CN104763079A - Foldable assembled integral concrete shear wall structure - Google Patents

Foldable assembled integral concrete shear wall structure Download PDF

Info

Publication number
CN104763079A
CN104763079A CN201510105739.3A CN201510105739A CN104763079A CN 104763079 A CN104763079 A CN 104763079A CN 201510105739 A CN201510105739 A CN 201510105739A CN 104763079 A CN104763079 A CN 104763079A
Authority
CN
China
Prior art keywords
shear wall
precast shear
shape
assembled integral
shaped precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510105739.3A
Other languages
Chinese (zh)
Other versions
CN104763079B (en
Inventor
任志鹏
任东海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510105739.3A priority Critical patent/CN104763079B/en
Publication of CN104763079A publication Critical patent/CN104763079A/en
Application granted granted Critical
Publication of CN104763079B publication Critical patent/CN104763079B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to assembled concrete structures, particularly to a foldable assembled integral concrete shear wall structure which aims at solving the problems that the existing assembled integral concrete shear wall structure is inconvenient to convey, difficult to be manufactured and poor in connection strength. The foldable assembled integral concrete shear wall structure comprises an L-shaped prefabricated shear wall and or a T-shaped prefabricated shear wall; two walls of the L-shaped prefabricated shear wall are hinged to each other; two walls of the T-shaped prefabricated shear wall are hinged to each other; each hinged structure is formed by a pre-embedded circular stirrup and circular pipe. During construction, the L-shaped prefabricated shear wall and or the T-shaped prefabricated shear wall are hoisted to a foundation to enable vertical thread ribs formed on the foundation to penetrate the circular pipe of the L-shaped prefabricated shear wall and or the circular pipe of the T-shaped prefabricated shear wall so as to enable the circular pipe of the L-shaped prefabricated shear wall and or the circular pipe of the T-shaped prefabricated shear wall to be pulled out upward and hoisted away and enable the circular stirrup of the L-shaped prefabricated shear wall and or the circular stirrup of the T-shaped prefabricated shear wall and the vertical thread ribs to be bound form rebar structure columns and pour concrete. The foldable assembled integral concrete shear wall structure is high in structural strength and suitable for the 8 degrees or more than 8 degrees of seismic fortification intensity of seismic design.

