continuous Y cycle detection to host apparatus port, and triggering described first exchanges
The primary transmission port continuous N cycle of equipment sends detection data frame to the second switching equipment;
The detection unit is additionally operable to, and detects that the primary transmission port does not receive the second friendship in the continuous N cycle
The detection data frame that exchange device is sent;The switch unit is additionally operable to, and the host apparatus of first switching equipment is closed in triggering
Port;
The detection unit is additionally operable to, and detects that the primary transmission port receives the second exchange in the continuous N cycle
The detection data frame that equipment is sent, it is determined that active link recovers;Trigger the primary transmission port week of first switching equipment
Phase sends detection data frame to second switching equipment;
Wherein, X, Y, M are positive integer, and X is not less than N.
7. device as claimed in claim 6, it is characterised in that the switch unit is additionally operable to:
The active link fault recovery, and the stand-by circuit failure are detected, switches back into the active link work.
8. device as claimed in claim 7, it is characterised in that the detection unit is specifically used for:
Continuous L cycle detection does not receive the detection data frame of the second switching equipment transmission to standby transport port, it is determined that standby
Use link failure;
The switch unit is specifically used for, and triggering stand-by equipment port stops receiving business data frame, and triggers and close described the
The stand-by equipment port of one switching equipment;
The detection unit is specifically used for, and the continuous P cycle is not detected by the electric signal of stand-by equipment port;The switch unit
It is specifically used for, triggering enables the host apparatus port of first switching equipment;Triggering enables the master of first switching equipment
With transmission port transmission services data frame, and notify detection unit by the standby transport port cycle to second switching equipment
Send detection data frame;
Wherein, L, P are positive integer.
9. device as claimed in claim 8, it is characterised in that the switch unit is additionally operable to:
Triggering stand-by equipment port is continuously closed Z cycle, and stand-by equipment port is opened in triggering;
The detection unit is additionally operable to continuous Q cycle detection and exchanged to the electric signal of stand-by equipment port, triggering described first
The standby transport port continuous L cycle of equipment sends detection data frame to the second switching equipment;
The detection unit is specifically used for, and detects that standby transport port does not receive the second exchange in the continuous L cycle
The detection data frame that equipment is sent;The switch unit is used for, and the stand-by equipment port of first switching equipment is closed in triggering;
The detection unit is specifically used for, and detects that the standby transport port receives the second friendship in the continuous L cycle
The detection data frame that exchange device is sent, it is determined that reserve link recovers, and triggers the standby transport port of first switching equipment
Cycle sends detection data frame to second switching equipment;
Wherein, Z, L, Q are positive integer, and Z is not less than P.
10. the device as described in claim 6~9 is any, it is characterised in that the switch unit is additionally operable to:
The host apparatus port for triggering the first switching equipment stops after receiving business data frame, and triggering enables the first switching equipment
Standby transport port transmission business data frame before, detect that the primary transmission port of the first switching equipment receives the second friendship
The business data frame that exchange device side is sent, host apparatus port is forwarded to by business data frame from primary transmission port, primary to set
Standby port is transmitted processing to business data frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410019427.6A CN104796329B (en) | 2014-01-16 | 2014-01-16 | A kind of link automatic switching method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410019427.6A CN104796329B (en) | 2014-01-16 | 2014-01-16 | A kind of link automatic switching method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104796329A CN104796329A (en) | 2015-07-22 |
CN104796329B true CN104796329B (en) | 2017-11-28 |
Family
ID=53560853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410019427.6A Active CN104796329B (en) | 2014-01-16 | 2014-01-16 | A kind of link automatic switching method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104796329B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107872822A (en) * | 2016-09-23 | 2018-04-03 | 大唐移动通信设备有限公司 | The bearing method and bogey of a kind of business |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105099825B (en) * | 2015-08-17 | 2018-10-02 | 北京神州绿盟信息安全科技股份有限公司 | A kind of safeguard method and device of external Bypass |
