CN104727192B - A kind of construction method for dismantling solid concrete roabed - Google Patents

A kind of construction method for dismantling solid concrete roabed Download PDF

Info

Publication number
CN104727192B
CN104727192B CN201510063515.0A CN201510063515A CN104727192B CN 104727192 B CN104727192 B CN 104727192B CN 201510063515 A CN201510063515 A CN 201510063515A CN 104727192 B CN104727192 B CN 104727192B
Authority
CN
China
Prior art keywords
section
solid concrete
concrete roabed
dismounting
thrustor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510063515.0A
Other languages
Chinese (zh)
Other versions
CN104727192A (en
Inventor
何贤军
薛恒鹤
殷业锁
贾炳义
雷鸣
王薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Anhui Xingyu Rail Equipment Co Ltd
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Anhui Xingyu Rail Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Anhui Xingyu Rail Equipment Co Ltd filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201510063515.0A priority Critical patent/CN104727192B/en
Publication of CN104727192A publication Critical patent/CN104727192A/en
Application granted granted Critical
Publication of CN104727192B publication Critical patent/CN104727192B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/32Installing or removing track components, not covered by the preceding groups, e.g. sole-plates, rail anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of construction method for dismantling solid concrete roabed, it is characterised in that comprises the following steps:(1), first remove rail on solid concrete roabed, then the concrete substrate at the tank of solid concrete roabed is got rid of and transported;(2), using cutter device solid concrete roabed is cut off and grooving by certain length, dismounting section is separated with solid concrete roabed;(3), again thrustor is placed in grooving, thrustor side is fixed on the section of solid concrete roabed, opposite side is withstood on the section of dismounting section, section will be dismantled using the jacking force of thrustor to promote from section of jurisdiction, and produces certain displacement amount, be peeled off with and by the section from section of jurisdiction;(4), the dismounting section peeled off is hung to flat car and is transported out tunnel.Benefit of the present invention is reduction of dismounting labor intensity, and the disintegrating slag and dust of generation are few, removes thoroughly, while dismounting solid concrete roabed efficiency is improved, also improves the overall progress of track transformation construction, the pollution to working environment is small.