Description

Folding assembled integral concrete shear wall structure
Technical field
the present invention relates to prefabricated concrete structure, particularly assembled monolithic concrete structure, be specially folding assembled integral concrete shear wall structure.
Background technology
people's Republic of China (PRC) industry standard JGJ1-2014 is " prefabricated concrete structure tecnical regulations ".This code only relate to assembled monolithic concrete structure.The main scope of application of this code is assembled integral concrete frame structure and assembled integral concrete shear wall structure.Assembled integral concrete shear wall structure is made up of various precast shear wall.According to code: precast shear wall should adopt in-line, also L shape, T-shaped or U-shaped can be adopted.The patent No. be 200410064569.0 Chinese invention patent disclose one " prefab assembled houses ", " L " shape wall corner skirt board prefabricated component (1) involved in " prefab assembled houses " and "T"-shaped partition wall gusset piece prefabricated component (3) should just belong to L shape, T-shaped precast shear wall.Existing L shape and T-shaped precast shear wall are fixed (non-collapsible) structure, and its volume, size are comparatively large, and transport is inconvenient; Its moulding form is difficult to manufacture, and brings difficulty to the manufacture of precast shear wall; According to code: each precast shear wall in assembled integral concrete shear wall structure be adopt reinforced bar sleeve to be in the milk to be connected between floor, not only difficulty of construction is large, and as the connection between the floor of multilayer or highrise building and floor, intensity is relatively poor.
Summary of the invention
the present invention solves the transport inconvenience that existing assembled integral concrete shear wall structure brings for fixed (non-collapsible) structure due to L shape and/or T-shaped precast shear wall, the problem that manufacture is difficult and bonding strength is relatively poor, there is provided a kind of folding assembled integral concrete shear wall structure, the L shape and/or the T-shaped precast shear wall that form this shear wall structure are folding structure.
the present invention adopts following technical scheme to realize: folding assembled integral concrete shear wall structure, comprises precast shear wall, and precast shear wall comprises L shape and/or T-shaped precast shear wall; The node of two walls of L shape precast shear wall is hinged: a side end face of a wall of L shape precast shear wall and the metope of another wall are reserved with the circular stirrups of upper and lower concentric arrangement respectively, circular stirrups on two walls of L shape precast shear wall is staggeredly located, and a pipe inserts the circular stirrups on two walls of L shape precast shear wall simultaneously and realizes being hinged of two walls of L shape precast shear wall; The node of two walls of T-shaped precast shear wall is hinged: the metope of a wall of T-shaped precast shear wall and a side end face of another wall are reserved with the circular stirrups (each wall of formation L shape, T-shaped precast shear wall comprises both sides end face, upper and lower end face and front and back metope) of upper and lower concentric arrangement respectively, circular stirrups on two walls of T-shaped precast shear wall is staggeredly located, and a pipe inserts the circular stirrups on two walls of T-shaped precast shear wall simultaneously and realizes being hinged of two walls of T-shaped precast shear wall.L shape and/or T-shaped precast shear wall are made articulated structure, L shape and/or T-shaped precast shear wall is folded, facilitates transport.Simplify the structure of moulding form, moulding form is easily manufactured, made the manufacture of precast shear wall convenient.
further, the vertical abutment joint in floor between contiguous prefabricated shear wall adopts emboss pit to connect, and a vertical contact surface namely between contiguous prefabricated shear wall has on upper and lower fin, another vertical contact surface and has the groove coordinated with fin.Emboss pit link enhancement bonding strength.Vertical abutment joint in floor between contiguous prefabricated shear wall, on the basis that emboss pit connects, uses high strength glue bond, to increase bonding strength further.
further, in floor, contiguous prefabricated shear wall is respectively equipped with metal embedded part at the upper and lower end of respective vertical contact surface, when after contiguous prefabricated shear wall docking, by two relative metal embedded part welding, to increase bonding strength further.Described metal embedded part is angle bar, and like this, metal embedded part also can weld with the respective metal built-in fitting on basis or floor, replaces the method that the grouting of existing reinforced bar sleeve connects, increases integrated connection intensity, improve antidetonation rank.
the construction method of folding assembled integral concrete shear wall structure of the present invention, comprises basis of formation, and the screw thread that the position that basis is assembled the node of L shape and/or T-shaped precast shear wall is reserved with upwards erects muscle; L shape and/or T-shaped precast shear wall are lifted on basis, screw thread on basis is erected pipe that muscle penetrates L shape and/or T-shaped precast shear wall, L shape and/or T-shaped precast shear wall are launched by folded state, pipe is upwards extracted out from L shape and/or T-shaped precast shear wall and hangs away, circular stirrups on L shape and/or T-shaped precast shear wall and screw thread are erected muscle colligation and forms reinforcement constitution post, at the peripheral fixed die template of reinforcement constitution post, on-the-spot to concreting formation concrete-constituted pile in reinforcement constitution post; Screw thread erects muscle and upwards extends, and repeats said process, makes L shape and/or T-shaped precast shear wall upwards superpose and form multilayer or high-level structure (building).By this construction method, make each L shape precast shear wall in whole assembled integral concrete shear wall structure, each T-shaped precast shear wall is connected up and down by concrete-constituted pile, form the connection string structure of similar " sugarcoated haws ", the concrete-constituted pile be connected with basis infinitely can extend to attic to upper strata, drastically increases the bonding strength of whole assembled integral concrete shear wall structure.
further, arrange by the horizontal longitudinal bar net of stirrup colligation and horizontal cross reinforcement net in the upper surface of L shape and/or T-shaped precast shear wall, horizontal longitudinal bar net and horizontal cross reinforcement net erect the crossing also colligation of muscle with the screw thread on basis, and scene forms level collar tie beam in length and breadth to concreting in horizontal longitudinal bar net and horizontal cross reinforcement net.Level collar tie beam structure is in length and breadth passed through crossing with the vertical concrete-constituted pile of shear wall, defines the 3 D stereo post and beam structure that collar tie beam and vertical constructional column are in length and breadth integrated, and improves bulk strength and antidetonation rank further.
the present invention is compared with existing product/technology, there is higher structural strength, bonding strength between each precast shear wall is high, and when suffering outside destroy or intense impact (as earthquake, typhoon), the connected node between each precast shear wall and between shear wall and floor can not be destroyed.Concrete structure of the present invention is applicable to the seismic design that seismic fortification intensity is more than 8 degree and 8 degree.The present invention also has that component is easy to manufacture, convenient transportation, the simple feature of construction.
Accompanying drawing explanation
fig. 1 is the schematic cross section of shear wall structure of the present invention;
fig. 2 is the vertical section schematic diagram of shear wall structure of the present invention;
fig. 3 is the structural representation (not showing pipe) under L shape precast shear wall folded state;
fig. 4 is the structural representation (not showing pipe) under L shape precast shear wall deployed condition;
fig. 5 is the structural representation (not showing pipe) under T-shaped precast shear wall folded state;
fig. 6 is the structural representation (not showing pipe) under T-shaped precast shear wall deployed condition;
fig. 7 is the structural representation of a wall of L shape, T-shaped precast shear wall;
fig. 8 is the structural representation of another wall of T-shaped precast shear wall;
fig. 9 is circular tube structure schematic diagram;
figure 10 is the emboss pit syndeton schematic diagram between contiguous prefabricated shear wall;
figure 11 is the structural representation that contiguous prefabricated shear wall arranges metal embedded part on respective vertical contact surface.
in figure: 1-circular stirrups, 2-pipe, 3-card rib, 4-metal embedded part.
Detailed description of the invention
folding assembled integral concrete shear wall structure, comprises precast shear wall, and precast shear wall comprises L shape and/or T-shaped precast shear wall; The node of two walls of L shape precast shear wall is hinged: a side end face of a wall of L shape precast shear wall and the metope of another wall are reserved with the circular stirrups 1 of upper and lower concentric arrangement respectively, circular stirrups on two walls of L shape precast shear wall is staggeredly located, and a pipe 2 inserts the circular stirrups on two walls of L shape precast shear wall simultaneously and realizes being hinged of two walls of L shape precast shear wall; The node of two walls of T-shaped precast shear wall is hinged: the metope of a wall of T-shaped precast shear wall and a side end face of another wall are reserved with the circular stirrups 1 of upper and lower concentric arrangement respectively, circular stirrups on two walls of T-shaped precast shear wall is staggeredly located, and a pipe 2 inserts the circular stirrups on two walls of T-shaped precast shear wall simultaneously and realizes being hinged of two walls of T-shaped precast shear wall.The upper end of described pipe 2 is provided with card rib 3, comes off to prevent pipe 2.Vertical abutment joint in floor between contiguous prefabricated shear wall adopts emboss pit to connect, and a vertical contact surface namely between contiguous prefabricated shear wall has the groove (as shown in Figure 10) upper and lower fin, another vertical contact surface having and coordinates with fin.Vertical abutment joint in floor between contiguous prefabricated shear wall, on the basis that emboss pit connects, uses high strength glue bond.In floor, contiguous prefabricated shear wall is respectively equipped with metal embedded part 4 at the upper and lower end of respective vertical contact surface, when after contiguous prefabricated shear wall docking, by two relative metal embedded part welding, described metal embedded part 4 is angle bar, like this, metal embedded part also can weld with the respective metal built-in fitting on basis or floor, replaces the method that the grouting of existing reinforced bar sleeve connects.
the construction method of folding assembled integral concrete shear wall structure, comprises basis of formation, and the screw thread that the position that basis is assembled the node of L shape and/or T-shaped precast shear wall is reserved with upwards erects muscle; L shape and/or T-shaped precast shear wall are lifted on basis, screw thread on basis is erected pipe 2 that muscle penetrates L shape and/or T-shaped precast shear wall, L shape and/or T-shaped precast shear wall are launched by folded state, pipe 2 is upwards extracted out from L shape and/or T-shaped precast shear wall and hangs away, circular stirrups 1 on L shape and/or T-shaped precast shear wall is erected muscle colligation with screw thread and forms reinforcement constitution post, at the peripheral fixed die template of reinforcement constitution post, on-the-spot to concreting formation concrete-constituted pile in reinforcement constitution post; Screw thread erects muscle and upwards extends, and repeats said process, makes L shape and/or T-shaped precast shear wall upwards superpose and form multilayer or high-level structure (building) (as shown in Figure 1, 2).Arrange by the horizontal longitudinal bar net of stirrup colligation and horizontal cross reinforcement net in the upper surface of L shape and/or T-shaped precast shear wall, horizontal longitudinal bar net and horizontal cross reinforcement net erect the crossing also colligation of muscle with the screw thread on basis, and scene forms level collar tie beam in length and breadth to concreting in horizontal longitudinal bar net and horizontal cross reinforcement net.