CN106656311A (en) * | 2016-12-15 | 2017-05-10 | 国网山东省电力公司长岛县供电公司 | Data link backup apparatus and method |
CN110267285B (en) * | 2019-06-28 | 2021-02-09 | 京信通信系统(中国)有限公司 | Main/standby link switching method and device and digital switch |
CN110545566B (en) * | 2019-09-11 | 2021-04-27 | 腾讯科技(深圳)有限公司 | Link switching method, device, equipment and storage medium |
CN110768848B (en) * | 2019-10-31 | 2022-07-01 | 杭州迪普科技股份有限公司 | Method and device for switching main server and standby server |
CN110943998B (en) * | 2019-12-04 | 2022-02-01 | 腾讯科技(深圳)有限公司 | Signal transmission method, device, equipment and medium |
CN113395726B (en) * | 2021-06-21 | 2023-02-17 | 迈普通信技术股份有限公司 | Backup link detection method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1984039A (en) * | 2006-04-23 | 2007-06-20 | 华为技术有限公司 | Fast re-routing method for shared multi-port transmitting link |
CN101026798A (en) * | 2007-03-12 | 2007-08-29 | 华为技术有限公司 | Iub interface business transmission method and device based on IP transmission |
CN101170459A (en) * | 2007-11-28 | 2008-04-30 | 中兴通讯股份有限公司 | Failure detection and link recovery method based on bidirectional forward link |
CN101212408A (en) * | 2006-12-29 | 2008-07-02 | 中兴通讯股份有限公司 | Load-sharing switching system and port-level protective switching method |
CN102664702A (en) * | 2012-04-05 | 2012-09-12 | 烽火通信科技股份有限公司 | Protection mode of cross disc of M to N |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9077561B2 (en) * | 2012-03-27 | 2015-07-07 | Juniper Networks, Inc. | OAM label switched path for fast reroute of protected label switched paths |
-
2014
- 2014-01-16 CN CN201410019427.6A patent/CN104796329B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1984039A (en) * | 2006-04-23 | 2007-06-20 | 华为技术有限公司 | Fast re-routing method for shared multi-port transmitting link |
CN101212408A (en) * | 2006-12-29 | 2008-07-02 | 中兴通讯股份有限公司 | Load-sharing switching system and port-level protective switching method |
CN101026798A (en) * | 2007-03-12 | 2007-08-29 | 华为技术有限公司 | Iub interface business transmission method and device based on IP transmission |
CN101170459A (en) * | 2007-11-28 | 2008-04-30 | 中兴通讯股份有限公司 | Failure detection and link recovery method based on bidirectional forward link |
CN102664702A (en) * | 2012-04-05 | 2012-09-12 | 烽火通信科技股份有限公司 | Protection mode of cross disc of M to N |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107872822A (en) * | 2016-09-23 | 2018-04-03 | 大唐移动通信设备有限公司 | The bearing method and bogey of a kind of business |
CN107872822B (en) * | 2016-09-23 | 2020-05-26 | 大唐移动通信设备有限公司 | Service bearing method and device |
Also Published As
Publication number | Publication date |
---|---|
CN104796329A (en) | 2015-07-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104796329B (en) | A kind of link automatic switching method and device | |
CN103780407B (en) | gateway dynamic switching method and device in distributed elastic network interconnection (DRNI) | |
CN105205021B (en) | Disconnect the method and apparatus linked between PCIe device and main frame | |
CN103312411B (en) | Optical fiber link fault detection method and device | |
CN103957155B (en) | Message transmitting method, device and interconnecting interface | |
CN101094121B (en) | Method, system and device for detecting Ethernet links among not direct connected devices | |
CN104243239B (en) | The condition detection method and device of controller in a kind of SDN clusters | |
CN101753284A (en) | 10/100M Ethernet double interface switching method based upon carrier detect and device thereof | |
CN105429814A (en) | Method and device for BFD protection by utilizing multiple board cards | |
CN106533736A (en) | Network device reboot method and apparatus | |
CN101335657A (en) | Communication device, communication method, communication interface, and program product | |
CN105227456B (en) | A kind of aggregated link failures restore the method and device of transmission | |
CN104317679B (en) | A kind of SCADA system is based on the communication fault-tolerance method of thread redundancy | |
CN106789387A (en) | A kind of chain circuit detecting method and device for SDN | |
CN101163059B (en) | Network node detection method and apparatus | |
CN106093683A (en) | Heater broken wire detection system and wire break detection method | |
CN103220201B (en) | A kind of method and device of detection and protection of ring network faults | |
CN102710483A (en) | RS485 (Recommended Standard 485) intelligent loop | |
CN101217405B (en) | SGSN backup method and communication system, communication device | |
CN104202193B (en) | The method of distributed protection link failure detection | |
CN105187274A (en) | Method for judging port state and selecting good port communication | |
CN103684719B (en) | Network dual-redundancy hot swap method independent of platforms | |
CN102355367B (en) | A kind of distributed LACP user equipments deadlock prevention technique and device | |
CN106850264B (en) | A kind of network equipment | |
CN102149116B (en) | Backup method and device for coordinator of wireless private area network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |