CN104712173B - Short-packaging spliced two-way folio spreading tent - Google Patents

Short-packaging spliced two-way folio spreading tent Download PDF

Info

Publication number
CN104712173B
CN104712173B CN201510143191.1A CN201510143191A CN104712173B CN 104712173 B CN104712173 B CN 104712173B CN 201510143191 A CN201510143191 A CN 201510143191A CN 104712173 B CN104712173 B CN 104712173B
Authority
CN
China
Prior art keywords
tube
transverse
tubule
spliced
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510143191.1A
Other languages
Chinese (zh)
Other versions
CN104712173A (en
Inventor
孟祥会
耿娜
孙新城
张慧
程翠翠
石昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Taipeng Smart Home Co., Ltd.
Original Assignee
Shandong Tai Peng Household Items Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tai Peng Household Items Co Ltd filed Critical Shandong Tai Peng Household Items Co Ltd
Priority to CN201510143191.1A priority Critical patent/CN104712173B/en
Publication of CN104712173A publication Critical patent/CN104712173A/en
Priority to FR1556430A priority patent/FR3033177B1/en
Application granted granted Critical
Publication of CN104712173B publication Critical patent/CN104712173B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/34Supporting means, e.g. frames
    • E04H15/42Supporting means, e.g. frames external type, e.g. frame outside cover
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/58Closures; Awnings; Sunshades

Abstract

The invention discloses a short-packaging spliced two-way folio spreading tent which comprises four stand columns, wherein each stand column is formed by inserting and connecting a first vertical tube and a second vertical tube; each second vertical tube is respectively connected with two cross rods and two vertical rods by threads; a rectangular frame is formed by the two cross rods and the corresponding two vertical rods which are connected end to end; the four corners of the rectangular frames are connected with the upper parts of the four stand columns; each cross rod comprises a first horizontal tube and a second horizontal tube; the first horizontal tube and the second horizontal tube of the same cross rod are respectively connected by a horizontal connecting pipe; two U-shaped pieces are respectively arranged at the two ends of each horizontal connecting pipe. The short-packaging spliced two-way folio spreading tent has the advantages of being convenient to assemble and disassemble, light in weight and good in connection firmness.