Description

A kind of construction method for dismantling solid concrete roabed
Technical field
The present invention relates to a kind of construction method for dismantling solid concrete roabed.
Background technology
It is divided into by the structure type of track traffic solid concrete roabed:Cast-in-place solid concrete roabed, cast-in-place rubber remove from office into pad solid concrete roabed, Prefabricated chunk formula floating plate railway roadbed and the common railway roadbed of prefabricated chunk formula.The current built subway of China or the subway built, big portion Divide and build solid concrete roabed using cast-in-place, it is a small amount of that cheese block railway roadbed is removed from office into using rubber, with the introduction of high ferro technology, with damping effect It is really good, build pollute small, short construction period, maintenance easily device of shifting block type solid concrete roabed by be urban rail transit construction development side To.Cast-in-place solid concrete roabed will be substituted progressively by device of shifting block type solid concrete roabed.In order to reduce the construction cost of device of shifting block type solid concrete roabed, Generally all it is that to have two methods under the shield tunnel using former cast-in-place solid concrete roabed, prior art cast-in-place to disassemble during construction Solid concrete roabed:One is the concrete substrate that solid concrete roabed is manually smashed using air compressor machine, this method not only inefficiency, noise Greatly, the disintegrating slag produced is more, and easy damaged section of jurisdiction;Two be first by the big portion of solid concrete roabed concrete substrate using rope away from cutting machine Segmentation is fallen, and the part that residue can not be sliced off manually is smashed again, and this method very waste water resource, efficiency is low, the dust of generation Big and poor removal effect.
The content of the invention
It is an object of the invention to solve to dismantle the dirt that cast-in-place solid concrete roabed efficiency is low, effect is poor, cause under prior art The problem of contaminating big and easy damaged section of jurisdiction, and a kind of construction method for dismantling solid concrete roabed is provided.
The purpose of the present invention is achieved by the following technical programs:
A kind of construction method for dismantling solid concrete roabed, it is characterised in that comprise the following steps:
(1), first remove rail on solid concrete roabed, then the concrete substrate at the tank of solid concrete roabed is got rid of and transported Walk;
(2), using cutter device solid concrete roabed is cut off and grooving by certain length, dismounting section is split with solid concrete roabed Open, be sure not to hurt section of jurisdiction during cutting;
(3), again thrustor is placed in grooving, thrustor side is fixed on the section of solid concrete roabed, opposite side On the section for withstanding dismounting section, it will dismantle section using the jacking force of thrustor and be promoted from section of jurisdiction, and produce certain displacement amount, Peeled off with and by the section from section of jurisdiction;
(4), the dismounting section peeled off is hung to flat car and is transported out tunnel.
Described section of jurisdiction includes constituting all piecemeals of section of jurisdiction ring, i.e. shield duct piece.
The cutter device includes the rack-track that an arc is set on support frame, support frame, and rack-track is provided with Movable stand, movable stand is provided with power transmission shaft, and power transmission shaft one end is connected with main hydraulic motor, and the other end is connected with saw blade, movable stand also A pair of gears by secondary fluid motor-driven are set, and wheel and rack track is engaged, make movable stand on rack-track back and forth It is mobile.
The thrustor includes hydraulic control device and riser, the hydraulic pressure that the uniform one group of axis horizontal in riser side is set Cylinder, each hydraulic cylinder is connected with hydraulic control device by oil pipe respectively, needs riser being fixed on cutting for solid concrete roabed before work On face, when hydraulic cylinder moves reciprocatingly, its piston rod supports on the section to dismounting section and carries out pushing tow.
When cutter device solid concrete roabed do not cut flat with or thrustor hydraulic cylinder curtailment when, it is necessary in dismounting section Section add backing plate carry out it is levelling, the thickness of backing plate should be determined according to practice of construction situation, to ensure each liquid of thrustor Cylinder pressure can prop up the section of dismounting section simultaneously, and divide equally the pushing tow pressure of its hydraulic cylinder, prevent from pushing up the section of broken dismounting section.
In order to which solid concrete roabed is stripped down from section of jurisdiction, therefore thrustor is needed to provide enough jacking force, the pushing tow Power can not only promote the railway roadbed of dismounting section to produce certain displacement amount on section of jurisdiction, but also can not push up the section of broken dismounting section, because And the size of the jacking force needs limitation.
According to the actual conditions of subway solid concrete roabed:If the concrete substrate of solid concrete roabed is contacted into seam with shield duct piece to regard For cold seam, then required jacking force should be the frictional resistance overcome completely on the two contact surface, be cut along with all in dismounting section The shearing resistance of power key, that is, draw minimum jacking force:Applied if with shield duct piece the concrete substrate of solid concrete roabed is contacted into seam and is considered as Work is stitched, then the contact surface between the two is integrally formed for bonding completely, the two is peeled off, then required jacking force should be complete gram Shearing resistance on the two contact surface of clothes, along with the shearing resistance of all shear connectors in dismounting section, that is, draws maximum jacking force.Typically It need to only implement during site operation according to maximum jacking force.
The beneficial effects of the present invention are dismounting labor intensity is reduced, the disintegrating slag and dust of generation are few, and removal is thorough, While improving dismounting solid concrete roabed efficiency, the overall progress of track transformation construction is also improved, the pollution to working environment is small.
Just it is described with reference to the drawings that the invention will be further described with embodiment below.
Brief description of the drawings
Fig. 1 is the tunnel internal structural representation after the concrete substrate removal at solid concrete roabed tank;
Fig. 2 is by tunnel internal schematic diagram when dismantling section with solid concrete roabed progress segmentation grooving;
Fig. 3 is tunnel internal schematic diagram when thrustor carries out pushing tow;
Fig. 4 for Fig. 3 A to structural representation;
Fig. 5 is Fig. 4 overlooking the structure diagram.
Embodiment
Embodiment 1
The construction method for a kind of dismounting solid concrete roabed that the present invention is provided, it is characterised in that comprise the following steps:
(1), as shown in figure 1, first remove the rail 3 on solid concrete roabed 2, then by the concrete at the tank 2a of solid concrete roabed Matrix is got rid of and transported;
(2), as shown in Fig. 2 solid concrete roabed is cut off and grooving using cutter device 4, make dismounting section 2b and solid concrete roabed 2 Separate, wherein the length of dismounting section is 1.2m, be sure not to hurt section of jurisdiction 1 during cutting;
(3), be placed in grooving as shown in Fig. 3, Fig. 4 and Fig. 5, then by thrustor 5, its side is fixed on solid concrete roabed On 2 section, then on dismounting section 2b section set the backing plate 7 of respective thickness to carry out levelling, make the opposite side of thrustor 5 Each hydraulic cylinder 6 can prop up dismounting section 2b section, and the respectively jacking force of hydraulic cylinder simultaneously, prevent it from pushing up broken dismounting section Section, will dismantle section 2b using the jacking force of thrustor 5 and be promoted from section of jurisdiction 1, and produce certain displacement amount, with and by the section Peeled off from section of jurisdiction;
(4), the dismounting section peeled off is hung to flat car and is transported out tunnel.
Embodiment 2
The construction method for a kind of dismounting solid concrete roabed that the present invention is provided, it is characterised in that comprise the following steps:
(1), as shown in figure 1, first remove the rail 3 on solid concrete roabed 2, then by the concrete at the tank 2a of solid concrete roabed Matrix is got rid of and transported;
(2), as shown in Fig. 2 solid concrete roabed 2 is cut off and grooving using cutter device 4, make dismounting section 2b and solid concrete roabed 2 separate, wherein the length of dismounting section is 2.4m, are sure not to hurt section of jurisdiction 1 during cutting;
(3), be placed in grooving as shown in Fig. 3, Fig. 4 and Fig. 5, then by thrustor 5, its side is fixed on solid concrete roabed On 2 section, then on dismounting section 2b section set the backing plate 7 of respective thickness to carry out levelling, make the opposite side of thrustor 5 Each hydraulic cylinder 6 can prop up dismounting section 2b section, and the respectively jacking force of hydraulic cylinder simultaneously, prevent it from pushing up broken dismounting section Section, will dismantle section 2b using the jacking force of thrustor 5 and be promoted from section of jurisdiction 1, and produce certain displacement amount, with and by the section Peeled off from section of jurisdiction;
(4), the dismounting section peeled off is hung to flat car and is transported out tunnel.

