CN104763108A - Method for constructing foamed concrete roof insulation layer - Google Patents

Method for constructing foamed concrete roof insulation layer Download PDF

Info

Publication number
CN104763108A
CN104763108A CN201410027187.4A CN201410027187A CN104763108A CN 104763108 A CN104763108 A CN 104763108A CN 201410027187 A CN201410027187 A CN 201410027187A CN 104763108 A CN104763108 A CN 104763108A
Authority
CN
China
Prior art keywords
foam concrete
layer
constructing
meet
regulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410027187.4A
Other languages
Chinese (zh)
Inventor
房志荣
董广安
刘俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Rong Neng Novel Material Co Ltd
Original Assignee
Xinjiang Rong Neng Novel Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Rong Neng Novel Material Co Ltd filed Critical Xinjiang Rong Neng Novel Material Co Ltd
Priority to CN201410027187.4A priority Critical patent/CN104763108A/en
Publication of CN104763108A publication Critical patent/CN104763108A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a method for constructing a foamed concrete roof insulation layer. The constructing method is characterized in that (1) thicknesses and technical requirements of a waterproof roll, a rolled waterproof material and a leveling layer used for a foamed concrete roof insulation system, and thicknesses of a basement layer treating agent, a pressing seam adhesion agent, a sealing material and a membrane waterproof layer used for a rolled waterproof pad meet national norms and regulations; (2) during concrete casting, regression operation is performed sequentially to prevent from disturbance, the foamed concrete surface is polished and jointed before initial set, and the distance from a discharge hole to a basement layer is not too tall; during large-area concrete casting, a method for gradually casting concretes by dividing zones is adopted and the once concrete casting height is not beyond 20cm, and the concrete is twice cast after initial set; (3) the concrete is cured after final set; (4) points warehouse seams are cut. The constructing method has the advantages that: firstly, selecting and using standards of constructing raw materials are strict, namely excellent raw materials are selected from good ones; secondly, fine constructing processes are present; thirdly, technological parameters are rigorous, scientific and standardized.

Description

A kind of construction method of foam concrete roofing heat-insulating layer
Technical field
The present invention relates to a kind of construction method of roofing heat-insulating layer, particularly a kind of construction method of foam concrete roofing heat-insulating layer.
Background technology
The construction method of current roofing heat-insulating layer has multiple, adopts foam concrete to be wherein a kind of as the construction method of roofing heat-insulating layer.But the construction method of existing foam concrete roofing heat-insulating layer has, and construction raw material are selected arbitrarily, technique is simply coarse and crude, the various disadvantages of the inadequate rigorous and scientific specification of technological parameter.
Summary of the invention
The object of the present invention is to provide a kind of raw material of constructing select strict, technique is meticulous, the construction method of the foam concrete roofing heat-insulating layer of technological parameter rigorous and scientific specification.
The technical solution used in the present invention is, the construction method of this foam concrete roofing heat-insulating layer:
(1) all kinds of waterproof rolls of foam concrete roof heat insulation system use, its presentation quality and physical property should meet the regulation of appendix A .0.1 in " roofworks inspection of quality specification " (GB50207-2002), all kinds of water-repellent paints that foam concrete roof heat insulation system uses, the regulation of appendix A .0.2 during its physical property should meet " roofworks inspection of quality specification " (GB50207-2002), the thickness of leveling layer and technical requirements should meet the regulation of annex 4.1.2 in " roofworks inspection of quality specification " (GB50207-2002), foam concrete roof heat insulation layer thickness should meet designing requirement, when build highly be greater than 20cm time, whether placement layer by layer should be selected according to actual conditions, base treatment agent selected by coil waterproof layer, by seam bonding adhesive, encapsulant should be compatible with the coiled material wood property of laying, coil thickness selects the regulation that should meet 5.3.2 in " Technical code for roof engineering " (GB50345-2004), coating waterproofing layer thickness selects the regulation that should meet 6.3.2 in " Technical code for roof engineering " (GB50345-2004),
(2) when building, should be regressed operation in order, prevent disturbance, avoid causing harmful effect to it, carry out drawing light to tie face before the non-initial set in foam concrete surface, discharging opening should not be too high from basic unit, prevent brokenly bubble, must not more than 1m, when large area is built, the method that subregion is built piecewise can be adopted, by template, working face is separated into some small pieces, construct piecewise, one-time-concreting height, no more than 20cm, in order to avoid the excessive and broken bubble of bottom foam concrete slurry pressure-bearing, can after initial set, carry out secondary to build, design draining ramp and planeness will be checked before final set, if any deviation, need to revise in time,
(3), after building, want static before final set, must not disturbance and people can not be gone up, can not load-bearing, maintenance is started, maintenance in summer 3-5 days, Maintenance in Winter 5-7 days after foam concrete final set, after having upper people's intensity, can adopt the moisture-keeping maintaining that suitably waters, winter can not water seasoning;
(4) parting seam is cut: after foam concrete final set, portable cutting machine is adopted to carry out the cutting of parting seam, the interval of parting seam should not be greater than 6m, the width 2-3cm of parting seam, the degree of depth is preferably between the 1/2-2/3 of cast thickness, before cutting, should the good line of ink marker of bullet, clean out in groove after cutting, the stone being no more than 16mm with particle diameter is filled and led up, and groove covers joint seal lath, prevents leveling mortar from infiltrating in parting seam, steam vent is set by designing requirement, can makes of UPVC pipe or galvanized pipe.
Owing to taking technique scheme, therefore the present invention has the following advantages: one is strict to the raw-material choice for use standard of construction, selects excellent in accomplishing.Such as waterproof roll, water-repellent paint, base treatment agent, by seam bonding adhesive, encapsulant etc. all to meet national technical standard code requirement.Two is that construction technology is meticulous.Each step for construction early stage, mid-term, later stage and curing time has all made detailed code requirement.Three is technological parameter rigorous and scientific specifications.For foam concrete roof heat insulation layer thickness, build height, build area, build number of times, coating waterproofing layer thickness, curing requirements, the technical data rigorous and scientific specification all in addition such as cutting parting seam.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail.
Embodiment 1, the construction method of this foam concrete roofing heat-insulating layer:
(1) all kinds of waterproof rolls of foam concrete roof heat insulation system use, its presentation quality and physical property should meet the regulation of appendix A .0.1 in " roofworks inspection of quality specification " (GB50207-2002), all kinds of water-repellent paints that foam concrete roof heat insulation system uses, the regulation of appendix A .0.2 during its physical property should meet " roofworks inspection of quality specification " (GB50207-2002), the thickness of leveling layer and technical requirements should meet the regulation of annex 4.1.2 in " roofworks inspection of quality specification " (GB50207-2002), foam concrete roof heat insulation layer thickness should meet designing requirement, when build highly be greater than 20cmm time, whether placement layer by layer should be selected according to actual conditions, base treatment agent selected by coil waterproof layer, by seam bonding adhesive, encapsulant should be compatible with the coiled material wood property of laying, coil thickness selects the regulation that should meet 5.3.2 in " Technical code for roof engineering " (GB50345-2004), coating waterproofing layer thickness selects the regulation that should meet 6.3.2 in " Technical code for roof engineering " (GB50345-2004),
(2) when building, should be regressed operation in order, prevent disturbance, avoid causing harmful effect to it, carry out drawing light to tie face before the non-initial set in foam concrete surface, discharging opening should not be too high from basic unit, prevent brokenly bubble, must not more than 1m, when large area is built, the method that subregion is built piecewise can be adopted, by template, working face is separated into some small pieces, construct piecewise, one-time-concreting height, no more than 20cm, in order to avoid the excessive and broken bubble of bottom foam concrete slurry pressure-bearing, can after initial set, carry out secondary to build, design draining ramp and planeness will be checked before final set, if any deviation, need to revise in time,
(3), after building, want static before final set, must not disturbance and people can not be gone up, can not load-bearing, maintenance is started, maintenance in summer 3-5 days, Maintenance in Winter 5-7 days after foam concrete final set, after having upper people's intensity, can adopt the moisture-keeping maintaining that suitably waters, winter can not water seasoning;
(4) parting seam is cut: after foam concrete final set, portable cutting machine is adopted to carry out the cutting of parting seam, the interval of parting seam should not be greater than 6m, the width 2-3cm of parting seam, the degree of depth is preferably between the 1/2-2/3 of cast thickness, before cutting, should the good line of ink marker of bullet, clean out in groove after cutting, the stone being no more than 16mm with particle diameter is filled and led up, and groove covers joint seal lath, prevents leveling mortar from infiltrating in parting seam, steam vent is set by designing requirement, can makes of UPVC pipe or galvanized pipe.

Claims (1)