Description

The spliced two-way split granny rag tent of short packaging
Technical field
The present invention be a kind of short packaging, spliced, can the outdoor sun-shading tent that slides of two-way pulling.
Background technology
The common each structure of tent is broadly divided into leg, crossbeam, push rod etc. three part, and packaging is essentially according to the length of leg or crossbeam Degree.The height of generally leg is 2 meters, general 3 meters of crossbeam, so Package size is substantially 2 meters about or 3 meters.This tent Minibus, Freight Transport can only be passed through, normal domestic use automobile is inconvenient to transport.
Content of the invention
The invention reside in releasing a kind of new, practical, convenient transportation tent, due to that it changes the connection side of structure Formula, makes assembling product succinctly convenient, time saving and energy saving, and Package size is greatly reduced, can pass through normal domestic use wing-rooms on either side of a one-story house or three The transport of railway carriage or compartment car, is easy to carry, in turn ensures that product firmness simultaneously, increased feature it is easy to handling, more practical and It is readily produced, thus, it is possible to resolve the problem that prior art exists.
For realizing goal of the invention, the technical solution used in the present invention is: the spliced two-way split granny rag tent bag of short packaging Include four root posts, every root post is made up of the first vertical tube 1 and the second vertical tube 2 grafting, and the second vertical tube 2 is bolted respectively Cross bar and vertical pole, two cross bars and two vertical poles join end to end composition rectangle frame, upper with four root posts at the corner of rectangle frame Portion connects, and every cross bar all has the first transverse tube 3 and the second transverse tube 4 to constitute, the first transverse tube 3 of same cross bar and the second transverse tube 4 Between respectively connected by a transverse connecting pipe 16, transverse connecting pipe 16 two ends respectively arrange a u-shaped part 28, two u-shaped parts 28 It is located at respectively in the first transverse tube 3 and the second transverse tube 4, between transverse connecting pipe 16, the first transverse tube 3 and the second transverse tube 4, pass through bolt Connect.On every transverse connecting pipe 16, the first transverse tube 3 and the second transverse tube 4 side wall, respectively a mounting seat 17 is set, two laterally connect Between adapter 16, a connecting rod is installed, between two first transverse tubes 3, a connecting rod is installed, pacify between two second transverse tubes 4 Fill a connecting rod, every connecting rod is connected and composed by first support tube 18 and second support tube 19 respectively, every The outer end of the first support tube 18 of connecting rod and the second support tube 19 is respectively bolted with corresponding a pair of mounting seat 17, the The inner of one support tube 18 and the second support tube 19 is connected by the second connecting plate 21, and the two ends of the second connecting plate 21 are located at first In support tube 18 and the second support tube 19 and be bolted.Every vertical pole has the first longitudinal tubule (L tubule) 5 and the second longitudinal tubule (L tubule) 6, same Respectively connected by first connecting plate 20 between first longitudinal tubule (L tubule) 5 of vertical pole and the second longitudinal tubule (L tubule) 6, the two of every first connecting plate 20 End is located in first longitudinal tubule (L tubule) 5 and the second longitudinal tubule (L tubule) 6 of homonymy respectively, is respectively provided with first track 7 below every first longitudinal tubule (L tubule) 5, It is respectively provided with second track 8, the first track 7 of homonymy and the second track 8 constitute a puggaree below every second longitudinal tubule (L tubule) 6 It is equipped with several slide blocks 9, each slide block 9 bottom respectively arranges a link on slide rail, the first track 7 and the second track 8, two pieces the Between one track 7 and between two second tracks 8 each horizontal corresponding one piece of puggaree 10 is installed, every piece of puggaree 10 