CN104790393A - 双锚固段预应力锚索结构及其施工方法 - Google Patents

双锚固段预应力锚索结构及其施工方法 Download PDF

Info

Publication number
CN104790393A
CN104790393A CN201510198480.1A CN201510198480A CN104790393A CN 104790393 A CN104790393 A CN 104790393A CN 201510198480 A CN201510198480 A CN 201510198480A CN 104790393 A CN104790393 A CN 104790393A
Authority
CN
China
Prior art keywords
steel strand
grouting
anchoring section
anchor cable
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510198480.1A
Other languages
English (en)
Other versions
CN104790393B (zh
Inventor
张玉芳
敖道朝
刘伟
万军利
陈达章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tieche Engineering Testing Co ltd
Railway Engineering Research Institute of CARS
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510198480.1A priority Critical patent/CN104790393B/zh
Publication of CN104790393A publication Critical patent/CN104790393A/zh
Application granted granted Critical
Publication of CN104790393B publication Critical patent/CN104790393B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种双锚固段预应力锚索结构及其施工方法,包括贯穿有钢绞线的内锚固段、自由段、外锚固段和锚头部分,内锚固段的钢绞线用注浆体粘结在钻孔的底部一段,内锚固段的上部为自由段,锚头部分设在钻孔口的外面并与钢绞线的顶端固定。在自由段的上端与至钻孔口之间设有外锚固段;注浆分三次进行,第一次注浆至自由段B中部止,第二次注浆采用劈裂注浆,形成内锚固段,在内锚固段浆体达到龄期对钢绞线进行张拉后,再进行第三次对外锚固段C注浆,除自由段的钢绞线处于自由外,内锚固段和外锚固段的钢绞线全部与注浆体粘结,形成内、外锚固段的双锚固段锚索。优点是具有技术先进、经济合理、施工快速等优势,是一种具有发展前途的新型边坡加固技术。

Description

双锚固段预应力锚索结构及其施工方法
技术领域
本发明涉及一种双锚段预应力锚索结构及其施工方法,适用于公路、铁路、矿山、市政等的边坡加固工程中。
背景技术
边坡锚固工程作为隐蔽工程,其主要材料钢材及混凝土埋设在各种类型的岩土体中,长期与地下水、场地土介质接触,都会不同程度地遭受各种侵蚀介质的腐蚀损坏,会导致结构的耐久性、强度等物理力学性能降低。
要提高锚固工程的耐久性和有效性,除了对现有技术进行完善之外,结合不断发展的新技术、新材料、新工艺,研究新型锚固结构,开发具有较好耐久性能的锚固技术,是必由之路。为了解决以上不足之处,研究创新了一种新型锚索结构,即双锚固段预应力型锚索。
发明内容
本发明目的是提供一种双锚固段预应力锚索结构及其施工方法,以解决传统的边坡加固技术现有技术存在的耐久性不够的问题。
本发明的技术方案是:一种双锚固段预应力锚索结构,包括贯穿有钢绞线的内锚固段、自由段和锚头部分,内锚固段的钢绞线用注浆体粘结在钻孔的底部一段,内锚固段的上部为钢绞线处于自由状态的自由段,锚头部分设在钻孔口的外面并与钢绞线的顶端固定,其特征在于,在所述的自由段的上端与至钻孔口之间设有外锚固段;注浆体注浆分三次进行,第一次注浆至自由段中部止,第二次注浆采用劈裂注浆,形成内锚固段,在内锚固段浆体达到龄期对钢绞线进行张拉后,再进行第三次注浆,即对外锚固段注浆,除自由段的钢绞线处于自由外,内锚固段和外锚固段的钢绞线全部与注浆体粘结,形成内、外锚固段的双锚固段锚索。
所述的内锚固段包括钢绞线、一次注浆管、二次注浆管、对中架和导向帽,钢绞线、一次注浆管和二次注浆管贯穿于整个锚索的内锚固段A、自由段B和外锚固段C,并分别穿过间隔设置的数个对中架上的对应的孔,在钢绞线的下端焊接导向帽;通过一次注浆管和二次注浆管向内锚固段的钻孔内进行一次、二次注浆,凝固后形成内锚固段结构。
所述的对中架分为Ⅰ型对中架和Ⅱ型对中架,所述的内锚固段和自由段采用Ⅰ型对中架,直径为105mm,厚度10mm,另在周边预留两个用于穿过注浆管的注浆孔或缺口,并设有定位孔,外缘呈弧状;所述的外锚固段采用Ⅱ型对中架,直径为85mm,厚度10mm,在周边均布四个与钢绞线配合的钢绞线缺口,在钢绞线缺口之间设有与注浆管配合的圆弧口。
所述的自由段采用套管使钢绞线处于自由状态,没有注浆体粘结,在自由段的上端设有止浆塞,用于阻隔外锚固段的注浆体进入自由段。
所述的外锚固段是指在钻孔口内部一定长度钢绞线预留粘结段,内部的钢绞线也采用对中架定位,在外锚固段的钻孔内设有波纹管,待钢绞线张拉完毕,确定不在需要补偿张拉后通过三次注浆管进行第三次注浆,通过三次注浆使钢绞线与注浆体、岩土体形成外锚固段。
所述的止浆塞长40-60cm,采用水泥浆制作,水泥浆水灰比为0.38~0.40。
所述的外锚固段、自由段和内锚固段的长度分别为5-12m、5-10m和1-15m;在相邻的对中架之间用铁丝捆扎。
所述的锚头部分包括钢筋混凝土框架梁、承压板、定型锚具和封锚砼体,网格状的框架梁用钢筋混凝土浇筑在欲锚固的斜坡上,框架梁的钢筋与伸出钻孔口的钢绞线连接,并浇注在一起;露出框架梁的钢绞线穿过承压板并用锚具锁紧,锚索的顶端用封锚砼体封住。
一种所述的双锚固段预应力锚索结构的施工方法,其特征在于,包括以下步骤:
(1)锚索加工:
锚索采用四根Φ15.24mm、fptk=1860MPa的高强度、低松弛无粘结预应力钢绞线,长度按设计长度切割,顶端焊接导向帽。
(2)对中架的制作:
对中架采用硬塑材料加工制作而成,圆形板的中部设有正方形分布的四个钢绞线通孔,在边缘设有用于穿过一、二次注浆管的缺口;沿一、二次注浆管和钢绞线间隔1.5~2m设置一道对中架,起对中作用;对中架之间用铁丝绑扎牢固。
(3)一、二次注浆管安装:
一、二次注浆管随钢绞线绑扎,一起伸入钻孔底,一次注浆管底部30cm内螺旋开孔眼,防治在下锚索过程中被堵塞;二次注浆管在5~10m范围内螺旋开孔,并用胶带缠绕几道,防治在下锚索过程中孔眼堵塞;一次、二次注浆管在锚索安装时制作,置于外锚固段的波纹管和止浆塞内;三次注浆管和排气管18在浇筑框架梁13时布置,从框架梁14底部侧面穿出;从波纹管8侧面开口19伸入波纹管8内,三次注浆管11应伸入波纹管内2m以上,排气管18伸入波纹管8内即可。
(4)止浆塞的制作:提前几天现场制作,要求外锚固段的波纹管与自由段套管搭接长度至少为60cm;制作止浆塞时将波纹管底部50cm长范围内两端堵死,从侧面两端开两个注浆小口,将配置好的水泥浆从小口注入波纹管内,注满即可,水泥浆凝固后形成止浆塞。
(5)钻孔:
锚索孔的钻孔工艺为:定孔位、搭设钻机平台、复合孔位、钻机精确定位、钻孔、检验;钻孔后,将上面制作的锚索主体穿入钻孔内;
(6)注浆:
(a)一次注浆:
采用一次注浆管注浆,浆液通过一次注浆管从孔底自下而上反向压浆,将管底残留的碎渣及漏浆压出孔口,且持续到孔口溢出净水泥浆。为防止下管安装时管口被残渣堵塞,在注浆管末端30cm范围内布置2排梅花形孔眼,孔径5-6mm;
(b)二次注浆:
二次注浆通过二次注浆管内进行,浆液通过高压将预留的二次注浆孔冲开并劈裂一次注浆体,向四周扩散、渗透,加固钻孔周围岩土体,提高其强度;注浆压力1~5Mpa。
(c)三次注浆:
三次注浆通过三次注浆管对外锚固段进行注浆,需要在孔口设置出气孔,防治被堵,无法注浆,注浆工艺同一次、二次注浆。
本发明的优点是:①反向自锁功能:锚索内、外锚固段能形成对拉效果,当外锚头失效或预应力损失时,锚索可以产生反向自锁锚固功能。
②有效减少锚索预应力损失:外锚固段注浆后,当外锚固段浆体达到龄期后逐步形成了锚固力时,外锚头的荷载有一部分传递分配给外锚固段,因而缓解了外锚头结构物的长期应力集中而导致的预应力损失问题。
③外锚固段注浆体具有先张法工作特性:外锚固段在锚索张拉锁定后再注浆,注浆体具先张法特性。
④外锚固段防腐效果较好:一般拉力型锚索自由段一般位于地表以下一定深度,在地表水下渗、空气对流及温度综合作用下,腐蚀较快,导致锚索失效,对自由段张拉后二次注浆,解决锚索腐蚀问题,提高锚索耐久性。
⑤外锚固段有足够锚固力:采取孔口扩孔方法可有效提高外锚固段的锚固力。
本发明双锚固段锚索结合了普通型锚索与控制注浆技术的优点,双锚固段预应力锚索结构,具有结构合理、技术先进、经济合理、防腐效果好等优势,是一种具有发展前途的新型边坡加固技术。
附图说明
图1是本发明的双锚固段预应力锚索总体结构示意图;
图2是图1的I-I剖视图;
图3是本发明的Ⅰ型对中架的结构示意图;
图4是图1的II-II剖视图;
图5是本发明的II型对中架的结构示意图;
图6是本发明的承压板的结构示意图;
图7是本发明的导向帽的结构示意图;
图8是图7的A-A剖视图;
图9是本发明的止浆塞的轴向剖视结构示意图。
具体实施方式
参见图1,本发明一种双锚固段预应力锚索结构,包括贯穿有钢绞线1的内锚固段A、自由段B、外锚固段C和锚头部分D,内锚固段A的钢绞线1用注浆体2粘结在钻孔3的底部一段,内锚固段A的上部为钢绞线1处于自由状态的自由段B,锚头部分D设在钻孔3口的外面并与钢绞线1的顶端固定。在所述的自由段B的上端与至钻孔口之间设有外锚固段C;注浆体2的注浆分三次进行,第一次注浆至自由段B中部止,第二次注浆采用劈裂注浆,形成内锚固段A,在内锚固段A浆体达到龄期对钢绞线1进行张拉后,再进行第三次注浆,即对外锚固段C注浆,除自由段B的钢绞线1处于自由外,内锚固段A和外锚固段C的钢绞线1全部与注浆体2粘结,形成内、外锚固段的双锚固段锚索。
所述的内锚固段A包括钢绞线1、一次注浆管4、二次注浆管5、对中架6和导向帽7,钢绞线1、一次注浆管4和二次注浆管5贯穿于整个锚索的内锚固段A、自由段B和外锚固段C,并分别穿过设在对中架6上的对应的孔,在钢绞线1的下端焊接导向帽7。通过一次注浆管4和二次注浆管5向内锚固段A的钻孔内进行一次、二次注浆,凝固后形成内锚固段A的结构。
所述的对中架6分为Ⅰ型对中架61(如图3所示)和Ⅱ型对中架62(如图5所示),所述的内锚固段A和自由段采B用Ⅰ型对中架61,直径为105mm,厚度10mm,中部设有四个正方形布置的钢绞线通孔613,另在周边预留两个用于穿过一次、二次注浆管的注浆孔或缺口611,并设有定位孔612,外缘呈圆弧状。所述的外锚固段C采用Ⅱ型对中架62,直径为85mm,厚度10mm,在周边均布四个与钢绞线配合的钢绞线缺口621,在钢绞线缺口621之间设有与一次、二次注浆管配合的圆弧口622。
本发明钢绞线1采用普通的钢绞线。由于钢绞线1是柔性结构,对中架6起到捋顺钢绞线1与注浆管、提高钢绞线刚度的作用,同时也设计一定的保护层厚度,确保钢绞线1周围由注浆体2包裹,提高锚索的防腐耐久性。
所述的自由段B采用套管8使钢绞线1处于自由状态,没有注浆体粘结,在自由段B的上端设有止浆塞9,用于阻隔外锚固段C的注浆体2进入自由段B。
所述的外锚固段C是指在钻孔口内部一定长度钢绞线预留粘结段,内部的钢绞线1采用Ⅱ型对中架62定位,在外锚固段C的钻孔内设有波纹管10,待钢绞线1张拉完毕,确定不在需要补偿张拉后通过三次注浆管11进行第三次注浆,通过三次注浆使钢绞线1与注浆体2以及钻孔壁的岩土体形成外锚固段C。
所述的止浆塞9长40-60cm,采用水泥浆制作,水泥浆水灰比为0.38~0.40。
所述的外锚固段C、自由段B和内锚固段A的长度分别为5-8m、5-10m和8-12m;在相邻的对中架6之间用铁丝12捆扎。
所述的锚头部分D包括钢筋混凝土框架梁13、承压板14、定型锚具15和封锚砼体16,网格状的框架梁13用钢筋混凝土浇筑在欲锚固的斜坡17上,框架梁13的钢筋与伸出钻孔口的钢绞线1连接,并与框架梁13浇注在一起;露出框架梁13的钢绞线1穿过承压板14的中心孔并用锚具15锁紧,锚索的顶端(承压板14、定型锚具15及钢绞线1顶端)用封锚砼体16封住。
本发明的施工过程如下:
(1)锚索加工:
锚索采用Φ15.24mm、fptk=1860MPa的高强度、低松弛无粘结预应力钢绞线1,长度按设计长度切割。
(2)对中架6的制作:
对中架6采用硬塑材料加工制作而成,其轴线与承载板14一致。间隔1.5~2m设置一道,相邻的对中架6之间用铁丝12绑扎牢固,对中架6起到对中作用。
(3)一、二次注浆管4和5的安装:
一、二次注浆管4和5随锚索(钢绞线1)绑扎,一起进入钻孔3的孔底,一次注浆管4底部30cm内螺旋开孔眼,防治在下锚索过程中被堵塞,二次注浆管5在5~10m范围内螺旋开孔,并用胶带缠绕几道,防治在下锚索过程中,孔眼堵塞,二次注浆管5起二次劈裂作用,二次劈裂注浆可提高锚索锚固力。
3)锚索孔钻孔:
锚管孔的钻孔工艺为:定孔位、搭设钻机平台、复合孔位、钻机精确定位、钻孔、检验。
4)注浆过程:
(1)一次注浆:
一次注浆采用一次注浆管4注浆,目的是在锚索1与钻孔3之间现成水泥柱体(注浆体2)。一次注浆管4采用Φ25mm PVC管。为保证浆液充满整个钻孔的空隙,一次注浆管4深入孔底,浆液通过一次注浆管4从孔底自下而上反向压浆,将管底残留的碎渣及漏浆压出孔口,且持续到孔口溢出净水泥浆。为防止下管安装时管口被残渣堵塞,在一次注浆管4的末端30cm范围内布置2排梅花形孔眼,孔径5-6mm。
一次注浆结束后,如果发现孔口浆液回缩,在现场要及时补浆。
(2)二次注浆:
二次注浆通过二次注浆管5内进行,浆液通过高压(一般在1~5MPa)将预留的二次注浆孔冲开并劈裂一次注浆体,向四周扩散、渗透,加固钻孔周围岩土体,提高其强度。其有两个标志性注浆控制压力,一是:注浆体瞬间劈裂压力,即将二次注浆孔冲开并劈裂一次注浆体的压力,其与一次注浆的强度有关,又与一、二次注浆间隔时间长短有关。一般浆体劈裂压力为1~5Mpa。二是岩体挤裂压力,一次注浆体被劈裂后,浆液在注浆压力驱动下将沿岩体中“通道”(主要为节理裂隙)向四周扩散。当钻孔周边“通道”被浆液填充完成后,在注浆压力作用下,岩土体内浆体压力持续上升,直至岩体中封闭的节理裂缝被挤破产生新的“通道”,此时注浆压力即为岩体挤裂压力。
二次注浆(劈裂注浆)时,由于注浆压力较大,注浆管口需加密封牢固。
(3)三次注浆:
三次注浆管11和排气管18在浇筑框架梁13时布置,从框架梁14底部侧面穿出;从波纹管8侧面开口19伸入波纹管8内,三次注浆管11应伸入波纹管内2m以上,排气管18伸入波纹管8内即可。
三次注浆主要是对外锚固段C进行注浆,需要在孔口设置出气孔(排气管18),防止被堵,无法注浆,注浆工艺同一次、二次注浆。
(4)注浆结束依据
在施工中,要注意:一是在瞬间劈裂压力作用下,钻孔周围不能跑浆。二是持续注浆压力,即在二次劈裂后浆液向四周扩散的持续压力,根据孔周围岩土体的强度和结构不同,会出现三种情况。第一种情况:在出现浆体瞬间劈裂压力后,持续注浆压力明显小于劈裂压力,而且持续注浆压力不会增加,即不会出现岩体挤裂压力,注浆量不断增加,此时按设计注浆量三倍控制注浆量。第二种情况:在出现浆体瞬间劈裂压力后,持续注浆压力虽然明显小于劈裂压力,但持续压力不断增加,会出现岩体挤裂压力,而注浆量不断减小,此情况对其注浆量进行双控,按满足总注浆量不大于设计注浆量的3倍和出现二次岩体挤裂压力后注浆效果不明显(每分钟注浆量不超过0.2~0.5L)时,两者其中之一即可停止注浆。第三种情况:在出现浆体瞬间劈裂注浆压力后持续注浆压力没有明显的减小,或注浆压力一直增加没有形成岩体挤裂压力,注浆效果不明显,按注浆压力不超过注浆机与注浆管的容许压力(5MPa)进行控制。

