CN104778502A - Digitalized monitoring method suitable for building decoration members - Google Patents

Digitalized monitoring method suitable for building decoration members Download PDF

Info

Publication number
CN104778502A
CN104778502A CN201510112540.3A CN201510112540A CN104778502A CN 104778502 A CN104778502 A CN 104778502A CN 201510112540 A CN201510112540 A CN 201510112540A CN 104778502 A CN104778502 A CN 104778502A
Authority
CN
China
Prior art keywords
product
progress
information
state node
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510112540.3A
Other languages
Chinese (zh)
Inventor
王辉平
张雨
连珍
邓惠根
江旖旎
周漪芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201510112540.3A priority Critical patent/CN104778502A/en
Publication of CN104778502A publication Critical patent/CN104778502A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a digitalized monitoring method suitable for building decoration members. The actual finish time of each state node is compared with the planned finish time to generate a plan progress comparison result, and first alarm information is sent out when the actual finish time exceeds the planned finish time, so that a product can be accurately and efficiently monitored from design and processing to installation and maintenance progress.

Description

Be applicable to the digital monitoring method of architectural decorative component
Technical field
The present invention relates to a kind of digital monitoring method being applicable to architectural decorative component.
Background technology
Along with the develop rapidly that the whole nation is economic, the decorative engineering of the large scale of construction, high request gets more and more, traditional leans on the method that row plans, deploy to ensure effective monitoring and control of illegal activities in managerial personnel scene unable to do what one wishes when in the face of these engineerings, cannot accurately tracing product processing actual progress, Product transport information cannot be obtained, product cannot be obtained in time store information, the installation situation of each component an etc. difficult problem cannot be monitored in real time emerge in an endless stream, grasping on-the-spot product information how efficiently, is in time problem demanding prompt solution.
There is the features such as the duration is short, component is many, construct and component process unit is many, precision is high, field staff is many in building decoration engineering, whether architectural decorative component, as important component part in decorative engineering, is grasped in time component information and is directly connected to the whole duration and can completes inside the plan.
The supervision of building decoration component comprises node states such as " design, drawing, processing, the examination and test of products, factory's warehouse-in, product transmission, logistics, storage, installation, periodic maintenance management ", obtain accurately for making these node states, in time management and control, JP sends out architectural decorative component design a kind of, processing, logistics, installation, maintenance digital management software desk Implementation one completely newly, monitoring and managing method easily.
Summary of the invention
The object of the invention is to develop the querying method of the states such as a kind of product " processing places an order, product design picture and text, technical standard, processing plan, the examination and test of products, factory's warehouse-in, product transmissions, building site Receipt Validation, product accessories (establishments) erection schedule, successively add up, mounting finished product examination and property periodic maintenance manage by program inquiring, installation effectiveness for Components installation " being applicable to architectural decorative component and the plan of process link is differentiated, obtaining digital early warning information.The Whole Course Management of the product life cycle that leading decorative engineering element factory processing, construction and installation, property are safeguarded.
For solving the problem, the invention provides a kind of digital monitoring method being applicable to architectural decorative component, comprising:
Obtain and storage products information;
To generate according to described product information and storage products places an order machining information;
To place an order machining information based on described product information and product, generate and the Projected completion time of each state node in storage products progress;
To place an order machining information based on described product information and product, generate and the actual finish time of each state node in storage products progress;
The actual finish time of each state node described and Projected completion time are carried out contrast and generates target advance comparison result, and send the first warning message when actual finish time exceeds Projected completion time.
Preferably, described product information comprises a kind of in the size of product, drawing, photo, texture and Facing material or combination in any.
Preferably, generate and storage products progress in each state node actual finish time step before, also comprise:
Generate the Quick Response Code of product;
Generate and in storage products progress each state node actual finish time in, by the Quick Response Code of the scanning input product of different account, according to the actual finish time scanning corresponding node in the Quick Response Code that obtains and account generation and storage products progress.
Preferably, by the Quick Response Code of the scanning input product of different account, the Quick Response Code obtained according to scanning and account generate and in storage products progress, the step of the actual finish time of corresponding node comprises,
The user of different account scans the Quick Response Code of product by mobile handheld terminal;
Mobile handheld terminal generates the actual finish time of corresponding node in product progress according to Quick Response Code and account, and actual finish time is sent to a server stores by network.
Preferably, described first warning message comprise plan overtime mail or APP plan overtime pushed information.
Preferably, after generating the step of target advance comparison result, also comprise:
According to the actual finish time of each state node in each product each product progress, calculate the average completion time of each state node in each product progress of each product;
The average completion time of each state node in each product progress compared with actual finish time and generates state node progress comparison result, and sending Secondary Report alarming information when actual finish time exceeds average completion time.
Preferably, described Secondary Report alarming information comprises state node time-out mail or APP state node time-out pushed information.
Preferably, described state node comprise place an order, prototype examination, initial workpiece examination, assembling, producer's outbound, on-the-spot warehouse-in, unpack check and accept, installation and installation check and accept in one or combination in any.