horizontal two End is connected with corresponding link respectively, parallel on every piece of puggaree 10 is provided with least two horizontal cloth sets 25, every cloth set 25 Be respectively arranged at the two ends with a hook 26, hook 26 and the cooperation of the link of slide block 9 bottom, in every cloth set 25, a connecting rod is respectively installed 27, every connecting rod 27 is mutually inserted and is constituted by two or many support bars.On cloth set 25 on puggaree 10 the inner, magnet is set, 10 two magnet of two pieces of puggarees can cooperate and so that two pieces of puggarees 10 is connected.Every first vertical tube 1 lower end is installed One base plate 11, base plate 11 upper surface is provided with connecting plate 29, and connecting plate 29 is located in the first vertical tube 1 and is passed through with the first vertical tube 1 Bolt connection.
Second vertical tube 2 and the first vertical tube 1 adopt grafting, then are connected with bolt 15, but in order to strengthen stability, perpendicular first On pipe 1, intubation 12 is set, the side wall of intubation 12 arranges raised 24, raised 24 and is uniformly distributed on the side wall of intubation 12.So, The second vertical tube 2 insert the first vertical tube 1 after, bolt 15 pass through the second vertical tube 2 on installing hole 13, and with intubation 12 on screw thread Hole 14 is connected, and also has certain gap after intubation 12 and the connection of the second vertical tube 2 inwall, about 0.5mm about, raised 24 just With the inwall of the second vertical tube 2 fitting together tightly, it is to avoid the unstability after connecting.
Cross bar is connected with the u-shaped part of the high-strength lengthening compactness of vertical pole, can connect separate two section or three sections of transverse tube, Consolidate but also solid, easy to connect, length is consistent not only.
The process of top puggaree, for avoiding top to have some setbacks because pipe track disconnects the slip bringing, that easily blocks asks Topic, has invented and has pulled, to both sides, the sunshade cloth treatment method sliding from centre.During use, the puggaree on both sides is slided into centre Position, has magnet to hold two sides inside cloth set.Just serve shaded effects.When irradiating or have wind, rain if necessary to sunlight, Just pull open and slide to both sides.
Employ above technical scheme, this product has the advantages that its structure adopts the high-strength u lengthening compactness Type part, intubation with raised locking, etc. the band of connected mode, especially the second vertical tube of disconnection and the first vertical tube raised lock Intubation connects, and crossbeam is connected with the u-shaped part of the high-strength lengthening compactness of crossbeam, has evaded the latter linked instability problem of disconnection. Make its assemble succinctly, convenient transportation, be suitable for batch production.
Brief description
Fig. 1 is the short structural representation packing spliced two-way split granny rag tent of the present invention;Fig. 2 is in the present invention Portion's rectangle frame and three connecting rods blow structural representation;Fig. 3 is the structural representation that column of the present invention connects;Fig. 4 Be a of Fig. 1 to enlarged drawing, cloth set that in figure shows sutures after being folded along by puggaree and constitutes;Fig. 5 is transverse connecting pipe Structural representation;Fig. 6 is to be placed on structural representation along the b-b line section view of Fig. 5;Fig. 7 is the structural representation of the second connecting plate;Figure 8 is the c-c line section view mplifying structure schematic diagram along Fig. 7;Fig. 9 is the overlooking the structure diagram of base plate;Figure 10 is the main view knot of Fig. 9 Structure schematic diagram.
Reference: 1 first vertical tube, 2 second vertical tube, 3 first transverse tube, 4 second transverse tube, 5 first longitudinal tubule (L tubule) 6 second longitudinal tubule (L tubule) 7 first track 8 second track, 9 slide block, 10 puggaree, 11 base plate, 12 intubation, 13 installing hole, 14 screwed hole 15 bolt 16 Transverse connecting pipe 17 mounting seat, 18 first support tube, 19 second support tube, 20 first connecting plate 21 second connecting plate 22 Raised 25 cloth set 26 hook 27 connecting rod 28u type part 29 connecting plate 31 pipe box of three slide rails 23 the 4th slide rail 24.