Claims (9)

1.一种双锚固段预应力锚索结构,包括贯穿有钢绞线的内锚固段、自由段和锚头部分,内锚固段的钢绞线用注浆体粘结在钻孔的底部一段,内锚固段的上部为钢绞线处于自由状态的自由段,锚头部分设在钻孔口的外面并与钢绞线的顶端固定,其特征在于,在所述的自由段的上端与至钻孔口之间设有外锚固段;注浆体注浆分三次进行,第一次注浆至自由段中部止,第二次注浆采用劈裂注浆,形成内锚固段,在内锚固段浆体达到龄期对钢绞线进行张拉后,再进行第三次注浆,即对外锚固段注浆,除自由段的钢绞线处于自由外,内锚固段和外锚固段的钢绞线全部与注浆体粘结,形成内、外锚固段的双锚固段锚索。
2.根据权利要求1所述的双锚固段预应力锚索结构,其特征在于,所述的内锚固段包括钢绞线、一次注浆管、二次注浆管、对中架和导向帽,钢绞线、一次注浆管和二次注浆管贯穿于整个锚索的内锚固段A、自由段B和外锚固段C,并分别穿过间隔设置的数个对中架上的对应的孔,在钢绞线的下端焊接导向帽;通过一次注浆管和二次注浆管向内锚固段的钻孔内进行一次、二次注浆,凝固后形成内锚固段结构。
3.根据权利要求1所述的双锚固段预应力锚索结构,其特征在于,所述的对中架分为Ⅰ型对中架和Ⅱ型对中架,所述的内锚固段和自由段采用Ⅰ型对中架,直径为105mm,厚度10mm,另在周边预留两个用于穿过注浆管的注浆孔或缺口,并设有定位孔,外缘呈弧状;所述的外锚固段采用Ⅱ型对中架,直径为85mm,厚度10mm,在周边均布四个与钢绞线配合的钢绞线缺口,在钢绞线缺口之间设有与注浆管配合的圆弧口。
4.根据权利要求1所述的双锚固段预应力锚索结构,其特征在于,所述的自由段采用套管使钢绞线处于自由状态,没有注浆体粘结,在自由段的上端设有止浆塞,用于阻隔外锚固段的注浆体进入自由段。
5.根据权利要求4所述的双锚固段预应力锚索结构,其特征在于,所述的外锚固段是指在钻孔口内部一定长度钢绞线预留粘结段,内部的钢绞线也采用对中架定位,在外锚固段的钻孔内设有波纹管,待钢绞线张拉完毕,确定不在需要补偿张拉后通过三次注浆管进行第三次注浆,通过三次注浆使钢绞线与注浆体、岩土体形成外锚固段。
6.根据权利要求5所述的双锚固段预应力锚索结构,其特征在于,所述的止浆塞长40-60cm,采用水泥浆制作,水泥浆水灰比为0.38~0.40。
7.根据权利要求1所述的双锚固段预应力锚索结构,其特征在于,所述的外锚固段、自由段和内锚固段的长度分别为5-8m、5-10m和8-12m;在相邻的对中架之间用铁丝捆扎。
8.根据权利要求1所述的双锚固段预应力锚索结构,其特征在于,所述的锚头部分包括钢筋混凝土框架梁、承压板、定型锚具和封锚砼体,网格状的框架梁用钢筋混凝土浇筑在欲锚固的斜坡上,框架梁的钢筋与伸出钻孔口的钢绞线连接,并浇注在一起;露出框架梁的钢绞线穿过承压板并用锚具锁紧,锚索的顶端用封锚砼体封住。
9.一种权利要求1所述的双锚固段预应力锚索结构的施工方法,其特征在于,包括以下步骤:
(1)锚索加工:
锚索采用四根Φ15.24mm、fptk=1860MPa的高强度、低松弛无粘结预应力钢绞线,长度按设计长度切割,顶端焊接导向帽。
(2)对中架的制作:
对中架采用硬塑材料加工制作而成,圆形板的中部设有正方形分布的四个钢绞线通孔,在边缘设有用于穿过一、二次注浆管的缺口;沿一、二次注浆管和钢绞线间隔1.5~2m设置一道对中架,起对中作用;对中架之间用铁丝绑扎牢固。
(3)一、二次注浆管安装:
一、二次注浆管随钢绞线绑扎,一起伸入钻孔底,一次注浆管底部30cm内螺旋开孔眼,防治在下锚索过程中被堵塞;二次注浆管在5~10m范围内螺旋开孔,并用胶带缠绕几道,防治在下锚索过程中孔眼堵塞;一次、二次注浆管在锚索安装时制作,置于外锚固段的波纹管和止浆塞内;三次注浆管和排气管18在浇筑框架梁13时布置,从框架梁14底部侧面穿出;从波纹管8侧面开口19伸入波纹管8内,三次注浆管11应伸入波纹管内2m以上,排气管18伸入波纹管8内即可。
(4)止浆塞的制作:提前几天现场制作,要求外锚固段的波纹管与自由段套管搭接长度至少为60cm;制作止浆塞时将波纹管底部50cm长范围内两端堵死,从侧面两端开两个注浆小口,将配置好的水泥浆从小口注入波纹管内,注满即可,水泥浆凝固后形成止浆塞。
(5)钻孔:
锚管孔的钻孔工艺为:定孔位、搭设钻机平台、复合孔位、钻机精确定位、钻孔、检验;钻孔后,将上面制作的锚索主体穿入钻孔内;
(6)注浆:
(a)一次注浆:
采用一次注浆管注浆,浆液通过一次注浆管从孔底自下而上反向压浆,将管底残留的碎渣及漏浆压出孔口,且持续到孔口溢出净水泥浆。为防止下管安装时管口被残渣堵塞,在注浆管末端30cm范围内布置2排梅花形孔眼,孔径5-6mm;
(b)二次注浆:
二次注浆通过二次注浆管内进行,浆液通过高压将预留的二次注浆孔冲开并劈裂一次注浆体,向四周扩散、渗透,加固钻孔周围岩土体,提高其强度;注浆压力1~5Mpa。
(c)三次注浆:
三次注浆通过三次注浆管对外锚固段进行注浆,需要在孔口设置出气孔,防治被堵,无法注浆,注浆工艺同一次、二次注浆。
CN201510198480.1A 2015-04-23 2015-04-23 双锚固段预应力锚索结构及其施工方法 Active CN104790393B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510198480.1A CN104790393B (zh) 2015-04-23 2015-04-23 双锚固段预应力锚索结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510198480.1A CN104790393B (zh) 2015-04-23 2015-04-23 双锚固段预应力锚索结构及其施工方法

