CN104724613B CN201510095359.6A CN201510095359A CN104724613B CN 104724613 B CN104724613 B CN 104724613B CN 201510095359 A CN201510095359 A CN 201510095359A CN 104724613 B CN104724613 B CN 104724613B
Authority
CN
China
Prior art keywords
lifting platform
wind
transferring machine
elevator boom
power tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510095359.6A
Other languages
Chinese (zh)
Other versions
CN104724613A (en
Inventor
梅骏
卫书满
卫学识
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Original Assignee
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Mechanical and Electrical Construction Co Ltd filed Critical China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority to CN201510095359.6A priority Critical patent/CN104724613B/en
Publication of CN104724613A publication Critical patent/CN104724613A/en
Application granted granted Critical
Publication of CN104724613B publication Critical patent/CN104724613B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/38Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes with separate prime movers for crane and vehicle

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)

Abstract

A kind of wind-power tower manufactures special crawler belt suspension transferring machine, it includes crawler body, lifting platform is fixed on crawler body, elevator boom rack is installed with lifting platform, multigroup guiding fixed pulley is installed on elevator boom rack, electric block is fixedly mounted on elevator boom rack, generator is fixedly mounted on lifting platform, Hydraulic Station is fixedly mounted on lifting platform, suspension hook and assembly pulley are connected by multigroup guiding fixed pulley by wirerope with the output shaft of electric block, balancing weight is arranged on lifting platform, and control module is arranged on lifting platform.This suspension transferring machine can aid in completing the transhipment rust cleaning spray painting of blower fan tower barrel manufacturing cell, handling and fall field, finished product the lifting transport such as piling up, the sequence of operations equipment such as the crane, flat car, tire transfer car(buggy), crawler type transport flat car and the hydraulic jacking device that need to use during original job can be substituted, improve the operating efficiency of suspension transferring machine, it is ensured that job safety.

