CN104790900A CN201510076302.1A CN201510076302A CN104790900A CN 104790900 A CN104790900 A CN 104790900A CN 201510076302 A CN201510076302 A CN 201510076302A CN 104790900 A CN104790900 A CN 104790900A
Authority
CN
China
Prior art keywords
gas pumping
coal
drilling
boring
bits
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510076302.1A
Other languages
Chinese (zh)
Inventor
高明忠
谢晶
张茹
徐晓炼
邱志强
李圣伟
谭强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN201510076302.1A priority Critical patent/CN104790900A/en
Publication of CN104790900A publication Critical patent/CN104790900A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Abstract

The invention provides a method for blocking gas extraction boreholes with coal and rock debris as a borehole sealing material. The method includes the steps that 1, the first-stage borehole is drilled in a coal and rock mass on the side of a bed plate tunnel of a coal seam needing gas control, wherein the included angle between the first-stage borehole and the horizontal plane ranges from 5 degree to 80 degrees; 2, a gas extraction tube where a wooden wedge is fixed is installed in the first-stage borehole, and then the section, close to an opening of the first-stage borehole, of the gas extraction tube is blocked through a sealing material; 3, a drill stem and a drill bit of drilling equipment are made to penetrate through the gas extraction tube to drill the second-stage borehole, water is injected to the drill bit through the hollow drill stem in the process of drilling the second-stage borehole, the water which has exchanged heat with the drill bit washes the coal and rock debris generated in drilling of the second-stage borehole downwards along the hole wall, the space between the outer wall of the gas extraction tube and the inner wall of the first-stage borehole is backfilled with the coal and rock debris, the water which is not absorbed by the coal and rock debris passes through the backfilling coal and rock debris and then flows out from the opening end of the first-stage borehole, drilling is stopped after the depth of the second-stage borehole reaches a design depth, and blocking of the gas extraction boreholes is completed after the backfilling coal and rock debris is solidified.

Description

A kind of with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling
Technical field
The invention belongs to technical field of mine safety, particularly a kind of with the method for coal petrography bits for sealing material shutoff gas pumping hole.
Background technology
Gas is the principal element affecting Safety of Coal Mine Production always, along with the increase of coal mining depth, Gas Disaster can be more and more obvious, and a large amount of superficial part low gaseous mines is changing highly gassy mine into gradually, and a number of gas accident and fatal rate are all the situation risen year by year.Gas is also very serious to the destruction of atmospheric environment, and the damage capability of gas to ozone layer is CO 27 times, its produce greenhouse effect be CO 221 times.Meanwhile, gas is also a kind of clean, efficient and safe novel energy.Gas is effectively administered, not only to safety of coal mines and environmental protection significant, and the situation of energy demand growing tension can also be alleviated.The measure of current gas control is more, and these measures all need in coal seam, to drill through boring and mash gas extraction, and the sealing quality of boring is the key factor affecting gas pumping efficiency, gas extraction concentration and extraction amount.
CN102877882A discloses a kind of method of shutoff gas pumping hole, its step is as follows: on coal body, drill through boring and install gas pumping pipe in boring, cloth matter polyurethane hole sealing bag is set at the two ends of gas pumping pipe, polyurethane foam material has been pre-charged with in hole sealing bag, the pre-buried Grouting Pipe stretched in sealing of hole section space in the hole sealing bag near aperture, sealing of hole material water is modulated into sealing of hole slurry, adopts grouting equipment sealing of hole slurry to be injected the shutoff namely completing gas pumping hole in space, block section by Grouting Pipe.The sulphur aluminium grog of described sealing material by 53 ~ 60wt%, the calcium aluminate powder of 10 ~ 17wt%, after the additional intermixture mixing of the anhydrite of 20 ~ 27wt%, the lime of 5 ~ 12wt% and 5 ~ 9wt%, grinding to granularity is greater than 200 object powder compositions, and additional intermixture is mixed by lithium carbonate, borax, aluminium powder, polyacrylamide, aluminium polychloride, sodium thiosulfate and sodium fluoride.The method has the following disadvantages: the formula of the sealing material that (1) uses is very complicated, and the component in formula is all that sealing of hole scene does not have, must prepare burden in proportion and be transported to scene in advance, dispensing operation is loaded down with trivial details, the expense expended that the price of sealing material itself is cheap, add transport, causes the sealing of hole high cost of the method.(2) grouting equipment is adopted to pump in space, block section by sealing of hole slurry, the amount of pumping into of sealing of hole slurry is difficult to control, and the grouting pressure that different coal petrography physical efficiencys is born is different, the amount of pumping into crosses that I haven't seen you for ages causes sealing of hole incomplete, the amount of pumping into too much can cause block section space pressure too high, cause that the crack of coal and rock is expanded, crack quantity increases, and the crack of coal and rock expansion and be increased in gas control and should avoid as far as possible, these all can cause adverse influence to sealing quality.(3) hole drill through to operate to separate with sealing of hole is carried out, and be unfavorable for the simplification operated, the coal petrography produced when drilling through boring bits and cooling drill bit water go out of use after discharging from boring, cause the waste of resource.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, to simplify sealing of hole operation, to reduce sealing of hole cost.
Of the present invention with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, step is as follows:
(1) in the coal and rock needing the end of carrying out gas control coal seam to take out lane, drill through one-level boring, the length of described one-level boring is 8 ~ 12 meters, and one-level boring is 5 ~ 80 degree with the angle of horizontal plane;
(2) canting quoin on gas pumping pipe, be arranged on by the gas pumping pipe securing timber wedge in one-level boring, then with encapsulant, gas pumping pipe is carried out shutoff near portion's section of one-level drilling orifice, shutoff length is 0.5 ~ 2 meter;
(3) drilling rod of rig and drill bit are passed gas pumping pipe, direction along one-level boring drills through secondary boring in coal and rock, to drill through in the process of secondary boring by the drilling rod of hollow to drill bit water filling, consider to be worth doing with the water after drill bit heat exchange sweep away drilling through the coal petrography produced when secondary is holed along hole wall, be backfilled between inwall that the outer wall of gas pumping pipe and one-level hole, part water is absorbed by the coal petrography bits backfilled, unabsorbed water flows out from the orifice end of one-level boring after the coal petrography bits of backfill, the degree of depth that secondary is holed stops boring after reaching projected depth, namely the shutoff in gas pumping hole is completed after the coal petrography bits consolidation backfilled.
In the step (3) of said method, the particle diameter that the rate of penetration controlling to drill through secondary boring makes the coal petrography of generation consider to be worth doing is no more than 10mm, and concrete rate of penetration is determined according to actual geological condition, and rate of penetration is lower, and the coal petrography bits of generation are thinner.
In said method, the design length of secondary boring should ensure secondary boring by gas pumping pipe with wait that the coal seam administering gas is through, and ensure that the backfill length in annular solid space between the inwall that the outer wall of gas pumping pipe and one-level are holed is at least the half of gas pumping length of tube.If the annular space body between gas pumping pipe outer wall and one-level drill hole inner wall has been drilled through the coal petrography backfilled when secondary is holed and has considered to be worth doing and fill up, the coal petrography bits so produced in the continuation drilling process of secondary boring with drill bit heat exchange after flow action under, can hole from drilling rod and secondary and flow out space between gas pumping pipe.
In the step (2) of said method, gas pumping pipe has at least two places be fixed with timber wedge, 2 ~ 3 timber wedges are fixed in everywhere; Preferred version is joint timber wedge being fixed on each gas pumping pipe.
In the step (2) of said method, with encapsulant by portion section shutoff 1 ~ 4 place of gas pumping pipe near one-level drilling orifice.
In the step (2) of said method, described encapsulant is the piece of sack, is fixed on gas pumping pipe by the piece of sack during shutoff with adhesive waterproof tape.
In said method, described one-level boring is the elevation angle with the angle of horizontal plane, and one-level boring is preferably 30 ~ 60 degree with the angle of horizontal plane.
Compared with prior art, the present invention has following beneficial effect:
1, the invention provides the new method of the different shutoff mash gas pumping drilling of a kind of technical conceive, the method makes full use of the water after coal petrography bits and cooling drill bit, the coal petrography bits produced during to hole are as sealing material, and coal petrography is considered to be worth doing and is brought between gas pumping pipe and one-level drill hole wall by the current after drill bit heat exchange, in the backfilling process of coal petrography bits, after coal petrography bits absorb moisture, weight increases, add the induced effect of current, coal petrography bits can form closely knit accumulation horizon, after borehole drilling is got, coal petrography bits can dewater, clayization and consolidation, form firm sealing of hole layer, thus ensure that good sealing effectiveness, further, the method for the invention is gathered materials on the spot, and makes full use of field resources, avoids and prepares sealing material in advance and the operation being transported to sealing of hole scene, have the advantage of the waste simplifying sealing of hole operation, reduction sealing of hole cost and avoid resource concurrently.
2, because sealing of hole and the operation drilling through boring carry out by the method for the invention simultaneously, and boring has certain elevation angle, therefore in the drilling process of secondary boring, coal petrography bits can easily be backfilled between the inwall that the outer wall of gas pumping pipe and one-level hole with current along drill hole wall, without the need to adopting grouting equipment, also without the need to preparing sealing of hole slurry, not only effectively simplify the plugging operations in existing gas pumping hole, and saved the expense of grouting equipment, be conducive to the reduction of sealing of hole cost.
3, the size of the coal petrography bits that the method for the invention produces when drilling through secondary boring is less, under flow action, coal petrography bits be easy to enter also pile up wherein between inwall that the outer wall of gas pumping pipe and one-level hole closely knit, after water is saturated in coal petrography bits, excessive water flows out from the orifice end of one-level boring through the coal petrography bits of backfill under gravity, because current go out through the coal petrography bits laminar flow piled up in natural situation, additionally need not apply pressure, avoiding problems between gas pumping pipe and one-level drill hole wall causes coal and rock to occur the phenomenon that crack is expanded and increased because pressure is excessive.
4, the method for the invention simple to operate, with low cost and sealing of hole is effective, has great practical value, easily applies in engineering practice.
Accompanying drawing explanation
Fig. 1 is the schematic diagram adopting the method for the invention shutoff mash gas pumping drilling;
In figure, 1-coal and rock, lane is taken out at 2-end, and 3-one-level is holed, and 4-secondary is holed, 5-gas pumping pipe, 6-joint coupling, 7-timber wedge, 8-encapsulant, and 9-coal petrography is considered to be worth doing, the angle of α-one-level boring and horizontal plane.
Detailed description of the invention
Be described further with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling of the present invention below in conjunction with drawings and Examples.
Embodiment 1
In the present embodiment, Fig. 1 is shown in by the schematic diagram of shutoff mash gas pumping drilling, the total length of mash gas pumping drilling is 38m, wherein, the length of one-level boring 3 is 12m, one-level boring is 60 ° with angle (elevation angle) α of horizontal plane, aperture is about 120mm, and the length of secondary boring 4 is 26m, diameter is about 75mm.
(1) according to actual requirement of engineering, determine to need to carry out gas control coal seam, install auger in the Di Chou lane, coal seam in this coal seam, adopting diameter to be the drill bit of 113mm and diameter is the drilling rod of 50mm, and the coal and rock 1 that lane 2 is taken out at the end drills through one-level boring 3.
(2) be 85mm by three external diameters, internal diameter is that 75mm gas pumping pipe 5 links together with joint coupling 6 and bonding agent, after connecting, its total length is 13.5m, at first joint fixation with steel wire two timber wedge 7 with second gas pumping pipe, two timber wedges are along the radial distribution of gas pumping pipe, similarly, in the joint of second and the 3rd gas pumping pipe with fixation with steel wire two timber wedges, timber wedge plays the effect be fixed on by gas pumping pipe in one-level boring 3.The gas pumping pipe securing timber wedge is pushed to gradually in one-level boring 3, in propelling movement process, at distance gas pumping tube end (one end near one-level drilling orifice) 3.5m and 1.5m place, with piece of sack parcel gas pumping Guan Houyong adhesive waterproof tape, the piece of sack is fastened respectively, the shutoff length of the everywhere piece of sack is 0.5m, when gas pumping pipe is pushed to one-level foot of hole, the block section at distance gas pumping tube end 1.5m place is just in time positioned at the aperture place of one-level boring 3.
(3) this step adopts diameter to be the drill bit of 65mm, external diameter is the hollow drill pipe of 50mm, described drilling rod and drill bit are passed gas pumping pipe 5, open rig in coal and rock, drill through secondary boring 4 along the direction that one-level is holed, control drills through the rate of penetration of secondary boring coal and rock to be drilled to the coal petrography bits that particle diameter is no more than 10mm, to drill through in the process of secondary boring by the drilling rod of hollow to drill bit water filling, consider to be worth doing with the water after drill bit heat exchange sweep away drilling through the coal petrography produced when secondary is holed along hole wall, be backfilled to the outer wall of gas pumping pipe 5 and one-level hole 3 inwall between, part water is absorbed by the coal petrography bits backfilled, unabsorbed water flows out from the orifice end of one-level boring after the coal petrography bits of backfill, secondary drilling depth stops boring when reaching 26m, take out drill bit and drilling rod, coal petrography bits progressively gather, dehydration, clayization and consolidation, after 3 days, the coal petrography of backfill considers complete consolidation to be worth doing, namely the shutoff in gas pumping hole is completed.
Embodiment 2
In the present embodiment, the total length of mash gas pumping drilling is 35m, wherein, the length of one-level boring 3 is 8m, one-level boring is 30 ° with angle (elevation angle) α of horizontal plane, aperture is about 120mm, and the length of secondary boring 4 is 27m, diameter is about 75mm.
(1) according to actual requirement of engineering, determine to need to carry out gas control coal seam, install auger in the Di Chou lane, coal seam in this coal seam, adopting diameter to be the drill bit of 113mm and diameter is the drilling rod of 50mm, and the coal and rock 1 that lane 2 is taken out at the end drills through one-level boring 3.
(2) be 85mm by three external diameters, internal diameter is that 75mm gas pumping pipe 5 links together with joint coupling 6 and bonding agent, after connecting, its total length is 9m, at first joint fixation with steel wire three timber wedge 7 with second gas pumping pipe, three timber wedges are evenly distributed on the joint of gas pumping pipe, similarly, in the joint of second and the 3rd gas pumping pipe with fixation with steel wire three timber wedges, timber wedge plays the effect be fixed on by gas pumping pipe in one-level boring 3.The gas pumping pipe securing timber wedge is pushed to gradually in one-level boring 3, in propelling movement process, at distance gas pumping tube end (one end near one-level drilling orifice) 1m place, with piece of sack parcel gas pumping Guan Houyong adhesive waterproof tape, the piece of sack is fastened, the shutoff length of the piece of sack is 2m, when gas pumping pipe is pushed to one-level foot of hole, the block section at distance gas pumping tube end 1m place is just in time positioned at the aperture place of one-level boring 3.
(3) this step adopts diameter to be the drill bit of 65mm, external diameter is the hollow drill pipe of 50mm, described drilling rod and drill bit are passed gas pumping pipe 5, open rig in coal and rock, drill through secondary boring 4 along the direction that one-level is holed, control drills through the rate of penetration of secondary boring coal and rock to be drilled to the coal petrography bits that particle diameter is no more than 10mm, to drill through in the process of secondary boring by the drilling rod of hollow to drill bit water filling, consider to be worth doing with the water after drill bit heat exchange sweep away drilling through the coal petrography produced when secondary is holed along hole wall, be backfilled to the outer wall of gas pumping pipe 5 and one-level hole 3 inwall between, part water is absorbed by the coal petrography bits backfilled, unabsorbed water flows out from the orifice end of one-level boring after the coal petrography bits of backfill, secondary drilling depth stops boring when reaching 27m, take out drill bit and drilling rod, coal petrography bits progressively gather, dehydration, clayization and consolidation, after 3 days, the coal petrography of backfill considers complete consolidation to be worth doing, namely the shutoff in gas pumping hole is completed.
Embodiment 3
In the present embodiment, the total length of mash gas pumping drilling is 36m, wherein, the length of one-level boring 3 is 11m, one-level boring is 80 ° with angle (elevation angle) α of horizontal plane, aperture is about 120mm, and the length of secondary boring 4 is 25m, diameter is about 75mm.
(1) according to actual requirement of engineering, determine to need to carry out gas control coal seam, install auger in the Di Chou lane, coal seam in this coal seam, adopting diameter to be the drill bit of 113mm and diameter is the drilling rod of 50mm, and the coal and rock 1 that lane 2 is taken out at the end drills through one-level boring 3.
(2) be 85mm by three external diameters, internal diameter is that 75mm gas pumping pipe 5 links together with joint coupling 6 and bonding agent, after connecting, its total length is 12m, at first joint fixation with steel wire two timber wedge 7 with second gas pumping pipe, two timber wedges are along the radial distribution of gas pumping pipe, similarly, in the joint of second and the 3rd gas pumping pipe with fixation with steel wire two timber wedges, timber wedge plays the effect be fixed on by gas pumping pipe in one-level boring 3.The gas pumping pipe securing timber wedge is pushed to gradually in one-level boring 3, in propelling movement process, at distance gas pumping tube end (one end near one-level drilling orifice) 4m, 3m, 2m and 1m place, with piece of sack parcel gas pumping Guan Houyong adhesive waterproof tape, the piece of sack is fastened respectively, the shutoff length of the everywhere piece of sack is 0.5m, when gas pumping pipe is pushed to one-level foot of hole, the block section at distance gas pumping tube end 1m place is just in time positioned at the aperture place of one-level boring 3.
(3) this step adopts diameter to be the drill bit of 65mm, external diameter is the hollow drill pipe of 50mm, described drilling rod and drill bit are passed gas pumping pipe 5, open rig in coal and rock, drill through secondary boring 4 along the direction that one-level is holed, control drills through the rate of penetration of secondary boring coal and rock to be drilled to the coal petrography bits that particle diameter is no more than 10mm, to drill through in the process of secondary boring by the drilling rod of hollow to drill bit water filling, consider to be worth doing with the water after drill bit heat exchange sweep away drilling through the coal petrography produced when secondary is holed along hole wall, be backfilled to the outer wall of gas pumping pipe 5 and one-level hole 3 inwall between, part water is absorbed by the coal petrography bits backfilled, unabsorbed water flows out from the orifice end of one-level boring after the coal petrography bits of backfill, secondary drilling depth stops boring when reaching 25m, take out drill bit and drilling rod, coal petrography bits progressively gather, dehydration, clayization and consolidation, after 3 days, the coal petrography of backfill considers complete consolidation to be worth doing, namely the shutoff in gas pumping hole is completed.
Embodiment 4
In the present embodiment, the total length of mash gas pumping drilling is 33m, wherein, the length of one-level boring 3 is 11m, one-level boring is 5 ° with angle (elevation angle) α of horizontal plane, aperture is about 120mm, and the length of secondary boring 4 is 22m, diameter is about 75mm.
(1) according to actual requirement of engineering, determine to need to carry out gas control coal seam, install auger in the Di Chou lane, coal seam in this coal seam, adopting diameter to be the drill bit of 113mm and diameter is the drilling rod of 50mm, and the coal and rock 1 that lane 2 is taken out at the end drills through one-level boring 3.
(2) be 85mm by three external diameters, internal diameter is that 75mm gas pumping pipe 5 links together with joint coupling 6 and bonding agent, after connecting, its total length is 12m, at first joint fixation with steel wire two timber wedge 7 with second gas pumping pipe, two timber wedges are along the radial distribution of gas pumping pipe, similarly, in the joint of second and the 3rd gas pumping pipe with fixation with steel wire two timber wedges, timber wedge plays the effect be fixed on by gas pumping pipe in one-level boring 3.The gas pumping pipe securing timber wedge is pushed to gradually in one-level boring 3, in propelling movement process, at distance gas pumping tube end (one end near one-level drilling orifice) 1m place, with piece of sack parcel gas pumping Guan Houyong adhesive waterproof tape, the piece of sack is fastened, piece of sack shutoff length is 1.5m, when gas pumping pipe is pushed to one-level foot of hole, the block section at distance gas pumping tube end 1m place is just in time positioned at the aperture place of one-level boring 3.
(3) this step adopts diameter to be the drill bit of 65mm, external diameter is the hollow drill pipe of 50mm, described drilling rod and drill bit are passed gas pumping pipe 5, open rig in coal and rock, drill through secondary boring 4 along the direction that one-level is holed, control drills through the rate of penetration of secondary boring coal and rock to be drilled to the coal petrography bits that particle diameter is no more than 10mm, to drill through in the process of secondary boring by the drilling rod of hollow to drill bit water filling, consider to be worth doing with the water after drill bit heat exchange sweep away drilling through the coal petrography produced when secondary is holed along hole wall, be backfilled to the outer wall of gas pumping pipe 5 and one-level hole 3 inwall between, part water is absorbed by the coal petrography bits backfilled, unabsorbed water flows out from the orifice end of one-level boring after the coal petrography bits of backfill, secondary drilling depth stops boring when reaching 22m, take out drill bit and drilling rod, coal petrography bits progressively gather, dehydration, clayization and consolidation, after 3 days, the coal petrography of backfill considers complete consolidation to be worth doing, namely the shutoff in gas pumping hole is completed.

Claims (10)

1., with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that step is as follows:
(1) in the coal and rock (1) needing the end of carrying out gas control coal seam to take out lane (2), one-level boring (3) is drilled through, the length of described one-level boring is 8 ~ 12 meters, and one-level boring is 5 ~ 80 degree with the angle (α) of horizontal plane;
(2) at the upper canting quoin (7) of gas pumping pipe (5), the gas pumping pipe securing timber wedge is arranged in one-level boring (3), then use encapsulant (8) that gas pumping pipe is carried out shutoff near portion's section of one-level drilling orifice, shutoff length is 0.5 ~ 2 meter;
(3) drilling rod of rig and drill bit are passed gas pumping pipe (5), direction along one-level boring drills through secondary boring (4) in coal and rock (1), to drill through in the process of secondary boring by the drilling rod of hollow to drill bit water filling, consider (9) with the water after drill bit heat exchange to be worth doing sweep away drilling through the coal petrography produced when secondary is holed along hole wall, be backfilled between inwall that the outer wall of gas pumping pipe and one-level hole, part water is absorbed by the coal petrography bits backfilled, unabsorbed water flows out from the orifice end of one-level boring after the coal petrography bits of backfill, the degree of depth of secondary boring (4) reaches after projected depth and stops boring, namely the shutoff in gas pumping hole is completed after the coal petrography bits consolidation backfilled.
2., according to claim 1 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that the particle diameter that the rate of penetration controlling in step (3) to drill through secondary boring makes the coal petrography of generation consider to be worth doing is no more than 10mm.
3. according to claim 1 or 2 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that design length that secondary is holed should ensure secondary boring by gas pumping pipe with wait that the coal seam administering gas is through, and ensure that the backfill length in annular solid space between the inwall that the outer wall of gas pumping pipe and one-level are holed is at least the half of gas pumping length of tube.
4. according to claim 1 or 2 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that, in step (2), gas pumping pipe having at least two places be fixed with timber wedge, 2 ~ 3 timber wedges are fixed in everywhere.
5., according to claim 3 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that, in step (2), gas pumping pipe having at least two places be fixed with timber wedge, 2 ~ 3 timber wedges are fixed in everywhere.
6. according to claim 1 or 2 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that in step (2), with encapsulant by portion section shutoff 1 ~ 4 place of gas pumping pipe near one-level drilling orifice.
7. according to claim 1 or 2 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that described encapsulant is the piece of sack, with adhesive waterproof tape, the piece of sack be fixed on gas pumping pipe during shutoff.
8. according to claim 3 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that described encapsulant is the piece of sack, with adhesive waterproof tape, the piece of sack is fixed on gas pumping pipe during shutoff.
9. according to claim 4 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that described encapsulant is the piece of sack, with adhesive waterproof tape, the piece of sack is fixed on gas pumping pipe during shutoff.
10. according to claim 6 with the method for coal petrography bits for sealing material shutoff mash gas pumping drilling, it is characterized in that described encapsulant is the piece of sack, with adhesive waterproof tape, the piece of sack is fixed on gas pumping pipe during shutoff.
CN201510076302.1A 2015-02-12 2015-02-12 Method for blocking gas extraction boreholes with coal and rock debris as borehole sealing material Pending CN104790900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510076302.1A CN104790900A (en) 2015-02-12 2015-02-12 Method for blocking gas extraction boreholes with coal and rock debris as borehole sealing material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510076302.1A CN104790900A (en) 2015-02-12 2015-02-12 Method for blocking gas extraction boreholes with coal and rock debris as borehole sealing material