Publications (2)

Publication Number Publication Date
CN104790393A true CN104790393A (zh) 2015-07-22
CN104790393B CN104790393B (zh) 2017-04-12

Family

ID=53555548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510198480.1A Active CN104790393B (zh) 2015-04-23 2015-04-23 双锚固段预应力锚索结构及其施工方法

Country Status (1)

Country Link
CN (1) CN104790393B (zh)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926581A (zh) * 2016-05-27 2016-09-07 福建工程学院 预应力锚杆波形板桩支挡结构
CN106223267A (zh) * 2016-08-30 2016-12-14 武大巨成结构股份有限公司 一种多层扩孔自锁预应力锚杆及其安装方法
CN106917411A (zh) * 2017-03-16 2017-07-04 广州市建誉科技有限责任公司 拉压互补型外锚固锁定锚索结构及其施工方法
CN107542086A (zh) * 2017-10-17 2018-01-05 甘肃中建市政工程勘察设计研究院 一种用于填方边坡的新型锚索及其施工方法
CN107882040A (zh) * 2017-11-23 2018-04-06 北京地矿工程建设有限责任公司 一种基坑预应力锚索的施工方法
CN108005097A (zh) * 2017-12-15 2018-05-08 兰州理工大学 高陡边坡坡顶建构/筑物锚筏基础构造及施工方法
CN108130911A (zh) * 2018-01-12 2018-06-08 张玉芳 竖向控制注浆钢花管植筋微型桩及其施工方法
CN108411912A (zh) * 2018-05-03 2018-08-17 大连理工大学 一种锚杆压力注浆的便捷方法
CN108797368A (zh) * 2018-08-27 2018-11-13 中国冶集团有限公司 钢箱拱桥锚管的快速找正方法
CN109113773A (zh) * 2018-08-21 2019-01-01 中铁工程设计咨询集团有限公司 一种快速张拉锚索结构及其施工方法
CN109578034A (zh) * 2019-01-25 2019-04-05 山东焱鑫矿用材料加工有限公司 一种具有自排气功能的高强度注浆锚索
CN109853544A (zh) * 2019-03-29 2019-06-07 华侨大学 一种能增强前后注浆体的组合承压板以及锚杆
CN110130370A (zh) * 2019-05-29 2019-08-16 中铁四局集团路桥工程有限公司 预应力锚杆锚固段之砂浆注浆量的控制施工方法
CN110344407A (zh) * 2019-07-05 2019-10-18 深圳宏业基岩土科技股份有限公司 适用于破碎软弱夹层的预应力锚索
CN110453695A (zh) * 2019-08-14 2019-11-15 中国二十冶集团有限公司 一种预应力锚索结构及预应力锚索一次注浆施工方法
CN110847168A (zh) * 2019-12-12 2020-02-28 长安大学 一种钻锚注组合施工装置及锚索施工方法
CN111910630A (zh) * 2020-07-27 2020-11-10 中国建筑第二工程局有限公司 一种锚索结构及锚索框架梁施工方法
CN112252339A (zh) * 2020-09-18 2021-01-22 中铁隧道集团一处有限公司 上仰式全长粘结锚索孔内分段止浆结构及止浆方法
CN117345309A (zh) * 2023-12-05 2024-01-05 矿冶科技集团有限公司 一种抗剪预应力锚索
CN118309089A (zh) * 2024-06-11 2024-07-09 中国铁道科学研究院集团有限公司铁道建筑研究所 一种高位危岩体原位整治的预应力锚索防护网结构及实施方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577389B (zh) * 2019-01-04 2020-07-07 中国水利水电科学研究院 一种预应力锚索智能监测装置及其安装方法
CN111501794B (zh) * 2020-04-29 2021-10-08 中铁二院工程集团有限责任公司 用于高陡边坡加固防护的锚固装置、锚固系统及施工方法
CN111501795B (zh) * 2020-04-29 2021-10-08 中铁二院工程集团有限责任公司 一种用于高陡边坡加固防护的锚网装置及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798812A (zh) * 2010-04-19 2010-08-11 北京科技大学 一种具有三层保护双锚固段预应力锚固体系及其锚固方法
CN202706023U (zh) * 2012-06-08 2013-01-30 深圳市工勘岩土工程有限公司 用于连接框架梁和锚杆的封锚体结构
KR20130113563A (ko) * 2012-04-06 2013-10-16 주식회사 삼우기초기술 인장재 교체가 가능한 하중분산형 영구앵커체
CN103410161A (zh) * 2013-08-28 2013-11-27 张玉芳 斜向控制注浆钢锚管框架及其施工方法
KR101394404B1 (ko) * 2013-06-17 2014-05-13 삼진스틸산업(주) 서포터형 압축 확장 그라운드 앵커
CN204252132U (zh) * 2014-11-13 2015-04-08 广州市泰基工程技术有限公司 一种锚杆导向定位器

