CN207426805U - A kind of power distribution room monitoring device - Google Patents

A kind of power distribution room monitoring device Download PDF

Info

Publication number
CN207426805U
CN207426805U CN201721535155.0U CN201721535155U CN207426805U CN 207426805 U CN207426805 U CN 207426805U CN 201721535155 U CN201721535155 U CN 201721535155U CN 207426805 U CN207426805 U CN 207426805U
Authority
CN
China
Prior art keywords
mounting portion
connecting tube
horizontal part
data transmission
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721535155.0U
Other languages
Chinese (zh)
Inventor
吴信文
田烨
周唯逸
胡朋杰
潘登
杨友乐
张小敏
张柯
赵海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yueqing Power Supply Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Zhejiang Yueqing Power Supply Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yueqing Power Supply Co Ltd, State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Zhejiang Yueqing Power Supply Co Ltd
Priority to CN201721535155.0U priority Critical patent/CN207426805U/en
Application granted granted Critical
Publication of CN207426805U publication Critical patent/CN207426805U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model is related to a kind of power distribution room monitoring devices, including monitoring unit, data transmission unit, stent, upright bar and power supply unit, stent includes horizontal part and vertical portion, vertical portion is equipped with the first mounting portion, horizontal part is equipped with the second mounting portion and the 3rd mounting portion, and data transmission unit is mounted on by the second mounting portion on horizontal part, and horizontal part is mounted on by the 3rd mounting portion in power distribution room, upright bar includes the first connecting tube and the second connecting tube, and installing plate is equipped in the first connecting tube;The advantages of the utility model:The installation of monitoring unit is realized by the first mounting portion on vertical portion, the installation of data transmission unit is realized by the second mounting portion on horizontal part, it can quickly realize the fixed installation of monitoring unit and data transmission unit, it can be unified rack-mount by monitoring unit and data transmission unit, reduce whole floor space, the connection distance of monitoring unit and data transmission unit is shortened, reduces the length of electric wire.