Claims (10)

1. a folding assembled integral concrete shear wall structure, comprises precast shear wall, and precast shear wall comprises L shape and/or T-shaped precast shear wall; It is characterized in that the node of two walls of L shape precast shear wall is hinged: a side end face of a wall of L shape precast shear wall and the metope of another wall are reserved with the circular stirrups (1) of upper and lower concentric arrangement respectively, circular stirrups on two walls of L shape precast shear wall is staggeredly located, and a pipe (2) is inserted the circular stirrups on two walls of L shape precast shear wall simultaneously and realizes being hinged of two walls of L shape precast shear wall; The node of two walls of T-shaped precast shear wall is hinged: the metope of a wall of T-shaped precast shear wall and a side end face of another wall are reserved with the circular stirrups (1) of upper and lower concentric arrangement respectively, circular stirrups on two walls of T-shaped precast shear wall is staggeredly located, and a pipe (2) is inserted the circular stirrups on two walls of T-shaped precast shear wall simultaneously and realizes being hinged of two walls of T-shaped precast shear wall.
2. folding assembled integral concrete shear wall structure according to claim 1, is characterized in that the upper end of pipe (2) is provided with card rib (3).
3. folding assembled integral concrete shear wall structure according to claim 1 and 2, it is characterized in that the vertical abutment joint in floor between contiguous prefabricated shear wall adopts emboss pit to connect, a vertical contact surface namely between contiguous prefabricated shear wall has on upper and lower fin, another vertical contact surface and have the groove coordinated with fin.
4. folding assembled integral concrete shear wall structure according to claim 3, is characterized in that the vertical abutment joint high strength glue bond in floor between contiguous prefabricated shear wall.
5. folding assembled integral concrete shear wall structure according to claim 1 and 2, is characterized in that in floor, contiguous prefabricated shear wall is respectively equipped with metal embedded part (4) at the upper and lower end of respective vertical contact surface.
6. folding assembled integral concrete shear wall structure according to claim 3, is characterized in that in floor, contiguous prefabricated shear wall is respectively equipped with metal embedded part (4) at the upper and lower end of respective vertical contact surface.
7. folding assembled integral concrete shear wall structure according to claim 5, is characterized in that metal embedded part (4) is angle bar.
8. folding assembled integral concrete shear wall structure according to claim 6, is characterized in that metal embedded part (4) is angle bar.
9. the construction method of folding assembled integral concrete shear wall structure according to claim 1, comprises basis of formation, it is characterized in that the screw thread that the position of the node assembling L shape and/or T-shaped precast shear wall on basis is reserved with upwards erects muscle; L shape and/or T-shaped precast shear wall are lifted on basis, screw thread on basis is erected pipe (2) that muscle penetrates L shape and/or T-shaped precast shear wall, L shape and/or T-shaped precast shear wall are launched by folded state, pipe (2) is upwards extracted out from L shape and/or T-shaped precast shear wall and hangs away, circular stirrups (1) on L shape and/or T-shaped precast shear wall and screw thread are erected muscle colligation and forms reinforcement constitution post, at the peripheral fixed die template of reinforcement constitution post, on-the-spot to concreting formation concrete-constituted pile in reinforcement constitution post; Screw thread erects muscle and upwards extends, and repeats said process, makes L shape and/or T-shaped precast shear wall upwards superpose and form multilayer or high-level structure.
10. the construction method of folding assembled integral concrete shear wall structure according to claim 9, it is characterized in that arranging by the horizontal longitudinal bar net of stirrup colligation and horizontal cross reinforcement net in the upper surface of L shape and/or T-shaped precast shear wall, horizontal longitudinal bar net and horizontal cross reinforcement net erect the crossing also colligation of muscle with the screw thread on basis, and scene forms level collar tie beam in length and breadth to concreting in horizontal longitudinal bar net and horizontal cross reinforcement net.
CN201510105739.3A 2015-03-11 2015-03-11 Folding assembled integral concrete shear wall structure Expired - Fee Related CN104763079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510105739.3A CN104763079B (en) 2015-03-11 2015-03-11 Folding assembled integral concrete shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510105739.3A CN104763079B (en) 2015-03-11 2015-03-11 Folding assembled integral concrete shear wall structure

Publications (2)

Publication Number Publication Date
CN104763079A true CN104763079A (en) 2015-07-08
CN104763079B CN104763079B (en) 2017-06-13

Family

ID=53645143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510105739.3A Expired - Fee Related CN104763079B (en) 2015-03-11 2015-03-11 Folding assembled integral concrete shear wall structure