Description

Wind-power tower manufactures special crawler belt suspension transferring machine
Technical field
The present invention relates to a kind of wind-power tower hoisting transportation apparatus field, particularly a kind of wind-power tower manufactures special crawler belt Suspension transferring machine.
Background technology
Wind-power tower manufacturing cell has the features such as weight is big, and volume is big(Weight, up to 4.5 meters, is grown up to 65 tons, diameter Degree is up to 30m), it is necessary to be produced the outdoor field arranged outside plant building after tower unit is offline on manufacturing line Carry out rust cleaning spray painting, handling and fall field, finished product the lifting transport such as piling up, and these work are typically necessary in wind-power tower Manufacturing is a series of using crane, flat car, tire transfer car(buggy), crawler type transport flat car and hydraulic jacking device etc. Complete all of job task under the cooperation of auxiliary equipment, Job Operations process is complicated, adjustment process is cumbersome, waste time and energy and Also there is certain potential safety hazard.
At present, general hoisting transportation equipment is due to by lifting weight, lifting volume and many using function etc. The limitation of aspect, it is impossible to complete the All Jobs flow of big quality large volume blower fan tower barrel manufacturing cell, and cannot replace simultaneously For the synthesis such as crane, flat car, tire transfer car(buggy), crawler type transport flat car and hydraulic jacking device work(in operation process Energy.Therefore, in order to solve the above problems, it is necessary to develop the blower fan tower barrel manufacturing cell of design specialized to meet above-mentioned job task And workflow, while effectively reducing the manufacturing cost of hoisting transportation equipment, the operating efficiency of blower fan tower barrel operation is improved, protect Security in card operation process.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of wind-power tower and manufacture special crawler belt suspension transferring machine, this suspension transferring machine Big quality can be aided in completing, the transhipment rust cleaning spray painting of large volume blower fan tower barrel manufacturing cell, handling are fallen field, finished product and pile up etc. and to rise Weight transport, can effectively substitute crane, flat car, tire transfer car(buggy), the crawler belt for needing during original job to use The sequence of operations implement such as formula transport flat car and hydraulic jacking device, substantially increases the operating efficiency of suspension transferring machine, Reduce the labour intensity of staff, it is ensured that job safety.
In order to reach above-mentioned technique effect, the technical characteristic for being used is the present invention:
Wind-power tower manufactures special crawler belt suspension transferring machine, and it includes crawler body, and lifting platform is fixed on crawler body, rises Elevator boom rack is installed with galassing platform, multigroup guiding fixed pulley is installed on elevator boom rack, electric block is fixedly mounted on On elevator boom rack, generator is fixedly mounted on lifting platform, and Hydraulic Station is fixedly mounted on lifting platform, suspension hook and assembly pulley It is connected with the output shaft of electric block by multigroup guiding fixed pulley by wirerope, balancing weight is arranged on lifting platform, control Module is arranged on lifting platform.
The lifting platform is mutually welded with crawler body by shaped steel and formed a fixed connection, lifting platform and crawler body it Between relative rotary motion can not occur.
The elevator boom rack uses truss structure, and the quantity of elevator boom rack is two, has certain between two elevator boom racks Spacing.
The quantity of the suspension hook and assembly pulley is two, is separately fixed on two elevator boom racks, and suspension hook and assembly pulley are Fixed pulley and the combined mode of movable pulley are constituted.
The height of the suspension hook and assembly pulley individually can be adjusted respectively.
The center of gravity of the crawler body center of gravity, the center of gravity of elevator boom rack and wind-power tower is all in the support span of crawler body Within.
The locus arrangement of the generator, electric block and Hydraulic Station, minimizes the quality of balancing weight.
In the biggest lifting capacity and when walking, the weight that can lift wind-power tower reaches 65 ~ 80 tons to the elevator boom rack, outward Shape size diameter reaches 4.5m, and length reaches 30m, can advance in the biggest lifting capacity, retreat, turning and 360 degree of whole machines Rotation.
The control module can receive extraneous wireless control signal, and each of whole suspension transferring machine is controlled by way of remote control Item action, it is not necessary to which setting up driver's cabin carries out artificial mechanism operation.
The lifting altitude of the suspension transferring machine is at most up to 1.5m.
The method have the advantages that:
The present invention uses above-mentioned design, can aid in completing its turn under blower fan tower barrel manufacturing cell complex job environment Fortune rust cleaning spray painting, handling are fallen field, finished product and the lifting transport such as pile up, and can effectively substitute need to use during original job To the sequence of operations operation such as crane, flat car, tire transfer car(buggy), crawler type transport flat car and hydraulic jacking device set It is standby, this suspension transferring machine operation process stabilization, easy to operate, operation process is safe and reliable.
Above-mentioned lifting platform is mutually welded with crawler body by shaped steel and formed a fixed connection, lifting platform and crawler body it Between relative rotary motion can not occur, ensure that suspension transferring machine during handling large-tonnage blower fan tower barrel by said structure Resistance to overturning.
Above-mentioned elevator boom rack uses truss structure, and the quantity of elevator boom rack is two, has certain between two elevator boom racks Spacing, can be by controlling the difference in height of two arms, so as to realize tower edge during handling by the structure design of double arms Axially inclined certain angle, to adapt to walking of the loop wheel machine in certain domatic walking.
The quantity of above-mentioned suspension hook and assembly pulley is two, is separately fixed on two elevator boom racks, and suspension hook and assembly pulley are Fixed pulley and the combined mode of movable pulley are constituted, and single wirerope can be mitigated by the Combination Design of the movable pulley of fixed pulley Stress, improves the security of its handling.
The height of above-mentioned suspension hook and assembly pulley individually can be adjusted respectively, and then air duct inclines during realizing handling The adjustment of rake angle.
The center of gravity of above-mentioned crawler body center of gravity, the center of gravity of elevator boom rack and wind-power tower is all in the support span of crawler body Within, guarantee suspension transferring machine is designed to by above-mentioned, whole machine security and stability in the process of running prevents what loop wheel machine from toppling Possibility.