Description

A kind of power distribution room monitoring device
Technical field
The utility model is related to a kind of power distribution room monitoring devices.
Background technology
At present, the house power distribution facility O&M automatization level in China is relatively low, still relies on patrol officer and inspects periodically The mode of residence power distribution room safeguards, distribution facility maintenance workload it is big, it is necessary to substantial amounts of monitoring device and DTU (wireless data passes Make arrangements for his funeral end), in the prior art, the electrical cabinet of power distribution room no worker monitor is specifically applied to, including monitoring device and DTU, except two Electric wire needed for person's power itself, between each other communication also need to connection, in addition, between monitoring device and monitored device also Connection is needed, if more monitoring devices and DTU are worked at the same time, inconvenience will be brought to equipment installation, work and maintenance, this Sample causes whole transformation cabinet to take up a large area, and is unfavorable for the installation of power distribution room.
Utility model content
The technical problems to be solved in the utility model is just to provide a kind of power distribution room monitoring device, solves existing electrical cabinet The technical issues of taking up a large area.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:A kind of power distribution room is used Monitoring device, including monitoring unit and data transmission unit, data transmission unit is equipped with GPRS transceiver modules, further includes branch Frame, upright bar and power supply unit, stent include horizontal part and vertical portion, and upright bar is arranged on horizontal part, and vertical portion is equipped with installation First mounting portion of monitoring unit, horizontal part are equipped with the second mounting portion and the 3rd mounting portion, and the data transmission unit passes through Second mounting portion is mounted on horizontal part, and horizontal part is mounted on by the 3rd mounting portion in power distribution room, and upright bar includes the first connection The second connecting tube in the first connecting tube is managed and is set in, the second connecting tube is equipped with screw, and the second connecting tube is equipped with connection Hole, the first connecting tube are equipped with threaded hole, and the screw is fixed in threaded hole after passing through connecting hole, is equipped in the first connecting tube The installing plate of power supply unit is installed, the bottom of installing plate is equipped with heat emission hole, and power supply unit is connected by cable with monitoring unit, the The winding displacement groove of fixed cable is equipped in two connecting tubes.
Preferably, first mounting portion is the through hole being arranged on vertical portion, and second mounting portion is to be arranged on water Cavity in flat portion, the 3rd mounting portion is the screw rod being arranged on horizontal part.
Preferably, the screw rod is equipped with nut, and the nut is equipped with antenna.
Preferably, said supply unit includes battery case and the dry cell batteries being arranged in battery case, the battery case peace Dress is on a mounting board.
In conclusion the advantages of the utility model:1. the peace of monitoring unit is realized by the first mounting portion on vertical portion Dress is realized the installation of data transmission unit by the second mounting portion on horizontal part, can quickly realize monitoring unit and data The fixed installation of transmission unit, can be unified rack-mount by monitoring unit and data transmission unit, reduces whole account for Ground area, and the connection distance of monitoring unit and data transmission unit is shortened, reduce the length of electric wire, and pass through horizontal part On the 3rd mounting portion realize stent be mounted on power distribution room in, can realize that the Fast Installation of stent is fixed, stability is good;
2. gathering the electric power data of power distribution room from monitoring unit by data transmission unit, and pass through on data transmission unit GPRS transceiver modules realize electric power data quick transmission, can guarantee that electric power data can accurately be shown in operation maintenance personnel In front, it is achieved thereby that the unmanned guard of power distribution room, reduces cost of labor, the reliability and safety of power distribution room power supply be can guarantee Property, the setting of the operating status power supply unit of equipment in power distribution room can be monitored in real time, when power distribution room powers off, Ke Yitong It crosses power supply unit and realizes power supply, can guarantee the steady and continuous power supply of data transmission unit, ensure that data can be transmitted out quickly It goes;
3. set upright bar on stent, the stationarity after stent installation can be improved, upright bar is arranged to the first connecting tube and the Two connecting tubes, and control the second connecting tube movable in the first connecting tube by the elastic of screw, so as to adjust upright bar Highly, can be adjusted according to the power distribution room of different installation environments, practical performance is good;
4. power supply unit is arranged on by installing plate in the first connecting tube, the damage of power supply unit, winding displacement groove can be reduced Setting, can realize the fixation of cable, avoid damaging cable during the second connecting tube activity, and can improve the first connecting tube realize peace The heat dissipation of loading board ensure that the stable operation of power supply unit;
5. the first mounting portion is arranged to through hole, be conducive to the Fast Installation dismounting of monitoring unit, the second mounting portion is set Into cavity, the installation for being conducive to data transmission unit is fixed, and reduces rocking for data transmission unit, and the 3rd mounting portion is arranged to Screw rod can guarantee the reliability that stent is connected with power distribution room, easy for assemble or unload;