Specific embodiment
As shown in figure 1, the spliced two-way split granny rag tent of short packaging of the present invention includes four root posts.Every is stood Post is made up of the first vertical tube 1 and the second vertical tube 2 grafting, and the first vertical tube 1 is located at below the second vertical tube 2.Difference spiral shell on second vertical tube 2 Line connects two cross bars and two vertical poles, convenient dismounting.Two cross bars and two vertical poles join end to end composition rectangle frame.Rectangle frame Corner at be connected with the top of four root posts or top.As shown in Fig. 2 every cross bar all has the first transverse tube 3 and the second transverse tube 4 Constitute.Respectively connected by a transverse connecting pipe 16 between first transverse tube 3 of same cross bar and the second transverse tube 4.Lateral connection Pipe 16 two ends respectively arrange a u-shaped part 28, and two u-shaped parts 28 are located in the first transverse tube 3 and the second transverse tube 4 respectively.Cross section is u The u-shaped part 28 of shape both can make connecting portion firm stable, prevents from rocking, and material-saving can mitigate weight again, meanwhile, also convenient slotting Connect cooperation.It is bolted between transverse connecting pipe 16, the first transverse tube 3 and the second transverse tube 4, fast and easy demolition and assembling. As shown in Fig. 2 every vertical pole has the first longitudinal tubule (L tubule) 5 and the second longitudinal tubule (L tubule) 6.Between first longitudinal tubule (L tubule) 5 of same vertical pole and the second longitudinal tubule (L tubule) 6 Respectively connected by first connecting plate 20.The two ends of every first connecting plate 20 are located at first longitudinal tubule (L tubule) 5 and the of homonymy respectively In two longitudinal tubule (L tubule)s 6.The cross section of the first connecting plate 20 is u shape, has and facilitates group to unload, light weight, the good advantage of connectivity robustness.Often It is respectively provided with first track 7 below root the first longitudinal tubule (L tubule) 5, below every second longitudinal tubule (L tubule) 6, be respectively provided with second track 8, homonymy The first track 7 and the second track 8 constitute a puggaree slide rail, the first track 7 and the second track 8 are equipped with several slide blocks 9, each slide block 9 bottom respectively arranges a link, each horizontal correspondence between two first tracks 7 and between two second tracks 8 One piece of puggaree 10 is installed, every piece of horizontal two ends of puggaree 10 are connected with corresponding link respectively.As shown in figure 1, two pieces of screenings Positive cloth 10 enables reverse opening, closes in the same direction.User can assemble according to Fig. 1, Fig. 2 and Fig. 3 and demolition described in split draw Cloth tent.
As shown in figure 3, the pipe box 31 of annular is installed in the seam periphery between described first vertical tube 1 and the second vertical tube 2.Pipe box 31 is airtight ring, and it can be the decoration of plastic material, and the seam between the first vertical tube 1 and the second vertical tube 2 can be hidden by it Lid protection, had both had the effect of rain-proof, can play effect attractive in appearance again.When connecting the first vertical tube 1 and the second vertical tube 2, can first by 31 sets of peripheries to the first vertical tube 1 and the second vertical tube 2 of pipe box, after the completion for the treatment of the first vertical tube 1 and the second vertical tube 2 grafting, then move Pipe box 31 is to seam crossing.Described pipe box 31 is also referred to as buckle.