The locus arrangement of above-mentioned generator, electric block and Hydraulic Station, minimizes the quality of balancing weight, by closing The space arrangement of reason can effectively mitigate the quality of balancing weight, so that the weight of whole machine is mitigated.
In the biggest lifting capacity and when walking, the weight that can lift wind-power tower reaches 65 ~ 80 tons to above-mentioned elevator boom rack, outward Shape size diameter reaches 4.5m, and length reaches 30m, can advance in the biggest lifting capacity, retreat, turning and 360 degree of whole machines Rotation, so as to ensure that suspension transferring machine can securely achieve the handling of large-tonnage wind-power tower, and can aid in its completion to remove Rust spray painting, handling are fallen field, finished product and the lifting transport such as pile up.
Above-mentioned control module can receive extraneous wireless control signal, and each of whole suspension transferring machine is controlled by way of remote control Item action, it is not necessary to which setting up driver's cabin carries out artificial mechanism operation, so as to further optimize the structure of suspension transferring machine so that hang The performance of fortune machine is more superior, and operational control more facilitates.
At most up to 1.5m, be ensure that by the limitation of lifting altitude is carrying out wind-powered electricity generation to the lifting altitude of above-mentioned suspension transferring machine Security during tower handling.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is integral installation distribution structure schematic diagram of the invention.
In figure:Crawler body 1, electric block 2, generator 3, guiding fixed pulley 4, elevator boom rack 5, suspension hook and assembly pulley 6, Lifting platform 7, Hydraulic Station 8, balancing weight 9, control module 10, wind-power tower 11.
Specific embodiment
Embodiments of the present invention are described further below in conjunction with the accompanying drawings.
Referring to Fig. 1, specific installation and connected mode have in figure, and wind-power tower manufactures special crawler belt suspension transferring machine, and it is wrapped Crawler body 1 is included, lifting platform 7 is fixed on crawler body 1, and elevator boom rack 5, crane arm are installed with lifting platform 7 Multigroup guiding fixed pulley 4 is installed, electric block 2 is fixedly mounted on elevator boom rack 5, and generator 3 has been fixedly mounted on frame 5 On galassing platform 7, Hydraulic Station 8 is fixedly mounted on lifting platform 7, and suspension hook and assembly pulley 6 are oriented to fixed cunning by wirerope by multigroup Wheel 4 is connected with the output shaft of electric block 2, and balancing weight 9 is arranged on lifting platform 7, and control module 10 is arranged on lifting platform 7 On.
Preferably, the lifting platform 7 is mutually welded with crawler body 1 by shaped steel and formed a fixed connection, lifting platform 7 with Relative rotary motion can not occur, it is also possible to which the mode being bolted is fixedly connected, it is ensured that hang between crawler body 1 The stability of fortune process.
Preferably, the elevator boom rack 5 uses truss structure, and the quantity of elevator boom rack 5 is two, two elevator boom racks 5 it Between have certain spacing, the intensity of elevator boom rack 5 can be improved using truss structure, it is ensured that the stability of its structure, crane arm Connection between frame 5 and lifting platform 7 can be using slight bolt connection high, it would however also be possible to employ the mode of welding is carried out.
Preferably, the quantity of the suspension hook and assembly pulley 6 be two, be separately fixed on two elevator boom racks 5, suspension hook and Assembly pulley 6 is that fixed pulley and the combined mode of movable pulley are constituted, and the quantity of crown block and movable pulley can be according to reality Situation is selected.
Preferably, the height of the suspension hook and assembly pulley 6 individually can be adjusted respectively.
Preferably, the center of gravity of the center of gravity of the crawler body 1, the center of gravity of elevator boom rack 5 and wind-power tower 11 is all in track bottom Within the support span of disk 1.
Preferably, the locus arrangement of the generator 3, electric block 2 and Hydraulic Station 8, makes the quality of balancing weight 9 most Smallization, the quality of balancing weight can be selected according to actual job requirement.
Preferably, in the biggest lifting capacity and when walking, the weight that can lift wind-power tower 11 reaches the elevator boom rack 5 65 ~ 80 tons, appearance and size diameter reaches 4.5m, and length reaches 30m, can advance in the biggest lifting capacity, retreat, turning and 360 degree of whole machine rotations, so as to ensure that suspension transferring machine can aid in whole job task.
Preferably, the control module 10 can receive extraneous wireless control signal, and whole is controlled by way of remote control The various actions of suspension transferring machine, it is not necessary to which setting up driver's cabin carries out artificial mechanism operation, and control module can use local area network signal The various control signal transmissions such as transmission, infrared signal transmission, WIFI signal transmission.
Preferably, the lifting altitude of the suspension transferring machine can be protected effectively at most up to 1.5m by limiting lifting altitude The security of handling appliance is demonstrate,proved, prevents to topple.
Optionally, described crawler body 1 can also use rubber belt track, so as to ensure that suspension transferring machine can be in hard surfacing Operation, reach effect without damaging the road surface, while can also less mixed mud road surface thickness.
Optionally, the lifter and elevating system that described electric block 2 is constituted, it would however also be possible to employ hoist engine etc. is other to be risen Descending mechanism is substituted.
Optionally, described generator 3 can be diesel-driven generator, or other kinds of generator.
Device specific work process of the invention and principle are:
First, wind-power tower 11 is clamped by installation by clamping device, and by whole clamp system and suspension transferring machine Suspension hook and assembly pulley 6 are connected, and then, start the generator 3 of suspension transferring machine, then driving electric cucurbit 2 is carried out to suspension hook and assembly pulley 6 Lifting, it is possible to be adjusted to the angle of inclination of wind-power tower 11 by the height for adjusting two suspension hooks and assembly pulley 6, so as to protect Demonstrate,proving it can travel in tilted road surface, while can also realize that the turning of whole suspension transferring machine is walked by the walking of crawler body 1, Can aid in completing rust cleaning spray painting, handling by other auxiliary bodies simultaneously and fall field, finished product the lifting transport, raising such as piling up The efficiency of whole lifting job, it is ensured that the security of operation.

