CN104762989A - 一种加快硬岩地层地连墙施工进度的方法 - Google Patents

一种加快硬岩地层地连墙施工进度的方法 Download PDF

Info

Publication number
CN104762989A
CN104762989A CN201510160393.7A CN201510160393A CN104762989A CN 104762989 A CN104762989 A CN 104762989A CN 201510160393 A CN201510160393 A CN 201510160393A CN 104762989 A CN104762989 A CN 104762989A
Authority
CN
China
Prior art keywords
ground
hard rock
wall
vertical holes
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510160393.7A
Other languages
English (en)
Inventor
柴艳飞
任富芝
徐利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201510160393.7A priority Critical patent/CN104762989A/zh
Publication of CN104762989A publication Critical patent/CN104762989A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/13Foundation slots or slits; Implements for making these slots or slits

Abstract

本发明公开了一种加快硬岩地层地连墙施工进度的方法,在硬岩地层施作地连墙的基槽前,在成槽位置施钻多个竖直孔,所述竖直孔沿硬岩地层内地连墙基槽的整个深度延伸。本发明通过在地连墙成槽的硬岩地层内部增加密排的竖直孔,使得硬岩地层内部增加了多个临空面,整体降低了硬岩地层的强度,从而加快了地连墙的成槽进度,进而加快了地连墙的施工速度,提升了硬岩地层地连墙施工的功效,降低了地连墙的施工成本。

Description

一种加快硬岩地层地连墙施工进度的方法
技术领域
本发明涉及一种地连墙的施工方法,特别是一种加快硬岩地层地连墙施工进度的方法。适用于地铁车站、地下结构工程及房屋建筑等深基坑工程地连墙在硬岩地层中的施工。
背景技术
城市轨道交通地铁车站及房屋建筑等深基坑围护结构的地连墙,在“上软下硬”的复合地层中或是在硬岩地层中施工时,由于硬岩地层强度高,采用液压抓斗无法破碎硬岩,需要采用冲击钻进行地连墙成槽施工,但是冲击钻的功效很低,一幅地连墙少则需要半个月,多则需要两个月完工,严重影响了工程建设进度,并且使得施工成本增加数倍。
目前城市轨道交通及房屋建筑等建设量逐年增大,迫切需要设计一种加快硬岩地层地连墙施工进度的方法,从根本上解决在硬岩地层中施工地连墙的功效和经济成本问题。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种加快硬岩地层地连墙施工进度的方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种加快硬岩地层地连墙施工进度的方法,在硬岩地层施作地连墙的基槽前,在成槽位置施钻多个竖直孔,所述竖直孔沿硬岩地层内地连墙基槽的整个深度延伸。
在所述竖直孔的施工完成后,在硬岩地层施作地连墙的基槽前,在所述竖直孔的下部实施爆破作业。
所述竖直孔的布置呈梅花形,孔径9~11cm,相邻孔的间距为20~25cm。
所述竖直孔采用潜水钻机进行施钻形成的。
所述潜水钻机采用跳孔施钻的方法完成所有所述竖直孔的施工。
本发明具有的优点和积极效果是:通过在地连墙成槽的硬岩地层内部增加密排的竖直孔,使得硬岩地层内部增加了多个临空面,整体降低了硬岩地层的强度,从而加快了地连墙的成槽进度,进而加快了地连墙的施工速度,提升了硬岩地层地连墙施工的功效,降低了地连墙的施工成本。
附图说明
图1为应用本发明的平面示意图;
图2为应用本发明的剖面示意图。
图中:1、地连墙;2、硬岩地层;3、土岩界面;4、竖直孔;5、土层。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1和图2,一种加快硬岩地层地连墙施工进度的方法,在硬岩地层2施作地连墙1的基槽前,在成槽位置施钻多个延伸竖直孔4,所述竖直孔4沿硬岩地层2内地连墙基槽的整个深度延伸。
在本实施例中,所述竖直孔4采用潜水钻机进行施钻形成的,是潜水钻孔。还可以是普通的钻孔。上述竖直孔4的布置呈梅花形,孔径9~11cm,相邻孔的间距为20~25cm。潜水钻孔可以从地连墙顶部(地面)施工,也可以从土岩界面3开始施工,视地质、土层条件而定。在本实施例中,潜水钻孔是从地连墙顶部利用潜水钻机进行钻孔的。
上述方法的具体步骤如下:在地连墙1的上部平整场地,使得潜水钻孔的钻头处于竖直状态,按照设计要求,运用潜水钻机进行施钻,施钻过程中进行跳孔施钻,确保垂直度满足施工要求。施钻潜水钻孔的目的是:降低硬岩地层2的强度,以方便地连墙的基槽施工,加快成槽进度。如果硬岩地层2的强度过高,可以在潜水钻孔下部安放炸药,进行深孔爆破来降低硬岩地层2的强度。
在将硬岩地层2的强度降低后,进行地连墙基槽的施工,步骤为:利用液压抓斗进行地连墙上部土层5的成槽施工,到了土岩分界面3后,改换冲击钻进行硬岩地层2中的地连墙成槽作业,成槽的垂直度和沉渣厚度满足施工要求。
在完成地连墙基槽的施工后,按照现有工法完成地连墙的施工。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本发明的保护范围之内。

Claims (5)

1.一种加快硬岩地层地连墙施工进度的方法,其特征在于,在硬岩地层施作地连墙的基槽前,在成槽位置施钻多个竖直孔,所述竖直孔沿硬岩地层内地连墙基槽的整个深度延伸。
2.根据权利要求1所述的加快硬岩地层地连墙施工进度的方法,其特征在于,在所述竖直孔的施工完成后,在硬岩地层施作地连墙的基槽前,在所述竖直孔的下部实施爆破作业。
3.根据权利要求1所述的加快硬岩地层地连墙施工进度的方法,其特征在于,所述竖直孔的布置呈梅花形,孔径9~11cm,相邻孔的间距为20~25cm。
4.根据权利要求1所述的加快硬岩地层地连墙施工进度的方法,其特征在于,所述竖直孔采用潜水钻机进行施钻形成的。
5.根据权利要求4所述的加快硬岩地层地连墙施工进度的方法,其特征在于,所述潜水钻机采用跳孔施钻的方法完成所有所述竖直孔的施工。
CN201510160393.7A 2015-04-07 2015-04-07 一种加快硬岩地层地连墙施工进度的方法 Pending CN104762989A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510160393.7A CN104762989A (zh) 2015-04-07 2015-04-07 一种加快硬岩地层地连墙施工进度的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510160393.7A CN104762989A (zh) 2015-04-07 2015-04-07 一种加快硬岩地层地连墙施工进度的方法

Publications (1)

Publication Number Publication Date
CN104762989A true CN104762989A (zh) 2015-07-08

Family

ID=53645056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510160393.7A Pending CN104762989A (zh) 2015-04-07 2015-04-07 一种加快硬岩地层地连墙施工进度的方法

Country Status (1)