As shown in Fig. 2 being bolted between transverse connecting pipe 16, the first transverse tube 3 and the second transverse tube 4.Every laterally One mounting seat 17 is respectively arranged on connecting tube 16, the first transverse tube 3 and the second transverse tube 4 side wall.Pacify between two transverse connecting pipes 16 Fill a connecting rod, between two first transverse tubes 3, a connecting rod is installed, a connecting rod is installed between two second transverse tubes 4. Above-mentioned three connecting rods usually be arranged in parallel, rectangle frame is played preferably tightly to support reinforcement effect.Every connecting rod is divided Do not connected and composed by first support tube 18 and second support tube 19.First support tube 18 and second of every connecting rod The outer end of support tube 19 is respectively bolted with corresponding a pair of mounting seat 17.First support tube 18 and the second support tube 19 The inner is connected by the second connecting plate 21, and the two ends of the second connecting plate 21 are located in the first support tube 18 and the second support tube 19 simultaneously It is bolted.The cross section of the second connecting plate 21 is u shape, its light weight, and grafting is convenient, is connected firmly, can effectively improve The overall stability of tent.
For improving the wind loading rating of puggaree 10, meanwhile, for ease of opening or closing puggaree 10, as shown in figure 1, described Every first support tube 18 bottom is respectively provided with the 3rd slide rail 22, and described every second support tube 19 bottom is respectively provided with one 4th slide rail 23, the 3rd slide rail 22 and the 4th slide rail 23 are respectively equipped with several slide blocks 9, and slide block 9 passes through link and puggaree 10 Connect.3rd slide rail 22 and the 4th slide rail 23 can provide support force for puggaree 10, prevent puggaree 10 sagging.
As shown in Figure 1 and Figure 4, parallel on every piece of puggaree 10 it is provided with least two horizontal cloth sets 25, every cloth set 25 Be respectively arranged at the two ends with a hook 26, hook 26 can be coordinated with the link of slide block 9 bottom.In every cloth set 25, a company is respectively installed Bar 27.Connecting rod 27 puggaree 10 is played a supportive role it is ensured that puggaree 10 can smooth expansion, to play good shaded effects. For reducing the volume of packaging, every connecting rod 27 is mutually inserted and is constituted by two or many support bars.Cloth on puggaree 10 the inner Magnet is arranged on set 25,10 two magnet of two pieces of puggarees can cooperate makes two pieces of puggarees 10 be connected it is ensured that two screenings The docking of positive cloth 10 seam crossing is closely it is ensured that shaded effects.For guaranteeing the stability of chief's tent, as shown in figure 1, every first perpendicular A base plate 11 is respectively installed in pipe 1 lower end.As shown in Figure 9 and Figure 10, base plate 11 upper surface is provided with connecting plate 29, and connecting plate 29 is located at It is bolted in first vertical tube 1 and with the first vertical tube 1, the first vertical tube 1 and base plate 11 pass through the company on bolt and base plate 11 Fishplate bar connects.Base plate 11 is provided with the convenient processing and manufacturing of structure of connecting plate 29, and it is stable to be connected firmly.For strengthening puggaree 10 Bonding strength and cloth set 25 between, reduces production cost simultaneously, improves working (machining) efficiency, as shown in figure 4, described cloth set 25 can be by Puggaree 10 plicating suture is constituted, i.e. as shown in figure 4, first fold puggaree 10 surrounding cloth set 25, then suture at suturing part Fixing.
As shown in figure 3, column passed through by the second vertical tube 2 and the first vertical tube 1 locking of band raised 24 intubation connection it may be assumed that The second vertical tube 2 disconnecting and the first vertical tube 1 are connected using intubation 12, then use screw connection.But in order to strengthen stability, first Little raised the 24 of circle is gone out using mould punching, raised 24 can be in array distribution on 12 4 side walls of the intubation of vertical tube 1.So, Second vertical tube 2 and the first vertical tube 1, intubation 12 and the second vertical tube 2 inwall also have certain gap after connecting, about 0.5mm about. In this gap by the projection 24 gone out just and the second vertical tube 2 inwall tightly fit together it can be ensured that the second vertical tube 2 and first Vertical tube 1 stability is difficult relatively to rock, thus, increased the overall stability of described tent.