1. a construction method for foam concrete roofing heat-insulating layer, is characterized in that:
(1) all kinds of waterproof rolls of foam concrete roof heat insulation system use, its presentation quality and physical property should meet the regulation of appendix A .0.1 in " roofworks inspection of quality specification " (GB50207-2002), all kinds of water-repellent paints that foam concrete roof heat insulation system uses, the regulation of appendix A .0.2 during its physical property should meet " roofworks inspection of quality specification " (GB50207-2002), the regulation of annex 4.1.2 during the thickness of leveling layer and technical requirements should meet " roofworks inspection of quality specification) " (GB50207-2002), foam concrete roof heat insulation layer thickness should meet designing requirement, when build highly be greater than 20cm time, whether placement layer by layer should be selected according to actual conditions, base treatment agent selected by coil waterproof layer, by seam bonding adhesive, encapsulant should be compatible with the coiled material wood property of laying, coil thickness selects the regulation that should meet 5.3.2 in " Technical code for roof engineering " (GB50345-2004), coating waterproofing layer thickness selects the regulation that should meet 6.3.2 in " Technical code for roof engineering " (GB50345-2004),
(2) when building, should be regressed operation in order, prevent disturbance, avoid causing harmful effect to it, carry out drawing light to tie face before the non-initial set in foam concrete surface, discharging opening should not be too high from basic unit, prevent brokenly bubble, must not more than 1m, when large area is built, the method that subregion is built piecewise can be adopted, by template, working face is separated into some small pieces, construct piecewise, one-time-concreting height, no more than 20cm, in order to avoid the excessive and broken bubble of bottom foam concrete slurry pressure-bearing, can after initial set, carry out secondary to build, design draining ramp and planeness will be checked before final set, if any deviation, need to revise in time,
(3), after building, want static before final set, must not disturbance and people can not be gone up, can not load-bearing, maintenance is started, maintenance in summer 3-5 days, Maintenance in Winter 5-7 days after foam concrete final set, after having upper people's intensity, can adopt the moisture-keeping maintaining that suitably waters, winter can not water seasoning;
(4) parting seam is cut: after foam concrete final set, portable cutting machine is adopted to carry out the cutting of parting seam, the interval of parting seam should not be greater than 6m, the width 2-3cm of parting seam, the degree of depth is preferably between the 1/2-2/3 of cast thickness, before cutting, should the good line of ink marker of bullet, clean out in groove after cutting, the stone being no more than 16mm with particle diameter is filled and led up, and groove covers joint seal lath, prevents leveling mortar from infiltrating in parting seam, steam vent is set by designing requirement, can makes of UPVC pipe or galvanized pipe.
CN201410027187.4A 2014-01-04 2014-01-04 Method for constructing foamed concrete roof insulation layer Pending CN104763108A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410027187.4A CN104763108A (en) 2014-01-04 2014-01-04 Method for constructing foamed concrete roof insulation layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410027187.4A CN104763108A (en) 2014-01-04 2014-01-04 Method for constructing foamed concrete roof insulation layer

Publications (1)

Publication Number Publication Date
CN104763108A true CN104763108A (en) 2015-07-08

Family

ID=53645171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410027187.4A Pending CN104763108A (en) 2014-01-04 2014-01-04 Method for constructing foamed concrete roof insulation layer

Country Status (1)

Country Link
CN (1) CN104763108A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681596A (en) * 2020-12-23 2021-04-20 天津远泰模块房制造有限公司 Energy-saving module house roof manufacturing method
CN112942832A (en) * 2021-02-03 2021-06-11 湖南宝家云建筑工程管理有限公司 Building main body structure building method
CN114934637A (en) * 2022-05-31 2022-08-23 中国十七冶集团有限公司 Construction method of large-area accessible roof waterproof protection surface layer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681596A (en) * 2020-12-23 2021-04-20 天津远泰模块房制造有限公司 Energy-saving module house roof manufacturing method
CN112942832A (en) * 2021-02-03 2021-06-11 湖南宝家云建筑工程管理有限公司 Building main body structure building method
CN112942832B (en) * 2021-02-03 2022-07-29 湖南宝家云建筑工程管理有限公司 Building main body structure building method
CN114934637A (en) * 2022-05-31 2022-08-23 中国十七冶集团有限公司 Construction method of large-area accessible roof waterproof protection surface layer

Similar Documents

Publication Publication Date Title
CN104314204B (en) Non-form stripping lightweight internal partition board and overall grouting construction method thereof
CN103967147A (en) Heat preservation demolition-free template and manufacturing method thereof
CN208293929U (en) A kind of roofing flashing structure
CN103046714A (en) Construction method for double-sided inorganic composite phenolic aldehyde fire-proof heat-insulating decorating integration plates
CN206916972U (en) A kind of external heat insulating wall
CN204703312U (en) A kind of outer shear wall bolt hole plugging structure
CN102505762A (en) Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof
CN106759993A (en) A kind of external heat insulating wall and construction method
CN110158796A (en) A kind of wall body heat insulating construction method
CN206352400U (en) Positively fixed type parapet of roofing position waterproof modular repair structure
CN109208830A (en) A kind of construction method and structure of parapet of roofing flashing
CN104763108A (en) Method for constructing foamed concrete roof insulation layer
CN104695706B (en) AAC building block freely loads wall construction
CN204343722U (en) swimming pool gutter
CN208996333U (en) A kind of inverted roof balcony node waterproof structure
CN205242457U (en) Basement bottom plate and outer wall waterproof construction
CN109989554A (en) A kind of skyscraper assembled piping shaft and preparation method thereof and installation method
CN109433547A (en) A kind of production method of fluorine carbon heat insulating decorative board
CN205444506U (en) Internal drainage structure of foam concrete wall
CN204266404U (en) A kind of outer-wall crack-resisting anti-leakage structure
CN204199585U (en) A kind of decoration of exterior wall integrated plate for heat insulation
KR101466644B1 (en) The construction method for root
CN102733427B (en) Water-proofing and permeability-proofing construction method for coastal civil air-defense constructions
CN202990446U (en) Overhang frame structure
CN105525759A (en) Building external wall water blocking structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150708

WD01 Invention patent application deemed withdrawn after publication