Preferably, after generating the step of state node progress comparison result, also comprise:
According to a kind of data or combination in any data genaration statistical report form in product information, the machining information that places an order, Projected completion time, actual finish time, target advance comparison result and state node progress comparison result.
Preferably, after generating the step of state node progress comparison result, also comprise:
A kind of data or combination in any data in product information, the machining information that places an order, Projected completion time, actual finish time, target advance comparison result and state node progress comparison result are backed up.
Compared with prior art, the present invention generates target advance comparison result by the actual finish time of each state node described and Projected completion time are carried out contrast, and send the first warning message when actual finish time exceeds Projected completion time, can carry out accurately and efficiently monitoring to Product processing and installation progress.Specifically can realize following function:
(1) any products information (as numbering, photo/drawing, size, texture etc.) can be inquired about by software in network-side (as computer, pad, mobile phone etc.) and mobile phone A PP software.
(2) actual finish time (as placed an order, prototype examination, outbound, install) of each state node of any products can be inquired about in network-side (as computer, flat board, mobile phone etc.) and mobile phone A PP software by software.
(3) can at the quantity of the product of any each state node (as installation) of the upper inquiry of network-side (as computer, flat board, mobile phone etc.) and inventory by software.
(4) all uploading and scanning information can be derived by software, each producer's production and installation situation form can be derived.
(5) averaging time that product is in this state at a certain state planned time and product can be contrasted, and adopt APP carefully to push and the mode of mail is reported to the police to the product being later than planned time certain hour.
(6) logistics information of product can be obtained.Timely understanding product trend, is confirmed whether to send to scene on time.
(7) building products life cycle maintenance information can be obtained.Still can follow the tracks of its service condition after product installs, safeguard in time.
(8) the witness main points of " member designs, processing, storage, transport, installation, examination, maintenance, use etc. participate in cost analysis and the examination of the contract performance of unit overall process ";
(9) decoration element is realized to the technical parameter electronic management of overall process, in-site installation does not need paper drawing, by mobile phone terminal check installation component up and down between spatial relationship, improve installation effectiveness;
(10) building use life cycle maintenance process can real-time query member designs, processing, installation unit information, acquisition of technology service with maintenance support;
Accompanying drawing explanation
Fig. 1 is the manual input interface figure of product information of one embodiment of the invention;
Fig. 2 is that the product information form of one embodiment of the invention imports surface chart;
Fig. 3 is the product information table fill request figure of one embodiment of the invention;
Fig. 4 is that the product information related accessories (drawing, photo) of one embodiment of the invention imports surface chart;
Fig. 5 is the information query surface chart of one embodiment of the invention;
Fig. 6 is the product information editing interface figure of one embodiment of the invention;
Fig. 7 is the manual input interface of product plan of one embodiment of the invention;
Fig. 8 is the product plan table fill request of one embodiment of the invention;
Fig. 9 is the material planning editing interface of one embodiment of the invention;
Figure 10 is the progress contrast interface of one embodiment of the invention;
Figure 11 be the material of one embodiment of the invention place an order table manual input interface;
Figure 12 is that the material of one embodiment of the invention places an order table fill request;
Figure 13 be the material of one embodiment of the invention place an order amendment interface;
Figure 14 is that the Quick Response Code of one embodiment of the invention prints surface chart;
Figure 15 is the Quick Response Code figure printed of one embodiment of the invention;
Figure 16 is the status inquiry surface chart that places an order of one embodiment of the invention;
Figure 17 is the Product Status node details surface chart of one embodiment of the invention;
Figure 18 is that the lower one-state of one embodiment of the invention derives surface chart;
Figure 19 is the product information details surface chart of one embodiment of the invention;
Figure 20 is the Product Status querying node figure of one embodiment of the invention;
Figure 21 is the Product Status node summary sheet of the derivation of one embodiment of the invention;
Figure 22 is the time series analysis surface chart of one embodiment of the invention;
Figure 23 is the process number assay surface figure of one embodiment of the invention;
Figure 24 is the quantity report derived table of one embodiment of the invention;
Figure 25 is that the data of one embodiment of the invention preserve surface chart;
Figure 26 is that the mail reception personnel of one embodiment of the invention arrange figure;
Figure 27 is that the plan number of days that exceedes of one embodiment of the invention arranges figure.
Embodiment
For enabling above-mentioned purpose of the present invention, feature and advantage become apparent more, and below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
The invention provides a kind of digital monitoring method being applicable to architectural decorative component, comprising:
Step S1, obtains and storage products information;
Step S2, generates according to described product (architectural decorative component) information and storage products places an order machining information;
Step S3, to place an order machining information based on described product information and product, generates and the Projected completion time of each state node in storage products progress;
Step S4, to place an order machining information based on described product information and product, generates and the actual finish time of each state node in storage products progress;
Step S5, carries out contrast by the actual finish time of each state node described and Projected completion time and generates target advance comparison result, and send the first warning message when actual finish time exceeds Projected completion time.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, and described product information comprises a kind of in the size of product, drawing, photo, texture and Facing material or combination in any.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, generate and storage products progress in each state node actual finish time step before, also comprise:
Generate the Quick Response Code of product;
Generate and in storage products progress each state node actual finish time in, by the Quick Response Code of the scanning input product of different account, according to the actual finish time scanning corresponding node in the Quick Response Code that obtains and account generation and storage products progress.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, by the Quick Response Code of the scanning input product of different account, the Quick Response Code obtained according to scanning and account generate and in storage products progress, the step of the actual finish time of corresponding node comprises
The user of different account scans the Quick Response Code of product by mobile handheld terminal; Described mobile handheld terminal can be mobile phone, PAD, notebook computer etc.;
Mobile handheld terminal generates the actual finish time of corresponding node in product progress according to Quick Response Code and account, and actual finish time is sent to a server stores by network.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, and described first warning message comprises the overtime mail of plan or APP plans overtime pushed information.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, after generating the step of target advance comparison result, also comprises:
According to the actual finish time of each state node in each product each product progress, calculate the average completion time of each state node in each product progress of each product;
The average completion time of each state node in each product progress compared with actual finish time and generates state node progress comparison result, and sending Secondary Report alarming information when actual finish time exceeds average completion time.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, and described Secondary Report alarming information comprises state node time-out mail or APP state node time-out pushed information.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, described state node comprise place an order, prototype examination, initial workpiece examination, assembling, producer's outbound, on-the-spot warehouse-in, unpack check and accept, installation and installation check and accept in one or combination in any.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, after generating the step of state node progress comparison result, also comprises:
According to a kind of data or combination in any data genaration statistical report form in product information, the machining information that places an order, Projected completion time, actual finish time, target advance comparison result and state node progress comparison result.
The present invention is applicable in a preferred embodiment of the digital monitoring method of architectural decorative component, after generating the step of state node progress comparison result, also comprises:
A kind of data or combination in any data in product information, the machining information that places an order, Projected completion time, actual finish time, target advance comparison result and state node progress comparison result are backed up.
Detailed, for product information, one product information module can be set, for the typing to product information, amendment, deletion, import feature.Wherein, product information typing is divided into two kinds: a kind of is the method for manual typing, and another kind is imported by EXECL list data.
A, such as, the information of typing product information click " preservation " button to typing can preserve according to Fig. 1;
B as shown in Figure 2, click Excel importing and import product information, fill in, and concrete fill request is shown in Fig. 3 by the form that form should specify.
For " excel import feature ", by the picture imported, the resources such as pdf are compressed into zip file, as Fig. 4.According to the sketch map that the name of specifying imports, photo/three-dimensional plot, the name of product drawing PDF, construction drawing PDF requires as follows:
Sketch map is named: production code member adds extension name (jpg).As: F8-GFRC-12-1.jpg;
Photo/three-dimensional plot name: 3D-adds that production code member adds extension name (jpg).As:
3D-F8-GFRC-12-1.jpg;
Product drawing PDF names: product drawing numbering adds extension name (PDF).As: A-501-C-4011.1.pdf;
Construction drawing PDF names: construction drawing numbering adds extension name (PDF).As: A-501-PSD-0161.pdf.
In addition, Product Information Management is mainly to the managing queries of product information, increase, deletion, editting function.
(1) inquire about
As Fig. 5, according to one or several information inquiry in the information tables such as production code member, monomer number, facade numbering.
(2) increase
Refer to the content of the said goods Data Enter.
(3) delete
Select the button of relative information to delete, also can delete by multiselect
(4) edit
Choose the product needing editor, the amendment of being correlated with can be carried out by picture shown in Fig. 6.
In addition, by a schedule module, planned product is numbered, plan places an order the time, plan prototype reception time, plan initial workpiece reception time, plan built-up time, plan producer's outbound time, plan on-the-spot entry time, the outbound time is received in plan, plan is installed reception time and added editor and upload onto the server and then carry out contrasting with actual operating time.Wherein, schedule module is numbered planned product, plan places an order the time, plan prototype reception time, plan initial workpiece reception time, plan built-up time, plan producer's outbound time, plan on-the-spot entry time, the outbound time is received in plan, plan installation reception time interpolation editor uploads onto the server.This module can have the inquiry of plan information, increase, deletion, editting function.
(1) inquire about
The typing situation of one or several condition query plan such as production code member, facade numbering, product drawing numbering, construction drawing numbering can be passed through.
(2) increase
The input function of this menu mainly product plan.Typing mode is divided into two kinds: a kind of is the method manually inputted, and another kind is according to data importing.
A typing product plan according to Fig. 7 is clicked the information of " preservation " button to typing and is preserved.
B clicks Excel importing and imports product information, and the form that form should specify is filled in, and concrete fill request is shown in Fig. 8.
(3) delete
Select the button of relative information to delete, also can delete by multiselect
(4) edit
Choose the product needing editor, the amendment of being correlated with can be carried out by picture shown in Fig. 9.
As shown in Figure 10, this Menu realization product (component) real time and planned time carry out progress contrast, click actual product (component) temporal information to there will be planned time and contrast, there is query function " 1 " as shown below and refer to real time " 2 " the brainchild time.
In addition, by the product module that places an order, product is placed an order the managing queries of machining information, increase, deletion, editor, printing function.
