CN104746522A - Intelligent deforming and adjusting type inclined throwing support protecting system for foundation pit in dredging sludge ground area - Google Patents

Intelligent deforming and adjusting type inclined throwing support protecting system for foundation pit in dredging sludge ground area Download PDF

Info

Publication number
CN104746522A
CN104746522A CN201510194561.4A CN201510194561A CN104746522A CN 104746522 A CN104746522 A CN 104746522A CN 201510194561 A CN201510194561 A CN 201510194561A CN 104746522 A CN104746522 A CN 104746522A
Authority
CN
China
Prior art keywords
foundation ditch
support
foundation pit
tiltedly
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510194561.4A
Other languages
Chinese (zh)
Other versions
CN104746522B (en
Inventor
曹玲珑
陆钊
王亮
林国威
王志强
石萍
田海涛
谢健
王琰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Pearl River Planning Surverying & Designing Co ltd
Guangzhou Offshore Marine Planning Research Institute Co ltd
Shenzhen Foundation Engineering Co ltd
Original Assignee
CHINA WATER RESOURCE PEARL RIVER PLANNING DESIGNING AND SURVEYING Co Ltd
South Sea Ocean Engineering Investigation & Environment Research Academy State
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA WATER RESOURCE PEARL RIVER PLANNING DESIGNING AND SURVEYING Co Ltd, South Sea Ocean Engineering Investigation & Environment Research Academy State, Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical CHINA WATER RESOURCE PEARL RIVER PLANNING DESIGNING AND SURVEYING Co Ltd
Priority to CN201510194561.4A priority Critical patent/CN104746522B/en
Publication of CN104746522A publication Critical patent/CN104746522A/en
Application granted granted Critical
Publication of CN104746522B publication Critical patent/CN104746522B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides an intelligent deforming and adjusting type inclined throwing support protecting system for a foundation pit in a dredging sludge ground area. The system comprises an inclined throwing support protecting structure, a data acquiring system, a mechanical adjusting system and an intelligent control element, wherein the intelligent control element is used for collecting actually-measured monitoring data of the outer earth surface sedimentation of the foundation pit, the deformation of a protecting pile, unheaval of sludge at the bottom part of the foundation pit, pore water pressure of the sludge at the outside of the foundation pit under different depth, and deformation of the inclined throwing support in excavating of the foundation pit, and comparing with the calculation result in a design document and analyzing; if the monitoring data are highly different from the design calculation result, the intelligent control element controls a hydraulic jack to apply prestressed force to the end part of the inclined throwing support in order to adjust the protecting stability of the whole foundation pit. According to the system, the foundation pit in the dredging sludge ground area is protected through the force on the intelligent deforming adjusting type inclined throwing support, which is of important significance on reduction of the protecting pile deformation, sedimentation of the outer earth surface of the foundation pit, and unheaval of sludge at the bottom of the foundation pit.

Description

A kind ofly oblique throwings that regulate of intelligent deformation can support support system for dredging silt matter soil district foundation ditch
Technical field
The present invention relates to the support technology field of excavation of foundation pit space enclosing structure form in dredging silt soil district.
Background technology
In the last few years, the dredging silt in shallow lake or bay used general as land-based area backfilling material, mud carries out construction and also becomes a kind of trend of building.Along with the excavation of foundation pit area of silt soil region and the degree of depth increasing, its excavation is also comparatively large on the impact of surrounding environment, and excavation of foundation pit design and analysis transfers Deformation Control Design to from strength control design.For controlling foundation pit deformation, the general classification of traditional campshed supporting has a supporting, pile-anchor retaining, stake to add horizontal support supporting etc.
Stake supporting is used in the shallow base pit engineering of early stage mucky soil, but along with the increase of the excavation of foundation pit degree of depth, the deformation effect that simple stake supporting controls foundation ditch is bad, is generally combined with anchor pole and horizontal support the distortion controlling foundation ditch.Pile-anchor retaining is restricted use owing to being distributed with " lifeline " engineerings such as intensive underground utilities near excavation pit.Stake add horizontal support supporting due to excavation of foundation pit area large, longer dimension, supports self compression comparatively large, makes the distortion of space enclosing structure can not get good control, also bring the increase of cost and be restricted use simultaneously.These support patterns can not regulate the power suffered by self to control the distortion of foundation ditch by Real-Time Monitoring distortion separately automatically, and this support action for foundation ditch is disadvantageous.
Publication date is on November 19th, 2014, publication number is CN104153374A, denomination of invention is that the Chinese invention patent application of " a kind of with diagonal brace and the combined type foundation pit supporting construction drawing anchor " discloses a kind of foundation pit supporting construction, it is provided with enclosure wall, tiltedly throws support, connects bearing, stiffening pile etc., a kind of exactly diagonal brace and the foundation pit supporting construction drawing anchor to combine.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency of the prior art, a kind of novel foundation ditch curing system with intelligent deformation regulating power is provided, soldier pile distortion, the outer technical problem such as ground settlement and foundation ditch bottom sludge protuberance of foundation ditch can be reduced.
To achieve these goals, present invention employs following technical scheme: a kind ofly oblique throwings that regulate of intelligent deformation can support support system for dredging silt matter soil district foundation ditch, it is characterized in that: comprise and tiltedly throw support supporting and protection structure, data collecting system, mechanical control system and Based Intelligent Control element
Described oblique throwing support supporting and protection structure comprises
Soldier pile, is arranged along foundation pit side-wall, among the dredging silt vertically inserting in foundation ditch,
Cushion cap, flying shore is more than foundation ditch earth's surface, and cushion cap cross section is right-angled trapezium, and
Antislide pile, is arranged at bottom cushion cap, for providing a supporting role cushion cap, and
Oblique throwing support, supports and is fixedly connected between soldier pile pile body and cushion cap inclined-plane;
Described data collecting system comprises some first inclinometer pipes being embedded in the outer earth's surface place of foundation ditch, some second inclinometer pipes be embedded in soldier pile, is embedded in the 3rd inclinometer pipe bottom foundation ditch in dredging silt, measure the outer ground settlement of foundation ditch, the distortion of soldier pile and the uplift capacity of foundation ditch bottom sludge respectively, and
Along some holes pressure meter that the vertical degree of depth of difference of the outer same plane position, earth's surface of foundation ditch is buried underground, for measuring the pore water pressure under the outer mud different depth of foundation ditch, and
Be pasted on the some foil gauges tiltedly throwing support surface, measure and tiltedly throw the deflection of support when excavation of foundation pit;
Described mechanical control system comprises a hydraulic jack;
The monitored data of pore water pressure, the tiltedly deflection of throwing support when excavation of foundation pit outside the distortion of the outer ground settlement of the actual foundation ditch recorded of described Based Intelligent Control component collection, soldier pile, the uplift capacity of foundation ditch bottom sludge, foundation ditch under mud different depth, and be analyzed with the result of calculation in design document, when monitored data and design calculation result differ greatly, Based Intelligent Control element controls described hydraulic jack to tiltedly throwing support end Shi Hanzhang to regulate the supporting of foundation ditch entirety is stable.
Preferably, described foil gauge is pasted with at least 3 along the axis direction tiltedly throwing support.
Preferably, described oblique throwing support is the assembly of a steel pipe or many steel pipes.
Oblique throwing support structure of the present invention make the mucky soil level of foundation pit side-wall to Stress transmit to foundation ditch bottom cushion cap and antislide pile on, the protuberance that the level of the mucky soil of foundation pit side-wall is produced to the top macroscopic destruction of stress and foundation ditch bottom sludge matter mud balances each other.On the other hand, by axially pasting the foil gauge being arranged in and tiltedly throwing in support, the hole pressure that the degree of depth is buried underground downward vertically along the outer earth's surface of foundation ditch is counted and is embedded in soldier pile, inclinometer pipe in the outer earth's surface place of foundation ditch and foundation ditch bottom sludge soil can tiltedly throw the distortion of support by Real-Time Monitoring, the pore water pressure change of the outer mud of foundation ditch and the distortion of soldier pile, the uplift capacity of the outer ground settlement of foundation ditch and foundation ditch bottom sludge, and the data they recorded are transferred to Based Intelligent Control element in real time, through the analyzing and processing of Based Intelligent Control element to these data, hydraulic control jack pair is tiltedly thrown support and is carried out regulable control again, to meet the support action to the foundation ditch of silt soil region.Intelligent deformation of the present invention regulates tiltedly to throw to support and carries out supporting by the foundation ditch of the power suffered by self to dredging silt soil district, and this is significant for the distortion of reduction soldier pile, the outer ground settlement of foundation ditch and foundation ditch bottom sludge protuberance.
Accompanying drawing explanation
Fig. 1 is that intelligent deformation regulates the schematic diagram tiltedly throwing support support form;
Fig. 2 is the schematic diagram tiltedly throwing support support form.
Fig. 3 is that after soldier pile, earth's surface, apart from the horizontal range of soldier pile and the graph of a relation of subsidence value, shows monitor value and calculated value difference is less in figure.
Fig. 4 is the graph of a relation of soldier pile horizontal movement and soldier pile buried depth, the monitor value shown in figure and calculated value difference less.
Fig. 5 is that after soldier pile, earth's surface is apart from the horizontal range of soldier pile and the graph of a relation of subsidence value, and in figure, before vision-control, monitor value and calculated value differ greatly, the foundation ditch after adjustment outward surface subsidence monitoring value and calculated value difference less.
Fig. 6 is the graph of a relation of soldier pile horizontal movement and soldier pile buried depth, and the monitor value in figure before vision-control and calculated value differ greatly, through regulate soldier pile horizontal displacement monitoring value and calculated value difference less.
Fig. 7 is that in figure, before vision-control, monitor value and calculated value differ greatly apart from the horizontal range of soldier pile and the uplift capacity graph of a relation of foundation ditch bottom soil body bottom foundation ditch, at the bottom of the monitoring foundation ditch of adjustment mud protuberance value and calculated value difference less.
In figure, foundation ditch 100, hole pressure meter 101, soldier pile 102, tiltedly throws support 103, foil gauge 104, cushion cap 105, antislide pile 106, the first inclinometer pipe 107, second inclinometer pipe the 108, three inclinometer pipe 109, Based Intelligent Control element 110, hydraulic jack 110, mud 1000
Detailed description of the invention
Should be understood that the upper and lower, left and right in this manual, upwards, downwards, left, to the right directional terms be the description for the orientation shown in accompanying drawing, these orientation are not restrictive.If there is no certain illustrated, term is herein inside, outside, inside and outside, inner side, outside refer to scope relative to part centre, such as using electrical axis as reference, interior and inner side refers to closer to or points to position or the orientation of electrical axis, and outer and outside refers to further from motor center position.In addition, term level, hold up, the term such as pendency do not represent and requires parts abswolute level or pendency, and allow to tilt a little.As level only refers to its direction opposed vertical level more, be not represent that this structure wants complete level, but can tilt a little.
Below in conjunction with accompanying drawing Fig. 1 and Fig. 2, realization of the present invention is described in detail.
What the present invention was used for dredging silt matter soil district foundation ditch can oblique the throwings support support system that regulates of intelligent deformation, comprises tiltedly throwing and supports supporting and protection structure, data collecting system, mechanical control system and Based Intelligent Control element.
Wherein, as shown in Figure 2, tiltedly throw support supporting and protection structure to comprise soldier pile 102, cushion cap 105, tiltedly throw support 103 and antislide pile 106.Soldier pile 102 is arranged along foundation ditch 100 sidewall, among the dredging silt 1000 vertically inserting in foundation ditch.Cushion cap cross section is right-angled trapezium, and hypotenuse is towards tiltedly throwing support 103 and soldier pile 102.Be provided with antislide pile 106 bottom cushion cap 105, cushion cap 105 is provided a supporting role.Oblique throwing support 103 one end supports to be fixed on soldier pile 102, and the other end supports the inclined-plane being fixed on cushion cap 105.Cushion cap 105 is as shown in Fig. 1 Fig. 2, and setting is suspended on the soil body bottom foundation ditch, can regulate the jack device 110 tiltedly thrown in support 103 easily.Simultaneously, the bottom of cushion cap 105 is connected with antislide pile 106 and effectively can be passed on antislide pile 106 tiltedly throwing the pressure that support 103 is subject to, and such transmission mechanical behavior makes the stressed trend of whole foundation pit supporting construction clear and be easy to regulable control to make supporting and protection structure keep safer distortion and stress.
As shown in Figure 1, described data collecting system comprises some first inclinometer pipes 107 being embedded in the outer earth's surface place of foundation ditch, some second inclinometer pipes 108 be embedded in soldier pile 102, is embedded in the 3rd inclinometer pipe 109 bottom foundation ditch in dredging silt, measures the outer ground settlement of foundation ditch, the distortion of soldier pile and the uplift capacity of foundation ditch bottom sludge respectively.The vertical degree of depth of difference along the outer same plane position, earth's surface of foundation ditch is embedded with multiple hole pressure meter 101, for measuring the pore water pressure under the outer mud different depth of foundation ditch.There are at least three pieces of foil gauges 104 along the axis direction tiltedly throwing support at its surface mount, tiltedly throw the deflection of support when excavation of foundation pit for measuring.
Mechanical control system comprises a hydraulic jack 110, and tiltedly throws support 104 and is connected, and prior Shi Hanzhang.
The outer ground settlement of the actual foundation ditch recorded collected by Based Intelligent Control element 110, the distortion of soldier pile, the uplift capacity of foundation ditch bottom sludge, pore water pressure under the outer mud different depth of foundation ditch, oblique monitored data of throwing the deflection of support when excavation of foundation pit, and be analyzed with the result of calculation in design document, when monitored data and design calculation result differ greatly, Based Intelligent Control element controls described hydraulic jack 110 to tiltedly throwing support end Shi Hanzhang to regulate the supporting of foundation ditch entirety is stable, to meet the support action to foundation ditch, can realize like this tiltedly throwing the Real-Time Monitoring of support supporting and protection structure and real-time regulable control.
As shown in Figure 3, Figure 4, Based Intelligent Control element 110 is collected pore water pressure under the outer ground settlement of the actual foundation ditch recorded, the distortion of soldier pile, the uplift capacity of foundation ditch bottom sludge, the outer mud different depth of foundation ditch, is tiltedly thrown the monitored data of the deflection of support when excavation of foundation pit, and be analyzed with the result of calculation in design document, when monitoring result and result of calculation close to time, can think that supporting and protection structure can ensure that base pit engineering is stablized and safety, not need to regulate.
As Fig. 5, Fig. 6, shown in Fig. 7, the outer ground settlement of the actual foundation ditch recorded collected by Based Intelligent Control element 110, the distortion of soldier pile, the uplift capacity of foundation ditch bottom sludge, pore water pressure under the outer mud different depth of foundation ditch, oblique monitored data of throwing the deflection of support when excavation of foundation pit, and be analyzed with the result of calculation in design document, when monitoring result differs larger with result of calculation, the automatic hydraulic control jack of data processing centre carries out Stress control, improve the stressed of supporting and protection structure, and the monitoring result after adjustment and result of calculation are analyzed simultaneously, when monitor value after adjustment (comprises the outer ground settlement of foundation ditch, soldier pile is out of shape, mud uplift capacity bottom foundation ditch) close to computationally secure value time, can think that supporting and protection structure can ensure that base pit engineering is stablized and safety, do not need to regulate.
The present invention includes but be not limited to above-described embodiment and content shown in the drawings, other all fall within protection scope of the present invention with the product structure that technical scheme of the present invention has identical essentiality content.

Claims (3)

1. for dredging silt matter soil district foundation ditch can oblique the throwings support support system that regulates of intelligent deformation, it is characterized in that: comprise tiltedly throwing and support supporting and protection structure, data collecting system, mechanical control system and Based Intelligent Control element,
Described oblique throwing support supporting and protection structure comprises
Soldier pile, is arranged along foundation pit side-wall, among the dredging silt vertically inserting in foundation ditch,
Cushion cap, flying shore is more than foundation ditch earth's surface, and cushion cap cross section is right-angled trapezium, and
Antislide pile, is arranged at bottom cushion cap, for providing a supporting role cushion cap, and
Oblique throwing support, supports and is fixedly connected between soldier pile pile body and cushion cap inclined-plane;
Described data collecting system comprises some first inclinometer pipes being embedded in the outer earth's surface place of foundation ditch, some second inclinometer pipes be embedded in soldier pile, is embedded in the 3rd inclinometer pipe bottom foundation ditch in dredging silt, measure the outer ground settlement of foundation ditch, the distortion of soldier pile and the uplift capacity of foundation ditch bottom sludge respectively, and
Along some holes pressure meter that the vertical degree of depth of difference of the outer same plane position, earth's surface of foundation ditch is buried underground, for measuring the pore water pressure under the outer mud different depth of foundation ditch, and
Be pasted on the some foil gauges tiltedly throwing support surface, measure and tiltedly throw the deflection of support when excavation of foundation pit;
Described mechanical control system comprises a hydraulic jack;
The monitored data of pore water pressure, the tiltedly deflection of throwing support when excavation of foundation pit outside the distortion of the outer ground settlement of the actual foundation ditch recorded of described Based Intelligent Control component collection, soldier pile, the uplift capacity of foundation ditch bottom sludge, foundation ditch under mud different depth, and be analyzed with the result of calculation in design document, when monitored data and design calculation result differ greatly, Based Intelligent Control element controls described hydraulic jack to tiltedly throwing support end Shi Hanzhang to regulate the supporting of foundation ditch entirety is stable.
2. according to claim 1 for dredging silt matter soil district foundation ditch can oblique the throwings support support system that regulates of intelligent deformation, it is characterized in that: described foil gauge is pasted with at least 3 along tiltedly throwing the axis direction supportted.
3. according to claim 1 for dredging silt matter soil district foundation ditch can oblique the throwings support support system that regulates of intelligent deformation, it is characterized in that: describedly tiltedly throw that to support be the assembly of a steel pipe or many steel pipes.
CN201510194561.4A 2015-04-22 2015-04-22 A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system Expired - Fee Related CN104746522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510194561.4A CN104746522B (en) 2015-04-22 2015-04-22 A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510194561.4A CN104746522B (en) 2015-04-22 2015-04-22 A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system

Publications (2)

Publication Number Publication Date
CN104746522A true CN104746522A (en) 2015-07-01
CN104746522B CN104746522B (en) 2016-08-24

Family

ID=53586722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510194561.4A Expired - Fee Related CN104746522B (en) 2015-04-22 2015-04-22 A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system

Country Status (1)

Country Link
CN (1) CN104746522B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440781A (en) * 2018-11-24 2019-03-08 天津大学 Active inclination foundation pit supporting method with double rows of piles
CN114541495A (en) * 2022-03-14 2022-05-27 上海建工四建集团有限公司 Foundation pit deformation monitoring device and monitoring method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001193069A (en) * 2000-01-17 2001-07-17 Ohbayashi Corp Measuring control method during earth retaining excavation, measuring control system during earth retaining excavation and recording media recorded computer programs for realizing measuring control system during earth retaining excavation
CN2647920Y (en) * 2003-07-23 2004-10-13 顺德市永基建筑基础有限公司 Diagonal post supporting ground hole for construction
CN101173518A (en) * 2007-04-30 2008-05-07 中山大学 Building pit support method
CN101294390A (en) * 2007-04-27 2008-10-29 上海市第五建筑有限公司 Support system and construction method for smoothening-digging partial center island foundation pit
CN103074898A (en) * 2013-01-18 2013-05-01 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN204551489U (en) * 2015-04-22 2015-08-12 国家海洋局南海海洋工程勘察与环境研究院 A kind ofly oblique throwings that regulate of intelligent deformation can support support system for dredging silt matter soil district foundation ditch

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001193069A (en) * 2000-01-17 2001-07-17 Ohbayashi Corp Measuring control method during earth retaining excavation, measuring control system during earth retaining excavation and recording media recorded computer programs for realizing measuring control system during earth retaining excavation
CN2647920Y (en) * 2003-07-23 2004-10-13 顺德市永基建筑基础有限公司 Diagonal post supporting ground hole for construction
CN101294390A (en) * 2007-04-27 2008-10-29 上海市第五建筑有限公司 Support system and construction method for smoothening-digging partial center island foundation pit
CN101173518A (en) * 2007-04-30 2008-05-07 中山大学 Building pit support method
CN103074898A (en) * 2013-01-18 2013-05-01 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN204551489U (en) * 2015-04-22 2015-08-12 国家海洋局南海海洋工程勘察与环境研究院 A kind ofly oblique throwings that regulate of intelligent deformation can support support system for dredging silt matter soil district foundation ditch

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440781A (en) * 2018-11-24 2019-03-08 天津大学 Active inclination foundation pit supporting method with double rows of piles
CN109440781B (en) * 2018-11-24 2021-04-23 天津大学 Active inclined double-row pile foundation pit supporting method
CN114541495A (en) * 2022-03-14 2022-05-27 上海建工四建集团有限公司 Foundation pit deformation monitoring device and monitoring method thereof
CN114541495B (en) * 2022-03-14 2023-08-25 上海建工四建集团有限公司 Foundation pit deformation monitoring device and monitoring method thereof