Country Status (1)

Country Link
CN (1) CN104763079B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829498A (en) * 2017-11-21 2018-03-23 北京建筑大学 A kind of rotatable pre-buried external member and prefabricated assembled wall structure
CN109914649A (en) * 2019-04-03 2019-06-21 董朝旭 A kind of precast shear wall component based in building structure
CN112560148A (en) * 2020-12-18 2021-03-26 中国二十冶集团有限公司 BIM-based wall modeling method and system for wall end processing

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4472919A (en) * 1982-05-19 1984-09-25 Con-Tex Elements, Inc. Prefabricated building panel
CN201395875Y (en) * 2009-02-04 2010-02-03 南通建筑工程总承包有限公司 L-shaped shear wall vertical connection node
CN102635197A (en) * 2012-04-27 2012-08-15 初明进 Prefabricated reinforced concrete component with grooves and manufacturing method thereof
CN203113556U (en) * 2013-03-08 2013-08-07 郑州大学 Fabricated concrete shear wall
CN203546916U (en) * 2013-06-09 2014-04-16 徐曼 Assembled reinforced concrete wall body connection structure
CN103790265A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4472919A (en) * 1982-05-19 1984-09-25 Con-Tex Elements, Inc. Prefabricated building panel
CN201395875Y (en) * 2009-02-04 2010-02-03 南通建筑工程总承包有限公司 L-shaped shear wall vertical connection node
CN102635197A (en) * 2012-04-27 2012-08-15 初明进 Prefabricated reinforced concrete component with grooves and manufacturing method thereof
CN203113556U (en) * 2013-03-08 2013-08-07 郑州大学 Fabricated concrete shear wall
CN203546916U (en) * 2013-06-09 2014-04-16 徐曼 Assembled reinforced concrete wall body connection structure
CN103790265A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829498A (en) * 2017-11-21 2018-03-23 北京建筑大学 A kind of rotatable pre-buried external member and prefabricated assembled wall structure
CN107829498B (en) * 2017-11-21 2023-06-02 北京建筑大学 Rotatable pre-buried external member and prefabricated wall body structure
CN109914649A (en) * 2019-04-03 2019-06-21 董朝旭 A kind of precast shear wall component based in building structure
CN109914649B (en) * 2019-04-03 2020-09-04 董朝旭 Prefabricated shear wall assembly based on building structure
CN112560148A (en) * 2020-12-18 2021-03-26 中国二十冶集团有限公司 BIM-based wall modeling method and system for wall end processing

Also Published As

Publication number Publication date
CN104763079B (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106088327B (en) The production method of assembling frame column based on 3D printing
CN205617420U (en) Building block formula panel reinforced earth retaining wall
CN106013800A (en) Constructional column construction method based on 3D printing filling wall
CN104763079A (en) Foldable assembled integral concrete shear wall structure
CN106245817A (en) A kind of fabricated shear wall vertical connection structure and installation method thereof
CN106480983A (en) A kind of assembled beam-column hinged joint and its assembling mode
CN206174195U (en) Assembled concrete shear force wall split, assemble connection structure
CN106121087A (en) A kind of steel building and wall construction method, beam column steel beam column
CN210067020U (en) Sub-structure assembled frame structure
CN203834738U (en) T-shaped prefabricated mixed coupled wall
CN106284644B (en) A kind of residential architecture structural system and its method of construction suitable for industrialized production
CN209211748U (en) A kind of structure node of assembled ceiling radiating system
CN107642104A (en) Prefabricated sandwich wall and middle overlapping board connecting structure and its construction method
CN205840153U (en) A kind of corrugated tube outsourcing spiral hoop slurry anchor connection structure
CN205530819U (en) Steel frame structure of embedded precast concrete shear force wall bending resistance simultaneously
CN203499110U (en) Rebar structure of prefabricated component
CN203834737U (en) Cross-shaped prefabricated mixed coupled wall
CN104060685A (en) House structure
CN207348231U (en) A kind of vertical connecting structure of Prefabricated stacking floor
CN107268774A (en) A kind of attachment structure of precast concrete balcony periphery shrouding levels and construction method
CN210507833U (en) Steel-pipe column and concrete column coincide connected node
CN203961055U (en) Assembling in-line mixing coupled wall
CN104594528B (en) Prefabricated connecting beam and prefabricated wall connecting end construction method
CN209308222U (en) A kind of connection structure with tongue and groove precast shear wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20210311