(1) inquire about:
The order placement information of one or several condition query product such as production code member, facade numbering, product drawing numbering, construction drawing numbering can be passed through
(2) increase
This menu is the input function that places an order of material mainly.Typing mode is divided into two kinds: a kind of is the method manually inputted, and another kind is according to data importing
A typing material according to Figure 11 places an order table, clicks the information of " preservation " button to typing and preserves.
B clicks Excel importing and imports material order placement information, and the form that form should specify is filled in, and concrete fill request is shown in Figure 12.
(3) delete:
Select the button of relative information to delete, also can delete by multiselect, but be to delete for those products carried out.
(4) edit
Choose the product needing editor, the amendment of being correlated with can be carried out by picture shown in Figure 13.
(5) print
Choose and need the product printed to carry out Quick Response Code printing, this operation must complete after the table typing that places an order, and Quick Response Code prints interface as shown in figure 14, and the Quick Response Code printed as shown in figure 15.
In addition, also can arrange the status inquiry that places an order:
(1) inquire about
Realize the corresponding product information of multi-condition inquiry, click " production code member " and the material details that this production code member is corresponding can be checked, as Figure 16.The detailed status of all products under click " details " can check this material, as Figure 17.
(2) under, one-state is derived
Derive key by the execl in the upper right corner, interface and can derive all information slips that places an order, as Figure 18.
In addition, also can enquiry module be set, for carrying out the inquiry of information query and Product Status node according to condition.
In information query, realize the corresponding product information of multi-condition inquiry, the data clicking " production code member " corresponding check specifying information, refer to Figure 19.
In Product Status querying node, many condition can be provided to search corresponding product progress status, and the running time of each state, and all statistical conversion can be become execl form, as shown in figs 20 and 21.
In analytic function, can analyze for each state for time residing for product (component), and calculate averaging time and the current residing state of inquiry product (component) of all products (component) each state.As can time series analysis be carried out, time of each state at counting yield (component) place and calculate all products (component) or the state averaging time residing for a collection of product (component), multi-condition inquiry product (component) information, as shown in figure 22.Also can carry out process number analysis and comprise process number analysis, time form derivation and the derivation of quantity form.
(1) process number analysis
As shown in figure 23, product status (initial workpiece is checked and accepted, assemble the field conditions such as examination, installation, the classification such as producer, monomer situation) can be passed through and carry out process number analysis.
(2) time form is derived
Refer to the inquiry of before-mentioned products state node.
(3) quantity form is derived
As shown in figure 24, through export quantity report can analyze each monomer, facade bai products as well as the total number of products in each state and proportion.
In addition, the present invention also can have Backup Data function.As shown in figure 25, server name (server ip or title), login name (database login name), password (database password) backup database (wanting the title of backup database) is inputted.
In overtime mail sending, state time-out mail sending can be divided into, plan overtime mail sending, mail reception personal information arranges three functions.
(1) mail reception personnel are arranged
As shown in figure 26, arranged mail reception personnel by increase and delete key, these personnel are for being necessary for website user, and mail will directly be sent in subscriber mailbox.
(2) state time-out mail sending
After the time that a certain product is in a certain state exceedes a certain amount of of averaging time or number percent (can arrange), direct click state time-out mail sending can send mail to designated person and report to the police.
(3) overtime mail sending is planned
First in upper left, interface, as Figure 27, set and exceed plan and how many days then send mail and report to the police, then click confirming button, next then carry out mail reception personnel setting, then click overtime mail sending and namely mail is sent to designated person and report to the police.
In sum, the present invention generates target advance comparison result by the actual finish time of each state node described and Projected completion time are carried out contrast, and send the first warning message when actual finish time exceeds Projected completion time, can carry out accurately and efficiently monitoring to Product processing and installation progress.Specifically can realize following function:
(1) any products information (as numbering, photo/drawing, size, texture etc.) can be inquired about by software in network-side (as computer, pad, mobile phone etc.) and mobile phone A PP software.
(2) actual finish time (as placed an order, prototype examination, outbound, install) of each state node of any products can be inquired about in network-side (as computer, flat board, mobile phone etc.) and mobile phone A PP software by software.
(3) can at the quantity of the product of any each state node (as installation) of the upper inquiry of network-side (as computer, flat board, mobile phone etc.) and inventory by software.
(4) all uploading and scanning information can be derived by software, each producer's production and installation situation form can be derived.
(5) averaging time that product is in this state at a certain state planned time and product can be contrasted, and adopt APP carefully to push and the mode of mail is reported to the police to the product being later than planned time certain hour.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.
Professional can also recognize further, in conjunction with unit and the algorithm steps of each example of embodiment disclosed herein description, can realize with electronic hardware, computer software or the combination of the two, in order to the interchangeability of hardware and software is clearly described, generally describe composition and the step of each example in the above description according to function.These functions perform with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can use distinct methods to realize described function to each specifically should being used for, but this realization should not thought and exceeds scope of the present invention.
Obviously, those skilled in the art can carry out various change and modification to invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (10)

1. be applicable to a digital monitoring method for architectural decorative component, it is characterized in that, comprising:
Obtain and storage products information;
To generate according to described product information and storage products places an order machining information;
To place an order machining information based on described product information and product, generate and the Projected completion time of each state node in storage products progress;
To place an order machining information based on described product information and product, generate and the actual finish time of each state node in storage products progress;
The actual finish time of each state node described and Projected completion time are carried out contrast and generates target advance comparison result, and send the first warning message when actual finish time exceeds Projected completion time.
2. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 1, it is characterized in that, described product information comprises a kind of in the size of product, deepen drawing, photo, texture and Facing material or combination in any.
3. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 1, it is characterized in that, generate and storage products progress in each state node actual finish time step before, also comprise:
Generate the Quick Response Code of product;
Generate and in storage products progress each state node actual finish time in, by the Quick Response Code of the scanning input product of different account, according to the actual finish time scanning corresponding node in the Quick Response Code that obtains and account generation and storage products progress.
4. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 1, it is characterized in that, by the Quick Response Code of the scanning input product of different account, the Quick Response Code obtained according to scanning and account generate and in storage products progress, the step of the actual finish time of corresponding node comprises
The user of different account scans the Quick Response Code of product by mobile handheld terminal;
Mobile handheld terminal generates the actual finish time of corresponding node in product progress according to Quick Response Code and account, and actual finish time is sent to a server stores by network.
5. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 1, it is characterized in that, described first warning message comprises the overtime mail of plan or APP plans overtime pushed information.
6. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 1, it is characterized in that, after generating the step of target advance comparison result, also comprise:
According to the actual finish time of each state node in each product each product progress, calculate the average completion time of each state node in each product progress of each product;
The average completion time of each state node in each product progress compared with actual finish time and generates state node progress comparison result, and sending Secondary Report alarming information when actual finish time exceeds average completion time.
7. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 6, it is characterized in that, described Secondary Report alarming information comprises state node time-out mail or APP state node time-out pushed information.
8. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 1, it is characterized in that, described state node comprises design, publishes picture, places an order, processes, prototype examination, initial workpiece examination, assembling, producer's outbound, logistics, on-the-spot warehouse-in, store, unpack and check and accept, install and install the one in checking and accepting or combination in any.
9. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 6, it is characterized in that, after generating the step of state node progress comparison result, also comprise:
According to a kind of data or combination in any data genaration statistical report form in product information, the machining information that places an order, Projected completion time, actual finish time, target advance comparison result and state node progress comparison result.
10. be applicable to the digital monitoring method of architectural decorative component as claimed in claim 6, it is characterized in that, after generating the step of state node progress comparison result, also comprise:
A kind of data or combination in any data in product information, the machining information that places an order, Projected completion time, actual finish time, target advance comparison result and state node progress comparison result are backed up.
CN201510112540.3A 2015-03-16 2015-03-16 Digitalized monitoring method suitable for building decoration members Pending CN104778502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510112540.3A CN104778502A (en) 2015-03-16 2015-03-16 Digitalized monitoring method suitable for building decoration members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510112540.3A CN104778502A (en) 2015-03-16 2015-03-16 Digitalized monitoring method suitable for building decoration members

