CN204081451U - A kind of building operations strengthens the treadle of false work of structure with having - Google Patents

A kind of building operations strengthens the treadle of false work of structure with having Download PDF

Info

Publication number
CN204081451U
CN204081451U CN201420597814.3U CN201420597814U CN204081451U CN 204081451 U CN204081451 U CN 204081451U CN 201420597814 U CN201420597814 U CN 201420597814U CN 204081451 U CN204081451 U CN 204081451U
Authority
CN
China
Prior art keywords
pedal body
reinforcement
main body
treadle
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420597814.3U
Other languages
Chinese (zh)
Inventor
邢国表
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan great faith construction engineering Co., Ltd.
Original Assignee
邢国表
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 邢国表 filed Critical 邢国表
Priority to CN201420597814.3U priority Critical patent/CN204081451U/en
Application granted granted Critical
Publication of CN204081451U publication Critical patent/CN204081451U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building operations with having the treadle of false work strengthening structure, comprising: a pedal body, it has a roof and two sidewalls, and two sidewalls are vertically connected at roof both sides respectively, and two ends of pedal body are respectively at least provided with two hooks; Two root edge portions, are respectively extended internally by two sidewall bottoms respectively and are formed; And at least one reinforcement, have a main body and two base plate, main body has a upper wall and two walls, and two base plate connect the bottom of two walls respectively, and each base plate two end longitudinally forms an extension respectively to protruding out outward along main body; Reinforcement is installed in pedal body, the longitudinal direction of main body and the longitudinal direction of pedal body perpendicular, the upper wall of reinforcement contacts with the bottom surface of the roof of pedal body, and reinforcement is connected to two root edge portions of pedal body by extension.The utility model can improve the section thickness of pedal body, and improves the warp resistance performance of pedal body, and the situation effectively reducing pedal compressive deformation occurs.