Publications (1)

Publication Number Publication Date
CN104790900A true CN104790900A (en) 2015-07-22

Family

ID=53556036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510076302.1A Pending CN104790900A (en) 2015-02-12 2015-02-12 Method for blocking gas extraction boreholes with coal and rock debris as borehole sealing material

Country Status (1)

Country Link
CN (1) CN104790900A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735935A (en) * 2016-03-07 2016-07-06 平顶山市安泰华矿用安全设备制造有限公司 Gas drainage borehole sealing process
CN109113786A (en) * 2018-10-12 2019-01-01 安徽理工大学 Drilling rod formula gas drainage device can be exited
CN110374497A (en) * 2019-08-29 2019-10-25 田振林 A kind of drilling equipment and its boring method in fire damp hole

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101251029A (en) * 2008-04-10 2008-08-27 中国矿业大学 Secondary hole sealing device for firedamp taking-out discharging drilling
US20090095484A1 (en) * 2007-10-12 2009-04-16 Baker Hughes Incorporated In-Flow Control Device Utilizing A Water Sensitive Media
CN201705387U (en) * 2010-06-14 2011-01-12 阳泉煤业(集团)有限责任公司 Hole drilling and sealing device for coal seam gas extraction
CN103266913A (en) * 2013-05-13 2013-08-28 西南石油大学 Gas extraction method
CN103775120A (en) * 2014-01-20 2014-05-07 中国矿业大学 Method for realizing drilling and hole sealing based on drill cuttings during uplink gas extraction
CN203702070U (en) * 2013-12-30 2014-07-09 平顶山天安煤业股份有限公司 Coal mine low pumping lane borehole slag-returning sealing apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090095484A1 (en) * 2007-10-12 2009-04-16 Baker Hughes Incorporated In-Flow Control Device Utilizing A Water Sensitive Media
CN101251029A (en) * 2008-04-10 2008-08-27 中国矿业大学 Secondary hole sealing device for firedamp taking-out discharging drilling
CN201705387U (en) * 2010-06-14 2011-01-12 阳泉煤业(集团)有限责任公司 Hole drilling and sealing device for coal seam gas extraction
CN103266913A (en) * 2013-05-13 2013-08-28 西南石油大学 Gas extraction method
CN203702070U (en) * 2013-12-30 2014-07-09 平顶山天安煤业股份有限公司 Coal mine low pumping lane borehole slag-returning sealing apparatus
CN103775120A (en) * 2014-01-20 2014-05-07 中国矿业大学 Method for realizing drilling and hole sealing based on drill cuttings during uplink gas extraction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735935A (en) * 2016-03-07 2016-07-06 平顶山市安泰华矿用安全设备制造有限公司 Gas drainage borehole sealing process
CN105735935B (en) * 2016-03-07 2018-06-22 平顶山市安泰华矿用安全设备制造有限公司 A kind of firedamp taking-out discharging drilling hole-sealing technology
CN109113786A (en) * 2018-10-12 2019-01-01 安徽理工大学 Drilling rod formula gas drainage device can be exited
CN110374497A (en) * 2019-08-29 2019-10-25 田振林 A kind of drilling equipment and its boring method in fire damp hole

Similar Documents

Publication Publication Date Title
CN103061785B (en) Grouting process for borehole casing pressure-proof seepage sealing grouting device for drilling roadway breaking water burst surrounding rock
CN102121395B (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN104481560B (en) Back water-bearing layer administering method
CN105114030B (en) A kind of non-condensable constant pressure slurries method for sealing of mash gas pumping drilling
CN106884655B (en) A kind of two-way reinforcement means of gob side entry driving coal column
CN102071961B (en) Downward gas drainage drill hole and pressure testing drill hole sealing method
CN105952475A (en) Coal mine residual mining zone falling waste roadway grouting reinforcing technology and method
CN104481540A (en) Method for controlling multiple coal mining hazards by high level borehole grouting
CN203223229U (en) Coal mine roadway uniformly distributing grouting structure
CN106223897B (en) A kind of broken coal petrography deep hole segmenting slip casting method of fully-mechanized mining working
CN109869152B (en) Mining method for reserved roadway of coal and gas outburst coal seam
CN102777185A (en) Inclined well shaft construction technology
CN104295309B (en) A kind of jet perforating hollow grouting anchor and its construction method with framework of steel reinforcement
CN106050302A (en) Constructing system and method for coal mine permanent sealing wall
CN104790900A (en) Method for blocking gas extraction boreholes with coal and rock debris as borehole sealing material
CN105952492A (en) A method for high-gas coal seam working surface drilling and exploitation gas pre-drainage
CN203035203U (en) Pressure-isolating, permeating and cementing grouting device of borehole casing for roadway water-surrounded broken rock
CN103742098B (en) A kind of colliery Di Chou lane layer-through drilling return slag hole sealing device and method
CN105888708B (en) A kind of detection of fall of ground area and processing method based on the radar exploration technique
CN108756883A (en) A kind of coal mine tight roof slip casting fracturing process and system
CN205477518U (en) Boring press seal hole device in colliery
CN201696048U (en) Coal seam gob fracture zone water-injection observation system
CN206477819U (en) One kind drilling artesian water fast plugging device
CN106121678B (en) A kind of detection of top plate empty top zone and roadway repair method based on the radar exploration technique
CN105221182B (en) Coal uncovering method under the complex geological condition of pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150722