Publications (1)

Publication Number Publication Date
CN104778502A true CN104778502A (en) 2015-07-15

Family

ID=53619955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510112540.3A Pending CN104778502A (en) 2015-03-16 2015-03-16 Digitalized monitoring method suitable for building decoration members

Country Status (1)

Country Link
CN (1) CN104778502A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327084A (en) * 2016-08-26 2017-01-11 广东坚美铝型材厂(集团)有限公司 Aluminum section product order completion time calculation system and method
CN106447196A (en) * 2016-09-27 2017-02-22 广东小天才科技有限公司 Content storage data processing method and system
CN107784444A (en) * 2017-10-31 2018-03-09 福建摩尔软件有限公司 A kind of production schedule performs tracking
CN107832951A (en) * 2017-11-10 2018-03-23 上海建工五建集团有限公司 Application processes and system of the BIM in precast concrete supply chain
CN107943522A (en) * 2017-10-27 2018-04-20 链家网(北京)科技有限公司 A kind of project delay rate computation processing method and device
CN109189567A (en) * 2018-08-30 2019-01-11 百度在线网络技术(北京)有限公司 Time-delay calculation method, apparatus, equipment and computer readable storage medium
CN109653400A (en) * 2019-01-31 2019-04-19 陈志敏 Building and two dimensional code architectural image construct system
CN109886576A (en) * 2019-02-20 2019-06-14 司空科技股份有限公司 Task management method, device and storage medium are delivered in digitlization
CN112381378A (en) * 2020-11-10 2021-02-19 湖北福泰建筑装饰工程有限公司 Digital monitoring method suitable for building decoration component

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103182838A (en) * 2011-12-31 2013-07-03 北大方正集团有限公司 Method and device for automatically monitoring newspaper production processes

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103182838A (en) * 2011-12-31 2013-07-03 北大方正集团有限公司 Method and device for automatically monitoring newspaper production processes

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327084A (en) * 2016-08-26 2017-01-11 广东坚美铝型材厂(集团)有限公司 Aluminum section product order completion time calculation system and method
CN106447196A (en) * 2016-09-27 2017-02-22 广东小天才科技有限公司 Content storage data processing method and system
CN107943522A (en) * 2017-10-27 2018-04-20 链家网(北京)科技有限公司 A kind of project delay rate computation processing method and device
CN107784444A (en) * 2017-10-31 2018-03-09 福建摩尔软件有限公司 A kind of production schedule performs tracking
CN107832951A (en) * 2017-11-10 2018-03-23 上海建工五建集团有限公司 Application processes and system of the BIM in precast concrete supply chain
CN109189567A (en) * 2018-08-30 2019-01-11 百度在线网络技术(北京)有限公司 Time-delay calculation method, apparatus, equipment and computer readable storage medium
CN109653400A (en) * 2019-01-31 2019-04-19 陈志敏 Building and two dimensional code architectural image construct system
CN109886576A (en) * 2019-02-20 2019-06-14 司空科技股份有限公司 Task management method, device and storage medium are delivered in digitlization
CN112381378A (en) * 2020-11-10 2021-02-19 湖北福泰建筑装饰工程有限公司 Digital monitoring method suitable for building decoration component

Similar Documents

Publication Publication Date Title
CN104778502A (en) Digitalized monitoring method suitable for building decoration members
US9679038B2 (en) Systems and methods for construction field management and operations with building information modeling
CN104573999B (en) A kind of application process of steel construction BIM informatization platforms
CN110580572B (en) Product life-span traceability system
CN110599007A (en) Project progress management system
CN103345235B (en) Method and module for establishing data acquisition rule of statistical process control system
CN103823426A (en) Visual monitoring and display method for wooden furniture manufacture process digital management platform
KR20170139239A (en) Mobile-based collaboration site provides methods of utilizing the construction site drawings conversion
CN107643742A (en) The system of printed circuit holding retrospect
CN1462974A (en) Intelligent method and device for managing production technology information
CN107908994A (en) Wood-based product's processing progress tracking and clout information management system based on cloud platform
CN117035691B (en) Engineering construction digital project management method and system based on BIM technology
CN102857949B (en) A kind of method and apparatus that layout data consistency guarantees
CN106227170A (en) A kind of CIM integrating central management system producing equipment for PCB
CN111488999A (en) Be applied to wind-powered electricity generation field safety production information-based management system
CN111881038A (en) Test case management method and device and electronic equipment
CN108681888B (en) Remanufacturing-oriented manufacturing execution system for whole process flow
CN105741023A (en) Informationized steel plate quality testing system
CN113763207B (en) Mobile data acquisition system based on Internet
CN210924670U (en) Electromechanical construction management system based on BIM
CN112288302A (en) Engineering quality control method and system based on BIM
CN114065794B (en) Production and work reporting method, system and equipment based on multi-dimensional two-dimensional code
KR101913343B1 (en) Smart factory mobile application management system using KPI
CN110640751A (en) Inspection robot interaction method based on transformer substation remote inspection platform
CN116186387A (en) Material identification analysis system based on product data source

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160812

Address after: 200123 3E1986 room, No. 2123, Pudong Avenue, Zhabei District Free Trade Zone, Shanghai

Applicant after: Shanghai Building Decoration Engineering Group Co., Ltd.

Applicant after: Shanghai Construction Group Co., Ltd.

Address before: 200123 room 3E1986, Pudong Avenue, Shanghai, Pudong New Area, 2123

Applicant before: Shanghai Building Decoration Engineering Group Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150715