Description

A kind of building operations strengthens the treadle of false work of structure with having
Technical field
The utility model relates to construction engineering technical field, refers to that a kind of building operations is with having the treadle of false work strengthening structure especially.
Background technology
General when carrying out building engineering construction, after the external wall construction of its building must scaffold erecting, staff just can construct.And general scaffold is built the both sides linking two opposed framves respectively by two cross-like links and formed, and overlap with pedal between support bar in relative stand, staff can be stood on pedal and constructs.
The pedal of prior art is vertical bar shape, and when pedal is trampled by gravity for a long time, therefore pedal structure intensity is not high, and the situation easily bending or rupture in the middle of its pedal, has certain potential safety hazard.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of building operations with having the treadle of false work strengthening structure, with the problem that the treadle of false work structural strength solving prior art is low.
For solving the problems of the technologies described above, embodiment of the present utility model provides a kind of building operations with having the treadle of false work strengthening structure, comprise: a pedal body, it has a roof and two sidewalls, described two sidewalls are vertically connected at described roof both sides respectively, and two ends of described pedal body are respectively at least provided with two hooks; Two root edge portions, are respectively extended internally by described two sidewall bottoms respectively and are formed; And at least one reinforcement, there are a main body and two base plate, described main body has a upper wall and two walls, described two walls are vertically connected at described upper wall both sides respectively, described two base plate connect the bottom of described two walls respectively, and each described base plate two end longitudinally forms an extension respectively to protruding out outward along described main body; Described reinforcement is installed in described pedal body, the longitudinal direction of described main body and the longitudinal direction of described pedal body perpendicular, the upper wall of described reinforcement contacts with the bottom surface of the roof of described pedal body, and described reinforcement is connected to the described two root edge portions of described pedal body by described extension.
The trisection that the root edge portion of described pedal body comprises an end section extended internally and upwards turned down by section of the described end; The extension of described reinforcement two end is connected to the bottom surface of the end section in described root edge portion; Main body two end of described reinforcement is posted by the trisection in described two root edge portions.
The roof of described pedal body longitudinally protrudes at least two reinforcing ribs down along it, and the main body of described reinforcement is arranged with at least two grooves at upper wall, with described two reinforcing ribs of correspondence.
Two grooves of the main body of described reinforcement are respectively adjacent to two ends of described main body longitudinal direction.
The roof of described pedal body is provided with multiple through hole.
The peritreme of each described through hole is upwards extended with a bulge loop.
The beneficial effect of technique scheme of the present utility model is as follows:
In such scheme, building operations of the present utility model strengthens the treadle of false work of structure with having, wherein, described reinforcement two ends longitudinally recline to described pedal body two side, and the longitudinal direction of described reinforcement and the longitudinal direction of pedal body perpendicular, form stable braced structures; Described reinforcement structure is simple, be easy to make, and can effectively control cost, be that face supports with the upper wall of reinforcement and pedal body again, improve the section thickness of pedal body with this, and improving the warp resistance performance of pedal body, the situation effectively reducing pedal compressive deformation occurs.
Accompanying drawing explanation
Fig. 1 is the building operations overall structure figure with the treadle of false work strengthening structure of the utility model embodiment.
Fig. 2 is the building operations decomposition chart with the treadle of false work strengthening structure of the utility model embodiment.
Fig. 3 is the structural representation of the reinforcement of the utility model embodiment.
Fig. 4 is the building operations profile with the treadle of false work strengthening structure of the utility model embodiment.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearly, be described in detail below in conjunction with the accompanying drawings and the specific embodiments.
Embodiment of the present utility model provides a kind of building operations with having the treadle of false work 20 strengthening structure, comprise: a pedal body 30, it has roof 31 and two sidewalls 32, described two sidewalls 32 are vertically connected at described roof 31 both sides respectively, and two ends of described pedal body 30 are respectively at least provided with two hooks 42; Two root edge portions 33, are respectively extended internally by described two sidewall 32 bottoms respectively and are formed; And at least one reinforcement 50, there are main body 51 and two base plate 52, described main body 51 has upper wall 511 and two walls 512, described two walls 512 are vertically connected at described upper wall 511 both sides respectively, described two base plate 52 connect the bottom of described two walls 512 respectively, and each described base plate 52 2 end longitudinally forms an extension 54 respectively to protruding out outward along described main body 51; Described reinforcement 50 is installed in described pedal body 30, the longitudinal direction of described main body 51 and the longitudinal direction of described pedal body 20 perpendicular, the upper wall 511 of described reinforcement 50 contacts with the bottom surface of the roof 31 of described pedal body 30, and described reinforcement 50 is connected to the described two root edge portions 33 of described pedal body 30 by described extension 54.
The trisection 332 that the root edge portion 33 of described pedal body 30 comprises an end section 331 extended internally and upwards turned down by section of the described end 331; The extension 54 of described reinforcement 50 2 end is connected to the bottom surface of the end section 31 in described root edge portion 33; Main body 51 2 end of described reinforcement 50 is posted by the trisection 332 in described two root edge portions 33.
The roof 31 of described pedal body 30 longitudinally protrudes at least two reinforcing ribs 34 down along it, and the main body 51 of described reinforcement 50 is arranged with at least two grooves 53 at upper wall 511, with described two reinforcing ribs 34 of correspondence.
Two grooves 53 of the main body 51 of described reinforcement 50 are respectively adjacent to two ends of described main body 51 longitudinal direction.
The roof 31 of described pedal body 30 is provided with multiple through hole 35.The peritreme of each described through hole 35 is upwards extended with a bulge loop 351, in order to increase frictional force when trampling.
In such scheme, building operations of the present utility model strengthens the treadle of false work of structure with having, wherein, described reinforcement two ends longitudinally recline to described pedal body two side, and the longitudinal direction of described reinforcement and the longitudinal direction of pedal body perpendicular, form stable braced structures; Described reinforcement structure is simple, be easy to make, and can effectively control cost, be that face supports with the upper wall of reinforcement and pedal body again, improve the section thickness of pedal body with this, and improving the warp resistance performance of pedal body, the situation effectively reducing pedal compressive deformation occurs.
The above is preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from principle described in the utility model; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (6)

1. a building operations is with having the treadle of false work strengthening structure, it is characterized in that, comprising: a pedal body, it has a roof and two sidewalls, described two sidewalls are vertically connected at described roof both sides respectively, and two ends of described pedal body are respectively at least provided with two hooks; Two root edge portions, are respectively extended internally by described two sidewall bottoms respectively and are formed; And at least one reinforcement, there are a main body and two base plate, described main body has a upper wall and two walls, described two walls are vertically connected at described upper wall both sides respectively, described two base plate connect the bottom of described two walls respectively, and each described base plate two end longitudinally forms an extension respectively to protruding out outward along described main body; Described reinforcement is installed in described pedal body, the longitudinal direction of described main body and the longitudinal direction of described pedal body perpendicular, the upper wall of described reinforcement contacts with the bottom surface of the roof of described pedal body, and described reinforcement is connected to the described two root edge portions of described pedal body by described extension.
2. building operations according to claim 1 strengthens the treadle of false work of structure with having, and it is characterized in that, the trisection that the root edge portion of described pedal body comprises an end section extended internally and upwards turned down by section of the described end; The extension of described reinforcement two end is connected to the bottom surface of the end section in described root edge portion; Main body two end of described reinforcement is posted by the trisection in described two root edge portions.
3. building operations according to claim 2 is with having the treadle of false work strengthening structure, it is characterized in that, the roof of described pedal body longitudinally protrudes at least two reinforcing ribs down along it, and the main body of described reinforcement is arranged with at least two grooves at upper wall, with described two reinforcing ribs of correspondence.
4. building operations according to claim 3 is with having the treadle of false work strengthening structure, and it is characterized in that, two grooves of the main body of described reinforcement are respectively adjacent to two ends of described main body longitudinal direction.
5. building operations according to claim 4 is with having the treadle of false work strengthening structure, and it is characterized in that, the roof of described pedal body is provided with multiple through hole.
6. building operations according to claim 5 is with having the treadle of false work strengthening structure, and it is characterized in that, the peritreme of each described through hole is upwards extended with a bulge loop.
CN201420597814.3U 2014-10-16 2014-10-16 A kind of building operations strengthens the treadle of false work of structure with having Expired - Fee Related CN204081451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420597814.3U CN204081451U (en) 2014-10-16 2014-10-16 A kind of building operations strengthens the treadle of false work of structure with having

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420597814.3U CN204081451U (en) 2014-10-16 2014-10-16 A kind of building operations strengthens the treadle of false work of structure with having

Publications (1)

Publication Number Publication Date
CN204081451U true CN204081451U (en) 2015-01-07

Family

ID=52174184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420597814.3U Expired - Fee Related CN204081451U (en) 2014-10-16 2014-10-16 A kind of building operations strengthens the treadle of false work of structure with having

Country Status (1)

Country Link
CN (1) CN204081451U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790649A (en) * 2015-05-12 2015-07-22 江苏博林机械制造有限公司 Steel spring board with joint structure
CN109954788A (en) * 2019-03-27 2019-07-02 东莞三思得仓储设备有限公司 A kind of scaffold board and its moulding process for climbing frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790649A (en) * 2015-05-12 2015-07-22 江苏博林机械制造有限公司 Steel spring board with joint structure
CN109954788A (en) * 2019-03-27 2019-07-02 东莞三思得仓储设备有限公司 A kind of scaffold board and its moulding process for climbing frame

Similar Documents

Publication Publication Date Title
CN204081451U (en) A kind of building operations strengthens the treadle of false work of structure with having
CN204919852U (en) Company's girder construction of steel plate concrete shear force wall
CN204112703U (en) A kind of treadle of false work with enhancing structure for building
CN204126247U (en) A kind of scaffold
CN204703495U (en) Aluminum alloy pattern plate back cord system
CN204435677U (en) High strength steel structural column
CN204059924U (en) A kind of scaffolding structure for building
CN209384649U (en) A kind of fastener of fixed square column template
CN204960130U (en) C shaped steel structural connection spare
CN204282643U (en) A kind of bending resistance, the steel plate box ellbeam that antitorque and anti-distortion ability is strong
CN205527351U (en) Be applied to hinged -support and tower crane of tower crane base girder
CN203129641U (en) Steel roof truss factory building
CN204059923U (en) A kind of scaffold pedal structure of construction work
CN202744941U (en) Reinforced crossed cable bridge
CN104358349A (en) Steel box beam with high bending resistance, torsion resistance and distortion resistance
CN203834675U (en) High-strength steel structure building
CN108755710B (en) Slope protection formwork device with irregular slope reinforced concrete grid structure
CN204899189U (en) Construction elevator connects material platform
CN205134556U (en) Improved connecting piece for steel -structure beam columns
CN202347447U (en) Reinforced hanging basket
CN205134557U (en) Connecting piece for steel -structure beam columns
CN204531364U (en) A kind of building scaffold pedal strengthens structure
CN204380836U (en) A kind of easy-to-dismount hurley log washer
CN203654471U (en) Connecting structure between assembly type prefabricated balcony slab and balcony support
CN205100532U (en) A electric block mounted frame for climbing on frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YANG YONG WANG CHANGJIAN CHEN XIAO PAN YULIN YIN W

Effective date: 20150112

Owner name: XUE JUSONG

Free format text: FORMER OWNER: XING GUOBIAO

Effective date: 20150112

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315700 NINGBO, ZHEJIANG PROVINCE TO: 610299 CHENGDU, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150112

Address after: 610299 Sichuan city of Chengdu province Shuangliu County Dongsheng Silk Street No. 9 unit 4 No. 6

Patentee after: Xue Jusong

Patentee after: Yang Qibing

Patentee after: Qing Mingchang

Patentee after: Lin Feng

Patentee after: Yang Houyi

Patentee after: Du Yan

Patentee after: Li Xiuqing

Patentee after: Deng Qingyuan

Patentee after: Yang Yong

Patentee after: Wang Changjian

Patentee after: Chen Xiao

Patentee after: Pan Yulin

Patentee after: Yin Wei

Patentee after: Zhao Xin

Patentee after: Luo Fupeng

Patentee after: Li Junchen

Address before: 315700, No. 156, Dan Feng Feng Road, Dan Town, Xiangshan County, Zhejiang, Ningbo

Patentee before: Xing Guobiao

ASS Succession or assignment of patent right

Free format text: FORMER OWNER: YANG YONG WANG CHANGJIAN CHEN XIAO PAN YULIN YIN WEI ZHAO XIN LUO FUPENG LI JUNCHEN YANG QIBING QING MINGCHANG LIN FENG YANG HOUYI DU YAN LI XIUQING DENG QINGYUAN

Effective date: 20150123

Owner name: SICHUAN XINSHUO CONSTRUCTION ENGINEERING CO., LTD.

Free format text: FORMER OWNER: XUE JUSONG

Effective date: 20150123

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 610299 CHENGDU, SICHUAN PROVINCE TO: 646208 LUZHOU, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150123

Address after: 646208 Luzhou City Fubao town family planning in Sichuan Province on the ground floor

Patentee after: Sichuan great faith construction engineering Co., Ltd.

Address before: 610299 Sichuan city of Chengdu province Shuangliu County Dongsheng Silk Street No. 9 unit 4 No. 6

Patentee before: Xue Jusong

Patentee before: Yang Qibing

Patentee before: Qing Mingchang

Patentee before: Lin Feng

Patentee before: Yang Houyi

Patentee before: Du Yan

Patentee before: Li Xiuqing

Patentee before: Deng Qingyuan

Patentee before: Yang Yong

Patentee before: Wang Changjian

Patentee before: Chen Xiao

Patentee before: Pan Yulin

Patentee before: Yin Wei

Patentee before: Zhao Xin

Patentee before: Luo Fupeng

Patentee before: Li Junchen

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20151016

EXPY Termination of patent right or utility model