CN104747195A - 一种天溜井扩刷施工方法 - Google Patents
一种天溜井扩刷施工方法 Download PDFInfo
- Publication number
- CN104747195A CN104747195A CN201510028473.7A CN201510028473A CN104747195A CN 104747195 A CN104747195 A CN 104747195A CN 201510028473 A CN201510028473 A CN 201510028473A CN 104747195 A CN104747195 A CN 104747195A
- Authority
- CN
- China
- Prior art keywords
- brush
- well
- expands
- row
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 239000011435 rock Substances 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 abstract description 3
- 241000209094 Oryza Species 0.000 description 6
- 235000007164 Oryza sativa Nutrition 0.000 description 6
- 235000009566 rice Nutrition 0.000 description 6
- 238000005065 mining Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/02—Driving inclined tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种天溜井扩刷施工方法,其步骤为:第一步,与传统施工方案相同,开一个直径较小的井;第二步,选取井底部一定高度H的部分,从上而下经行扩刷,要求H<h(h=围岩不需支护或简单支护可保持稳定的时间×作业效率);第三步,选取距离井底距离为H至2H的部分,从上而下经行扩刷;第四步,选取距离井底距离为2H至3H的部分,从上而下经行扩刷;以此类推,扩刷至井口。本发明具有步骤简单、实用性强等优点。
Description
技术领域
本发明涉及矿体开采技术领域,具体是一种天溜井扩刷施工方法。
背景技术
天溜井是矿体开采必不可少的,一般的施工方法是先开一个直径较小的井,由于直径较小,围岩较为稳定,但直径较小的井无法满足使用要求,需要对井扩刷,将直径扩大,直径扩大后,围岩稳定性下降,帮板容易出现片邦,对扩刷作业人员带来很大安全隐患。传统的施工方案是从上往下逐步扩刷,一直施工至井底,其优点是工艺简单,但为了保证深部作业时人员安全,上部扩刷部分全部需要经行喷浆,防止围岩掉落伤人,导致成本高,且天溜井越深施工难度越大,喷浆支护很难操作。
发明内容
为解决上述问题,本发明公开了一种天溜井扩刷施工方法,其步骤为:
第一步,与传统施工方案相同,开一个直径较小的井;
第二步,选取井底部一定高度H的部分,从上而下经行扩刷,要求H<h(h=围岩不需支护或简单支护可保持稳定的时间×作业效率);
第三步,选取距离井底距离为H至2H的部分,从上而下经行扩刷;
第四步,选取距离井底距离为2H至3H的部分,从上而下经行扩刷;
.. ...
以此类推,扩刷至井口。
本发明是一种天溜井扩刷施工方法,改变传统的天溜井扩刷施工方案,从底部分阶段扩刷,每次扩刷时,围岩都处于相对稳定时期,保证了人员的安全,同时正常情况不需要喷浆,大大节约了成本。
本发明具有步骤简单、实用性强等优点。
具体实施方式
以下结合实施例进一步解释本发明。
现以开一个深度为60米的天溜井为例:
第一步,开一个直径为2米深度为60米的井;
第二步,选取距离井底0-10米的部分,经行扩刷;
第三步,选取距离井底10-20米的部分,经行扩刷;
第四步,选取距离井底20-30米的部分,经行扩刷;
第五步,选取距离井底30-40米的部分,经行扩刷;
第六步,选取距离井底40-50米的部分,经行扩刷;
第七步,选取距离井底50-60米的部分,经行扩刷;
最后应说明的是:以上实施例仅用以说明本发明而并非限制本发明所描述的技术方案;因此,尽管本说明书参照上述的各个实施例对本发明已进行了详细的说明,但是,本领域的普通技术人员应当理解,仍然可以对本发明进行修改或等同替换;而一切不脱离本发明的精神和范围的技术方案及其改进,其均应涵盖在本发明的权利要求范围中。
Claims (1)
1.一种天溜井扩刷施工方法,其特征在于:其步骤为:
第一步,与传统施工方案相同,开一个直径较小的井;
第二步,选取井底部一定高度H的部分,从上而下经行扩刷,要求H<h(h=围岩不需支护或简单支护可保持稳定的时间×作业效率);
第三步,选取距离井底距离为H至2H的部分,从上而下经行扩刷;
第四步,选取距离井底距离为2H至3H的部分,从上而下经行扩刷;
.. ...