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798812A (zh) * 2010-04-19 2010-08-11 北京科技大学 一种具有三层保护双锚固段预应力锚固体系及其锚固方法
KR20130113563A (ko) * 2012-04-06 2013-10-16 주식회사 삼우기초기술 인장재 교체가 가능한 하중분산형 영구앵커체
CN202706023U (zh) * 2012-06-08 2013-01-30 深圳市工勘岩土工程有限公司 用于连接框架梁和锚杆的封锚体结构
KR101394404B1 (ko) * 2013-06-17 2014-05-13 삼진스틸산업(주) 서포터형 압축 확장 그라운드 앵커
CN103410161A (zh) * 2013-08-28 2013-11-27 张玉芳 斜向控制注浆钢锚管框架及其施工方法
CN204252132U (zh) * 2014-11-13 2015-04-08 广州市泰基工程技术有限公司 一种锚杆导向定位器

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范海林等: "二次劈裂注浆框架梁锚索施工技术", 《公路》 *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926581A (zh) * 2016-05-27 2016-09-07 福建工程学院 预应力锚杆波形板桩支挡结构
CN106223267B (zh) * 2016-08-30 2018-05-25 武大巨成结构股份有限公司 一种多层扩孔自锁预应力锚杆的安装方法
CN106223267A (zh) * 2016-08-30 2016-12-14 武大巨成结构股份有限公司 一种多层扩孔自锁预应力锚杆及其安装方法
CN106917411A (zh) * 2017-03-16 2017-07-04 广州市建誉科技有限责任公司 拉压互补型外锚固锁定锚索结构及其施工方法
CN107542086A (zh) * 2017-10-17 2018-01-05 甘肃中建市政工程勘察设计研究院 一种用于填方边坡的新型锚索及其施工方法
CN107542086B (zh) * 2017-10-17 2023-05-12 甘肃中建市政工程勘察设计研究院有限公司 一种用于填方边坡的锚索施工方法
CN107882040A (zh) * 2017-11-23 2018-04-06 北京地矿工程建设有限责任公司 一种基坑预应力锚索的施工方法
CN108005097A (zh) * 2017-12-15 2018-05-08 兰州理工大学 高陡边坡坡顶建构/筑物锚筏基础构造及施工方法
CN108005097B (zh) * 2017-12-15 2024-02-23 兰州理工大学 高陡边坡坡顶建构/筑物锚筏基础构造及施工方法
CN108130911A (zh) * 2018-01-12 2018-06-08 张玉芳 竖向控制注浆钢花管植筋微型桩及其施工方法
CN108411912A (zh) * 2018-05-03 2018-08-17 大连理工大学 一种锚杆压力注浆的便捷方法
CN109113773A (zh) * 2018-08-21 2019-01-01 中铁工程设计咨询集团有限公司 一种快速张拉锚索结构及其施工方法
CN108797368A (zh) * 2018-08-27 2018-11-13 中国冶集团有限公司 钢箱拱桥锚管的快速找正方法
CN109578034B (zh) * 2019-01-25 2023-09-15 山东焱鑫矿用材料加工有限公司 一种具有自排气功能的高强度注浆锚索
CN109578034A (zh) * 2019-01-25 2019-04-05 山东焱鑫矿用材料加工有限公司 一种具有自排气功能的高强度注浆锚索
CN109853544B (zh) * 2019-03-29 2024-02-23 华侨大学 一种能增强前后注浆体的组合承压板以及锚杆
CN109853544A (zh) * 2019-03-29 2019-06-07 华侨大学 一种能增强前后注浆体的组合承压板以及锚杆
CN110130370A (zh) * 2019-05-29 2019-08-16 中铁四局集团路桥工程有限公司 预应力锚杆锚固段之砂浆注浆量的控制施工方法
CN110344407A (zh) * 2019-07-05 2019-10-18 深圳宏业基岩土科技股份有限公司 适用于破碎软弱夹层的预应力锚索
CN110344407B (zh) * 2019-07-05 2021-10-01 深圳宏业基岩土科技股份有限公司 适用于破碎软弱夹层的预应力锚索
CN110453695A (zh) * 2019-08-14 2019-11-15 中国二十冶集团有限公司 一种预应力锚索结构及预应力锚索一次注浆施工方法
CN110847168A (zh) * 2019-12-12 2020-02-28 长安大学 一种钻锚注组合施工装置及锚索施工方法
CN111910630A (zh) * 2020-07-27 2020-11-10 中国建筑第二工程局有限公司 一种锚索结构及锚索框架梁施工方法
CN112252339A (zh) * 2020-09-18 2021-01-22 中铁隧道集团一处有限公司 上仰式全长粘结锚索孔内分段止浆结构及止浆方法
CN117345309B (zh) * 2023-12-05 2024-02-20 矿冶科技集团有限公司 一种抗剪预应力锚索
CN117345309A (zh) * 2023-12-05 2024-01-05 矿冶科技集团有限公司 一种抗剪预应力锚索
CN118309089A (zh) * 2024-06-11 2024-07-09 中国铁道科学研究院集团有限公司铁道建筑研究所 一种高位危岩体原位整治的预应力锚索防护网结构及实施方法
CN118309089B (zh) * 2024-06-11 2024-08-30 中国铁道科学研究院集团有限公司铁道建筑研究所 一种高位危岩体原位整治的预应力锚索防护网结构及实施方法

