CN104790401A - Material spraying and stirring construction device for filling foundation pit through building dredging mud - Google Patents
Material spraying and stirring construction device for filling foundation pit through building dredging mud Download PDFInfo
- Publication number
- CN104790401A CN104790401A CN201510199449.XA CN201510199449A CN104790401A CN 104790401 A CN104790401 A CN 104790401A CN 201510199449 A CN201510199449 A CN 201510199449A CN 104790401 A CN104790401 A CN 104790401A
- Authority
- CN
- China
- Prior art keywords
- foundation ditch
- building
- dredged mud
- slide block
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
A material spraying and stirring construction device for filling a foundation pit through building dredging mud is characterized by comprising a plurality of guide rails evenly and symmetrically distributed on the wall face of the foundation pit, sliding blocks are clamped to the guide rails, a main slurry pipe is connected between every two symmetric sliding blocks, and branch spraying nozzles and stirring blades are evenly distributed on the upper faces of the main slurry pipes; transition channels are further arranged inside the sliding blocks, slurry injection pipes are connected to the inlet ends of the transition channels, and slurry discharging pipes are connected at the outlet ends of the transition channels and in the main slurry pipes; motors are installed on the side edge of the top of the foundation pit, gears are arranged at one ends of the main slurry pipes, and transmission chains are connected between the motors and the gears. Compared with the prior art, the material spraying and stirring construction device has the advantages that the dredging mud can be directly sprayed and stirred in the foundation pit to meet the requirement of filling soil for building engineering, the device is simple in structure, the treatment process of the dredging mud is reduced, and the construction period is shortened.
Description
Technical field
The invention belongs to technical field of building construction, be specifically related to a kind of building dredged mud foundation ditch embankment material spray and stir construction equipment.
Background technology
In the Dredging Process in harbour, navigation channel, usually can produce a large amount of dredging silts.Because quantity is many, the process problem of dredged mud seems particularly outstanding in the middle of the construction and maintenance in harbour, navigation channel.The dredged mud produced in dredging works adopts the method stacked or abandon usually, stacks and will take a large amount of soils, and the marine environmental pollution problem of mud owing to causing is thrown in ocean, is subject to the restriction of each side more and more.In addition, in the process of construction of the coastal engineerings such as marine port, a large amount of cubic metres of earth and stone is usually needed to carry out sea reclamation.China coast port city multidigit is in alluvial plain and Delta Area, and will obtain a large amount of cubic metres of earth and stone in locality more difficult, remote Mining Transport is uneconomical again.By being cured process to dredged mud, improveing its high-moisture percentage, low intensive character and become the soil with good engineering properties and used, is the better method solving above two contradictions.
In order to dredged mud is native as embankment base pit engineering, the requirement making its bearing capacity reach engineering earth must be processed to it, at present all carry out processing in factory being transported to job site again and using for the process of dredged mud, the process time of such centre is very long, cost is also higher simultaneously, if directly can process dredged mud at engineering site, construction cost can be made greatly to reduce, save the duration simultaneously.
Summary of the invention
The present invention is directed to above shortcoming, adopt dredged mud to fill operation based on the existing foundation ditch of solution loaded down with trivial details, problem long in time limit.Propose a kind of building dredged mud foundation ditch embankment material spray and stir construction equipment.This device directly can carry out stir process to dredged mud in foundation ditch, makes it reach the requirement of embankment engineering earth, and simple by this device construction method, fast, cost is low, can use in a large number in engineering.
For realizing object of the present invention, the technical solution used in the present invention is:
A kind of building dredged mud foundation ditch embankment material spray stirs construction equipment, it is characterized in that: comprise the guide rail that multiple uniform symmetry is laid in foundation ditch wall, on described guide rail, buckle has slide block, and main slurry pipe is connected between two symmetrical slide blocks, is laid with multi-branched nozzle and stirring piece above described main slurry pipe; Described slide block inside is also provided with transition passage, and described transition passage entrance point is connected with Grouting Pipe, is connected with discharge pipe in the port of export and main slurry pipe; Described foundation ditch top side is provided with motor, and described main slurry pipe one end is provided with gear, is connected with driving-chain between described motor and gear.