Claims (2)

1. a kind of construction method for dismantling solid concrete roabed, it is characterised in that comprise the following steps:
(1), first remove solid concrete roabed(2)On rail(3), then by solid concrete roabed(2)Tank(2a)The concrete substrate at place Get rid of and transport;
(2), utilize cutter device(4)Solid concrete roabed is cut off and grooving by certain length, makes dismounting section(2b)With solid concrete roabed Separate;
(3), again by thrustor(5)It is placed in grooving, thrustor side is fixed on the section of solid concrete roabed, opposite side top Firmly on the section of dismounting section, section will be dismantled from section of jurisdiction using the jacking force of thrustor(1)It is upper to promote, and produce certain displacement Amount, is peeled off with and by the section from section of jurisdiction;
(4), the dismounting section peeled off is hung to flat car and is transported out tunnel.
2. a kind of construction method for dismantling solid concrete roabed according to claim 1, it is characterised in that in dismounting section(2b)'s Backing plate is added on section(7)Progress is levelling, while the respectively pushing tow pressure of thrustor.
CN201510063515.0A 2015-02-09 2015-02-09 A kind of construction method for dismantling solid concrete roabed Active CN104727192B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510063515.0A CN104727192B (en) 2015-02-09 2015-02-09 A kind of construction method for dismantling solid concrete roabed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510063515.0A CN104727192B (en) 2015-02-09 2015-02-09 A kind of construction method for dismantling solid concrete roabed

Publications (2)

Publication Number Publication Date
CN104727192A CN104727192A (en) 2015-06-24
CN104727192B true CN104727192B (en) 2017-07-21

Family

ID=53451557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510063515.0A Active CN104727192B (en) 2015-02-09 2015-02-09 A kind of construction method for dismantling solid concrete roabed

Country Status (1)

Country Link
CN (1) CN104727192B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350408A (en) * 2015-11-17 2016-02-24 中铁四局集团有限公司 Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway
CN105274911A (en) * 2015-11-17 2016-01-27 中铁四局集团有限公司 Breaking reconstruction method for performing cutting, chiseling and incremental launching on existing integral track bed of subway
CN107781504B (en) * 2016-08-27 2020-11-03 中国二十冶集团有限公司 Integrated dismounting method for overhead pipeline
CN108708233A (en) * 2018-05-19 2018-10-26 中铁十局集团青岛工程有限公司 Track switch integrally draws paving construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418535B (en) * 2008-10-10 2012-05-23 中铁十一局集团第三工程有限公司 Construction method of monolithic road-bed in rail tunnel
KR20120037158A (en) * 2010-10-11 2012-04-19 이용봉 Apparatus for reducing friction noise from flanged wheel entering curved rail
CN104131498B (en) * 2014-08-12 2016-03-16 中国铁道科学研究院铁道建筑研究所 A kind of for curved section sedimentation non-fragment orbit lifting restorative procedure

Also Published As

Publication number Publication date
CN104727192A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN104727192B (en) A kind of construction method for dismantling solid concrete roabed
CN104763446A (en) Multi-functional trolley for subway station construction
CN208563525U (en) A kind of gutter construction concreting integral mold plate
CN109281689A (en) Integral construction method based on tunnel trestle full width inverted arch template
CN203668805U (en) Milling and repairing integrated system device for bituminous pavements
CN105587322B (en) A kind of method that TBM monoblock types stepping is missed the stop
CN202071224U (en) Rapid cutting device for aerated concrete building blocks
CN205188929U (en) Road bed construction ramming compaction device
CN206109958U (en) Pavement grooving machine
CN204125952U (en) The outfitting tool of bank protection Cast-in-place concrete construction
CN204041078U (en) A kind of tunnel lining trolley plugging device
CN202969384U (en) Pile breaker
CN204532374U (en) The multi-functional chassis of metro station construction
CN108941738A (en) Metal-cutting device is used in a kind of machining
CN215104799U (en) Town road bridge crack reinforced structure
CN203947419U (en) A kind of high-speed railway bridge pinner template
CN204385590U (en) A kind of road roller cleaning shoe device
CN204608525U (en) A kind of thrustor for dismantling solid concrete roabed
CN105274911A (en) Breaking reconstruction method for performing cutting, chiseling and incremental launching on existing integral track bed of subway
CN201833484U (en) Stone sawing machine
CN205000228U (en) Pavement grooving machine
CN206598406U (en) Concrete power saw
CN202530428U (en) Full-circle needle beam steel form carrier with downward opening
CN212528276U (en) Mechanical traction type cutting device
CN216193909U (en) Highway is repaired with demolising device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: He Xianjun

Inventor after: Xue Henghe

Inventor after: Yin Yesuo

Inventor after: Jia Bingyi

Inventor after: Lei Ming

Inventor after: Wang Wei

Inventor before: Xue Henghe

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161115

Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023

Applicant after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Applicant after: ANHUI XINGYU RAILWAY EQUIPMENT Co.,Ltd.

Address before: High tech Zone in Anhui city of Bengbu Province Xinghua Road 233010 No. 168

Applicant before: ANHUI XINGYU RAILWAY EQUIPMENT Co.,Ltd.

GR01 Patent grant