Also Published As

Publication number Publication date
CN104790393B (zh) 2017-04-12

Similar Documents

Publication Publication Date Title
CN104790393A (zh) 双锚固段预应力锚索结构及其施工方法
CN104775428B (zh) 复合型预应力锚索结构及其施工方法
CN204703160U (zh) 双锚固段预应力锚索结构
CN103410161B (zh) 斜向控制注浆钢锚管框架及其施工方法
CN105041325B (zh) 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN204703159U (zh) 预制锚头压力型锚索结构
CN104790394A (zh) 预制锚头压力型锚索结构及其施工方法
CN104389628B (zh) 滑坡地段隧道加固装置及加固施工方法
CN105351001B (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN107060774A (zh) 一种防隧道洞口围岩坍塌装置及施工方法
CN205576940U (zh) 一种桩顶全连接的抗滑桩复合支挡结构
CN104499479A (zh) 一种穿越砂砾石回填层的挖孔桩施工方法
CN108677943A (zh) 多次控制注浆预应力钢锚管锚索组合结构及其施工方法
CN102606176A (zh) 湿陷性黄土隧道施工方法
CN106988750A (zh) 一种大跨度区间隧道超近距离下穿既有站的实施方式
CN203488189U (zh) 用于脱空整治的隧道结构
CN109930609A (zh) 一种用于上软下硬地层的排桩复合支护结构及其施工方法
CN105370289A (zh) 一种复杂环境既有管线超长浅埋暗挖施工方法
CN109113749A (zh) 软弱围岩四线超大断面铁路隧道施工方法
CN103321663A (zh) 巷道底板下锚上注式预应力锚索加固装置和施工方法
CN110130324B (zh) 一种钢管微型桩及其施工方法
CN103410144B (zh) 预应力钢筋嵌岩灌注桩及施工方法
CN108842792B (zh) 一种分层内抬升卸荷式地拉锚杆及施工方法
CN108755677A (zh) 一种多次控制注浆的预制内锚头锚索结构
CN208502786U (zh) 用于富水砂砾层巷道的多级层次支护装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170705

Address after: 100081 Beijing City, Haidian District Road No. 2 Daliushu floor three railway construction test

Patentee after: Beijing Railway Sience Engineering Inspection Center

Address before: 518004 B1, Shenzhen, Liantang, Guangdong, Luohu District, 602

Patentee before: Wan Junli

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100081 the three floor of the iron building test building, 2, Da Liu Shu Lu, Haidian District, Beijing.

Patentee after: Beijing Tieche Engineering Testing Co.,Ltd.

Address before: 100081 the three floor of the iron building test building, 2, Da Liu Shu Lu, Haidian District, Beijing.

Patentee before: BEIJING RAILWAY SCIENCE ENGINEERING INSPECTION CENTER

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200629

Address after: 100081 the three floor of the iron building test building, 2, Da Liu Shu Lu, Haidian District, Beijing.

Co-patentee after: CARS RAILWAY ENGINEERING Research Institute

Patentee after: Beijing Tieche Engineering Testing Co.,Ltd.

Address before: 100081 the three floor of the iron building test building, 2, Da Liu Shu Lu, Haidian District, Beijing.

Patentee before: Beijing Tieche Engineering Testing Co.,Ltd.