以此类推,扩刷至井口。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510028473.7A CN104747195A (zh) | 2015-01-21 | 2015-01-21 | 一种天溜井扩刷施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510028473.7A CN104747195A (zh) | 2015-01-21 | 2015-01-21 | 一种天溜井扩刷施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104747195A true CN104747195A (zh) | 2015-07-01 |
Family
ID=53587374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510028473.7A Pending CN104747195A (zh) | 2015-01-21 | 2015-01-21 | 一种天溜井扩刷施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104747195A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107461205A (zh) * | 2017-09-25 | 2017-12-12 | 中国华冶科工集团有限公司 | 一种扩刷天溜井的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU628317A1 (ru) * | 1977-05-16 | 1978-10-15 | Mets Evgenij S | Устройство дл выпуска руды |
SU1352060A1 (ru) * | 1985-07-11 | 1987-11-15 | Джезказганский Научно-Исследовательский И Проектный Институт Цветной Металлургии | Способ сооружени погрузочно-перепускного комплекса |
CN101699030A (zh) * | 2009-11-20 | 2010-04-28 | 中冶集团华冶资源开发有限责任公司 | 一种大硐室掘进方法 |
CN103940309A (zh) * | 2014-03-26 | 2014-07-23 | 南京梅山冶金发展有限公司 | 一种井下爆破成井的方法 |
-
2015
- 2015-01-21 CN CN201510028473.7A patent/CN104747195A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU628317A1 (ru) * | 1977-05-16 | 1978-10-15 | Mets Evgenij S | Устройство дл выпуска руды |
SU1352060A1 (ru) * | 1985-07-11 | 1987-11-15 | Джезказганский Научно-Исследовательский И Проектный Институт Цветной Металлургии | Способ сооружени погрузочно-перепускного комплекса |
CN101699030A (zh) * | 2009-11-20 | 2010-04-28 | 中冶集团华冶资源开发有限责任公司 | 一种大硐室掘进方法 |
CN103940309A (zh) * | 2014-03-26 | 2014-07-23 | 南京梅山冶金发展有限公司 | 一种井下爆破成井的方法 |
Non-Patent Citations (1)
Title |
---|
胡军生等: "吴集铁矿(北段)高溜井施工工艺探讨", 《现代矿业》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107461205A (zh) * | 2017-09-25 | 2017-12-12 | 中国华冶科工集团有限公司 | 一种扩刷天溜井的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104278978B (zh) | 可溶桥塞压裂工艺管柱及其压裂方法 | |
SA519401339B1 (ar) | إحكام إغلاق منطقة تكوين غير مرغوب فيها في جدار حفرة بئر | |
AU2017262690A1 (en) | Geothermal energy extraction subterranean system | |
WO2014126959A3 (en) | Systems, methods, and computer-readable media for modeling complex wellbores in field-scale reservoir simulation | |
MY177712A (en) | Method and system for plugging a well and use of explosive charges in plugging wells | |
CN105484698B (zh) | 一种复合桥塞 | |
WO2016041823A3 (en) | Well service fluid compositions and method of using microemulsions as flowback aids | |
MY193816A (en) | Downhole completion system sealing against the cap layer | |
WO2015088524A3 (en) | Cementing a liner using reverse circulation | |
CN104763462A (zh) | 岩巷穿层钻孔高压水力造穴瓦斯抽采方法 | |
WO2015197705A3 (en) | Assembly and method for expanding a tubular element | |
WO2014181105A3 (en) | Self-boring shield anchor apparatus and method | |
CN103726812A (zh) | 冲砂充填防砂一体化管柱 | |
GB2517881A (en) | Reservoir wellbore fluid | |
MY177770A (en) | Method for stabilizing a cavity in a well | |
WO2016085454A8 (en) | Optimizing hydraulic fracturing in a subterranean formation | |
WO2014168699A3 (en) | Controlling pressure during perforating operations | |
MX2016007169A (es) | Sistema y metodo de cañon de perforacion en fase de entrada limitada. | |
CN104747195A (zh) | 一种天溜井扩刷施工方法 | |
AR110641A1 (es) | Proceso de reducción directa y horno de cuba que utiliza un cono de desviación de flujo extendido | |
WO2015079003A3 (en) | A downhole production casing string | |
CN105350948A (zh) | 页岩气水平井分段压裂方法和页岩气水平井完井方法 | |
CN105952433A (zh) | 一种井位部署的方法及装置 | |
CN204283289U (zh) | 油井套管整形头 | |
RU2013142794A (ru) | Способ разработки газонефтяных залежей |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150701 |