6. the setting of antenna can realize the stability of signal on stent, be conducive to data stablizes transmission, and passes through nut The position of adjustment antenna in real time, the damage of antenna when being avoided that installation;
7. power supply unit is arranged to battery case and dry cell batteries, be conducive to the quick-replaceable of power supply unit, and whole Radiating efficiency is fast.
Description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structure diagram of power distribution room monitoring device of the utility model.
Reference numeral:
1 monitoring unit, 2 data transmission units, 21GPRS transceiver modules, 3 stents, 31 horizontal parts, 32 vertical portions, 33 first Mounting portion, 34 second mounting portions, 35 the 3rd mounting portions, 36 nuts, 37 antennas, 4 upright bars, 41 first connecting tubes, 42 second connections Pipe, 43 screws, 44 winding displacement grooves, 5 power supply units, 51 battery cases, 52 dry cell batteries, 6 installing plates, 61 heat emission holes
Specific embodiment
As shown in Figure 1, a kind of power distribution room monitoring device, including monitoring unit 1 and data transmission unit 2, data transmission Unit 2 is equipped with GPRS transceiver modules 21, further includes stent 3, upright bar 4 and power supply unit 5, by data transmission unit 2 from prison It controls unit 1 and gathers the electric power data of power distribution room, and pass through the GPRS transceiver modules 21 on data transmission unit 2 and realize electric power data Quick transmission, can guarantee that electric power data can be accurately shown in face of operation maintenance personnel, it is achieved thereby that the nothing of power distribution room People guard, and reduces cost of labor, can guarantee the reliability and security of power distribution room power supply, can monitor in power distribution room and set in real time The setting of standby operating status power supply unit 5 when power distribution room powers off, can be realized by power supply unit 5 and powered, can protected The steady and continuous power supply of data transmission unit 2 is demonstrate,proved, ensures that data can be transferred out quickly, stent 3 includes 31 He of horizontal part Vertical portion 32, upright bar 4 are arranged on horizontal part 31, and vertical portion 32 is equipped with the first mounting portion 33 of installation monitoring unit 1, horizontal Portion 31 is equipped with the second mounting portion 34 and the 3rd mounting portion 35, and the data transmission unit 2 is mounted on by the second mounting portion 34 On horizontal part 31, horizontal part 31 is mounted on by the 3rd mounting portion 35 in power distribution room, during installation, passes through first on vertical portion 32 Mounting portion 33 realizes the installation of monitoring unit 1, and the peace of data transmission unit 2 is realized by the second mounting portion 34 on horizontal part 31 Dress, can quickly realize the fixed installation of monitoring unit 1 and data transmission unit 2, can be by monitoring unit 1 and data transmission unit 2 is unified on stent 3, reduces whole floor space, and shortens the company of monitoring unit 1 and data transmission unit 2 Distance is connect, reduces the length of electric wire, and realizes that stent 3 is mounted on power distribution room by the 3rd mounting portion 35 on horizontal part 31 It is interior, it can realize that the Fast Installation of stent 3 is fixed, stability is good, and upright bar 4 includes the first connecting tube 41 and is set in the first connection The second connecting tube 42 on pipe 41, the second connecting tube 42 are equipped with screw 43, and the second connecting tube 42 is equipped with connecting hole, and first connects Take over 41 is equipped with threaded hole, and the screw 43 is fixed on after passing through connecting hole in threaded hole, in use, the pine by screw 43 It is tight control the second connecting tube 42 movable in the first connecting tube 41, it, can be according to different installations so as to adjust the height of upright bar 4 The power distribution room of environment is adjusted, and practical performance is good, and the installing plate 6 of installation power supply unit 5, installation are equipped in the first connecting tube 41 The bottom of plate 6 is equipped with heat emission hole 61, and power supply unit 5 is connected by cable with monitoring unit 1, is equipped with and fixes in the second connecting tube 42 The winding displacement groove 44 of cable, can reduce the damage of power supply unit 5, and the setting of winding displacement groove 44 can realize the fixation of cable, avoid second Cable is damaged during 42 activity of connecting tube, and the heat dissipation that the first connecting tube 41 realizes installing plate 6 can be improved, ensure that power supply unit 5 Stable operation.
In addition, first mounting portion 33 is the through hole being arranged on vertical portion 32, second mounting portion 34 is setting Cavity on horizontal part 31, the 3rd mounting portion 35 are the screw rod being arranged on horizontal part 31, are conducive to monitoring unit 1 Fast Installation is dismantled, and the second mounting portion 34 is arranged to cavity, and the installation for being conducive to data transmission unit 2 is fixed, and reduces data Transmission unit 2 rocks, and the 3rd mounting portion 35 is arranged to screw rod, can guarantee the reliability that stent 3 is connected with power distribution room, and installation is torn open It unloads conveniently, the screw rod is equipped with nut 36, and the nut 36 is equipped with antenna 37, and antenna 37 can realize signal on stent 3 Stability is conducive to the transmission of stablizing of data, and adjusts the position of antenna 37, day when being avoided that installation in real time by nut 36 The damage of line 37, said supply unit 5 include battery case 51 and the dry cell batteries 52 being arranged in battery case 51, the battery case 51 are mounted on installing plate 6.
In addition to above preferred embodiment, the utility model also has other embodiments, and those skilled in the art can root It is made various changes and modifications according to the utility model, without departing from the spirit of the utility model, the utility model should all be belonged to Scope defined in appended claims.