Preferentially, also comprise lifting motor, described lifting motor is arranged on slider top, is connected with wire rope between itself and described slide block, and motor and lifting motor are PLC and control motor.
Preferentially, described slide block medial surface is also provided with the pulley with guide rail contact.
Preferentially, stirring piece is rectangle, triangle or fan-shaped.
Compared with prior art, advantage of the present invention is: this device directly can carry out material spray stir process to dredged mud in foundation ditch, and make it reach the requirement of construction work embankment soil, this apparatus structure is simple, decrease the treatment process of dredged mud, save the construction period.
Accompanying drawing explanation
The following accompanying drawing by means of embodiment carries out brief description to the present invention now.In accompanying drawing:
Fig. 1 shows the present invention and builds dredged mud foundation ditch embankment material spray stirring construction equipment front view;
Fig. 2 shows the present invention and builds dredged mud foundation ditch embankment material spray stirring construction equipment lateral view;
Fig. 3 shows the present invention and builds schematic diagram when dredged mud foundation ditch embankment material spray stirring construction equipment is constructed.
In figure: 1, guide rail, 2, pulley, 3, slide block, 4, multi-branched nozzle, 5, stirring piece, 6, main slurry pipe, 7, Grouting Pipe, 8, discharge pipe, 9, transition passage, 10, driving-chain, 11, motor, 12, wire rope, 13, lifting motor, 14, gear.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following examples will contribute to those skilled in the art and understand the present invention further, but not limit the present invention in any form.It should be pointed out that to those skilled in the art, without departing from the inventive concept of the premise, some distortion and improvement can also be made.These all belong to protection scope of the present invention.
Embodiment 1
A kind of building dredged mud foundation ditch embankment material spray stirs construction equipment, comprise the guide rail 1 that multiple uniform symmetry is laid in foundation ditch wall, on described guide rail 1, buckle has slide block 3, main slurry pipe 6 is connected between two symmetrical slide blocks 3, slide block 3 medial surface is also provided with the pulley 2 contacted with guide rail 1, and main slurry pipe 6 is laid with multi-branched nozzle 4 and stirring piece 5 above.Stirring piece 5 is rectangle.
Slide block 3 inside is also provided with transition passage 9, and described transition passage 9 entrance point is connected with Grouting Pipe 7, is connected with discharge pipe 8 in the port of export and main slurry pipe 6; Described foundation ditch top side is provided with motor 11, and described main slurry pipe 6 one end is provided with gear 14, is connected with driving-chain 10 between described motor 11 and gear 14.
In addition, also comprise lifting motor 13, described lifting motor 13 is arranged on slide block 3 top, is connected with wire rope 12 between itself and described slide block 3, and motor 11 and lifting motor 13 are PLC and control motor.
This building dredged mud foundation ditch embankment material spray disclosed by the invention stirs construction equipment, during use, construction method is such, first by transport vehicle, dredged mud is poured in foundation ditch, motor 11 drives Grouting Pipe 7 to rotate by driving-chain 10, stirring piece 5 pairs of dredged mud are stirred, in whipping process, Grouting Pipe 7 connects curing compound, curing compound enters in discharge pipe 8 by transition passage 9, because discharge pipe 8 is in rotation, curing compound is sprayed in dredged mud by multi-branched nozzle 4 and mixes with it, by the continuous stirring of stirring piece 5, dredged mud and curing compound rapid mixing can be made to react and to reach engineering earth requirement.
Because the degree of depth of foundation ditch is different, therefore, the lifting motor 13 adopting PLC to control is connected with slide block 3 by wire rope 12, and the control by lifting motor 13 makes whole main slurry pipe 6 rise in foundation ditch or decline, and processes the dredged mud of different depth.
Claims (5)
1. a building dredged mud foundation ditch embankment material spray stirs construction equipment, it is characterized in that: comprise the guide rail (1) that multiple uniform symmetry is laid in foundation ditch wall, the upper buckle of described guide rail (1) has slide block (3), main slurry pipe (6) is connected between two symmetrical slide blocks (3), and described main slurry pipe (6) is laid with multi-branched nozzle (4) and stirring piece (5) above; Described slide block (3) inside is also provided with transition passage (9), and described transition passage (9) entrance point is connected with Grouting Pipe (7), the port of export and main starch to manage in (6) be connected with discharge pipe (8); Described foundation ditch top side is provided with motor (11), and described main slurry pipe (6) one end is provided with gear (14), is connected with driving-chain (10) between described motor (11) and gear (14).
2. building dredged mud foundation ditch embankment material spray according to claim 1 stirs construction equipment, it is characterized in that, also comprise lifting motor (13), described lifting motor (13) is arranged on slide block (3) top, is connected with wire rope (12) between itself and described slide block (3).
3. building dredged mud foundation ditch embankment material spray according to claim 1 stirs construction equipment, it is characterized in that, described motor (11) and lifting motor (13) are PLC and control motor.
4. building dredged mud foundation ditch embankment material spray according to claim 1 stirs construction equipment, and it is characterized in that, described slide block (3) medial surface is also provided with the pulley (2) contacted with guide rail (1).
5. building dredged mud foundation ditch embankment material spray according to claim 1 stirs construction equipment, it is characterized in that, described stirring piece (5) is rectangle, triangle or fan-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510199449.XA CN104790401B (en) | 2015-04-24 | 2015-04-24 | A kind of building dredging mud foundation ditch embankment material spray stirs constructing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510199449.XA CN104790401B (en) | 2015-04-24 | 2015-04-24 | A kind of building dredging mud foundation ditch embankment material spray stirs constructing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104790401A true CN104790401A (en) | 2015-07-22 |
CN104790401B CN104790401B (en) | 2016-05-25 |
Family
ID=53555556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510199449.XA Active CN104790401B (en) | 2015-04-24 | 2015-04-24 | A kind of building dredging mud foundation ditch embankment material spray stirs constructing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104790401B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105220684A (en) * | 2015-10-28 | 2016-01-06 | 东南大学 | A kind of original position vertically isolates preparation facilities and the preparation method of Engineering Barrier Materials |
CN109987805A (en) * | 2019-01-10 | 2019-07-09 | 浙江海洋大学 | Waterway dredging slurry curing equipment |
CN116733010A (en) * | 2023-08-11 | 2023-09-12 | 山东三箭建设工程股份有限公司 | Construction equipment of filling |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000240059A (en) * | 1999-02-22 | 2000-09-05 | Toyo Constr Co Ltd | Banking method |
JP4282507B2 (en) * | 2004-02-17 | 2009-06-24 | 積水化成品工業株式会社 | Lightweight embankment structure and widening method for lighter embankment structure using the same |
CN102409677A (en) * | 2011-08-22 | 2012-04-11 | 武汉大学 | Grouting device special for abnormal concrete construction |
CN104131588A (en) * | 2014-08-13 | 2014-11-05 | 新昌县康泓机械科技有限公司 | Sludge rapid cleaning device |
CN204000874U (en) * | 2014-07-29 | 2014-12-10 | 中国电建集团贵阳勘测设计研究院有限公司 | The structure of a kind of concrete plug backfill grouting |
CN204825901U (en) * | 2015-04-24 | 2015-12-02 | 浙江海洋学院 | Building is dredged mud foundation ditch and is filled and spout material stirring construction equipment |
-
2015
- 2015-04-24 CN CN201510199449.XA patent/CN104790401B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000240059A (en) * | 1999-02-22 | 2000-09-05 | Toyo Constr Co Ltd | Banking method |
JP4282507B2 (en) * | 2004-02-17 | 2009-06-24 | 積水化成品工業株式会社 | Lightweight embankment structure and widening method for lighter embankment structure using the same |
CN102409677A (en) * | 2011-08-22 | 2012-04-11 | 武汉大学 | Grouting device special for abnormal concrete construction |
CN204000874U (en) * | 2014-07-29 | 2014-12-10 | 中国电建集团贵阳勘测设计研究院有限公司 | The structure of a kind of concrete plug backfill grouting |
CN104131588A (en) * | 2014-08-13 | 2014-11-05 | 新昌县康泓机械科技有限公司 | Sludge rapid cleaning device |
CN204825901U (en) * | 2015-04-24 | 2015-12-02 | 浙江海洋学院 | Building is dredged mud foundation ditch and is filled and spout material stirring construction equipment |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105220684A (en) * | 2015-10-28 | 2016-01-06 | 东南大学 | A kind of original position vertically isolates preparation facilities and the preparation method of Engineering Barrier Materials |
CN105220684B (en) * | 2015-10-28 | 2017-03-01 | 东南大学 | A kind of original position vertically isolates preparation facilitiess and the preparation method of Engineering Barrier Materials |
CN109987805A (en) * | 2019-01-10 | 2019-07-09 | 浙江海洋大学 | Waterway dredging slurry curing equipment |
CN116733010A (en) * | 2023-08-11 | 2023-09-12 | 山东三箭建设工程股份有限公司 | Construction equipment of filling |
CN116733010B (en) * | 2023-08-11 | 2023-11-07 | 山东三箭建设工程股份有限公司 | Construction equipment of filling |
Also Published As
Publication number | Publication date |
---|---|
CN104790401B (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209323523U (en) | A kind of deep drilled shaft concrete pours device | |
CN104863113A (en) | Method for curing in-situ soil in situ and stirring device | |
CN101824820B (en) | Construction process for reclamation by hydraulic filling of silt and device thereof | |
CN104314129B (en) | For architectural engineering embankment dredging mud filling Mixing Machine and construction method thereof | |
GB2156877A (en) | Method and apparatus for the subsequent underground sealing of dumps | |
CN104790401B (en) | A kind of building dredging mud foundation ditch embankment material spray stirs constructing device | |
CN204715368U (en) | A kind of foundation ditch dredging markets embankment structure | |
CN201738297U (en) | Construction device for filling silt and reclaiming land | |
CN111074959A (en) | Desilting and curing construction equipment and construction method thereof | |
CN204825901U (en) | Building is dredged mud foundation ditch and is filled and spout material stirring construction equipment | |
CN104030546A (en) | Construction site mobile type dredged mud curing stirring device | |
CN204644106U (en) | Dredging markets dehydrating and curing integrated device | |
CN108104108B (en) | Construction equipment and method for shallow in-situ solidification of waste sludge | |
CN204238282U (en) | For construction work embankment dredged mud filling Mixing Machine | |
CN211816535U (en) | Desilting solidification construction equipment | |
CN212595083U (en) | River silt ecological remediation is with stirring fill | |
CN105672389A (en) | Dredged sediment adding mixing machine for building engineering filling and construction method of machine | |
CN210887307U (en) | Special engineering ship for sand filling of immersed tube tunnel foundation | |
CN203846549U (en) | Digging and cutting machine cutter used for construction adopting TRD (trench cutting and re-mixing deep) wall method | |
CN210031785U (en) | Cement-soil mixing pile construction equipment for shallow sand layer or saturated sand layer | |
CN114991158B (en) | Underwater foundation bed leveling method | |
CN105672388A (en) | Dredged sediment adding mixing machine for building engineering filling and construction method of machine | |
CN105735242A (en) | Adding and stirring machine for filling dredged sediment of construction projects and construction method thereof | |
CN114592482B (en) | Mobile high-precision underwater layered hydraulic filling control construction method | |
CN105672247B (en) | For architectural engineering embankment dredged mud filling Mixing Machine and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |