CN104753176B - Dispatching of power netwoks controls system - Google Patents
Dispatching of power netwoks controls system Download PDFInfo
- Publication number
- CN104753176B CN104753176B CN201510144914.XA CN201510144914A CN104753176B CN 104753176 B CN104753176 B CN 104753176B CN 201510144914 A CN201510144914 A CN 201510144914A CN 104753176 B CN104753176 B CN 104753176B
- Authority
- CN
- China
- Prior art keywords
- end processor
- switch
- server
- modem
- dispatching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 12
- 238000002955 isolation Methods 0.000 claims abstract description 8
- 239000000523 sample Substances 0.000 claims description 16
- 230000005540 biological transmission Effects 0.000 claims description 11
- 239000013307 optical fiber Substances 0.000 claims description 6
- 230000006378 damage Effects 0.000 abstract description 14
- 230000007423 decrease Effects 0.000 abstract description 7
- 238000009434 installation Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000007639 printing Methods 0.000 description 2
- 238000012549 training Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/128—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Alarm Systems (AREA)
- Closed-Circuit Television Systems (AREA)
Abstract
The present invention relates to dispatching of power netwoks and control system, including master server, video monitoring main frame, WEB server, main front end processor, work station, several substations, the first switch, main front end processor is connected to the modem realizing data exchange, a physical isolation apparatus it is equipped with between first switch and WEB server, between modem and main front end processor, Ethernet is connected to the second switch, the second switch is connected to Video Controller;Advantages of the present invention: realize the exchange of data in main front end processor by modem; realize the protection of data between the first switch and WEB server, between modem and main front end processor respectively by the physical isolation apparatus being provided with; prevent loss or the damage of data; and the Video Controller being provided with by the second switch realizes the collection to information; and realize observing by video monitoring main frame; safety and reliability are higher, decrease damage and the destruction of data.
Description
Technical field
The present invention relates to dispatching of power netwoks and control system.
Background technology
Power scheduling is to ensure that power network safety operation, external reliable power supply, a kind of effective management means that the work of all kinds of power generations carries out in order and adopts, the specific works content of power scheduling is based on the data message that various information collecting device feeds back, or the information that monitoring personnel provide, in conjunction with electrical network actual operation parameters, such as voltage, electric current, frequency, load etc., consider every production work development condition, to power grid security, economical operation state judges, existing dispatching of power netwoks controls system and there is the poor stability of data transmission, operator can not well carry out data and be read out, it is unfavorable for the safe and stable operation of electrical network.
Summary of the invention
The technical problem to be solved in the present invention is exactly that dispatching of power netwoks controls system, it is possible to well solves the data transmission instability that existing power network dispatching system exists, is unfavorable for the defect of the safe and stable operation of electrical network.
nullIn order to solve above-mentioned technical problem,The present invention is achieved by the following technical solutions: dispatching of power netwoks controls system,Including master server、Video monitoring main frame、WEB server、Main front end processor、Work station、Several substations,Described master server、Video monitoring main frame、WEB server、Main front end processor、The equal access network based on ethernet of work station,Described WEB server is connected to the first switch,Described work station is connected to report writer,Described main front end processor is connected to the modem realizing data exchange,Described modem is connected at least one substation,Between described first switch and WEB server、A physical isolation apparatus it is equipped with between modem and main front end processor,Described Ethernet is connected at least two substation and at least one the second switch,Described second switch is connected to a Video Controller and several substations,Between described substation and the second switch、It is connected transmission each through conductive connections between second switch and Ethernet.
Preferably, described modem is connected to data acquisition unit and dispatch data net, fire wall and router it is provided with between described dispatch data net and modem, collection and the scheduling of data can be realized, the setting of fire wall and router, it is ensured that the security performance of data, transmission is reliable, result of use is good, decreases the damage of data.
Preferably, described conductive connections includes the first optical-electrical converter, the second optical-electrical converter, the optical fiber that is arranged between the first optical-electrical converter and the second optical-electrical converter, described first optical-electrical converter and the second optical-electrical converter are equipped with connection optical fiber, connect reliable, transmission is convenient, stability is good, decreases the damage of data.
nullPreferably,Described Video Controller includes the video server being connected with the second switch、Several probes being connected with video server、At least one video camera being connected with video server,A probe it is equipped with in each described substation,Described substation is provided with support,Described support is provided with some with being easy to the horizontal cross bar that probe is installed,Described support above horizontal cross bar is provided with horizontal baffle,The front end of described horizontal baffle is provided with downward-sloping rake,The bottom of described rake is provided with vertical portion,Described vertical portion is provided with the gathering sill being easy to rainwater flowing,The bottom of described support is provided with base plate,Described base plate is provided with the installed part that at least two control supports are arranged in substation,Described installed part includes the axle sleeve being fixedly connected on base plate、It is movably connected in the fixing axle on axle sleeve,The tapered body in bottom of described fixing axle is arranged,Described axle sleeve is provided with and controls the control bar that fixing axle is movably connected in axle sleeve,Described axle sleeve is provided with stopper slot,Described control bar is movably connected in stopper slot,The front end of described control bar is threadably secured with fixing axle and is connected,It is easy to the detection realized substation information by popping one's head in,And stored by video server,And realize each work station or substation are carried out shooting process by video camera,Ensure that the security reliability of video data,Result of use is good,By support, probe is installed,Easy installation and removal,Connect reliable,The setting of horizontal baffle,Avoid sleet and enter probe,Improve the service life of probe,Security performance is good,And the installed part being provided with by base plate bottom controls the installation of base plate,Can be adjusted according to different installation substation environment,Practical Performance is good,The activity in axle sleeve of fixing axle is controlled by controlling bar,Easy to adjust,Install reliable,Adapt to work under the environment of differing heights,Fixing axle is arranged in axle sleeve,It is easy to support steadily place,Connect reliable,Can according to the substation model at outdoor and indoor selection installed part,Can place fixing axle can also be made to fix by the fixing axle activity on axle sleeve of adjustment by axle sleeve,Practical Performance is strong.
Preferably, also including the standby server identical with master server configuration, described standby server access network based on ethernet, when master server is under damaged condition, still can pass through standby server and ensure the properly functioning of power scheduling, safe and reliable, result of use is good.
Preferably, also include the standby front end processor identical with main front end processor configuration, described standby front end processor access network based on ethernet and being connected with modem, when main front end processor is under damaged condition, still can ensureing the properly functioning of power scheduling by standby front end processor, safe and reliable, result of use is good.
Preferably, described standby front end processor is connected to an alarm printer, the printing to data can be realized, it is achieved that the operator's quick analysis to data, result of use is good, safe and reliable.
Preferably, described main front end processor and standby front end processor being connected to satellite clock, can quickly realize the location to substation by satellite clock, can make, in operator's very first time, substation is carried out maintenance process, security performance is high.
Preferably, described first switch is connected to DTS server, described DTS server is connected to PC and some the PCs being easy to student's operation that a teacher operates, facilitate implementation the training to student's electric power network technique knowledge, improve the operant skill of student, meeting the requirement of different levels student, Practical Performance is strong.
In sum, advantages of the present invention: realize the exchange of data in main front end processor by modem, realize between the first switch and WEB server respectively by the physical isolation apparatus being provided with, the protection of data between modem and main front end processor, prevent loss or the damage of data, conductive connections control sub-station and the second switch are connected, ensure that the information in substation is transmitted to the second switch, and the Video Controller being provided with by the second switch realizes the collection to information, and realize observing by video monitoring main frame, safety and reliability are higher, decrease damage and the destruction of data, security performance is higher, be conducive to the regulation and control of electrical network, result of use is good.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is the structured flowchart that dispatching of power netwoks of the present invention controls system;
Fig. 2 is the structured flowchart of conductive connections of the present invention;
Fig. 3 is the structured flowchart of Video Controller of the present invention;
Fig. 4 is the structural representation of support of the present invention.
Detailed description of the invention
nullSuch as Fig. 1、Fig. 2、Fig. 3、Shown in Fig. 4,Dispatching of power netwoks controls system,Including master server 1、Video monitoring main frame 2、WEB server 3、Main front end processor 4、Work station 5、Several substations 6,Described master server 1、Video monitoring main frame 2、WEB server 3、Main front end processor 4、The equal access network based on ethernet of work station 5,Described WEB server 3 is connected to the first switch 7,Described work station 5 is connected to report writer 8,Described main front end processor 4 is connected to the modem 9 realizing data exchange,Described modem 9 is connected at least one substation 6,Between described first switch 7 and WEB server 3、A physical isolation apparatus 10 it is equipped with between modem 9 and main front end processor 4,Described Ethernet is connected at least two substation 6 and at least one the second switch 11,Described second switch 11 is connected to a Video Controller 13 and several substations 6,Between described substation 6 and the second switch 11、It is connected transmission each through conductive connections 12 between second switch 11 and Ethernet,Described modem 9 is connected to data acquisition unit 91 and dispatch data net 92,Fire wall 93 and router 94 it is provided with between described dispatch data net 92 and modem 9,Collection and the scheduling of data can be realized,The setting of fire wall and router,Ensure that the security performance of data,Transmission is reliable,Result of use is good,Decrease the damage of data,Described conductive connections 12 includes the first optical-electrical converter 121、Second optical-electrical converter 122、It is arranged on the optical fiber 123 between the first optical-electrical converter 121 and the second optical-electrical converter 122,Described first optical-electrical converter 121 and the second optical-electrical converter 122 are equipped with connection optical fiber 124,Connect reliable,Transmission is convenient,Stability is good,Decrease the damage of data,Described Video Controller 13 includes the video server 131 being connected with the second switch 11、Several probes 132 being connected with video server 131、At least one video camera 133 being connected with video server 131,A probe 132 it is equipped with in each described substation 6,Described substation 6 is provided with support 20,Described support 20 is provided with some with the horizontal cross bar 21 being easy to probe 132 installation,Described support 20 above horizontal cross bar 21 is provided with horizontal baffle 22,The front end of described horizontal baffle 22 is provided with downward-sloping rake 23,The bottom of described rake 23 is provided with vertical portion 24,Described vertical portion 24 is provided with the gathering sill 241 being easy to rainwater flowing,The bottom of described support 20 is provided with base plate 25,Described base plate 25 is provided with the installed part 26 that at least two control supports are arranged in substation,Described installed part 26 includes the axle sleeve 27 being fixedly connected on base plate 25、It is movably connected in the fixing axle 28 on axle sleeve 27,The tapered body in bottom of described fixing axle 28 is arranged,Described axle sleeve 27 is provided with and controls the control bar 29 that fixing axle 28 is movably connected in axle sleeve,Described axle sleeve 27 is provided with stopper slot 271,Described control bar is movably connected in stopper slot 271,It is easy to the detection realized substation information by popping one's head in,And stored by video server,And realize each work station or substation are carried out shooting process by video camera,Ensure that the security reliability of video data,Result of use is good,By support, probe is installed,Easy installation and removal,Connect reliable,The setting of horizontal baffle,Avoid sleet and enter probe,Improve the service life of probe,Security performance is good,And the installed part being provided with by base plate bottom controls the installation of base plate,Can be adjusted according to different installation substation environment,Practical Performance is good,The activity in axle sleeve of fixing axle is controlled by controlling bar,Easy to adjust,Install reliable,Adapt to work under the environment of differing heights,Fixing axle is arranged in axle sleeve,It is easy to support steadily place,Connect reliable,Can according to the substation model at outdoor and indoor selection installed part,Can place fixing axle can also be made to fix by the fixing axle activity on axle sleeve of adjustment by axle sleeve,Practical Performance is strong,Also include configuring identical standby server 14 with master server 1,Described standby server 14 access network based on ethernet,When master server is under damaged condition,Still can pass through standby server and ensure the properly functioning of power scheduling,Safe and reliable,Result of use is good,Also include configuring identical standby front end processor 15 with main front end processor 4,Described standby front end processor access network based on ethernet and being connected with modem 9,When main front end processor is under damaged condition,Still can ensure the properly functioning of power scheduling by standby front end processor,Safe and reliable,Result of use is good,Described standby front end processor 15 is connected to an alarm printer 16,The printing to data can be realized,Achieve the operator's quick analysis to data,Result of use is good,Safe and reliable,Described main front end processor 4 and standby front end processor 15 are connected to satellite clock 17,The location to substation can be quickly realized by satellite clock,Can make, in operator's very first time, substation is carried out maintenance process,Security performance is high,Described first switch 7 is connected to DTS server 18,Described DTS server 18 is connected to PC and some the PCs being easy to student's operation that a teacher operates,Facilitate implementation the training to student's electric power network technique knowledge,Improve the operant skill of student,Meet the requirement of different levels student,Practical Performance is strong.
nullDuring use,The probe 132 being provided with by Video Controller 13 realizes the monitoring to each substation 6,And by video camera 133 by the video collect transmission after integration to video server 131,And realize each substation 6 internal information is observed by master server 1,Realized voltage by data acquisition unit 91、Electric current、Temperature、The collection of pressure,And realize the transmission of data and by being delivered in main front end processor 4 after modem 9 conversion by dispatch data net 92,Physical isolation apparatus 10 between dispatch data net 92 and main front end processor 4 ensure that security performance when data are transmitted,And realize the data in front end processor 4 are observed by master server 1 by Ethernet,And the safety of data is ensured by fire wall 93 and router 94,Avoid loss and the damage of data,The simulated operation to regulator control system can also be realized by the DTS server 18 that the first switch 7 is provided with,Effectively raise the operation level of operator.