Claims (10)

1. short packaging spliced two-way split granny rag tent it is characterised in that: include four root posts, every root post is by the first vertical tube (1) and the second vertical tube (2) grafting is constituted, the second vertical tube (2) upper threaded two cross bars and two vertical poles respectively, two cross bars Join end to end composition rectangle frame with two vertical poles, be connected with the top of four root posts at the corner of rectangle frame, every cross bar all has First transverse tube (3) and the second transverse tube (4) are constituted, and respectively pass through one between first transverse tube (3) of same cross bar and the second transverse tube (4) Root transverse connecting pipe (16) connects, and transverse connecting pipe (16) two ends respectively arrange a u-shaped part (28), and two u-shaped parts (28) are respectively In the first transverse tube (3) and the second transverse tube (4), logical between transverse connecting pipe (16), the first transverse tube (3) and the second transverse tube (4) Cross bolt connection;Every vertical pole has the first longitudinal tubule (L tubule) (5) and the second longitudinal tubule (L tubule) (6), and first longitudinal tubule (L tubule) (5) of same vertical pole and second is indulged Respectively pass through first connecting plate (20) between pipe (6) to connect, the two ends of every first connecting plate (20) are located at homonymy respectively In first longitudinal tubule (L tubule) (5) and the second longitudinal tubule (L tubule) (6), below every first longitudinal tubule (L tubule) (5), it is respectively provided with first track (7), every second It is respectively provided with second track (8), first track (7) of homonymy and the second track (8) constitute a puggaree below longitudinal tubule (L tubule) (6) Several slide blocks (9) are equipped with slide rail, the first track (7) and the second track (8), each slide block (9) bottom respectively arranges an extension Ring, between two first tracks (7) and between two second tracks (8) each horizontal corresponding one piece of puggaree (10) is installed, every piece The horizontal two ends of puggaree (10) are connected with corresponding link respectively.
2. the spliced two-way split granny rag tent of short packaging according to claim 1 it is characterised in that: described every is laterally One mounting seat (17), two transverse connecting pipes are respectively arranged on connecting tube (16), the first transverse tube (3) and the second transverse tube (4) side wall (16) between, a connecting rod is installed, between two first transverse tubes (3), a connecting rod is installed, between two second transverse tubes (4) A piece connecting rod is installed, every connecting rod connects structure by first support tube (18) and second support tube (19) respectively Become, first support tube (18) of every connecting rod and the outer end of the second support tube (19) are each logical with corresponding a pair of mounting seat (17) Cross bolt connection, the inner of the first support tube (18) and the second support tube (19) is passed through the second connecting plate (21) and connected, and second even The two ends of fishplate bar (21) are located in the first support tube (18) and the second support tube (19) and are bolted.
3. according to claim 2 short packaging spliced two-way split granny rag tent it is characterised in that: described every first Support tube (18) bottom is respectively provided with the 3rd slide rail (22), and described every second support tube (19) bottom is respectively provided with one Four slide rails (23), the 3rd slide rail (22) and the 4th slide rail (23) are respectively equipped with several slide blocks (9), slide block (9) pass through link with Puggaree (10) connects.
4. according to claim 1 short packaging spliced two-way split granny rag tent it is characterised in that: described every piece of sunshade Cloth (10) upper parallel be provided with least two horizontal cloth sets (25), every cloth set (25) be respectively arranged at the two ends with a hook (26), Hook (26) and the link cooperation of slide block (9) bottom, respectively install a connecting rod (27), every connecting rod (27) in every cloth set (25) It is mutually inserted and is constituted by two or many support bars.
5. according to claim 4 short packaging spliced two-way split granny rag tent it is characterised in that: described puggaree (10) the cloth set (25) on the inner is upper arranges magnet, and (10) two magnet of two pieces of puggarees can cooperate and make two pieces of puggarees (10) it is connected.
6. according to claim 4 short packaging spliced two-way split granny rag tent it is characterised in that: described cloth set (25) It is made up of puggaree (10) plicating suture.
7. according to claim 1 short packaging spliced two-way split granny rag tent it is characterised in that: described every first A base plate (11) is respectively installed in vertical tube (1) lower end, and base plate (11) upper surface is provided with connecting plate (29), and connecting plate (29) is located at first It is bolted in vertical tube (1) and with the first vertical tube (1).
8. according to claim 1 short packaging spliced two-way split granny rag tent it is characterised in that: in the first vertical tube (1) upper setting intubation (12), the side wall of intubation (12) is arranged raised (24), after intubation (12) inserts the second vertical tube (2), intubation (12) have certain gap and between the second vertical tube (2) inwall, the inwall of raised (24) and the second vertical tube (2) tightly be fitted in one Rise and strengthen the stability connecting.
9. according to claim 1 short packaging spliced two-way split granny rag tent it is characterised in that: described first vertical tube (1) pipe box (31) of annular is installed in the seam periphery between and the second vertical tube (2).
10. the spliced two-way split granny rag tent of short packaging according to claim 1 it is characterised in that: described first even The cross section of fishplate bar (20) is u-shaped.
CN201510143191.1A 2015-02-28 2015-03-30 Short-packaging spliced two-way folio spreading tent Expired - Fee Related CN104712173B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510143191.1A CN104712173B (en) 2015-02-28 2015-03-30 Short-packaging spliced two-way folio spreading tent
FR1556430A FR3033177B1 (en) 2015-02-28 2015-07-07 BIDIRECTIONAL EXTENSIBLE TENT OF LOW-DIMENSIONAL TYPE

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2015201193694 2015-02-28
CN201520119369 2015-02-28
CN201510143191.1A CN104712173B (en) 2015-02-28 2015-03-30 Short-packaging spliced two-way folio spreading tent

Publications (2)

Publication Number Publication Date
CN104712173A CN104712173A (en) 2015-06-17
CN104712173B true CN104712173B (en) 2017-01-18

Family

ID=53411860

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510143191.1A Expired - Fee Related CN104712173B (en) 2015-02-28 2015-03-30 Short-packaging spliced two-way folio spreading tent
CN201520183418.0U Active CN204531604U (en) 2015-02-28 2015-03-30 Short packaging is spliced two-wayly splits granny rag tent

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201520183418.0U Active CN204531604U (en) 2015-02-28 2015-03-30 Short packaging is spliced two-wayly splits granny rag tent

Country Status (2)

Country Link
CN (2) CN104712173B (en)
FR (1) FR3033177B1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712173B (en) * 2015-02-28 2017-01-18 山东泰鹏家居用品有限公司 Short-packaging spliced two-way folio spreading tent
CN110065974B (en) * 2018-09-30 2023-12-05 内蒙古久科康瑞环保科技有限公司 Modular assembled pool body
CN113802884B (en) * 2021-08-17 2023-01-31 山东泰鹏智能家居股份有限公司 Reinforced spliced bidirectional split tent
CN113982205B (en) * 2021-09-22 2023-03-07 杭州科技职业技术学院 Combined house eave awning structure and construction method thereof
CN115251643A (en) * 2022-05-19 2022-11-01 厦门新技术集成有限公司 Bedstead of iron frame bed

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE510688C2 (en) * 1997-10-24 1999-06-14 Jonsereds Miljoesystem Ab cover construction
CN2670520Y (en) * 2003-12-30 2005-01-12 欣业企业股份有限公司 Tent with sliding front door-curtain
CN201007104Y (en) * 2007-01-05 2008-01-16 罗帮仁 Tent
CN201943420U (en) * 2010-12-15 2011-08-24 受兴家居饰品(厦门)有限公司 Flexible tent
CN202299603U (en) * 2012-01-30 2012-07-04 河北佳音帐篷制造有限公司 Tent support which is convenient to unfold and retract
GB201301779D0 (en) * 2013-01-31 2013-03-20 Potvin Fernand A system for opening a remote carports canvas
CN103669989B (en) * 2013-12-11 2016-03-02 河北佳音帐篷制造有限公司 The expansion of disaster relief environmental protection tent and Tent frame with remove receiving method
CN203879100U (en) * 2014-06-13 2014-10-15 浙江永强集团股份有限公司 Roller type pulled top cloth opening and closing tent
CN204126363U (en) * 2014-07-15 2015-01-28 山东泰鹏家居用品有限公司 Granny rag tent
CN104712173B (en) * 2015-02-28 2017-01-18 山东泰鹏家居用品有限公司 Short-packaging spliced two-way folio spreading tent

Also Published As

Publication number Publication date
FR3033177B1 (en) 2018-09-07
CN104712173A (en) 2015-06-17
FR3033177A1 (en) 2016-09-02
CN204531604U (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN104712173B (en) Short-packaging spliced two-way folio spreading tent
CN206745037U (en) A kind of folding bed framework
CN209891394U (en) Novel light steel keel building structure
CN203626375U (en) Tent with opened top
CN202148490U (en) Guardrail column profile
CN205330034U (en) Combined stair
CN203716820U (en) Expandable translation door
CN203129633U (en) Arc-shaped roof type container combined room
CN201195963Y (en) Folding single-rod goods shelf sail
CN203066591U (en) Tent
CN204995049U (en) Double track way mosquito net frame
CN201195962Y (en) Folding single-rod goods shelf sail
CN201888478U (en) Fully-folding fabric wardrobe frame
CN209653466U (en) A kind of construction combined type ladder cage
CN102960978B (en) Plug structure for bed and plug structure-based bedding
CN206174622U (en) Tent
CN105534175A (en) Child rail supporting rod assembly
CN206667478U (en) A kind of expansion type movable plank house being convenient for carrying
CN201485860U (en) Steel structural house foundation framework
CN104779529A (en) High-intensity prefabricated cabin type transformer substation combined structure
CN201627479U (en) Demountable composite door
CN215838029U (en) Novel student bunk bed
CN201581503U (en) Steel structure beam supporting mechanism
CN201943375U (en) Pavilion
CN220001341U (en) Foldable spareribs frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 271600 Feicheng High-tech Development Zone, Taian City, Shandong Province

Patentee after: Shandong Taipeng Smart Home Co., Ltd.

Address before: 271600 No. 136 Industrial Road, Feicheng City, Taian City, Shandong Province

Patentee before: SHANDONG TAI PENG HOUSEHOLD ITEMS CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20200330