Also Published As

Publication number Publication date
CN104746522B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN107938722B (en) The field testing procedure that horizontal whirl-sprayed pile influences Vertical Bearing Capacity of Pile Foundation
CN111236299B (en) Municipal road pipeline reinforcement protection system and construction method thereof
US3903662A (en) Method of securing structural support elements in soil
CN100580192C (en) Building pit support method
CN111851523B (en) Settlement deviation prevention method for foundation pit construction
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN110644509A (en) Vertical anchoring and pulling balance weight type pile plate wall and construction method thereof
CN204551489U (en) A kind ofly oblique throwings that regulate of intelligent deformation can support support system for dredging silt matter soil district foundation ditch
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN105220719B (en) Deep Thick Soft Ground Area bridge struction pile method for correcting error
CN104746522A (en) Intelligent deforming and adjusting type inclined throwing support protecting system for foundation pit in dredging sludge ground area
CN104196035B (en) Pipeline foundation ditch predeformation method for protecting support
CN113434947A (en) Anchor pile type supporting structure in narrow space and design method
CN108330963A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN209636804U (en) Orientation constantly regulates and controls the isolation pile of displacement
CN115164798B (en) Embedded multi-angle slope stability dynamic monitoring system
CN206562613U (en) A kind of mini pile suspension roof support structure
KR101384168B1 (en) installation method of slab foundation for offshore wind power generator using position senser
CN208884359U (en) A kind of king-post base configuration being suitable for bridge tower on steep side slope
CN207919567U (en) High roadbed tunnel off-load safeguard structure
CN108252303B (en) A kind of tier building basic engineering method based on anchor jacked pile technology
CN104060605A (en) Folding-line-shaped pile foundation structure and foundation acting-force computing method as well as construction method thereof
CN219298266U (en) Novel support retaining wall structure
CN110608712B (en) Foundation separation type deformation measurement robot foundation point station room
CN104532884B (en) A kind of buttress outer eccentric accumulation load method foundation pile test for static load, pile pressing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510300 Guangzhou, Guangdong, Xingang Road, No. 353 compound

Applicant after: STATE OCEAN ADMINISTRATION SOUTH CHINA SEA PLANNING AND ENVIRONMENT Research Institute

Applicant after: SHENZHEN GONGKAN GEOTECHNICAL GROUP Co.,Ltd.

Applicant after: CHINA WATER RESOURCES PEARL RIVER PLANNING, SURVERYING & DESIGNING Co.,Ltd.

Address before: 510300 Guangzhou, Guangdong, Xingang Road, No. 353 compound

Applicant before: SOUTH CHINA SEA MARINE ENGINEERING AND ENVIRONMENT INSITUTE

Applicant before: SHENZHEN GONGKAN GEOTECHNICAL GROUP Co.,Ltd.

Applicant before: CHINA WATER RESOURCES PEARL RIVER PLANNING, SURVERYING & DESIGNING Co.,Ltd.

CB03 Change of inventor or designer information

Inventor after: Cao Linglong

Inventor after: Lu Zhao

Inventor after: Wang Zhiqiang

Inventor after: Wang Liang

Inventor after: Shi Ping

Inventor after: Tian Haitao

Inventor after: Xie Jian

Inventor after: Lin Guowei

Inventor after: Wang Yan

Inventor before: Cao Linglong

Inventor before: Lu Zhao

Inventor before: Wang Liang

Inventor before: Lin Guowei

Inventor before: Wang Zhiqiang

Inventor before: Shi Ping

Inventor before: Tian Haitao

Inventor before: Xie Jian

Inventor before: Wang Yan

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161205

Address after: 510000 Guangdong, Guangzhou Tianhe East Road, No. 18-24

Patentee after: Guangzhou offshore marine Planning Research Institute Co.,Ltd.

Patentee after: SHENZHEN FOUNDATION ENGINEERING CO.,LTD.

Patentee after: CHINA WATER RESOURCES PEARL RIVER PLANNING, SURVERYING & DESIGNING Co.,Ltd.

Address before: 510300 Guangzhou, Guangdong, Xingang Road, No. 353 compound

Patentee before: STATE OCEAN ADMINISTRATION SOUTH CHINA SEA PLANNING AND ENVIRONMENT RESEARCH INSTITUTE

Patentee before: SHENZHEN GONGKAN GEOTECHNICAL GROUP Co.,Ltd.

Patentee before: CHINA WATER RESOURCES PEARL RIVER PLANNING, SURVERYING & DESIGNING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

CF01 Termination of patent right due to non-payment of annual fee