The exchange of data in main front end processor is realized by modem, realize between the first switch and WEB server respectively by the physical isolation apparatus being provided with, the protection of data between modem and main front end processor, prevent loss or the damage of data, conductive connections control sub-station and the second switch are connected, ensure that the information in substation is transmitted to the second switch, and the Video Controller being provided with by the second switch realizes the collection to information, and realize observing by video monitoring main frame, safety and reliability are higher, decrease damage and the destruction of data, security performance is higher, be conducive to the regulation and control of electrical network, result of use is good.
Claims (7)
- null1. dispatching of power netwoks controls system,It is characterized in that: include master server (1)、Video monitoring main frame (2)、WEB server (3)、Main front end processor (4)、Work station (5)、Several substations (6),Described master server (1)、Video monitoring main frame (2)、WEB server (3)、Main front end processor (4)、Work station (5) is access network based on ethernet all,Described WEB server (3) is connected to the first switch (7),Described work station (5) is connected to report writer (8),Described main front end processor (4) is connected to the modem (9) realizing data exchange,Described modem (9) is connected at least one substation (6),Between described first switch (7) and WEB server (3)、A physical isolation apparatus (10) it is equipped with between modem (9) and main front end processor (4),Described Ethernet is connected at least two substation (6) and at least one the second switch (11),Described second switch (11) is connected to a Video Controller (13) and several substations (6),Between described substation (6) and the second switch (11)、It is connected transmission each through conductive connections (12) between second switch (11) and Ethernet,Described modem (9) is connected to data acquisition unit (91) and dispatch data net (92),Fire wall (93) and router (94) it is provided with between described dispatch data net (92) and modem (9),Described conductive connections (12) includes the first optical-electrical converter (121)、Second optical-electrical converter (122)、It is arranged on the optical fiber (123) between the first optical-electrical converter (121) and the second optical-electrical converter (122),Described first optical-electrical converter (121) and the second optical-electrical converter (122) are equipped with connection optical fiber (124).
- null2. dispatching of power netwoks according to claim 1 controls system,It is characterized in that: described Video Controller (13) includes the video server (131) being connected with the second switch (11)、Several probes (132) being connected with video server (131)、At least one video camera (133) being connected with video server (131),A probe (132) it is equipped with in each described substation (6),Described substation (6) is provided with support (20),Described support (20) is provided with some with being easy to the horizontal cross bar (21) that probe (132) is installed,The described support (20) of horizontal cross bar (21) top is provided with horizontal baffle (22),The front end of described horizontal baffle (22) is provided with downward-sloping rake (23),The bottom of described rake (23) is provided with vertical portion (24),Described vertical portion (24) is provided with the gathering sill (241) being easy to rainwater flowing,The bottom of described support (20) is provided with base plate (25),Described base plate (25) is provided with the installed part (26) that at least two control supports are arranged in substation,Described installed part (26) includes the axle sleeve (27) being fixedly connected on base plate (25)、It is movably connected in the fixing axle (28) on axle sleeve (27),The tapered body in bottom of described fixing axle (28) is arranged,Described axle sleeve (27) is provided with and controls the control bar (29) that fixing axle (28) is movably connected in axle sleeve,Described axle sleeve (27) is provided with stopper slot (271),Described control bar is movably connected in stopper slot (271),The front end of described control bar is threadably secured with fixing axle and is connected.
- 3. dispatching of power netwoks according to claim 1 controls system, it is characterised in that: also include configuring identical standby server (14), described standby server (14) access network based on ethernet with master server (1).
- 4. dispatching of power netwoks according to claim 1 controls system, it is characterized in that: also include configuring identical standby front end processor (15) with main front end processor (4), described standby front end processor access network based on ethernet and being connected with modem (9).
- 5. dispatching of power netwoks according to claim 4 controls system, it is characterised in that: described standby front end processor (15) is connected to an alarm printer (16).
- 6. dispatching of power netwoks according to claim 4 controls system, it is characterised in that: described main front end processor (4) and be connected to satellite clock (17) on standby front end processor (15).
- 7. dispatching of power netwoks according to claim 1 controls system, it is characterized in that: described first switch (7) is connected to DTS server (18), described DTS server (18) is connected to PC and some the PCs being easy to student's operation that a teacher operates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510144914.XA CN104753176B (en) | 2015-03-30 | 2015-03-30 | Dispatching of power netwoks controls system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510144914.XA CN104753176B (en) | 2015-03-30 | 2015-03-30 | Dispatching of power netwoks controls system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104753176A CN104753176A (en) | 2015-07-01 |
CN104753176B true CN104753176B (en) | 2016-07-06 |
Family
ID=53592441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510144914.XA Active CN104753176B (en) | 2015-03-30 | 2015-03-30 | Dispatching of power netwoks controls system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104753176B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105184442A (en) * | 2015-07-23 | 2015-12-23 | 国网青海省电力公司西宁供电公司 | Power distribution network dispatching management statistical analysis system |
CN111427324B (en) * | 2020-04-23 | 2021-05-04 | 滨州戴森车轮科技有限公司 | Hub production monitoring system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101388568A (en) * | 2008-10-31 | 2009-03-18 | 广西大学 | Method for implementing electric grid scheduling automation |
CN101795018A (en) * | 2009-12-31 | 2010-08-04 | 华北电力大学 | Visualization-based support system of electric network intelligent scheduling technique |
CN204231028U (en) * | 2014-11-28 | 2015-03-25 | 国家电网公司 | Intelligent grid data dispatching remote online diagnosis and analysis device |
CN204497845U (en) * | 2015-03-30 | 2015-07-22 | 国家电网公司 | Dispatching of power netwoks control system |
-
2015
- 2015-03-30 CN CN201510144914.XA patent/CN104753176B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101388568A (en) * | 2008-10-31 | 2009-03-18 | 广西大学 | Method for implementing electric grid scheduling automation |
CN101795018A (en) * | 2009-12-31 | 2010-08-04 | 华北电力大学 | Visualization-based support system of electric network intelligent scheduling technique |
CN204231028U (en) * | 2014-11-28 | 2015-03-25 | 国家电网公司 | Intelligent grid data dispatching remote online diagnosis and analysis device |
CN204497845U (en) * | 2015-03-30 | 2015-07-22 | 国家电网公司 | Dispatching of power netwoks control system |
Also Published As
Publication number | Publication date |
---|---|
CN104753176A (en) | 2015-07-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
KR101940384B1 (en) | Monitoring system for air conditioning systems based on distributed power generation and air conditioning system using same | |
CN105356618B (en) | the fault oscillograph networking method of integrated monitoring system | |
CN203774866U (en) | Intelligent ground wire apparatus and ground wire operation safety monitoring and error-preventing system | |
CN105376534A (en) | Integrated electric power information communication monitoring platform based on wireless transmission technology | |
CN101592946A (en) | A kind of remotely monitoring communication network storage battery method and system | |
CN104753176B (en) | Dispatching of power netwoks controls system | |
CN204497845U (en) | Dispatching of power netwoks control system | |
CN106157594A (en) | The intelligent electric meter communication unit of a kind of built-in stand-by power supply and control method | |
CN206332331U (en) | A kind of DC intelligent power supply unit | |
CN114019932A (en) | Safe and environment-friendly integrated intelligent optimization control platform | |
CN210639233U (en) | Power distribution network fault monitoring device based on mobile internet | |
CN109598903A (en) | Bridge real time monitoring early-warning work station with early warning and alarming function | |
CN209150788U (en) | The power supply system of mobile base station | |
CN205610344U (en) | Smart power grids's wireless monitoring system | |
CN204789872U (en) | Distribution system trouble on -line monitoring system | |
CN209387146U (en) | A kind of device of monitoring breaker contact temperature | |
CN208781374U (en) | A kind of power plant fire alarm system | |
CN102891536B (en) | Integrated electric energy management platform | |
CN105140965A (en) | Distributed power supply integration equipment supporting hot plug | |
CN111669289A (en) | Network architecture system for orderly power utilization management | |
CN206135433U (en) | Get electric installation based on exchange insulating ground wire of overhead transmission line | |
CN218158191U (en) | Distribution network line running state real-time supervision device | |
CN104092301A (en) | Remote centralized online monitoring system and method for storage battery of power distribution equipment | |
CN207426805U (en) | A kind of power distribution room monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |