CN104727215B - Temporary passing bridge for construction - Google Patents

Temporary passing bridge for construction Download PDF

Info

Publication number
CN104727215B
CN104727215B CN201510128043.2A CN201510128043A CN104727215B CN 104727215 B CN104727215 B CN 104727215B CN 201510128043 A CN201510128043 A CN 201510128043A CN 104727215 B CN104727215 B CN 104727215B
Authority
CN
China
Prior art keywords
screw nut
bridge
pontic
lead screw
feed screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510128043.2A
Other languages
Chinese (zh)
Other versions
CN104727215A (en
Inventor
李伟坡
许舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University of Forestry and Technology
Original Assignee
Central South University of Forestry and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University of Forestry and Technology filed Critical Central South University of Forestry and Technology
Priority to CN201510128043.2A priority Critical patent/CN104727215B/en
Publication of CN104727215A publication Critical patent/CN104727215A/en
Application granted granted Critical
Publication of CN104727215B publication Critical patent/CN104727215B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a temporary passing bridge for construction. The temporary passing bridge comprises a first bridge body, a second bridge body and a third bridge body. The upper end of the first bridge body, the upper end of the second bridge body and the upper end of the third bridge body are provide with passing flat plates. The bottom of the first bridge body and the bottom of the third bridge body are provided with lead screw nut drill bit devices. The left end of the first bridge body and the right end of the third bridge body are both provided with a hand-operated type lead screw nut pulling device. Each lead screw nut drill bit device comprises a first lead screw nut pair with the bottom provided with a drill bit. The upper end of each first lead screw nut pair is provided with an electric motor device enabling the first lead screw nut pair to advance, stretch and retract. Each hand-operated type lead screw nut drilling device comprises a groove. Cross plates are arranged in the grooves, wherein the bottom of each cross plate is provided with a corresponding hand-operated type lead screw nut pair. The movable end of each cross plate is provided with a bolt fixing hole. According to the temporary passing bridge, through splicing and transverse and a longitudinal lead screw nut system, the installation mode of the bridge and the connecting mode between the bridge and a river bed can be greatly simplified, and the temporary passing bridge is safe and firm.

Description

A kind of temporary traffic bridge for building
Technical field
The device the present invention relates to a kind of building is passed through, more particularly, to a kind of temporary traffic bridge for building.
Background technology
When building bridge on the less river of some width, sometimes for the needs of temporary traffic, must be in bridge construction beam Nearby set up a temporary traffic bridge, this bridge can be additionally used in assisting bridge construction to be used simultaneously it is common practice to frame If a Simple bridge with wood or bamboo weaving, remove at once after formal bridge is built up, but simultaneously, such bridge Potential safety hazard is also that ratio is larger, especially runs into the river of the frequent fluctuation of river, and potential safety hazard is just bigger.
Content of the invention
The present invention is aiming at the problems referred to above, proposes a kind of temporary traffic bridge for building, and this temporary traffic bridge is installed simply, Using firm, degree of safety also greatly improves.
For reaching above-mentioned technical purpose, present invention employs a kind of temporary traffic bridge for building, including can be each other by spiral shell Tether the first pontic connecing, the second pontic and the 3rd pontic, described first pontic, the second pontic, the 3rd pontic upper end are provided with logical Row flat board, described first pontic, the bottom of the 3rd pontic are provided with feed screw nut's drill bit device, and the left end of described first pontic It is equipped with hand-rail type feed screw nut's drawing device with the right-hand member of the 3rd pontic;Described feed screw nut's drill bit device includes a bottom belt There is the first feed screw nut pair of drill bit, described first feed screw nut pair upper end is provided with can make the first feed screw nut pair traveling stretch Electro-motor device;Described hand-rail type feed screw nut's drawing device includes a groove, is provided with a bottom and carries handss in described groove Shake the transverse slat of formula feed screw nut pair, described transverse slat movable end is provided with bolt fixing hole.
The present invention passes through splicing and horizontal, longitudinal feed screw nut's system so that the mounting means of bridge and and river The connected mode at bottom is greatly simplified, and securely.
Brief description
Shown in Fig. 1 is surface structure schematic diagram of the present invention;
Wherein, the 1, first pontic;2nd, the second pontic;3rd, the 3rd pontic;4th, pass through flat board;5th, drill bit;6th, the first screw mandrel spiral shell Female secondary;7th, electro-motor device;8th, groove;9th, hand-rail type feed screw nut pair;10th, transverse slat;11st, bolt fixing hole.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in more detail.
As shown in Figure 1, a kind of temporary traffic bridge for building, including can be each other by bolted first pontic 1, second Pontic 2 and the 3rd pontic 3, are provided with current flat board 4 in the first pontic 1, the second pontic 2, the 3rd pontic 3 upper end, in the first pontic 1st, the bottom of the 3rd pontic 3 is provided with feed screw nut's drill bit device, and equal in the right-hand member of the first pontic 1 left end and the 3rd pontic 3 It is provided with hand-rail type feed screw nut's drawing device;
In the present invention, it is preferred to feed screw nut's drill bit device include a bottom carry drill bit 5 the first feed screw nut pair 6, it is provided with, in the upper end of the first feed screw nut pair 6, the electro-motor device 7 that the first feed screw nut pair 6 traveling can be made flexible.
In the present invention, it is preferred to hand-rail type feed screw nut's drawing device include a groove 8, be provided with a bottom in groove 8 Portion carries the transverse slat 10 of hand-rail type feed screw nut pair 9, is provided with bolt fixing hole 11 in the movable end of transverse slat 10.
The present invention specifically so use: the first first pontic 1, the second pontic 2 and the 3rd pontic 3 are by bolt even Connect, the second pontic 2 can be one or more in actual use, if bridge floor is relatively wide, can use multiple second pontics 2 to carry out Connect, if bridge floor is narrow, can use a small amount of second pontic to be attached;Then pass through hand-rail type feed screw nut pair 9 by horizontal stroke Both sides extend plate 10 to the left and right, are bolted hole 11 using bolt simultaneously and are fixed even transverse slat 10 and riverbank two ends Connect, finally start electro-motor device 7, the first feed screw nut pair 6 is deeply penetrated river bed together with the drill bit 5 of bottom, play solid Fixed effect, so completes the erection of temporary traffic bridge.

Claims (1)

1. a kind of temporary traffic bridge for building is it is characterised in that inclusion can be each other by bolted first pontic, the second bridge Body and the 3rd pontic, described first pontic, the second pontic, the 3rd pontic upper end are provided with current flat board, described first pontic, the 3rd The bottom of pontic is provided with feed screw nut's drill bit device, and the left end of described first pontic and the right-hand member of the 3rd pontic are equipped with handss Shake formula feed screw nut's drawing device;Described feed screw nut's drill bit device includes the first feed screw nut pair that a bottom carries drill bit, Described first feed screw nut pair upper end is provided with the electro-motor device that the first feed screw nut pair traveling can be made flexible;Described hand-rail type Feed screw nut's drawing device includes a groove, is provided with the transverse slat that a bottom carries hand-rail type feed screw nut pair, institute in described groove State transverse slat movable end and be provided with bolt fixing hole.
CN201510128043.2A 2015-03-23 2015-03-23 Temporary passing bridge for construction Expired - Fee Related CN104727215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510128043.2A CN104727215B (en) 2015-03-23 2015-03-23 Temporary passing bridge for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510128043.2A CN104727215B (en) 2015-03-23 2015-03-23 Temporary passing bridge for construction

Publications (2)

Publication Number Publication Date
CN104727215A CN104727215A (en) 2015-06-24
CN104727215B true CN104727215B (en) 2017-02-01

Family

ID=53451578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510128043.2A Expired - Fee Related CN104727215B (en) 2015-03-23 2015-03-23 Temporary passing bridge for construction

Country Status (1)

Country Link
CN (1) CN104727215B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220610B (en) * 2015-10-26 2017-03-22 中国海洋石油总公司 Novel trestle used between offshore oil platforms
CN111305036A (en) * 2020-03-31 2020-06-19 山东华邦建设集团有限公司 Combined roof pipeline trestle
CN111560832A (en) * 2020-05-18 2020-08-21 河南建筑职业技术学院 Steel frame bridge structure of concatenation fast

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2362630B (en) * 2000-05-23 2004-04-07 Rodney Philpin A modular ramp
CN2554221Y (en) * 2002-06-24 2003-06-04 徐杰 Quick assembling bridge
US9133588B2 (en) * 2005-07-22 2015-09-15 Benjamin G. Stroyer Boardwalk, deck, and platform system
KR20100126070A (en) * 2009-05-22 2010-12-01 박정극 Movable and multipurpose temporary bridge
CN203583346U (en) * 2013-10-28 2014-05-07 沈宝山 Highway quick clearing device
CN203729194U (en) * 2013-12-04 2014-07-23 国网河南省电力公司驻马店供电公司 Height-adjustable temporary passage bridge for cable trench with fixing rotary head

Also Published As

Publication number Publication date
CN104727215A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN104727215B (en) Temporary passing bridge for construction
WO2016133291A3 (en) Prefabricated truss-embedded composite beam
WO2008156934A3 (en) Concrete form system for low-clearance applications
CN103835375B (en) The connected node of a kind of Self-resetting beam and post
DE07717425T1 (en) EMBEDDED LADDERWAVE CORE AND SANDWICH PLATE THEREOF
CN206477444U (en) A kind of green wood SIP plates interior wall and steel column butt joint attachment structure
CN204435677U (en) High strength steel structural column
EP2913607B1 (en) Geothermal heat probe base and geothermal heat probe
CN203007814U (en) Connection piece used for building bailey beam truss
CN102485127A (en) Child guard railing
CN207687130U (en) A kind of curtain frame assembly
DE102012106997B4 (en) Device for producing a room cell in monolithic design
CN203939254U (en) A kind of dismountable vertical channel stair
CN105545202A (en) Manufacture method of hydraulic engineering detachable U-shaped crawling ladder
CN204081451U (en) A kind of building operations strengthens the treadle of false work of structure with having
CN204370283U (en) The bridge of adjustable dome height
CN204418153U (en) A kind of native gabion structure of construction work
CN106760102A (en) The compound floor support plate component of steel construction stalk material plate
ATE505107T1 (en) CONNECTOR WITH ADJUSTABLE ANGLE FOR HANDRAILS
CN204899189U (en) Construction elevator connects material platform
CN107370100A (en) A kind of folding bus bridge frame
CN209854979U (en) Friction type high-strength bolt connecting node of assembled shear wall
EP2594704A3 (en) Assembly of massive wood strips
CN205421899U (en) Remove alternately bracing connecting device of scaffold
CN205820634U (en) A kind of biography dish elevator car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201