CN104730452A - Automatic action testing device of automatic change-over switch - Google Patents
Automatic action testing device of automatic change-over switch Download PDFInfo
- Publication number
- CN104730452A CN104730452A CN201510115457.1A CN201510115457A CN104730452A CN 104730452 A CN104730452 A CN 104730452A CN 201510115457 A CN201510115457 A CN 201510115457A CN 104730452 A CN104730452 A CN 104730452A
- Authority
- CN
- China
- Prior art keywords
- automatic change
- automatic
- change over
- guide rail
- over switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The invention relates to an automatic action testing device of an automatic change-over switch. The automatic action testing device comprises a bottom plate. The automatic action testing device is characterized in that an installation guide rail is arranged on the bottom plate, the installation guide rail defines a rectangular area through three guide rail bodies, and the size and the shape of the rectangular area consistent with those of the automatic change-over switch; the upper side and the lower side of the bottom plate are each provided with four centres, and the centres correspond to binding posts at the two sides of the automatic change-over switch respectively and are connected with an additional power supply through wires and installed at the output end of an air valve. One side of the rectangular area defined by the installation guide rail is open, a fixing pressing plate is arranged at the side where the opening is located, and one end of the fixing pressing plate is in rotation connection with the bottom plate. The distances between the top points of the centres and the corresponding binding posts are equal. The automatic action testing device meets the requirement for checking and testing of an automatic change-over switch device, various functional characteristics of the automatic change-over switch can be conveniently tested, and efficiency is improved.
Description
Technical field
The present invention relates to a kind of auto-action proving installation of automatic change over, especially a kind of automatic transfer switching electric appliance dispatches from the factory and confirms the proving installation of inspection acting characteristic.
Background technology
The controller electric power system of PC level automatic change over and the power supply of control secondary circuit are all provided by primary circuit, generally, commissioning staff will connect primary circuit, and then manually the switch transition situation of automatic change in decompression situation debugged by switch; Debugged the action situation of power supply automatic change in overvoltage/undervoltage situation by pressure regulator, such debugging bothers very much, all will access two-way three-phase four-wire power at every turn, and necessary screw fastening, dismantle again after having debugged wiring, process is loaded down with trivial details, expends time in long.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of auto-action proving installation of dynamic switch is provided, meet the requirement that automatic transfer switching electric appliance confirms verification test, raise the efficiency, save time, automatic control power supply voltage, the various functions characteristic of convenient test automatic change over.
According to technical scheme provided by the invention, a kind of auto-action proving installation of automatic change over, comprise base plate, feature is: on described base plate, arrange mounting guide rail, and mounting guide rail is surrounded by three guide rails and forms the rectangular area consistent with automatic change over size, shape; Arrange four thimbles respectively in the both sides up and down of described base plate, each thimble corresponds respectively to the connection terminal of automatic change over both sides, and thimble is connected with additional power source respectively by wire, and each thimble is arranged on the output terminal of air valve respectively.
Further, described mounting guide rail surrounds a side opening of the rectangular area formed, and arranges fixation clip in opening side, and one end and the base plate of fixation clip are rotationally connected.
Further, the summit of described each thimble is all consistent to the distance between corresponding connection terminal.
Further, also comprise touch display screen, touch display screen is connected with proving installation by cable.
The present invention has the following advantages:
(1) the mounting guide rail size of proving installation of the present invention and the mounting base consistent size of automatic change over, can ensure that installation is fixed, and ensure that each pole connection terminal of automatic change over contacts with thimble well, instead of the complex process that screw is fixing, the dismounting of automatic change over is very convenient, test result is accurate, and speed is fast;
(2) test event that the present invention is all is all performed by programmable touch display screen, completed by electric elements such as Single-chip Controlling pressure regulator and relays, realize the automatic conversion of automatic change in under-voltage, overvoltage, decompression, single-phase fault situation, data are accurate, intuitively read.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation of described mounting guide rail.
Fig. 3 is the schematic diagram of touch display screen.
Embodiment
Below in conjunction with concrete accompanying drawing, the invention will be further described.
As shown in FIG. 1 to 3: the auto-action proving installation of described automatic change over comprises base plate 1, mounting guide rail 2, fixation clip 3, thimble 4, air valve 5, automatic change over 6, connection terminal 7, touch display screen 8, cable 9, wire 10 etc.
As shown in Figure 1 and Figure 2, the present invention includes base plate 1, base plate 1 arranges mounting guide rail 2, mounting guide rail 2 is surrounded by three guide rails and forms the rectangular area consistent with automatic change over 6 size, shape, one side opening of this rectangular area, automatic change over 6 can be put into mounting guide rail 2 by this opening part and surround the region formed, and in opening side, fixation clip 3 is set, one end and the base plate 1 of fixation clip 3 are rotationally connected, after automatic change over 6 is put into and is put in place, rotate fixation clip 3 automatic change over is fixed, be convenient to test; In the both sides up and down of described base plate 1, four thimbles 4 are set respectively, each thimble 4 corresponds respectively to the connection terminal 7 of automatic change over 6 both sides, thimble 4 is connected with additional power source respectively by wire 10, each thimble 4 is arranged on the output terminal of air valve 5 respectively, and thimble 4 promotes thimble 4 by the air pressure of air valve 5; The summit of described each thimble 4 is all consistent to the distance between corresponding connection terminal 7.
As shown in Figure 3, the present invention also comprises touch display screen 8, touch display screen 8 is connected with proving installation by cable 9, all test events are all operated by touch display screen 8, the control module of the high-grade single-chip microcomputer composition of AVR is adopted to finish the work, tester can carry out setting parameter by touch display screen 8, enlightenment test event.
The material of described thimble 4 is 2.5mm brass bar, is positive conductive material, ensures that primary circuit is reliably connected.
In use, the automatic change over 6 that will test is put in fixing mounting guide rail 2, and mounting guide rail 2 is according to the ready-made fixture of the size of automatic change over 6, as long as automatic change over 6 is put into position, just can not move, then rotate fixation clip 3, automatic change over 6 is fixed; Opening power, touch display screen 8 starts test, enlightens corresponding air valve 5, thus promote corresponding thimble 4 by air pressure, connection terminal 7 good contact of thimble 4 meeting and automatic change over 6, and produces certain pressure, ensures that contact is good; And thimble 4 is connected with additional power source by wire, installs without screw like this and power with regard to the primary circuit achieving automatic change over 6.After test completes, air valve 5 is opened, and thimble 4 is retracted original position, automatic change over 6 primary circuit power-off, again not knockout screw.Rotate fixation clip 3, automatic change over 6 can easily be taken down.Proving installation of the present invention test is simple, and speed is efficient soon, and parameter can sets itself, and convenient, flexible, operating personnel's easily-learned easily mastered, can improve testing efficiency and accuracy greatly.
Claims (4)
1. the auto-action proving installation of an automatic change over, comprise base plate (1), it is characterized in that: on described base plate (1), arrange mounting guide rail (2), mounting guide rail (2) is surrounded by three guide rails and forms the rectangular area consistent with automatic change over (6) size, shape; Four thimbles (4) are set respectively in the both sides up and down of described base plate (1), each thimble (4) corresponds respectively to the connection terminal (7) of automatic change over (6) both sides, thimble (4) is connected with additional power source respectively by wire, and each thimble (4) is arranged on the output terminal of air valve (5) respectively.
2. the auto-action proving installation of automatic change over as claimed in claim 1, it is characterized in that: described mounting guide rail (2) surrounds a side opening of the rectangular area formed, and arrange fixation clip (3) in opening side, one end and the base plate (1) of fixation clip (3) are rotationally connected.
3. the auto-action proving installation of automatic change over as claimed in claim 1, is characterized in that: the summit of described each thimble (4) is all consistent to the distance between corresponding connection terminal (7).
4. the auto-action proving installation of automatic change over as claimed in claim 1, it is characterized in that: also comprise touch display screen (8), touch display screen (8) is connected with proving installation by cable (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510115457.1A CN104730452A (en) | 2015-03-16 | 2015-03-16 | Automatic action testing device of automatic change-over switch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510115457.1A CN104730452A (en) | 2015-03-16 | 2015-03-16 | Automatic action testing device of automatic change-over switch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104730452A true CN104730452A (en) | 2015-06-24 |
Family
ID=53454532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510115457.1A Pending CN104730452A (en) | 2015-03-16 | 2015-03-16 | Automatic action testing device of automatic change-over switch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104730452A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200968979Y (en) * | 2006-08-18 | 2007-10-31 | 天津市百利电气有限公司 | Testing device for breaker detection having transferring device |
CN101169468A (en) * | 2007-11-27 | 2008-04-30 | 天津市百利电气有限公司 | Board back insertion type circuit breaker characteristic detection and test device |
CN201130192Y (en) * | 2007-11-27 | 2008-10-08 | 天津市百利电气有限公司 | Fixed device for detecting breaker magnetic test |
CN102564785A (en) * | 2011-12-20 | 2012-07-11 | 施耐德万高(天津)电气设备有限公司 | Automatic inspection device of automatic changeover switch electric appliance |
CN202815179U (en) * | 2012-08-30 | 2013-03-20 | 苏州杰思精工自动化设备有限公司 | Computer keyboard function test device |
KR20130055789A (en) * | 2011-11-21 | 2013-05-29 | 한국철도공사 | Test apparatus for brake pressure switch of electric train |
CN104198933A (en) * | 2014-09-05 | 2014-12-10 | 江阴力源电子有限公司 | Test fixture for magnetic latching relay |
CN104237778A (en) * | 2014-09-01 | 2014-12-24 | 江苏华鹏智能电气股份有限公司 | Intelligent test device for frame circuit breaker mechanism |
CN204515086U (en) * | 2015-03-16 | 2015-07-29 | 无锡韩光电器股份有限公司 | The auto-action proving installation of automatic change over |
-
2015
- 2015-03-16 CN CN201510115457.1A patent/CN104730452A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200968979Y (en) * | 2006-08-18 | 2007-10-31 | 天津市百利电气有限公司 | Testing device for breaker detection having transferring device |
CN101169468A (en) * | 2007-11-27 | 2008-04-30 | 天津市百利电气有限公司 | Board back insertion type circuit breaker characteristic detection and test device |
CN201130192Y (en) * | 2007-11-27 | 2008-10-08 | 天津市百利电气有限公司 | Fixed device for detecting breaker magnetic test |
KR20130055789A (en) * | 2011-11-21 | 2013-05-29 | 한국철도공사 | Test apparatus for brake pressure switch of electric train |
CN102564785A (en) * | 2011-12-20 | 2012-07-11 | 施耐德万高(天津)电气设备有限公司 | Automatic inspection device of automatic changeover switch electric appliance |
CN202815179U (en) * | 2012-08-30 | 2013-03-20 | 苏州杰思精工自动化设备有限公司 | Computer keyboard function test device |
CN104237778A (en) * | 2014-09-01 | 2014-12-24 | 江苏华鹏智能电气股份有限公司 | Intelligent test device for frame circuit breaker mechanism |
CN104198933A (en) * | 2014-09-05 | 2014-12-10 | 江阴力源电子有限公司 | Test fixture for magnetic latching relay |
CN204515086U (en) * | 2015-03-16 | 2015-07-29 | 无锡韩光电器股份有限公司 | The auto-action proving installation of automatic change over |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106646209B (en) | Intelligent testing equipment for high-temperature and low-temperature tripping of charge control circuit breaker | |
CN203552557U (en) | Electrical automation teaching experiment training comprehensive device | |
CN103779967B (en) | For TT&C system and the observing and controlling module thereof of distribution power automation terminal | |
CN104966457B (en) | A kind of maintenance electrician's intelligent training checking system based on MCGS interfaces | |
CN206684228U (en) | A kind of high-voltage circuit-breaker switching on-off coil resistance universal test device | |
CN216013591U (en) | Multifunctional handcart switch control loop tester | |
CN204904704U (en) | Maintenance electrician's intelligence training checking system based on MCGS interface | |
CN203870229U (en) | Time-control voltage-regulating light fixture testing apparatus | |
CN202563064U (en) | Test tooling for frequency converter driver board | |
CN204515086U (en) | The auto-action proving installation of automatic change over | |
CN104215913A (en) | Analogue grounding tester used for direct-current power | |
CN206161804U (en) | Accuse circuit breaker dropout testing arrangement is taken to intelligence | |
CN203365594U (en) | Testing device for control panel of variable-frequency drive | |
CN204316171U (en) | A kind of debugging operations platform of automatic change-over controller | |
CN218848216U (en) | Integrated circuit electric leakage testing device with protection function | |
CN220231876U (en) | Direct current switch machine test box | |
CN104730452A (en) | Automatic action testing device of automatic change-over switch | |
CN111175597A (en) | Multifunctional transformer comprehensive experiment system and method | |
CN203191540U (en) | Negative control terminal and ammeter pairing debugging device | |
CN206161806U (en) | Take high, low temperature dropout intelligent test equipment of accuse circuit breaker | |
CN206161803U (en) | Take accuse circuit breaker automatic opening/closing switching test equipment | |
CN103513215A (en) | Automatic switching detection apparatus of electric energy meter | |
CN207336601U (en) | Electric energy meter standardizes erecting device | |
CN212723222U (en) | Intelligent relay tester | |
CN203751529U (en) | Digital display chip circuit board applied to laser engraving machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150624 |
|
RJ01 | Rejection of invention patent application after publication |