Claims (5)

1. wind-power tower manufactures special crawler belt suspension transferring machine, and it includes crawler body(1), it is characterised in that:Lifting platform(7)It is fixed In crawler body(1)On, lifting platform(7)On be installed with elevator boom rack(5), elevator boom rack(5)On multigroup leading is installed To fixed pulley(4), electric block(2)It is fixedly mounted on elevator boom rack(5)On, generator(3)It is fixedly mounted on lifting platform(7) On, Hydraulic Station(8)It is fixedly mounted on lifting platform(7)On, suspension hook and assembly pulley(6)By wirerope by multigroup guiding fixed pulley (4)With electric block(2)Output shaft be connected, balancing weight(9)It is arranged on lifting platform(7)On, control module(10)It is arranged on Lifting platform(7)On;
The lifting platform(7)By shaped steel and crawler body(1)Mutually welding forms a fixed connection, lifting platform(7)With crawler belt Chassis(1)Between relative rotary motion can not occur;
The suspension hook and assembly pulley(6)Quantity be two, be separately fixed at two elevator boom racks(5)On, suspension hook and assembly pulley (6)It is that fixed pulley and the combined mode of movable pulley are constituted;
The suspension hook and assembly pulley(6)Height individually can be adjusted respectively;
The elevator boom rack(5)Using truss structure, elevator boom rack(5)Quantity be two, two elevator boom racks(5)Between have one Fixed spacing;
The crawler body(1)Center of gravity, elevator boom rack(5)Center of gravity and wind-power tower(11)Center of gravity all in crawler body(1) Support span within.
2. wind-power tower according to claim 1 manufactures special crawler belt suspension transferring machine, it is characterized in that:The generator(3), electricity Dynamic cucurbit(2)And Hydraulic Station(8)Locus arrangement, make balancing weight(9)Quality minimize.
3. wind-power tower according to claim 1 manufactures special crawler belt suspension transferring machine, it is characterized in that:The elevator boom rack(5) In the biggest lifting capacity and when walking, wind-power tower can be lifted(11)Weight reach 65 ~ 80 tons, appearance and size diameter reaches 4.5m, length reaches 30m, can advance in the biggest lifting capacity, retreat, turning and 360 degree of whole machine rotations.
4. wind-power tower according to claim 1 manufactures special crawler belt suspension transferring machine, it is characterized in that:The control module(10) Extraneous wireless control signal can be received, the whole various actions of suspension transferring machine are controlled by way of remote control, it is not necessary to set up and drive Sailing room carries out artificial mechanism operation.
5. wind-power tower according to claim 1 manufactures special crawler belt suspension transferring machine, it is characterized in that:The raising of the suspension transferring machine Height is at most up to 1.5m.
CN201510095359.6A 2015-03-04 2015-03-04 Wind-power tower manufactures special crawler belt suspension transferring machine Expired - Fee Related CN104724613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510095359.6A CN104724613B (en) 2015-03-04 2015-03-04 Wind-power tower manufactures special crawler belt suspension transferring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510095359.6A CN104724613B (en) 2015-03-04 2015-03-04 Wind-power tower manufactures special crawler belt suspension transferring machine

Publications (2)

Publication Number Publication Date
CN104724613A CN104724613A (en) 2015-06-24
CN104724613B true CN104724613B (en) 2017-06-30

Family

ID=53449126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510095359.6A Expired - Fee Related CN104724613B (en) 2015-03-04 2015-03-04 Wind-power tower manufactures special crawler belt suspension transferring machine

Country Status (1)

Country Link
CN (1) CN104724613B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3977530A (en) * 1974-06-13 1976-08-31 The Manitowoc Company, Inc. Crane with gantry backhitch and boom hoist assembly removable as a unit
US4266903A (en) * 1979-08-27 1981-05-12 Offset Newspaper Equipment Inc. Lifting dollie
SU1625821A1 (en) * 1988-07-26 1991-02-07 Киевский Филиал Научно-Производственного Объединения "Техэнергохимпром" Carriage-mounted crane
US5443169A (en) * 1992-09-15 1995-08-22 The Manitowoc Company Crane backhitch
CN2153536Y (en) * 1993-04-08 1994-01-19 章崇焕 Trackless wheel type crane
CN204454333U (en) * 2015-03-04 2015-07-08 中国葛洲坝集团股份有限公司 Wind-power tower manufactures special crawler belt suspension transferring machine

Also Published As

Publication number Publication date
CN104724613A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN203806941U (en) Hoisting overturning device of direct-drive wind power generator
CN107010550A (en) A kind of counterweight can adjust cantilever type rotating crane
CN101920914A (en) Vehicle-type upper rotating tower crane
CN206842919U (en) A kind of stable type monkey
CN206033141U (en) Mould transport fork truck
WO2015042945A1 (en) An assembled tower type crane with movable counter-weight system
CN107298388A (en) Bridge crane with suspender maintenance rig
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN103010952B (en) Tail slipping device for hoisting equipment, tail slipping vehicle and equipment hoisting method
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN204454333U (en) Wind-power tower manufactures special crawler belt suspension transferring machine
CN202625655U (en) Tower tube transporter
CN202358850U (en) Light lift-type cantilever crane
CN207483217U (en) A kind of building crane
CN105540433B (en) One kind tilts installation site overweight equipment hanging method
CN103253602B (en) The elevated super lifting device of crawler vehicle voluntarily and hoisting crane
CN204251234U (en) For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance
CN201873499U (en) Mobile swinging boom type girder turnover machine
CN104724613B (en) Wind-power tower manufactures special crawler belt suspension transferring machine
CN202449763U (en) Simple pneumatic crane
CN106743250A (en) A kind of single pile movement system
CN207061690U (en) Bridge crane with suspender maintenance rig
CN203820294U (en) Dual-purpose lifting sling with anti-swaying revolving container and hanger
CN203269355U (en) Hoisting appliance for hoisting concrete pipes
CN203998710U (en) Tower crane with concrete distributing function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 430033 Hubei province in Qiaokou District of Wuhan City Jiefang Road Gezhouba Dam Building No. 558

Applicant after: CHINA GEZHOUBA GROUP Co.,Ltd.

Applicant after: GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUTION Co.,Ltd.

Address before: 443002 Hubei province Yichang City Road No. 1

Applicant before: CHINA GEZHOUBA GROUP Co.,Ltd.

Applicant before: GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUTION Co.,Ltd.

COR Change of bibliographic data
CB02 Change of applicant information

Address after: 430033 Hubei province in Qiaokou District of Wuhan City Jiefang Road Gezhouba Dam Building No. 558

Applicant after: CHINA GEZHOUBA GROUP Co.,Ltd.

Applicant after: CHINA GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUCTION Co.,Ltd.

Address before: 430033 Hubei province in Qiaokou District of Wuhan City Jiefang Road Gezhouba Dam Building No. 558

Applicant before: CHINA GEZHOUBA GROUP Co.,Ltd.

Applicant before: GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUTION Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20170601

Address after: 610015 Sichuan City, Qingyang province Qingyang Industrial Development Zone (Eastern District) into the road, No. 4, building No. 1,

Applicant after: CHINA GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUCTION Co.,Ltd.

Address before: 430033 Hubei province in Qiaokou District of Wuhan City Jiefang Road Gezhouba Dam Building No. 558

Applicant before: CHINA GEZHOUBA GROUP Co.,Ltd.

Applicant before: CHINA GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUCTION Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20180304

CF01 Termination of patent right due to non-payment of annual fee