Country Link
CN (1) CN104762989A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519176A (zh) * 2019-01-28 2019-03-26 粤水电轨道交通建设有限公司 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构
CN110826286A (zh) * 2019-12-06 2020-02-21 广西交通科学研究院有限公司 一种数值模拟中地连墙外围土范围的计算方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259079A (ja) * 1994-03-16 1995-10-09 Kenchiyou Kobe:Kk 地中壁の構築施工方法
JP2004197565A (ja) * 2004-04-19 2004-07-15 Fumio Hoshi 硬岩地層への鋼矢板連続打設工法及び該工法に用いる器具
CN101586340A (zh) * 2009-06-17 2009-11-25 广州市第二市政工程有限公司 连续墙在微风化岩层成槽施工中的预处理工艺
CN101824821A (zh) * 2010-05-17 2010-09-08 中国葛洲坝集团股份有限公司 一种基岩中建造混凝土地下连续墙的方法
CN102002952A (zh) * 2009-09-03 2011-04-06 中国二十冶集团有限公司 土岩结合地域的旋流池基坑防护施工方法
CN104005415A (zh) * 2014-02-18 2014-08-27 中铁十六局集团北京轨道交通工程建设有限公司 微风化花岗岩中地下连续墙的高效成槽施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259079A (ja) * 1994-03-16 1995-10-09 Kenchiyou Kobe:Kk 地中壁の構築施工方法
JP2004197565A (ja) * 2004-04-19 2004-07-15 Fumio Hoshi 硬岩地層への鋼矢板連続打設工法及び該工法に用いる器具
CN101586340A (zh) * 2009-06-17 2009-11-25 广州市第二市政工程有限公司 连续墙在微风化岩层成槽施工中的预处理工艺
CN102002952A (zh) * 2009-09-03 2011-04-06 中国二十冶集团有限公司 土岩结合地域的旋流池基坑防护施工方法
CN101824821A (zh) * 2010-05-17 2010-09-08 中国葛洲坝集团股份有限公司 一种基岩中建造混凝土地下连续墙的方法
CN104005415A (zh) * 2014-02-18 2014-08-27 中铁十六局集团北京轨道交通工程建设有限公司 微风化花岗岩中地下连续墙的高效成槽施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519176A (zh) * 2019-01-28 2019-03-26 粤水电轨道交通建设有限公司 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构
CN109519176B (zh) * 2019-01-28 2024-04-02 粤水电轨道交通建设有限公司 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构
CN110826286A (zh) * 2019-12-06 2020-02-21 广西交通科学研究院有限公司 一种数值模拟中地连墙外围土范围的计算方法

Similar Documents

Publication Publication Date Title
CN102966108B (zh) 紧临既有建筑物以地下结构为内支撑的深基坑施工方法
CN104947690B (zh) 地下连续墙入岩成槽施工方法
CN103643918B (zh) 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法
CN103774690A (zh) 一种抓钻冲相结合的地下连续墙成槽施工方法
CN103046931B (zh) 一种竖井/导井冲击式钻机冲击成孔施工方法
CN103726495B (zh) 近海深基坑支护结构及其施工方法
CN103510520A (zh) 深大基坑的分区施工方法
CN103590406A (zh) 一种超大型深基坑分区同步开挖的施工方法
CN102562076A (zh) 上软下硬地质条件下大断面地铁车站暗挖施工工艺
CN106869966A (zh) 一种离层水补给源的封堵方法
CN101793487A (zh) 小净距隧道施工控制爆破技术
CN102562087B (zh) 水钻跟进管棚施工方法
CN110374091A (zh) 一种矩形抗滑桩机械成孔施工方法
CN110984132B (zh) 复杂地质条件下地下连续墙成槽的施工方法
CN106703059B (zh) 沉井十字形拉槽施工方法
CN110512588B (zh) 一种横跨矿区地表拉张裂隙带式保护区的保护方法
CN104895121A (zh) 一种减小地下结构建设中地表沉降及建构筑物变形的横向隔断法
CN103291312A (zh) 能够实现三维注浆的盾构机
CN107023033A (zh) 城市地下管廊硬质岩体绳锯切割开挖方法
CN104762989A (zh) 一种加快硬岩地层地连墙施工进度的方法
Calin et al. Dewatering system of a deep of excavation in urban area–Bucharest case study
CN204609897U (zh) 一种管幕冻结法支护结构
CN204982935U (zh) 一种加快硬岩地层地连墙施工进度的结构
CN206644159U (zh) 硬质岩体绳锯切割结构
CN203347799U (zh) 能够实现三维注浆的盾构机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150708