Claims (4)

1. a kind of power distribution room monitoring device, including monitoring unit and data transmission unit, data transmission unit is equipped with GPRS Transceiver module, it is characterised in that:Stent, upright bar and power supply unit are further included, stent includes horizontal part and vertical portion, and upright bar is set On horizontal part, vertical portion is equipped with the first mounting portion of installation monitoring unit, and horizontal part is equipped with the second mounting portion and the 3rd Mounting portion, the data transmission unit are mounted on by the second mounting portion on horizontal part, and horizontal part is installed by the 3rd mounting portion In power distribution room, upright bar includes the first connecting tube and the second connecting tube being set in the first connecting tube, is set in the second connecting tube There is screw, the second connecting tube is equipped with connecting hole, and the first connecting tube is equipped with threaded hole, and the screw is fixed after passing through connecting hole In threaded hole, the installing plate of installation power supply unit is equipped in the first connecting tube, the bottom of installing plate is equipped with heat emission hole, and power supply is single Member is connected by cable with monitoring unit, and the winding displacement groove of fixed cable is equipped in the second connecting tube.
2. a kind of power distribution room monitoring device according to claim 1, it is characterised in that:First mounting portion is setting Through hole on vertical portion, second mounting portion are the cavity being arranged on horizontal part, and the 3rd mounting portion is to be arranged on Screw rod on horizontal part.
3. a kind of power distribution room monitoring device according to claim 2, it is characterised in that:The screw rod is equipped with nut, The nut is equipped with antenna.
4. a kind of power distribution room monitoring device according to claim 1, it is characterised in that:Said supply unit includes battery Box and the dry cell batteries being arranged in battery case, the battery case installation is on a mounting board.
CN201721535155.0U 2017-11-16 2017-11-16 A kind of power distribution room monitoring device Active CN207426805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721535155.0U CN207426805U (en) 2017-11-16 2017-11-16 A kind of power distribution room monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721535155.0U CN207426805U (en) 2017-11-16 2017-11-16 A kind of power distribution room monitoring device

Publications (1)

Publication Number Publication Date
CN207426805U true CN207426805U (en) 2018-05-29

Family

ID=62306440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721535155.0U Active CN207426805U (en) 2017-11-16 2017-11-16 A kind of power distribution room monitoring device

Country Status (1)

Country Link
CN (1) CN207426805U (en)

Similar Documents

Publication Publication Date Title
CN207426805U (en) A kind of power distribution room monitoring device
CN206618828U (en) A kind of discharge signal monitoring system of switch cubicle
CN206498437U (en) A kind of power supply cloud control terminal equipment
CN203588057U (en) Wind power monitoring device
CN206532375U (en) A kind of infrared induction bird-scaring unit with self-checking function
CN213240382U (en) Partial discharge detection system with remote dormancy and awakening functions
CN208421135U (en) Distribution line status display apparatus
CN107831398A (en) A kind of power customer has a power failure repairing system of taking the initiative in offering a hand
CN207869275U (en) Double frequency mutually helps radio transmitting device
CN206695917U (en) A kind of controller switching equipment device for detecting temperature based on Internet of Things
CN208400299U (en) A kind of optical cable fiber-dividing box monitoring device based on NB-IoT
CN208754312U (en) A kind of terminal management apparatus
CN209150788U (en) The power supply system of mobile base station
CN208143245U (en) Architectural Equipment management system
CN206096892U (en) 10KV looped netowrk cabinet integrated intelligence monitored control system
CN202772907U (en) Machine room intelligent array cabinet system
CN110970863A (en) Automatic power-off protection module for intelligent air conditioner and control method thereof
AU2021100094A4 (en) An Intelligent Solar Power Generation Management System Based on The Internet of Things
CN213126239U (en) Image monitoring device for power transmission line
CN208112757U (en) A kind of low power-consumption intelligent high definition inspection device
CN217036507U (en) Communication engineering is with exchanging first cabinet of row
CN221261100U (en) Earthquake monitoring station fault alarm device
CN218097855U (en) Comprehensive monitoring equipment of transmission tower
CN221121727U (en) Intelligent control system for schools
CN213028850U (en) Intelligent road science and technology integrated cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant